SPILL PREVENTION CONTROL AND COUNTERMEASURE …

25
SPILL PREVENTION CONTROL AND COUNTERMEASURE (SPCC) PLAN Prepared for: California State University, Dominguez Hills 1000 East Victoria Street Carson, California 90747 April 2020 .

Transcript of SPILL PREVENTION CONTROL AND COUNTERMEASURE …

Page 1: SPILL PREVENTION CONTROL AND COUNTERMEASURE …

SPILL PREVENTION CONTROL AND COUNTERMEASURE (SPCC) PLAN

Prepared for: California State University, Dominguez Hills

1000 East Victoria Street Carson, California 90747

April 2020 .

Page 2: SPILL PREVENTION CONTROL AND COUNTERMEASURE …

Ver. 1-E-doc-3-18-10

Facility Name: CSU Dominguez Hills Page 1 Tier I Qualified Facility SPCC Plan

This template constitutes the SPCC Plan for the facility, when completed and signed by the owner or operator of a facility that meets the applicability criteria in §112.3(g)(1). This template addresses the requirements of 40 CFR part 112. Maintain a complete copy of the Plan at the facility if the facility is normally attended at least four hours per day, or for a facility attended fewer than four hours per day, at the nearest field office. When making operational changes at a facility that are necessary to comply with the rule requirements, the owner/operator should follow state and local requirements (such as for permitting, design and construction) and obtain professional assistance, as appropriate.

Facility Description

I. Self-Certification Statement (§112.6(a)(1))The owner or operator of a facility certifies that each of the following is true in order to utilize this template to comply

with the SPCC requirements:

I Mike Williams certify that the following is accurate: 1. I am familiar with the applicable requirements of 40 CFR part 112;2. I have visited and examined the facility;3. This Plan was prepared in accordance with accepted and sound industry practices and standards;4. Procedures for required inspections and testing have been established in accordance with industry inspection

and testing standards or recommended practices;5. I will fully implement the Plan;6. This facility meets the following qualification criteria (under §112.3(g)(1)):

a. The aggregate aboveground oil storage capacity of the facility is 10,000 U.S. gallons or less; andb. The facility has had no single discharge as described in §112.1(b) exceeding 1,000 U.S. gallons and no

two discharges as described in §112.1(b) each exceeding 42 U.S. gallons within any twelve month periodin the three years prior to the SPCC Plan self-certification date, or since becoming subject to 40 CFR part112 if the facility has been in operation for less than three years (not including oil discharges as describedin §112.1(b) that are the result of natural disasters, acts of war, or terrorism); and

c. There is no individual oil storage container at the facility with an aboveground capacity greater than 5,000U.S. gallons.

7. This Plan does not deviate from any requirement of 40 CFR part 112 as allowed by §112.7(a)(2) (environmentalequivalence) and §112.7(d) (impracticability of secondary containment) or include any measures pursuant to§112.9(c)(6) for produced water containers and any associated piping;

8. This Plan and individual(s) responsible for implementing this Plan have the full approval of management and Ihave committed the necessary resources to fully implement this Plan.

Facility Name California State University, Dominguez Hills

Facility Address 1000 East Victoria Street

City Carson State California ZIP 90747

County Los Angeles Tel. Number (310) 243 - 2895

Owner or Operator Name California State University, Dominguez Hills

Owner or Operator Address 1000 East Victoria Street

City Carson State California ZIP 90747

County Los Angeles Tel. Number (310) 243 - 3012

Tier I Qualified Facility SPCC Plan

Page 3: SPILL PREVENTION CONTROL AND COUNTERMEASURE …

Ver. 1-E-doc-3-18-10

Facility Name: CSU Dominguez Hills Page 2 Tier I Qualified Facility SPCC Plan

I also understand my other obligations relating to the storage of oil at this facility, including, among others:

1. To report any oil discharge to navigable waters or adjoining shorelines to the appropriate authorities. Notificationinformation is included in this Plan.

2. To review and amend this Plan whenever there is a material change at the facility that affects the potential for anoil discharge, and at least once every five years. Reviews and amendments are recorded in an attached log [SeeFive Year Review Log and Technical Amendment Log in Attachments 1.1 and 1.2.]

3. Optional use of a contingency plan. A contingency plan:a. May be used in lieu of secondary containment for qualified oil-filled operational equipment, in accordance

with the requirements under §112.7(k), and;b. Must be prepared for flowlines and/or intra-facility gathering lines which do not have secondary

containment at an oil production facility, and;c. Must include an established and documented inspection or monitoring program; must follow the provisions

of 40 CFR part 109; and must include a written commitment of manpower, equipment and materials toexpeditiously remove any quantity of oil discharged that may be harmful. If applicable, a copy of thecontingency plan and any additional documentation will be attached to this Plan as Attachment 2.

I certify that I have satisfied the requirement to prepare and implement a Plan under §112.3 and all of the requirements under §112.6(a). I certify that the information contained in this Plan is true.

Signature Title: Environmental, Health & Safety Manager

Name Mike Williams Date:

II. Record of Plan Review and Amendments

Five Year Review (§112.5(b)):Complete a review and evaluation of this SPCC Plan at least once every five years. As a result of the review, amend this Plan

within six months to include more effective prevention and control measures for the facility, if applicable. Implement any SPCC Plan amendment as soon as possible, but no later than six months following Plan amendment. Document completion of the review and evaluation, and complete the Five Year Review Log in Attachment 1.1. If the facility no longer meets Tier I qualified facility eligibility, the owner or operator must revise the Plan to meet Tier II qualified facility requirements, or complete a full PE certified Plan.

Table G-1 Technical Amendments (§§112.5(a), (c) and 112.6(a)(2)) This SPCC Plan will be amended when there is a change in the facility design, construction, operation, or maintenance that materially affects the potential for a discharge to navigable waters or adjoining shorelines. Examples include adding or removing containers, reconstruction, replacement, or installation of piping systems, changes to secondary containment systems, changes in product stored at this facility, or revisions to standard operating procedures.

Any technical amendments to this Plan will be re-certified in accordance with Section I of this Plan template. [§112.6(a)(2)] [See Technical Amendment Log in Attachment 1.2] ☒

Page 4: SPILL PREVENTION CONTROL AND COUNTERMEASURE …

Ver. 1-E-doc-3-18-10

Facility Name: CSU Dominguez Hills Page 3 Tier I Qualified Facility SPCC Plan

III. Plan Requirements

1. Oil Storage Containers (§112.7(a)(3)(i)):Table G-2 Oil Storage Containers and Capacities

This table includes a complete list of all oil storage containers (aboveground containersa and completely buried tanksb) with capacity of 55 U.S. gallons or more, unless otherwise exempt from the rule. For mobile/portable containers, an estimated number of containers, types of oil, and anticipated capacities are provided.

