12-14-2011
Project number: 1112024003
Project name: 18.5" Bedside Terminal, models xxxx-ONYX-BE18xDT-xxxxxxx
ONYX-BE18xDTShort name:
Version number:
Workable version for evaluation purposeVersion description:
Project manager:
Subst. project manager: James Chen
Steven Chen
Functional designLife cycle phase:
Project data
1.00
Project manager:
Subst. project manager:
Steven Chen
James Chen
Description of project
The models xxxx-ONYX-BE18xDT-xxxxxxx are 18.5" Bedside Terminal for medical equipment used.
Risk responsible: Steve Chen
Name of superior project:
Name of subordinate project:
Structure plan of complete project:
Marking:
Title:
Number:
Location:
Path:
References:
Product type: ISO 14971:2007
Page 2 of 148
12-14-2011
Project number: 1112024003
Project name: 18.5" Bedside Terminal, models xxxx-ONYX-BE18xDT-xxxxxxx
ONYX-BE18xDTShort name:
Version number:
Workable version for evaluation purposeVersion description:
Project manager:
Subst. project manager: James Chen
Steven Chen
Functional designLife cycle phase:
Version data
1.00
Version number:
Workable version for evaluation purpose
Version description:
1.00 Derived from version:
NoSpecial version:
Freezing of analysis and evaluation part: inactive
Intended use/purpose:
1. 18.5" RISC Mini Bedside Terminal benefits medical staff by providing secure access to electronic patient data with an optimized hospital workflow. As an aid to
professional diagnosis, the terminal can remotely retrieve electronic patient records, access databases from the bedside and comply with Hospital Information Systems
(HIS) requirements. Hospital administrators will see their medical facilities gain operational efficiencies, increase patient and visitor satisfaction, and improve their quality
of care, while boosting profitability. RISC Mini Bedside Terminal the xxxx-ONYX-BE18xDT-xxxxxxx (x = 0-9, A-Z, "-" or blank) is a 18.5" multi-function terminal with
touchscreen, WiFi, RFID, and smart card reader. The xxxx-ONYX-BE18xDT-xxxxxxx (x = 0-9, A-Z, "-" or blank) is certified to ANSI/AAMI ES 60601-1 and EN60601-1:
2006 medical standards. The WiFi, and Ethernet (RJ-45) connectivity provides video phone service to help patients communicate with their families by internet .
Identification recognition for both patients and hospital staff is made possible with RFID and a smart card reader. Two USB ports, an earphone jack and a microphone
provide added flexibility. Additionally, an LED light indicator button help alert hospital staff to important incidents. Equipped with a slim, clean, hospital-fit design. There is a VESA compliant for mounting the support arm.
2. The rated input: 24V dc, 2.91 A (There is a VESA compliant for appropriate wall mount apparatus); 100-240 V ac, 50/60 Hz, 1.8-0.8 A (for power supply, model GMPU70A-6 by Eljintek Inc.)
3. The operation temperature/humidity: 0-40 °C, 30%-75% RH and suitable storage from -20°C to 60°C, 10% - 90% RH.
4. This Bedside Terminal intended to be used at any altitudes between 0 to 3,000 m.
5. The Bedside Terminal expected services life was 43,800 hours
6. This Bedside Terminal was judged on the basis of the required creepage and clearances in the Third Edition of the Standard for Medical Electrical Equipment, IEC
60601-1 3rd Ed., Sub. clause 8.9 which covers the end-use product for which the component was designed.
7. This Bedside Terminal was tested on a 20 A branch circuit. If used on a branch circuit greater than this, additional evaluation was necessary.
8. This Bedside Terminal has not been evaluated for patient connected applications .
9. This Bedside Terminal has been evaluated as a Class I, continuous operation, ordinary equipment and has not been evaluated for use in the presence of a flammable
anesthetic mixture with air, oxygen, or nitrous oxide. An additional evaluation shall be made if the power supply is intended for use in other than Class I equipment.
10. This Bedside Terminal shall be installed assembled maintained or repair .
11. This Bedside Terminal incorporates the UL R/C and IEC 6060-1-1 certified power adapter, model GMPU70A-6 by ELJINTEK INC. This power is used in
the conditions of overvoltage category II, Pollution Degree II.
12. This Bedside Terminal does not deliverer the energy to or extract the energy from the patient .
Page 3 of 148
Project number: 1112024003 Version: 1.00 Short name: ONYX-BE18xDT 12-14-2011
Onyx Healthcare Inc.
13. This Bedside Terminal does not deliver the substances to or extract the substances from the patient .
14. No any biological materials processed by the Ward Terminal for subsequent re -use.
15. This Bedside Terminal does not supply sterile or intended to be sterilized by the user , or other applicable microbiological controls.
