Additional Mathematics - Circular Measure ( SPM Project Work )
SPM Project Report
-
Upload
knt-nallasamy-gounder -
Category
Documents
-
view
235 -
download
3
Transcript of SPM Project Report
-
7/29/2019 SPM Project Report
1/18
Contents
Introduction
..3
Project Overview
3
Background
.4
Objectives of
Project
5
Constraints
5
Methods/Technologies used
6
Project Deliverables
6
Product breakdown
diagram10
Activities
11
Activity Flow Diagram (PERT)
12
1
-
7/29/2019 SPM Project Report
2/18
Resources
..14
Risk Analysis
.16
Bibliography
..17
2
-
7/29/2019 SPM Project Report
3/18
1. INTRODUCTION
In recent years the use of the Internet has changed the way our world functions.From social interaction to a new focus and availability of wider education, it hascreated a new way of life. But one of the greatest effects of the World Wide Web
has been the integration of business, as with the many companies that now providetheir products for purchase online.
The process is called ecommerce, and it has been proven that the development ofan ecommerce web site is the perfect way to increase retail sales. This is especiallybeneficial for those who commonly find themselves with a product overstock, or aneed to quickly move unsold merchandise and close-out products, which wouldotherwise result in a profit loss. The next major benefit of developing an ecommerceweb site is increasing the sales to supplement those that are already generated bythe business.
This Document gives details about a software project development plan to develop
an e-commerce website for a brick and mortar retail stores. The Retail store chain is
a medium sized retail chain company ABC retails Ltd. currently involved in Brick
and Mortar retails operations. However, increasing the reach through internet and
other issues such as inventory turnover made them to implement an e-commerce
website which would assist its current business model both in terms of sales and
managing inventory. The retail chain is based in Ahmedabad and has its 5 stores in
Ahmadabad Region.
1.1 Project Overview
This project deals with identifying the needs of a Brick and Mortar Retail chain
business which wants to foray into the web world to tap the consumers through
internet. The project consists of managing a software project involving design and
development of a web site. This website needs to be designed from the start
identifying the needs and target customers of the retail chain. The website would be
tested on test environments and then deployed to live for actual use. The Project
would also involve maintaining the website once it is live. The Project is expected to
finish in 4 months. The major resources required would include human resources,
hardware (web, application and database servers), computers, Network/Web
equipments, software for programming language and other licensed software such
as oracle/mySQL DB. Etc. The Project is expected to cost about Rs. 10,00,000 and
would deliver an ecommerce website connecting the ABC stores to the internet
world.
3
-
7/29/2019 SPM Project Report
4/18
1.2 Background
Client: ABC Retails Ltd.
Current business: Five retail stores in Ahmedabad. The retail stores are
supermarkets which includes all the grocery items, collection of various apparels,
footwear etc. Currently there is no online presence of the store and all the
operations are carried out through physical stores. The company wants to enter into
the online ecommerce business where users would shop online, make the payment
online and their goods would be delivered to their homes. Home delivery is also
available currently but this is done only when customers come to the stores, payand ask it to be delivered to their homes in case the shopping cart size is large and
they are unable to carry it to their homes. The company does not charge anything
for home delivery currently.
Current status of Online presence: Nil.
Functionalities required:
1) Website with information of all the available products.
2) User Login and storing of users information by maintaining a DB.
3) Shopping cart.
4) Payment system.
5) Shipment and delivery details.
6) Connecting and coordinating website operations with current operations.
Existing Software: Inventory management and billing system. The Company
already processes the backhouse operations (Supply chain management) with their
inventory management systems which take care of the purchase and inventory. The
Billing system is specifically used for billing purposes at the Retail stores. The
inventory management system is a centrally located server which is connected toterminals present at various retail chains. Also the individual billing data is updated
on the real time basis to the central server located at the Head office IT.