Oil Storage Container (indicate whether aboveground (A) or completely buried (B))

Type of Oil Shell Capacity (gallons)

A – Steel Tank, Facility Services Unleaded Gasoline 983.5

A – Steel Tank, Facility Services Unleaded Gasoline 983.5

A – Steel Tank, Facility Services Diesel 500

A – Steel Drum, Central Plant Vacuum Pump Oil 55

A – Steel Drum, Central Plant Waste Oil 55

A – Steel Drum, Auto Shop at Facility Services Waste Oil 55

A – Steel Tank, Student Union, Loading Dock near propane

Waste Cooking Oil 160

A – Emergency Generator, Located at Central Plant but used for Science and Innovation Building

Diesel 195.5

A – Emergency Generator, Library Diesel 195

A – Emergency Generator, Gym Diesel 90

A – Emergency Generator, Between Welch Hall and Health Center

Diesel 1,000

A – Transformer, P5046772, Facility Services Transformer Oil 270

A – Transformer, CMSCPHV6-5, CA Academy of Math and Science (CAMS)

Transformer Oil 361

A – Transformer, EACSUBSBS54, East Academic Complex

Transformer Oil 271

A – Transformer, SCC-004-HV5-6, School of Education Transformer Oil 290

A – Transformer, P5063207, Pueblo Dominguez SH-1, BLDG F

Transformer Oil 192

A – Transformer, CPHV6-4, Pueblo Dominguez SH-2, BLDG X

Transformer Oil 195

A – Transformer, Extended Education Center Transformer Oil 203

A – Transformer, JWH SUB SHC 200HV1&2 T1, Welch Hall

Transformer Oil 272

A – Transformer, JWH SUB SHC 200HV1&2 T2, Welch Hall

Transformer Oil 272

A – Transformer, South Library Building, Room 1921 Transformer Oil – Silicon Dielectric Fluid 440

A – Transformer, T-52, Science and Innovation Building

Transformer Oil – BIOTEMP Dielectric Fluid

300

A – Steel Tank, Elevator, Natural Science and Math Room E-033

Hydraulic Oil 110

A – Steel Tank, Elevator, Social & Behav. Science Room A122

Hydraulic Oil 100

A – Steel Tank, Elevator, University Theatre Room A-002

Hydraulic Oil 55

A – Steel Tank, Elevator #1, Welch Hall, Room E-162 Hydraulic Oil 80

A – Steel Tank, Elevator #2, Welch Hall, Room E-162 Hydraulic Oil 80

Page 5: SPILL PREVENTION CONTROL AND COUNTERMEASURE …

Ver. 1-E-doc-3-18-10

Facility Name: CSU Dominguez Hills Page 4 Tier I Qualified Facility SPCC Plan

Table G-2 Oil Storage Containers and Capacities (continued)

Oil Storage Container (indicate whether aboveground (A) or completely buried (B)) Type of Oil Shell Capacity (gallons)

A – Steel Tank, Elevator #3, Welch Hall, Room E-162 Hydraulic Oil 80

A – Steel Tank, Elevator, Lacorte Hall Basement Room A008

Hydraulic Oil 80

A – Steel Tank, Elevator, Student Union, Room 185 Hydraulic Oil 240

A – Steel Tank, Elevator, Student Union, Room 205 Hydraulic Oil 180

A – Steel Tank, Elevator, Student Union Basement, Elevator #1

Hydraulic Oil 145

A – Steel Tank, Elevator, Student Union Basement, Elevator #2

Hydraulic Oil 145

A – Steel Tank, Elevator, Science and Innovation Building, Room 110, Elevator #1

Hydraulic Oil 152

A – Steel Tank, Elevator, Science and Innovation Building, Room 116, Elevator #2

Hydraulic Oil 170

a Aboveground storage containers that must be included when calculating total facility oil storage capacity include: tanks and mobile or portable containers; oil-filled operational equipment (e.g. transformers); other oil-filled equipment, such as flow-through process equipment. Exempt containers that are not included in the capacity calculation include: any container with a storage capacity of less than 55 gallons of oil; containers used exclusively for wastewater treatment; permanently closed containers; motive power containers; hot-mix asphalt containers; heating oil containers used solely at a single-family residence; and pesticide application equipment or related mix containers.

b Although the criteria to determine eligibility for qualified facilities focuses on the aboveground oil storage containers at the facility, the completely buried tanks at a qualified facility are still subject to the rule requirements and must be addressed in the template; however, they are not counted toward the qualified facility applicability threshold.

c Counts toward qualified facility applicability threshold.

2. Secondary Containment and Oil Spill Control (§§112.6(a)(3)(i) and (ii), 112.7(c) and 112.9(c)(2)):

Table G-3 Secondary Containment and Oil Spill Control Appropriate secondary containment and/or diversionary structures or equipmenta is provided for all oil handling containers, equipment, and transfer areas to prevent a discharge to navigable waters or adjoining shorelines. The entire secondary containment system, including walls and floor, is capable of containing oil and is constructed so that any discharge from a primary containment system, such as a tank or pipe, will not escape the containment system before cleanup occurs.

a Use one of the following methods of secondary containment or its equivalent: (1) Dikes, berms, or retaining walls sufficiently impervious to contain oil; (2) Curbing; (3) Culverting, gutters, or other drainage systems; (4) Weirs, booms, or other barriers; (5) Spill diversion ponds; (6) Retention ponds; or (7) Sorbent materials.

Total Aboveground Storage Capacity c 8,956 gallons Total Completely Buried Storage Capacity 0 gallons

Facility Total Oil Storage Capacity 8,956 gallons

Page 6: SPILL PREVENTION CONTROL AND COUNTERMEASURE …

Ver. 1-E-doc-3-18-10

Facility Name: CSU Dominguez Hills Page 5 Tier I Qualified Facility SPCC Plan

Table G-4 below identifies the tanks and containers at the facility with the potential for an oil discharge; the mode of failure; the flow direction and potential quantity of the discharge; and the secondary containment method and containment capacity that is provided.