16. This Bedside Terminal is not intended to be routinely cleaned and disinfected by the user .
17. This Bedside Terminal is not intended to modify the patient environment .
18. This Bedside Terminal does not take any measurements.
19. This Bedside Terminal is not intended for use in conjunction with medicines or other medical technologies .
20. This Bedside Terminal has no unwanted outputs of energy.
21. This Bedside Terminal is susceptible to environmental influences (ambient, emc).
22. This Bedside Terminal influences the environment (emi).
23. This Bedside Terminal does not provided the essential consumables or accessories .
24. This Bedside Terminal is no need to maintenance and/or calibration.
25. This Bedside Terminal contain ssoftware, but the failure of the software does not lead to an unacceptable RISK.
26. This Bedside Terminal has a restricted shelf-life.
27. This Bedside Terminal has no any delayed and/or long-term use effects.
28. This Bedside Terminal does not subject mechanical forces.
29. This Bedside Terminal is not intended for single use.
30. No need to safe decommissioning or disposal of the Bedside Terminal .
31. Installation or use of the Bedside Terminal is required special training .
32. This Bedside Terminal has no output wire to connection end-product.
33. This Bedside Terminal is not used by person with special needs.
34. This Bedside Terminal did not use an alarm system.
35. This Bedside Terminal did not hold data critical to patient care .
36. The least favourable working conditions are: maximum normal load and placed in a test corner.
37. Allowable maximum time for the part can be touched.
Location Touch time
Touch Panel Surface < 1min
Plastic Enclosure < 1min
Metal Enclosure < 1sec
Adapter Plastic Enclosure 10 sec - 1 min
Reasonably foreseeable misuse:
Diagnose use in computed tomography (CT), magnetic resonance imaging (MRI), endoscopy, ultrasound physiotherapy equipment and digital mammography system.
Life cycle phase: Functional design
Page 4 of 148
Project number: 1112024003 Version: 1.00 Short name: ONYX-BE18xDT 12-14-2011
Onyx Healthcare Inc.
Reused components of other projects:
Description: Project: Abbreviation: Proj.-No: Vers.-No:
Additional information:
Marking: Name: References:
Page 5 of 148
Project number: 1112024003 Version: 1.00 Short name: ONYX-BE18xDT 12-14-2011
Onyx Healthcare Inc.
Additional documents:
Description: Title: No.: Location: Path: References:
IEC Standard Medical electrical
equipment -- Part
1: General
requirements for
basic safety and
essential
performance
IEC
60601-1:
2005
IEC Standard Medical electrical
equipment -- Part
1-2: General
requirements for
basic safety and
essential
performance -
Collateral
standard:
Electromagnetic
compatibility -
Requirements
and tests
IEC
60601-1-2:
2007
(Modified)
IEC Standard Analysis
techniques for
system reliability
- Procedure for
failure mode and
effects analysis
(FMEA)
IEC60812:
2006
IEC Standard Information
technology
equipment -
Safety - Part 1:
General
requirements
IEC
60950-1
ed. 2:
2005
Page 6 of 148
Project number: 1112024003 Version: 1.00 Short name: ONYX-BE18xDT 12-14-2011
Onyx Healthcare Inc.
Additional documents:
Description: Title: No.: Location: Path: References:
ISO Standard Medical devices
- Application of
risk management
to medical
devices
ISO
14971:
2007
Page 7 of 148
12-14-2011
Project number: 1112024003
Project name: 18.5" Bedside Terminal, models xxxx-ONYX-BE18xDT-xxxxxxx
ONYX-BE18xDTShort name:
Version number:
Workable version for evaluation purposeVersion description:
Project manager:
Subst. project manager: James Chen
Steven Chen
Functional designLife cycle phase:
Project team
1.00
Project number: 1112024003 Version: 1.00 Short name: ONYX-BE18xD
T
12-14-2011
Onyx Healthcare Inc.
Project manager:
Subst. project manager:
Steven Chen
James Chen
Risk responsible: Steve Chen
Team members:
Steven Chen
Implement measures:
Validate measures:
Release measures:
Rights:
Data at time of risk control:
Position:
Yes
Yes
Yes
Task / status in the project:
Qualification:
Comments:
Location:
E-Mail:
Fax:
Phone:
Division:
Close version:
Create project:
JamesUser name:
Current data:
Yes
Yes
Others:
Date, Signature Signature
Page 8 of 148
Project number: 1112024003 Version: 1.00 Short name: ONYX-BE18xDT
12-14-2011
Onyx Healthcare Inc.