Stakeholders in the project:
4
-
7/29/2019 SPM Project Report
5/18
Stakeholders in the project include all the upper management of the Retail chain stores, steering
committee which is responsible for the project, all the other employees as the accuracy of the
transactions will depend on the success of the project, shareholders who have stake in the retail
chain, and the employees and customers of the stores who will using this site for their purchase
activities.
1.3 Objectives of the Project
The objectives of the project would be:
1. Develop an e-commerce website for retail chain stores for the purpose of
shopping through internet.
2. Deploy the site on Live servers and make it available to public for purchasing.
3. Create and link the site with the customers database.
4. Link the current inventory management system and billing system with the
website.
1.4 Constraints
The project undertaken would have following constraints:
1. Website created would be available on World Wide Web but operations would be
restricted (for operation) only to the users in Ahmedabad as Retail chain does not
have presence outside Ahmedabad.
2. As this is a low scale project hence there are resource constraints both in terms
of money and people.
3. There are external timelines demanded which are imposed by the ABC ltd. as
they would want to go Live according to their business strategy. Thus once the
website is on Live and that company has already advertised for its promotions and
5
-
7/29/2019 SPM Project Report
6/18
declared the date. Not availability of the site on the expected date would certainly
affect the reputation. Hence the project has an externally imposed timescales.
1.5 Methods/Technology to be used:
The Project would be using J2EE weblogic technologies for developing the website.
The coding language would be java language (weblogic version) and the Operating
system used would be UNIX. A content management tool (CMS Teamsite) would be
used to manage and upload the content on the website. The Application would
connect the Oracle database through weblogic database drivers. A weblogic 8.1
version would be used for the project. This would also provide the console for
deploying the builds onto the application and webservers. The xmls would be
hosted on webserver which would be dynamic pages of the website.
As discussed earlier, the project would follow a waterfall model where. The
processes would go sequentially starting from Feasibility study, User requirements,
Analysis, System Design, Program Design, Coding, Testing and Operation.
1.6 Project Deliverables
Since this project is basically a Product driven project, it will follow a waterfall
model. Since the operations of the retail chain stores is small and is confined to only
one city hence the website which has been designed in the initial delivery is with
the complete understanding of the stores requirements. However the content of
the website can be modified through the interactions. Ordering journey would by
and large remain same as mentioned in the initial requirement phase.
The Project deliverables at each stage would thus be:
1) System Products
2) Module Products
3) Management Products
6
-
7/29/2019 SPM Project Report
7/18
Service Level Agreement:
A service level agreement ( SLA) is a part of a service contract where the level ofservice is formally defined. IT is a negotiated agreement between the IT provider
and ABC Ltd. The SLA would record a common understanding about services,
priorities, responsibilities, guarantees and warranties. Each area of service scope
will have the 'level of service' defined. The SLA would specify the levels of
availability, serviceability, performance, operation, or other attributes of the service.
The Warranty time for code development, after sales services, Website downtime,
delivery time etc. would be covered under this document. Violation of this
document can lead to legal complications.
Requirement Specification Document:
This is very important phase at the start of the project. The business analyst and
the technical analysts would have interactions with the client (ABC ltd.) to
understand its basic requirements of the website. The business analysts would then
analyze the functional requirements and then pass it on to the technical analysts for
technological requirements. Once the analysis is completed they would prepare a
requirement specification document which would include all the functionalities that
the website should provide, GUI interface or front end interface, order journeys,
content displayed and other facilities provided. It will also contain all the technical
requirements that are needed to carry out this project in terms of hardware,
technological requirements. This document is then approved by the client and once
approved is then given to system designers to work on the design part. In case of
waterfall model and depending on the SLAs mentioned, any changes to be done in
the later stages of this document after the client signoff is received would involve
complications in terms of budget and time as mentioned in SLAs.
High Level and Low level Design Document:
Once the requirements are finalized, the next product is the design document. It will
involve design of various modules involved and the interconnections between them.
There will be two types of design procedures carried out, high level design anddetailed or low level design.