Table G-4 Containers with Potential for an Oil Discharge

Area Type of failure (discharge scenario)

Potential discharge volume (gallons)

Direction of flow for uncontained discharge

Secondary containment methoda

Secondary containment capacity (gallons)

Bulk Storage Containers and Mobile/Portable Containersb

A – Unleaded Gasoline, Steel Tank, Facility Services

Vehicle gas tank overfill, fitting leak/failure, seam failure, tank overfill, fuel transfer hose failure

<1 – 983.5 South Double Wall and Concrete Berm

Double Wall: 1,082 Concrete Berm: 754

A – Unleaded Gasoline, Steel Tank, Facility Services

Vehicle gas tank overfill, fitting leak/failure, seam failure, tank overfill, fuel transfer hose failure

<1 – 983.5 South Double Wall and Concrete Berm

Double Wall: 1,082 Concrete Berm: 754

A – Diesel, Steel Tank, Facility Services Vehicle gas tank overfill, fitting leak/failure, seam failure, tank overfill, fuel transfer hose failure

<1 – 500 South Double Wall and Concrete Berm

Double Wall: 550 Concrete Berm: 549

A – Waste Oil, Steel Drum, Auto Shop at Facility Services

Fitting leak/failure, seam failure, tank overfill, oil transfer hose failure

<1 – 55 Northeast Secondary Containment Pallet

> 61

A – Vacuum Pump Oil, Steel Drum, Central Plant

Fitting leak/failure, seam failure, oil transfer hose failure

<1 – 55 North Secondary Containment Bin

85

A – Waste Oil, Steel Drum, Central Plant Fitting leak/failure, seam failure, tank overfill, oil transfer hose failure <1 – 55 North

Secondary Containment Bin

85

A – Diesel, Emergency Generator, Located at Central Plant but used for Science and Innovation Building

Fitting leak, seam failure, tank overfill

<1 – 195.5 West Double Wall 215

A – Waste Cooking Oil, Steel Tank, Student Union, Loading Dock near propane

Fitting leak, seam failure, tank overfill, oil transfer hose failure

<1 – 160 Northwest Spill kit, sorbent materials

Absorbs up to 5

A – Diesel, Emergency Generator, Library Fitting leak, seam failure, tank overfill

<1 – 195 Radial Double Wall 215

A – Diesel, Emergency Generator, Gym Fitting leak, seam failure, tank overfill <1 – 90 Radial Double Wall 99

A – Diesel, Emergency Generator, Between Welch Hall and Health Center

Fitting leak, seam failure, tank overfill

<1 – 1,000 Northeast Double Wall 1,100

Oil-filled Operational Equipment (e.g., hydraulic equipment, transformers)c

A – Transformer Oil, P5046772, Facility Fitting leak, seam failure <1 – 270 Southwest, 5-10 gal pit for incidental -

Page 7: SPILL PREVENTION CONTROL AND COUNTERMEASURE …

Ver. 1-E-doc-3-18-10

Facility Name: CSU Dominguez Hills Page 6 Tier I Qualified Facility SPCC Plan

Table G-4 Containers with Potential for an Oil Discharge

Area Type of failure (discharge scenario)

Potential discharge volume (gallons)

Direction of flow for uncontained discharge

Secondary containment methoda

Secondary containment capacity (gallons)

Services East spills (refer to Oil Spill Contingency Plan)

A – Transformer Oil, CMSCPHV6-5, CA Academy of Math and Science (CAMS)

Fitting leak, seam failure <1 – 361 West

5-10 gal pit for incidentalspills (refer to Oil SpillContingency Plan)

-

A – Transformer Oil, EACSUBSBS54, East Academic Complex

Fitting leak, seam failure <1 – 271 West

5-10 gal pit for incidentalspills (refer to Oil SpillContingency Plan)

-

A – Transformer Oil, SCC-004-HV5-6, School of Education

Fitting leak, seam failure <1 – 290 Southwest

5-10 gal pit for incidentalspills (refer to Oil SpillContingency Plan)

-

A – Transformer Oil, P5063207, Pueblo Dominguez SH-1, BLDG F

Fitting leak, seam failure <1 – 192 Northwest

5-10 gal pit for incidentalspills (refer to Oil SpillContingency Plan)

-

A – Transformer Oil, CPHV6-4, Pueblo Dominguez SH-2, BLDG X

Fitting leak, seam failure <1 – 195 Radial, West

5-10 gal pit for incidentalspills (refer to Oil SpillContingency Plan)

-

A – Transformer Oil, Extended Education Center

Fitting leak, seam failure <1 – 203 Northwest

5-10 gal pit for incidentalspills (refer to Oil SpillContingency Plan)

-

A – Transformer Oil, JWH SUB SHC 200HV1&2 T1, Welch Hall

Fitting leak, seam failure

<1 – 272 Northeast, West

10-15 gal pit forincidental spills (refer toOil Spill ContingencyPlan)

-

A – Transformer Oil, JWH SUB SHC 200HV1&2 T2, Welch Hall

Fitting leak, seam failure

<1 – 272 Northeast, West

10-15 gal pit forincidental spills (refer toOil Spill ContingencyPlan)

-

A – Transformer Oil, South Library Building, Room 1921

Fitting leak, seam failure <1 – 440

Radial, Southwest

Refer to Oil Spill Contingency Plan -

A – Transformer Oil, T-52, Science and Innovation Building

Fitting leak, seam failure <1 – 300 Radial, Northwest

Refer to Oil Spill Contingency Plan

-

A – Hydraulic Oil, Steel Tank, Elevator, Natural Science and Math, Room E-033

Fitting leak, seam failure, tank overfill

<1 – 110 Radial Refer to Oil Spill Contingency Plan -

A – Hydraulic Oil, Steel Tank, Elevator, Social & Behav. Science, Room A122

Fitting leak, seam failure, tank overfill <1 – 100

Radial, N-NW

Refer to Oil Spill Contingency Plan -

Page 8: SPILL PREVENTION CONTROL AND COUNTERMEASURE …

Ver. 1-E-doc-3-18-10

Facility Name: CSU Dominguez Hills Page 7 Tier I Qualified Facility SPCC Plan

Table G-4 Containers with Potential for an Oil Discharge

Area Type of failure (discharge scenario)

Potential discharge volume (gallons)

Direction of flow for uncontained discharge

Secondary containment methoda

Secondary containment capacity (gallons)