James Chen
Implement measures:
Validate measures:
Release measures:
Rights:
Data at time of risk control:
QCPosition:
Yes
Yes
Yes
Task / status in the project:
Qualification:
O025
Comments:
Location:
E-Mail:
Fax:
Phone:
Division:
Close version:
Create project:
James_Chen_OnyxUser name:
Current data:
Yes
Yes
- Provide guidance for applying the risk management
process
- Approve Risk Management File and risk review records
Others:
Date, Signature Signature
Steve Chen
Implement measures:
Validate measures:
Release measures:
Rights:
Data at time of risk control:
PMPosition:
Yes
Yes
Yes
Task / status in the project:
Qualification:
O013
Comments:
Location:
E-Mail:
Fax:
Phone:
Division:
Close version:
Create project:
Steve_Chen_OnyxUser name:
Current data:
Yes
Yes
- Provide guidance regarding hazardous situation
identification
- Provide the severity and likelihood of harm values and
rationales for the hazardous situation
Others:
Page 9 of 148
Project number: 1112024003 Version: 1.00 Short name: ONYX-BE18xDT
12-14-2011
Onyx Healthcare Inc.
- Approve all changes to Risk Management File
Date, Signature Signature
Mike Ho
Implement measures:
Validate measures:
Release measures:
Rights:
Data at time of risk control:
SalesPosition:
Yes
Yes
Yes
Task / status in the project: Product Surveillance
Director
Qualification:
O032
Comments:
Location:
E-Mail:
Fax:
Phone:
Division:
Close version:
Create project:
Mike_Ho_OnyxUser name:
Current data:
Yes
Yes
Ensure post-production risk assessments follow this
procedure.
Ensure all post-production monitoring activities are
executed according to this procedure.
Others:
Date, Signature Signature
Page 10 of 148
Project number: 1112024003 Version: 1.00 Short name: ONYX-BE18xDT
12-14-2011
Onyx Healthcare Inc.
Owen Hsieh
Implement measures:
Validate measures:
Release measures:
Rights:
Data at time of risk control:
HW EngineerPosition:
Yes
Yes
Yes
Task / status in the project: Lead System Design
Engineer
Qualification:
O042
Comments:
Location:
E-Mail:
Fax:
Phone:
Division:
Close version:
Create project:
Owen_Hsieh_OnyxUser name:
Current data:
Yes
Yes
- Lead the Risk Management Project Team and facilitate
meetings
- Identify the Risk Management Project Team and
determine the assignments of each functional role
- Assign administrative duties
- Manage product architecture, design, quality, and risk
- Ensure deliverables are complete and executing the
Go/No Go decision
Others:
Date, Signature Signature
Page 11 of 148
Project number: 1112024003 Version: 1.00 Short name: ONYX-BE18xDT
12-14-2011
Onyx Healthcare Inc.
Peter Pan
Implement measures:
Validate measures:
Release measures:
Rights:
Data at time of risk control:
MEPosition:
Yes
Yes
Yes
Task / status in the project: Engineering
Representative
Qualification:
O038
Comments:
Location:
E-Mail:
Fax:
Phone:
Division:
Close version:
Create project:
Peter_Pan_OnyxUser name:
Current data:
Yes
Yes
- Manage the product’s Risk Management File (RMF)
- Provide the technical input including probability of
occurrence of the hazardous situation (P1) value and
rationale regarding the risk assessment
- Update the product’s Risk Management File in
post-production
Others:
Date, Signature Signature
Page 12 of 148
12-14-2011
Project number: 1112024003
Project name: 18.5" Bedside Terminal, models xxxx-ONYX-BE18xDT-xxxxxxx
ONYX-BE18xDTShort name:
Version number:
Workable version for evaluation purposeVersion description:
Project manager:
Subst. project manager: James Chen
Steven Chen
Functional designLife cycle phase:
Definition of risk-graph
1.00
Defined graph
P5
P4
P3
P2
P1
S1 S2 S3 S4 S5
Intolerable region
ALARP region
Broadly acceptable region
Severity:
Description:Abbreviat Criteria: Example:
S1 Negligible Inconvenience or temporary
discomfort.
S2 Minor Results in temporary injury or
impairment not requiring
professional medical intervention.
S3 Serious Results in injury requiring
professional medical intervention
S4 Critical Results in permanent impairment or
life-threatening injury
S5 Catastrophic Results in patient death.
Page 13 of 148
Project number: 1112024003 Version: 1.00 Short name: ONYX-BE18xDT 12-14-2011
Onyx Healthcare Inc.
Probability:
Description:Abbreviat Criteria: Example:
P1 Improbable < 1/1,000,000 Event is not reproducible or cannot be
replicated under the specified
operating conditions of the device.
P2 Remote <1/100,000 and >= 1/1,000,000 Event occurs infrequently during the life
of the product under the specified
operating conditions of the device.
P3 Occasional <1/10,000 and >= 1/100,000 Event occurs occasionally during the
life of the product under the specified
operating conditions of the device.