High level design will outline various functionalities that will go into the package on
a broader view. Since the software will be using a J2EE Weblogic platform, it will
7
-
7/29/2019 SPM Project Report
8/18
outline the object classes required for the major functionalities. The functionalities
would include:
1.Creation of Users Registration and login
2.Creation of the order journeys through jsps.
3.Creation of the products database and its display on the front end.
4.Connection of these jsps through content management tool.
5. Linking payment system by using the functionality of PayPal system.
It will also mention the database connection and various database drivers to be
used for connecting database with the application. Currently, a central server is
been used for storing all the products in the inventory at various stores. Hence the
application will be connected to this server.
Detailed level design will explain all the functions in great detail. It will explain the
actual flow of different java classes and its connection with the database and the
front end (which will be done using jsp). It will mention all the calls and how will
they be called. In case of jsp, it will explain which structure these jsps are using. It
will also explain how the connection will be established with the database and how
the calls will be made. Thus a complete technical design document would becreated for carrying out the coding processes.
Code:
Once the Design documents are ready the next phase is the coding. The coding in
this project would essentially be done on UNIX operating systems and would be in
java (J2EE version). The various five modules described above would be developed
by different set of developers. The output would be a code done in java languages
in the form of Jsps which would adhere to the design documents prepared.
Test cases:
Once the code is developed it requires testing. Thus specifying the test cases is
very important. These would include White box and Black box test cases. Black box
test cases are generally for the end user or acceptance test cases which are
generally done at the end of every module or completion of the website by users to
8
-
7/29/2019 SPM Project Report
9/18
check the business functionalities being met. These would include test cases for
ordering journeys for purchasing and payment.
Black box test cases would include scenarios where the code is checked technically
from inside. These cases are comprehensive and should check solidarity of the
coding being done.
These documents are fairly important in order to check the performance and
limitations of the code as to how much load it can sustain and extreme cases. IT is
important from both the developers (IT providers) and users aspects.
Application builds:
This is the combined package of the coded jsps, its interlinked connection tools
which is to be deployed on application servers. This build package also includes the
xml files to be deployed on the webservers. The Jsps would go to app. Servers and
xml to webservers. This would also contain the content needed to be uploaded as a
part of feed to the website. This content is a collection of product related jpgs, flash
files, and other promotional related content files which are dynamic on the website.
User Manuals:
This document would cover in detail about the various functionalities of the website
(as per the requirements). This would contain exhaustive description step by step
about the different functions and its working and uses that are incorporated in the
website. By using this manual the users can easily come to know about the working
of website through a users point of view.
Module description Documents:
These would contain the technical details of the different modules that are built for
making the website. Since it would contain the internal working of these modules
these would be confidential documents. This would also contain the working of
webserver and its connection to the app servers and content servers and app server
connection to database. A complete flow of the internal working would be covered
in this document.
Progress Report/Dashboard.
This document would essentially help the management and the project steering
committee to continuously monitor and view the progress of the project. It would
indicate deviations if any and hence would help the project committee to take
necessary actions if required.
9
-
7/29/2019 SPM Project Report
10/18
The product breakdown diagram for this project is shown below:
10
Project
Products
System
Products
Module Products Management
Products
Progress
Report/
Design
docume
nt for
Order
Design
docume
nt for
Products
DB and
Display
Design
docume
nt for
Contentmgmt.
Design
docume
nt for
Paymentsystem
Code
for
Order
jrny. Jsp
Code
for
ContentMgmt.
Code
for
Products
Test
plan
and
test
casesfor
Code
for
Payme
nt
s stem
Test
plan
and
test
casesTest
plan
and
testcases
Test
plan
and
testcases
System Level
Agreement
Overall
Requirement
Specification
document
User Manual
Module
Description
documents
Applicationbuilds
Design
for
Registr
ationand
Code
for
Reg. &
login
Test
cases
for
reg.&
-
7/29/2019 SPM Project Report
11/18
1.7 Activities:
The following are the activities that are identified and would be carried out
accordingly for this project.