A – Hydraulic Oil, Steel Tank, Elevator, University Theatre, Room A-002

Fitting leak, seam failure, tank overfill <1 – 55

Radial, N-NW

Refer to Oil Spill Contingency Plan -

A – Hydraulic Oil, Steel Tank, Elevator #1, Welch Hall, Room E-162

Fitting leak, seam failure, tank overfill <1 – 80

Radial, Southeast

Refer to Oil Spill Contingency Plan -

A – Hydraulic Oil, Steel Tank, Elevator #2, Welch Hall, Room E-162

Fitting leak, seam failure, tank overfill <1 – 80 Radial,

Southeast

Refer to Oil Spill Contingency Plan -

A – Hydraulic Oil, Steel Tank, Elevator #3, Welch Hall, Room E-162

Fitting leak, seam failure, tank overfill

<1 – 80 Radial, Southeast

Refer to Oil Spill Contingency Plan -

A – Hydraulic Oil, Steel Tank, Elevator, Lacorte Hall Basement, Room A008

Fitting leak, seam failure, tank overfill <1 – 80

Radial, North Refer to Oil Spill Contingency Plan -

A – Hydraulic Oil, Steel Tank, Elevator, Student Union, Room 185

Fitting leak, seam failure, tank overfill <1 – 240 Radial,

W-SW

Refer to Oil Spill Contingency Plan -

A – Hydraulic Oil, Steel Tank, Elevator, Student Union, Room 205

Fitting leak, seam failure, tank overfill <1 – 180 Radial,

S-SE

Refer to Oil Spill Contingency Plan -

A – Hydraulic Oil, Steel Tank, Elevator, Student Union Basement, Elevator #1

Fitting leak, seam failure, tank overfill <1 – 145

Radial, West Refer to Oil Spill Contingency Plan -

A – Hydraulic Oil, Steel Tank, Elevator, Student Union Basement, Elevator #2

Fitting leak, seam failure, tank overfill <1 – 145

Radial, West Refer to Oil Spill Contingency Plan -

A – Hydraulic Oil, Steel Tank, Elevator, Science and Innovation Building, Room 110, Elevator #1

Fitting leak, seam failure, tank overfill <1 – 152

Radial

Refer to Oil Spill Contingency Plan

-

A – Hydraulic Oil, Steel Tank, Elevator, Science and Innovation Building, Room 116, Elevator #2

Fitting leak, seam failure, tank overfill <1 – 170

Radial

Refer to Oil Spill Contingency Plan

-

Piping, Valves, etc. Oil Dispensing Hoses/Attachments (throughout)

Fitting leak or failure, hose failure <1 Radial Spill Kit and Drip Pans Absorbs up to 5/pans contain

Page 9: SPILL PREVENTION CONTROL AND COUNTERMEASURE …

Ver. 1-E-doc-3-18-10

Facility Name: CSU Dominguez Hills Page 8 Tier I Qualified Facility SPCC Plan

Table G-4 Containers with Potential for an Oil Discharge

Area Type of failure (discharge scenario)

Potential discharge volume (gallons)

Direction of flow for uncontained discharge

Secondary containment methoda

Secondary containment capacity (gallons) up to 2

Product Transfer Areas (location where oil is loaded to or from a container, pipe or other piece of equipment.)

Refilling Oil Dispensers (throughout) Fitting Leak or Failure <1 Radial Spill Kit and Drip Pans Absorbs up to 5/pans contain up to 2

Other Oil-Handling Areas or Oil-Filled Equipment (e.g. flow-through process vessels at an oil production facility) None

a Use one of the following methods of secondary containment or its equivalent: (1) Dikes, berms, or retaining walls sufficiently impervious to contain oil; (2) Curbing; (3) Culverting, gutters, or other drainage systems; (4) Weirs, booms, or other barriers; (5) Spill diversion ponds; (6) Retention ponds; or (7) Sorbent materials. b For storage tanks and bulk storage containers, the secondary containment capacity must be at least the capacity of the largest container plus additional capacity to contain rainfall or other precipitation. c For oil-filled operational equipment: Document in the table above if alternative measures to secondary containment (as described in §112.7(k)) are implemented at the facility.

Page 10: SPILL PREVENTION CONTROL AND COUNTERMEASURE …

Ver. 1-E-doc-3-18-10

Facility Name: CSU Dominguez Hills Page 9 Tier I Qualified Facility SPCC Plan

3. Inspections, Testing, Recordkeeping and Personnel Training (§§112.7(e) and (f), 112.8(c)(6) and(d)(4), 112.9(c)(3), 112.12(c)(6) and (d)(4)):

Table G-5 Inspections, Testing, Recordkeeping and Personnel Training An inspection and/or testing program is implemented for all aboveground bulk storage containers and piping at this facility. [§§112.8(c)(6) and (d)(4), 112.9(c)(3), 112.12(c)(6) and (d)(4)] ☒ The following is a description of the inspection and/or testing program (e.g. reference to industry standard utilized, scope, frequency, method of inspection or test, and person conducting the inspection) for all aboveground bulk storage containers and piping at this facility: Inspections, Testing, Recordkeeping

Designated CSUDH staff are trained to do visual inspections of oil storage, oil transfer areas, and oil equipment. Adesignated trained staff performed periodic visual inspections of the aboveground oil storage containers and oil-filledoperational equipment using Attachment 3.1 to document inspections; records of inspections consist of the monthlyinspection checklist and the annual inspection checklist in the Steel Tank Institute (STI) SP001 inspection standard.Visual inspections of oil storage containers follow the inspection schedule in Attachment 3.2 of this plan.

The liquid level gauges on the unleaded gasoline tanks at the Facility Services are inspected and calibrated at leastannually following the manufacturer’s procedures by an outside vendor. Attachment 3.1 documents theseinspections.

An assigned employee also visually inspects the dispensers on the unleaded gasoline and diesel oil tanks at theFacility Services for indications of deterioration and discharges, including the transfer hoses, valves, and other fittings,at least weekly following the manufacturer’s procedures.

Designated CSUDH staff will inspect concrete berm secondary containment(s) and secondary containment pallet(s)on a weekly basis for signs of deterioration, discharges (leaking tanks or piping), or accumulation of oil. In addition,staff will inspect the exterior containment(s) after any rainfall. Inspections will be documented using Attachment 3.1.If the containment does not have drains, any collected rainwater will be removed from the containment using aportable pump, but only after sampling the water for analysis of hydrocarbons. If the laboratory reports the presenceof hydrocarbons, or oil sheen is detected, then a waste oil hauler will be contracted to transport the oily rainwater forproper disposal. Each drainage activity is recorded in Attachment 3.3. Record keeping for disposal of waste oil or oil-contaminated water accumulated in the concrete berm containment area is in Attachment 3.3.

Emergency generators are inspected by an outside vendor biannually for filters, hoses, caps, leaks, locks, and/or oilchanges. The generators are “test run” monthly. All inspection and test records are signed and kept on file.

Elevators are serviced monthly by an outside vendor and as needed. Inspections include inspecting for lamps,signals, emergency lighting, leaks, oil level, controller, motor, etc. Internal inspections are also performed bydesignated trained CSUDH staff on a weekly basis for signs of deterioration or discharges (leaking tanks or piping orvalves). Inspections will be documented using Attachment 3.1.

Transformers are serviced as needed by an outside vendor. Inspections for transformers are completed on a weeklybasis for signs of deterioration or discharges (leaking tanks or piping or valves). Inspections will be documented usingAttachment 3.1.

If an employee encounters a spill during an inspection of the oil storage, operational or transfer equipment, theemployee will immediately take the necessary actions outlined in Table G-7.

Inspections, tests, and records are conducted in accordance with written procedures developed for the facility. Records of inspections and tests kept under usual and customary business practices will suffice for purposes of this paragraph. [§112.7(e)]

A record of the inspections and tests are kept at the facility or with the SPCC Plan for a period of three years. [§112.7(e)] [See Inspection Log and Schedule in Attachment 3.1] ☒

Inspections and tests are signed by the appropriate supervisor or inspector. [§112.7(e)] ☒

Page 11: SPILL PREVENTION CONTROL AND COUNTERMEASURE …

Ver. 1-E-doc-3-18-10

Facility Name: CSU Dominguez Hills Page 10 Tier I Qualified Facility SPCC Plan

Personnel, training, and discharge prevention procedures [§112.7(f)] Oil-handling personnel are trained in the operation and maintenance of equipment to prevent discharges; discharge procedure protocols; applicable pollution control laws, rules, and regulations; general facility operations; and, the contents of the facility SPCC Plan. [§112.7(f)]

A person who reports to facility management is designated and accountable for discharge prevention. [§112.7(f)] ☒

Name/Title: Mike Williams, Environmental, Health & Safety Manager

Discharge prevention briefings are conducted for oil-handling personnel annually to assure adequate understanding of the SPCC Plan for that facility. Such briefings highlight and describe past reportable discharges or failures, malfunctioning components, and any recently developed precautionary measures. [§112.7(f)][See Oil-handling Personnel Training and Briefing Log in Attachment 3.4]

4. Security (excluding oil production facilities) §112.7(g):Table G-6 Implementation and Description of Security Measures

Security measures are implemented at this facility to prevent unauthorized access to oil handling, processing, and storage area. ☒ The following is a description of how you secure and control access to the oil handling, processing and storage areas; secure master flow and drain valves; prevent unauthorized access to starter controls on oil pumps; secure out-of-service and loading/unloading connections of oil pipelines; address the appropriateness of security lighting to both prevent acts of vandalism and assist in the discovery of oil discharges:

All areas with oil handling and storage areas are locked when not in use or being serviced. Only authorized CSUDHstaff can gain access with keys. Facility Services diesel and unleaded gasoline is stored behind a gated area that isunlocked during business hours and locked outside of business hours.

Drums are located in the shop areas, which are locked when not in use. Emergency Generators and select transformers are within locked/gated areas or rooms, and only authorized

CSUDH staff can gain access with keys.

5. Emergency Procedures and Notifications (§112.7(a)(3)(iv) and 112.7(a)(5)):Table G-7 Description of Emergency Procedures and Notifications

The following is a description of the immediate actions to be taken by facility personnel in the event of a discharge to navigable waters or adjoining shorelines [§112.7(a)(3)(iv) and 112.7(a)(5)]:

CSUDH maintains a “protect in place” policy for spills. In the event of a spill, a spill response list is available and used by trained staff. For a small release (<5 gal), CSUDH designated staff will use the appropriate devices to stop the spill and eliminate the hazard. During business hours, the designated personal accountable for discharge prevention is contacted. During off hours, the CSUDH Police department is contacted.

In the event of a spill: Shut down pumping in event of a spill during fuel transfer operation. Eliminate potential sources of ignition such as open flames or sparks. If possible, safe, and trained to do so, identify and secure source of the discharge and contain the discharge with

sorbents, sandbags, or other material from the spill kits. Typically small releases only (<5 gallons).o Main spill kit located [Facility Services – Office & Auto Shop]o Other spill kits located [Central Plant – Office; Welch Hall – Elevator Room; La Corte Hall – Elevator Room]o Sorbent granules and pads [Facility Services; Central Plant; Loker Student Union – Maintenance Shop at

Loading Dock] Limit access to the area by shutting the room door. Large spills are to be addressed by the emergency response contractor, North State Environmental, and contact

regulatory authorities and other response personnel and organization (see section 6). Evacuate to a safe area away from the building for a major spill; do not return to the building/area until instructed that

it safe to do so.

Page 12: SPILL PREVENTION CONTROL AND COUNTERMEASURE …

Ver. 1-E-doc-3-18-10

Facility Name: CSU Dominguez Hills Page 11 Tier I Qualified Facility SPCC Plan

6. Contact List (§112.7(a)(3)(vi)):

Table G-8 Contact List Contact Organization / Person Telephone Number

National Response Center (NRC) 1-800-424-8802Cleanup Contractor(s) North State Environmental 1045 West Rialto Avenue, Rialto, CA 92376

909-875-9288

Key Facility Personnel Designated Person Accountable for Discharge Prevention:

Johnathan Scheffler – Director, Facilities Services Office: 310-243-2139

Emergency: 310-428-5871

Richard Tetrick (secondary) – Associate Director, Facilities Services

Office: 310-243-3795

Emergency: 310-261-1908

State Oil Pollution Control Agencies Office of Spill Prevention and Response 800-852-7550

Other State, Federal, and Local Agencies

California Governor’s Office of Emergency Services

US EPA Emergency Management Program – Region IX

DTSC Emergency Response Program

Regional Water Quality Control Board Los Angeles Region 4

800-852-7550 or 916-845-8911

866-372-9378

M-F, 8am-5pm: 800-260-3972

After Hours: 800-852-7550

213-576-6600

Local Fire Department LA County Fire Dept. Station 116 310-324-5941

Or 911Local Police Department CSUDH Police Los Angeles County Sheriff’s Department – Carson Station

310-243-3639 (or 911 for emergencies)

310-830-1123

Hospital Harbor-UCLA Medical Center 1000 W. Carson Street, Torrance, CA 90509

310-222-2345

Page 13: SPILL PREVENTION CONTROL AND COUNTERMEASURE …

Ver. 1-E-doc-3-18-10

Facility Name: CSU Dominguez Hills Page 12 Tier I Qualified Facility SPCC Plan

7. NRC Notification Procedure (§112.7(a)(4) and (a)(5)):Table G-9 NRC Notification Procedure

In the event of a discharge of oil to navigable waters or adjoining shorelines, the following information identified in Attachment 4 will be provided to the National Response Center immediately following identification of a discharge to navigable waters or adjoining shorelines [See Discharge Notification Form in Attachment 4]: [§112.7(a)(4)]

The exact address or location and phonenumber of the facility;

Date and time of the discharge; Type of material discharged; Estimate of the total quantity discharged; Estimate of the quantity discharged to navigable

waters; Source of the discharge;

Description of all affected media; Cause of the discharge; Any damages or injuries caused by the discharge; Actions being used to stop, remove, and mitigate the

effects of the discharge; Whether an evacuation may be needed; and Names of individuals and/or organizations who have

also been contacted.