Activity Estimate
d Days
Activity Estimate
d Days
A Overall specification 20 I Coding/testing Order
jrny. Module
12
B Technical Design &
Architecture
17 J Coding/testing Product
DB & display module
12
C Low level Design for
Registration & login
module
5 K Coding/testing content
mgmt. module
12
D Low level Design for Order
jrny. module
5 L Coding/testing Payment
system module
12
E Low level Design for
Product DB & display
module
5 M System Integration 5
11
-
7/29/2019 SPM Project Report
12/18
F Low level Design for
content mgmt. module
5 N Overall system testing 4
G Low level Design for
Payment system module
5 O Build and Deployment
on LIVE servers
2
H Coding/testingRegistration & login
module
12 P Creating User manual 14
Below is the Activity network diagram shown for the project. The required days for
activities are estimated keeping the contingency factor for each activity.
12
C 5
37 Design forRegistratio
n & login
module
42
37 42
5 0
H 12
42 Code/testRegistratio
n & login
54
42 54
12 0
D 5
37 Design fororder
journey
module
42
37 42
5 0
I 12
42 Code/testorder
journey
54
42 54
12 0
A 20
0 Overall
Specification
20
0 20
20 0
B 17
20 TechnicalDesign &
Architecture
37
20 37
17 0
E 5
37 Design for
ProductsDB &
display
42
37 42
5 0
J 12
42 Code/test
ProductsDB &
display
54
42 54
12 0
F 5
37 Design forcontent
mgmt.
module
42
37 42
5 0
k 12
42 Code/testContent
Manageme
nt
54
42 54
12 0
-
7/29/2019 SPM Project Report
13/18
13
G 5
37 Design forPayment
system
module
42
37 42
5 0
L 12
42 Code/testPayment
system
54
42 54
12 0
M 5
54 SystemIntegration
59
54 59
5 0
N 4
59 Overallsystem
testing
63
59 63
4 0
O 2
63 Build &deploymen
t on Live
Servers
65
63 65
2 0
P 14
37 CreatingUser
manual
51
49 63
26 12
Activity
Label
duration
Earlie
st
start
Activity
Description
Earlie
st
finish
Lates
t
start
Latest
finish
Activity
span
float
-
7/29/2019 SPM Project Report
14/18
It is apparent form the Activity diagram that the complete project is bound to
finish in 65 days which is well within the given deadline of three months
(considering working of total 14 weeks and 5 days per week)
Here the System analyst/Architect would design the system specification and
high level design for system, while the developers would carry out the Design
and coding part of each module which would run in parallel. Testers would
test the code initially during the development of the modules
The system integration would then take place which would include
integration of all the modules, connection of jsp code with database and
current inventory system through appropriate calls, drivers and queues.
The overall system would again be tested in terms of end to end working.
Then the final build and deployment would be done on Live servers along
with the domain name registration and activation which would make the
website go live.
1.8 Resources
Resources are one of the key components of any software project. The project is a fixed
time/money project involving three months of time in which the IT Company has to develop and
deliver complete website up and running in three months from the date of start. There would be a
fixed amount of Rs. 10,00,00 would be paid by ABC ltd to the IT company. Also the cost of
licensing of the softwares and hardwares would be borne by ABC ltd. Resources for this project
can be classified into the following categories:
Labour: There needs to be a proper hierarchical structure in place for efficient managing.
There will be a project steering committee controlling the flow of project. A project manager
who will be responsible for the entire project. Each module will employ 1 developer who will
be responsible for developing each module. The developers will be responsible for testing and
14
-
7/29/2019 SPM Project Report
15/18
integrating their respective modules. There will be 5 testers for testing the integrated codes
base. The team will also consist of a system analyst who will analyze the client system and
will accordingly prepare the technical specifications. The system analyst would also do the
technical architecture design of the complete project. It will also consist of a quality assurance
team, which will be responsible for ensuring quality. Along with that a build, deployment and
an integration personnel looking after the integration of builds onto the development, test and
production servers. A content manager would work with the client for management and
uploading of content on the website.