8. SPCC Spill Reporting Requirements (Report within 60 days) (§112.4):

Submit information to the EPA Regional Administrator (RA) and the appropriate agency or agencies in charge of oil pollution control activities in the State in which the facility is located within 60 days from one of the following discharge events:

1. A single discharge of more than 1,000 U.S. gallons of oil to navigable waters or adjoining shorelines, or2. Two discharges to navigable waters or adjoining shorelines each more than 42 U.S. gallons of oil occurring within

any twelve-month period

* * * * *

You must submit the following information to the RA:

(1) Name of the facility;

(2) Your name;

(3) Location of the facility;

(4) Maximum storage or handling capacity of the facility and normal daily throughput;

(5) Corrective action and countermeasures you have taken, including a description ofequipment repairs and replacements;

(6) An adequate description of the facility, including maps, flow diagrams, and topographicalmaps, as necessary;

(7) The cause of the reportable discharge, including a failure analysis of the system orsubsystem in which the failure occurred; and

(8) Additional preventive measures you have taken or contemplated to minimize thepossibility of recurrence

(9) Such other information as the Regional Administrator may reasonably require pertinentto the Plan or discharge

Page 14: SPILL PREVENTION CONTROL AND COUNTERMEASURE …

Ver. 1-E-doc-3-18-10

Facility Name: CSU Dominguez Hills Page 13 Tier I Qualified Facility SPCC Plan

The owner or operator must meet the general rule requirements as well as requirements under this section. Note that not all provisions may be applicable to all owners/operators. For example, a facility may not maintain completely buried metallic storage tanks installed after January 10, 1974, and thus would not have to abide by requirements in §§112.8(c)(4) and 112.12(c)(4), listed below. In cases where a provision is not applicable, write “N/A”.

Table G-10 General Rule Requirements for Onshore Facilities N/A Drainage from diked storage areas is restrained by valves to prevent a discharge into the drainage system or facility effluent treatment system, except where facility systems are designed to control such discharge. Diked areas may be emptied by pumps or ejectors that must be manually activated after inspecting the condition of the accumulation to ensure no oil will be discharged. [§§112.8(b)(1) and 112.12(b)(1)]

☒ ☐

Valves of manual, open-and-closed design are used for the drainage of diked areas. [§§112.8(b)(2) and 112.12(b)(2)] ☐ ☒ The containers at the facility are compatible with materials stored and conditions of storage such as pressure and temperature. [§§112.8(c)(1) and 112.12(c)(1)] ☒ ☐ Secondary containment for the bulk storage containers (including mobile/portable oil storage containers) holds the capacity of the largest container plus additional capacity to contain precipitation. Mobile or portable oil storage containers are positioned to prevent a discharge as described in §112.1(b). [§112.6(a)(3)(ii)]

☒ ☐

If uncontaminated rainwater from diked areas drains into a storm drain or open watercourse the following procedures will be implemented at the facility: [§§112.8(c)(3) and 112.12(c)(3)]

Bypass valve is normally sealed closed☐ ☒

Retained rainwater is inspected to ensure that its presence will not cause a discharge tonavigable waters or adjoining shorelines ☒ ☐

Bypass valve is opened and resealed under responsible supervision ☐ ☒

Adequate records of drainage are kept [See Dike Drainage Log in Attachment 3.3] ☒ ☐

For completely buried metallic tanks installed on or after January 10, 1974 at this facility [§§112.8(c)(4) and 112.12(c)(4)]:

Tanks have corrosion protection with coatings or cathodic protection compatible with local soilconditions. ☐ ☒

Regular leak testing is conducted. ☐ ☒

For partially buried or bunkered metallic tanks [§112.8(c)(5) and §112.12(c)(5)]:

Tanks have corrosion protection with coatings or cathodic protection compatible with local soilconditions. ☐ ☒

Each aboveground bulk container is tested or inspected for integrity on a regular schedule and whenever material repairs are made. Scope and frequency of the inspections and inspector qualifications are in accordance with industry standards. Container supports and foundations are regularly inspected. [See Inspection Log and Schedule and Bulk Storage Container Inspection Schedule in Attachments 3.1 and 3.2] [§112.8(c)(6) and §112.12(c)(6)(i)]

☒ ☐

Outsides of bulk storage containers are frequently inspected for signs of deterioration, discharges, or accumulation of oil inside diked areas. [See Inspection Log and Schedule in Attachment 3.1] [§§112.8(c)(6) and 112.12(c)(6)]

☒ ☐

For bulk storage containers that are subject to 21 CFR part 110 which are shop-fabricated, constructed of austenitic stainless steel, elevated and have no external insulation, formal visual inspection is conducted on a regular schedule. Appropriate qualifications for personnel performing tests and inspections are documented. [See Inspection Log and Schedule and Bulk Storage Container Inspection Schedule in Attachments 3.1 and 3.2] [§112.12(c)(6)(ii)]

☐ ☒

A. Onshore Facilities (excluding production) (§§112.8(b) through (d), 112.12(b) through (d)):

Page 15: SPILL PREVENTION CONTROL AND COUNTERMEASURE …

Ver. 1-E-doc-3-18-10

Facility Name: CSU Dominguez Hills Page 14 Tier I Qualified Facility SPCC Plan

Table G-10 General Rule Requirements for Onshore Facilities N/A Each container is provided with a system or documented procedure to prevent overfills for the container. Describe:

Tank truck fuel delivery procedures: 1) Gauge (manually or via visual gauge) receiving tank to confirm liquid level in tank and quantity to

be delivered to prevent tank overfill. 2) Set parking brake and use chock blocks to prevent movement; inspect fittings and fueling hose

for damage before starting fuel transfer operation. The fuel delivery person makes all hook-ups. 3) Place drip pans under valve-hose fitting connections. 4) The person responsible for monitoring the delivery will remain attentive and observe the entire

fuel delivery, be prepared to stop the flow of fuel from the truck to the tank at any time, and respond to any unusual condition, leak, or spill which may occur during delivery.

5) Following complete delivery, the fuel delivery person is responsible for disconnecting all hook-ups.

6) Record accurate readings for product in tank after fuel delivery, verify the amount of fuel received and make sure fill ports are properly secured.

7) If an oil spill occurs, the spill kit will be used to contain the spill. The main spill kit is located in the Facility Services – Auto Shop and Office.

Dispenser and mobile refueler fueling procedures:

1) Before filling motorized equipment, shutoff all engines and cell phone, and set parking brakes; do not leave filling operation unattended.

2) Do not top off tank after automatic shut-off. 3) If an oil spill occurs, the spill kit will be used to contain the spill.

Transfers into waste oil drums: transfer all waste oil into the drum fill port using a funnel. If an oil spill occurs, the spill kit in the Central Plant & Facility Services will be used to contain the spill. Transfers into waste oil AST: gauge AST (manually or via visual gauge) to confirm liquid level in tank to prevent tank overfill. If an oil spill occurs, the spill kit in the student union will be used to contain the spill. Transfers from oil dispensing system drums: transfer all oil using a drum pump. Place drip pans under transfer/pump area. If an oil spill occurs, the spill kit in Central Plant & Facility Services will be used to contain the spill.

☒ ☐

Liquid level sensing devices are regularly tested to ensure proper operation [See Inspection Log and Schedule in Attachment 3.1]. [§112.6(a)(3)(iii)] ☒ ☐ Visible discharges which result in a loss of oil from the container, including but not limited to seams, gaskets, piping, pumps, valves, rivets, and bolts are promptly corrected and oil in diked areas is promptly removed. [§§112.8(c)(10) and 112.12(c)(10)]

☒ ☐

Aboveground valves, piping, and appurtenances such as flange joints, expansion joints, valve glands and bodies, catch pans, pipeline supports, locking of valves, and metal surfaces are inspected regularly. [See Inspection Log and Schedule in Attachment 3.1] [§§112.8(d)(4) and 112.12(d)(4)]

☒ ☐

Integrity and leak testing are conducted on buried piping at the time of installation, modification, construction, relocation, or replacement. [See Inspection Log and Schedule in Attachment 3.1] [§§112.8(d)(4) and 112.12(d)(4)]

☐ ☒

Page 16: SPILL PREVENTION CONTROL AND COUNTERMEASURE …

Ver. 1-E-doc-3-18-10

Facility Name: CSU Dominguez Hills Page 15 Tier I Qualified Facility SPCC Plan

ATTACHMENT 1 – Five Year Review and Technical Amendment Logs

I have completed a review and evaluation of the SPCC Plan for this facility, and will/will not amend this Plan as a result.

Table G-13 Review and Evaluation of SPCC Plan for Facility Review Date Plan Amendment Name and signature of person authorized to review this

Plan Will Amend Will Not Amend

4/30/20 ☒ ☐ Mike Williams

☐ ☐

☐ ☐

☐ ☐

☐ ☐

☐ ☐

☐ ☐

☐ ☐

☐ ☐

☐ ☐

☐ ☐

☐ ☐

☐ ☐

ATTACHMENT 1.1 – Five Year Review Log

Page 17: SPILL PREVENTION CONTROL AND COUNTERMEASURE …

Ver. 1-E-doc-3-18-10

Facility Name: CSU Dominguez Hills Page 16 Tier I Qualified Facility SPCC Plan

Any technical amendments to this Plan will be re-certified in accordance with Section I of this Plan template.

Table G-15 Description and Certification of Technical Amendments Review Date

Description of Technical Amendment Name and signature of person certifying this technical amendment

ATTACHMENT 1.2 – Technical Amendment Log

Page 18: SPILL PREVENTION CONTROL AND COUNTERMEASURE …

Ver. 1-E-doc-3-18-10

Facility Name: CSU Dominguez Hills Page 17 Tier I Qualified Facility SPCC Plan

An oil spill contingency plan and written commitment of resources is required for:

Flowlines and intra-facility gathering lines at oil production facilities and

Qualified oil-filled operational equipment which has no secondary containment.

An oil spill contingency plan meeting the provisions of 40 CFR part 109, as described below, and a written commitment of manpower, equipment and materials required to expeditiously control and remove any quantity of oil discharged that may be harmful is attached to this Plan.

Complete the checklist below to verify that the necessary operations outlined in 40 CFR part 109 - Criteria for State, Local and Regional Oil Removal Contingency Plans - have been included.

Table G-15 Checklist of Development and Implementation Criteria for State, Local and Regional Oil Removal Contingency Plans (§109.5)a

(a) Definition of the authorities, responsibilities and duties of all persons, organizations or agencies which areto be involved in planning or directing oil removal operations. ☒

(b) Establishment of notification procedures for the purpose of early detection and timely notification of an oildischarge including:

(1) The identification of critical water use areas to facilitate the reporting of and response to oil discharges. ☒ (2) A current list of names, telephone numbers and addresses of the responsible persons (with alternates)

and organizations to be notified when an oil discharge is discovered. ☒

(3) Provisions for access to a reliable communications system for timely notification of an oil discharge,and the capability of interconnection with the communications systems established under related oilremoval contingency plans, particularly State and National plans (e.g., NCP).

(4) An established, prearranged procedure for requesting assistance during a major disaster or when thesituation exceeds the response capability of the State, local or regional authority. ☒

(c) Provisions to assure that full resource capability is known and can be committed during an oil dischargesituation including:(1) The identification and inventory of applicable equipment, materials and supplies which are available

locally and regionally. ☒

(2) An estimate of the equipment, materials and supplies which would be required to remove the maximumoil discharge to be anticipated. ☒

(3) Development of agreements and arrangements in advance of an oil discharge for the acquisition ofequipment, materials and supplies to be used in responding to such a discharge. ☒

(d) Provisions for well defined and specific actions to be taken after discovery and notification of an oildischarge including:

(1) Specification of an oil discharge response operating team consisting of trained, prepared and availableoperating personnel. ☒

(2) Predesignation of a properly qualified oil discharge response coordinator who is charged with theresponsibility and delegated commensurate authority for directing and coordinating response operationsand who knows how to request assistance from Federal authorities operating under existing nationaland regional contingency plans.

(3) A preplanned location for an oil discharge response operations center and a reliable communicationssystem for directing the coordinated overall response operations. ☒

(4) Provisions for varying degrees of response effort depending on the severity of the oil discharge. ☒

(5) Specification of the order of priority in which the various water uses are to be protected where morethan one water use may be adversely affected as a result of an oil discharge and where responseoperations may not be adequate to protect all uses.

(6) Specific and well defined procedures to facilitate recovery of damages and enforcement measures asprovided for by State and local statutes and ordinances. ☒

a The contingency plan must be consistent with all applicable state and local plans, Area Contingency Plans, and the National Contingency Plan (NCP)

ATTACHMENT 2 – Oil Spill Contingency Plan and Checklist

Page 19: SPILL PREVENTION CONTROL AND COUNTERMEASURE …

Ver. 1-E-doc-3-18-10

Facility Name: CSU Dominguez Hills Page 18 Tier I Qualified Facility SPCC Plan

ATTACHMENT 3 – Inspections, Dike Drainage and Personnel Training Logs

Table G-16 Inspection Log and Schedule This log is intended to document compliance with §§112.6(a)(3)(iii), 112.8(c)(6), 112.8(d)(4), 112.9(b)(2), 112.9(c)(3), 112.9(d)(1), 112.9(d)(4), 112.12.(c)(6), and

112.12(d)(4), as applicable.