Hardware/Software/Network It will include workstations and other computing and office
equipments. It will include the hardware requirements for the projects like servers, network
cables, internet ports, printers, scanners, photo copiers, etc. Software like OS, antivirus and
other various important software need to be updated on all the workstations. For this project
Sun Solaris servers are being used with UNIX OS and licenses for other softwares such as
Oracle DB, Weblogic, Teamsite, Loadrunner, Toad, Etc would be required.
Other Requirements: The management will require proper space for housing the resources. It
will include cabin for the manager and cubicles for other employees. It will also include
desks, chairs, proper lightings and other such stuff for the staff.
Time: The time required for the completion of project has been estimated to 3 months in
which the Website needs to be On Live fully functional. Further distribution of timelines in
terms of activities has been discussed in detail in Activity section.
Cost: The costs would in general is categorized into two sections:
1. Staff Costs: Staff costs for the project are shown below :
Member Weekly cost (in Rs.)
Module code developers (5) (7500)1500 x 5
Module code testers (5) (6000)1200 x 5
System Analyst/ Technical Architect (1) 2500
Project Manager (1) 2500
15
-
7/29/2019 SPM Project Report
16/18
Integration manager (1) 1500
Content Manager (1) 1200
Quality/security assurance manager (1) 1000
2. Overheads: Overheads for this project are estimated as Rs. 10,000 per week.
Hence for three months (approximately 15 weeks) the Overhead + staff costs add up to Rs.
4,83,000
The resource allocation needs to be done on the basis of skill set and the management needs to be
in constant touch with the HR department in order to get the right people. They have to manage
the resource attrition and have to find suitable replacement. Also, if some critical activity is
taking more than estimated time, management needs to employ extra resources there from some
other module or activity.
The management, also, need to keep the resources motivated in order to get the maximum out of
them, so that there will be no issues in completing the project on time.
1.9 Risk Analysis
Project needs to follow a strict deadline and also works on a budget. Any deviation from that cancause the company huge deal of losses. Hence, risk analysis is very important step in the success
of the project. It helps in analyzing where the project can go wrong. The three major causes of
risk in this project would be Unavailability of resources, Unavailability of key client
personnel, Technical problems.
A priority can be given to each risk by allocating a probability rating (1 10) and a seriousness
of impact rating (1 10). Multiplying the two together gives an overall score of priority
purposes.
A standard risk exposure assessment for this project is shown below:
S No. HAZARD LIKELIHOOD IMPACT RISK EXPOSURE
1 Major sickness of employees
involved in critical path
4 8 32
16
-
7/29/2019 SPM Project Report
17/18
activities
2 Requirement specification
changes during coding or testing
phase
7 9 63
3 Design and specification t akes
longer than expected
6 7 42
4 Major sickness of employees
involved in non critical path
activities
8 4 32
5 Coding of individual modules
takes longer time
5 4 20
6 Design flaws during module
testing
4 8 32
7 Architecture & design flaw
during system integration
3 10 30
The required score in the risk exposure column gives the priorities for the risks
which need to be either reduced or prevented first. For example the personnel
shortfall could be reduced by staffing with top talent, training and development and
early scheduling of key personnel. Technical faults in coding could be avoided by
improved software evaluation and formal specification methods. Quality of the
design and code could be improved through quality assurance procedures and
certification.
The major risk exposure is certainly on changes in requirement specifications during
coding and testing phase. Since it involves changes in design and lots of rework, its
impact is also high both in terms of time and money. Hence Stringent control
procedures high change threshold and incremental code development could be
done to reduce this risk.
Bibliography:
1. Software Project Management
17
-
7/29/2019 SPM Project Report
18/18
(Bob Hughes & Mike Cotterell, Fourth Edition, 2009)