Date of Inspection

Container / Piping / Equipment

Describe Scope (or cite Industry Standard)

Observations Name/ Signature of Inspector

Records maintained separately a

ASTs (2) 983.5-gal unleaded

gasoline tank (1) 500-gal diesel tank (3) 55-gal oil drum 160-gal waste cooking oil

tank (4) 90-1,000-gal diesel

generator tanks

Monthly and annual visual inspections for STI Category 1 criteria if overfill prevention present or Category 3 if overfill prevention not present (STI SP001, Standard for the Inspection of Aboveground Storage Tanks);

Monthly interstitial monitoring (visual or continuous monitoring) on double-walled tanks;

Annual testing for generators by vendor.

Oil-filled Operational Equipment (11) 190-440-gal

transformer oil (13) 55-240-gal hydraulic

oil elevator tanks

Weekly visual inspections; monthly elevator servicing by vendor.

Secondary containment concrete berm

Weekly visual inspections and after heavy rainfall ☐

Liquid level gauges Annual inspections and calibration following manufacturer’s procedures

ATTACHMENT 3.1 – Inspection Log and Schedule

Page 20: SPILL PREVENTION CONTROL AND COUNTERMEASURE …

Ver. 1-E-doc-3-18-10

Facility Name: CSU Dominguez Hills Page 19 Tier I Qualified Facility SPCC Plan

Dispensers Weekly visual inspections of the dispenser sumps, fill nozzles, hoses, and fittings (manufacturer instructions)

Spill kits Monthly visual inspections and equipment/supply inventory ☐

a Indicate in the table above if records of facility inspections are maintained separately at this facility.

Facility Name: CSU Dominguez Hills

Page 21: SPILL PREVENTION CONTROL AND COUNTERMEASURE …

Ver. 1-E-doc-3-18-10

Facility Name: CSU Dominguez Hills Page 20 Tier I Qualified Facility SPCC Plan

Table G-16 Inspection Log and Schedule

This log is intended to document compliance with §§112.6(a)(3)(iii), 112.8(c)(6), 112.8(d)(4), 112.9(b)(2), 112.9(c)(3), 112.9(d)(1), 112.9(d)(4), 112.12.(c)(6), and 112.12(d)(4), as applicable.

Date of Inspection

Container / Piping / Equipment

Describe Scope (or cite Industry Standard)

Observations Name/ Signature of Inspector Records

maintained separately a

a Indicate in the table above if records of facility inspections are maintained separately at this facility.

Page 22: SPILL PREVENTION CONTROL AND COUNTERMEASURE …

Ver. 1-E-doc-3-18-10

Tier I Qualified FacPage 21Facility Name: CSU Dominguez Hills ility SPCC Plan

To comply with integrity inspection requirement for bulk storage containers, inspect/test each shop-built aboveground bulk storage container on a regular schedule in accordance with a recognized container inspection standard based on the minimum requirements in the following table.

Table G-17 Bulk Storage Container Inspection Schedule Container Size and Design Speci Inspection requirementfication

Portable containers (including drums, totes, and intermodal bulk containers (IBC)): (3) 55-gal drums (1) 160-gal waste cooking oil tank

Visually inspect monthly for signs of deterioration, discharges or accumulation of oil inside diked areas

55 to 1,100 gallons with sized secondary containment:

(2) 983.5-gal unleaded gasoline tank

(1) 500-gal diesel tank

(4) 90-1,000-gal diesel generator tanks

Visually inspect monthly for signs of deterioration, discharges or accumulation of oil inside diked areas plus any annual inspection elements per industry inspection standards. Monthly interstitial monitoring (visual or continuous monitoring) on double-walled tanks. 1,101 to 5,000 gallons with sized secondary containment and a

means of leak detectiona

None 1,101 to 5,000 gallons with sized secondary containment and no method of leak detectiona

None

Visually inspect monthly for signs of deterioration, discharges or accumulation of oil inside diked areas, plus any annual inspection elements and other specific integrity tests that may be required per industry inspection standards

ATTACHMENT 3.2 – Bulk Storage Container Inspection Schedule – onshore facilities (excluding production):

formal external inspections by a certified tank inspector and leak tests by the facility every 10 years.gal unleaded gasoline tanks, 500-gal diesel tank, and (4) 90-1,000-gal diesel generator tanks also require Note: According to STI SP001, in addition to monthly and annual visual inspections in the standard, the (2) 983.5-

identified.

a Examples of leak detection include, but are not limited to, double-walled tanks and elevated containers where a leak can be visually

Page 23: SPILL PREVENTION CONTROL AND COUNTERMEASURE …

Ver. 1-E-doc-3-18-10

Facility Name: CSU Dominguez Hills Page 22 Tier I Qualified Facility SPCC Plan

Table G-18 Dike Drainage Log

Date

Bypass valve

sealed closed

Rainwater inspected to be sure no oil (or

sheen) is visible

Open bypass valve and reseal it following drainage

Drainage activity

supervised Observations Signature of Inspector

☐ ☐ ☐ ☐

☐ ☐ ☐ ☐

☐ ☐ ☐ ☐

☐ ☐ ☐ ☐

☐ ☐ ☐ ☐

☐ ☐ ☐ ☐

☐ ☐ ☐ ☐

☐ ☐ ☐ ☐

ATTACHMENT 3.3 – Dike Drainage Log

Page 24: SPILL PREVENTION CONTROL AND COUNTERMEASURE …

Ver. 1-E-doc-3-18-10

Facility Name: CSU Dominguez Hills Page 23 Tier I Qualified Facility SPCC Plan

Table G-19 Oil-Handling Personnel Training and Briefing Log Date Description / Scope Attendees

ATTACHMENT 3.4 – Oil-handling Personnel Training and Briefing Log

Page 25: SPILL PREVENTION CONTROL AND COUNTERMEASURE …

Ver. 1-E-doc-3-18-10

Facility Name: CSU Dominguez Hills Page 24 Tier I Qualified Facility SPCC Plan

In the event of a discharge of oil to navigable waters or adjoining shorelines, the following information will be provided to the National Response Center [also see the notification information provided in Section 7 of the Plan]:

Table G-20 Information provided to the National Response Center in the Event of a Discharge Discharge/Discovery Date Time

Facility Name

Facility Location (Address/Lat-Long/Section Township Range)

Name of reporting individual Telephone #

Type of material discharged Estimated total quantity discharged

Gallons/Barrels

Source of the discharge Media affected ☐ Soil

☐ Water (specify)

☐ Other (specify)

Actions taken

Damage or injuries ☐ No ☐ Yes (specify) Evacuation needed? ☐ No ☐ Yes (specify)

Organizations and individuals contacted ☐ National Response Center 800-424-8802, Time

☐ Cleanup contractor (Specify), Time

☐ Facility personnel (Specify), Time

☐ State Agency (Specify), Time

☐ Other (Specify), Time

ATTACHMENT 4 – Discharge Notification Form