P4 Probable < 1/1000 and >= 1/10,000 Event occurs proable during the life of
the product under the specified
operating conditions of the device.
P5 Frequent >= 1/1,000 Event can be replicated repeatedly
and/or is likely to occur regularly or
many times during the life of the
product under the specified operating
conditions of the device.
Defined filters:
Filter name:
Page 14 of 148
12-14-2011
Project number: 1112024003
Project name: 18.5" Bedside Terminal, models xxxx-ONYX-BE18xDT-xxxxxxx
ONYX-BE18xDTShort name:
Version number:
Workable version for evaluation purposeVersion description:
Project manager:
Subst. project manager: James Chen
Steven Chen
Functional designLife cycle phase:
Criteria for release of risk analysis
1.00
Complete risk management documentation including the complete release report of single action.
Required documentation:
References:
QD2-010 - Risk Management Procedure
When is a risk acceptable:
The criteria for risk acceptability were based upon applicable national or regional regulations and relevant
International Standards, and takes into account available information such as the generally accepted state of the
art and known stakeholder concerns.
Risk = Severity x Probability
Results:
1... 6 (exclude 5): Acceptable;
5, 8.... 25: Not acceptable
References:
- Definition Risk Graph with the mentioned parameters
- QD2-010 - Risk Management Procedure
Criteria of the QM system:
QD2-001 Verification Planning
QP2-002 Design Validation
QD2-010 Risk Management Procedure
QQ2-002 Retention Time of Quality Records
References:
QQ1-001 Quality Manual
Reference to the review plan:
Annual Review as Review Plan QQ2-010
QQ2-006 Preparation and Management of the Technial Documentation
QQ2-001 501 Management
References:
QQ1-001 Quality Manual
Procedure to prove the effectiveness of risk control:
Recognition of all functions, hazards and their causes, assessment of the individual risks, introduction,
implementation and enabling of all individual measures decided to be necessary for the implementation,
reassessment of the risks and acceptance of the residual risks.
References:
QD2-010 - Risk Management Procedure
Page 15 of 148
Project number: 1112024003 Version: 1.00 Short name: ONYX-BE18xDT
12-14-2011
Onyx Healthcare Inc.
Limits of acceptance for the procedure:
Method is only acceptable when either all non-acceptable risks have been eliminated or satisfactory reasons have
been given for the release in the enabling sheet.
References:
QD2-010 - Risk Management Procedure
Procedure for verification:
Checking the risk management on correctness and completeness before it is enabled by the technical manager.
References:
QD2-010 - Risk Management Procedure
Limits of acceptance for verification:
Exceptions from the procedure only with the written approval of the entire management.
References:
QD2-010 - Risk Management Procedure
Procedure for validation:
Checking the results of the user studies (focus groups) QP2-002 Design Validation and taking them into
consideration, then: regular market investigations and updates of the risk analysis
References:
QD2-010 - Risk Management Procedure
Limits of acceptance for validation:
Exceptions from the procedure only with the written approval of the entire management.
References:
QD2-010 - Risk Management Procedure
Page 16 of 148
Project number: 1112024003 Shorty: ONYX-BE18xDT Version number: 1.00 12-14-2011
Page 17 of 148
12-14-2011
Project number: 1112024003
Project name: 18.5" Bedside Terminal, models xxxx-ONYX-BE18xDT-xxxxxxx
ONYX-BE18xDTShort name:
Version number:
Workable version for evaluation purposeVersion description:
Project manager:
Subst. project manager: James Chen
Steven Chen
Functional designLife cycle phase:
Risk analysis
1.00
Project number: 1112024003 Version: 1.00 Short name: ONYX-BE18xDT 12-14-2011
Onyx Healthcare Inc.
F-01Function: Connect to Mains
F-01
Hazard: Cause: Effect on: Measure: Type of measure:
The limits specified in IEC
60601-1, Clause 8.4 is not be
exceeded for ACCESSIBLE
PARTS
M-01Short circuit of any or all
insulation that does not comply
with the requirements of IEC
60601-1, 3rd Ed., Clause. 8.8
Electromagnetic energyH-01 C-01
The limits specified in IEC
60601-1, Clause 8.4 is not be
exceeded for ACCESSIBLE
PARTS
M-01Short circuit of any or all
CREEPAGE DISTANCES or AIR
CLEARANCES that do not
comply with the requirements of
IEC 60601-1, 3rd Ed., Clause 8.9
C-02
The limits specified in IEC
60601-1, Clause 8.4 is not be
exceeded for ACCESSIBLE
PARTS
M-01Open circuit of any or all earth
connections that do not comply
with the requirements of IEC
60601-1, Clause 8.6, including
any functional earth connection.
C-03
The HAZARDOUS
SITUATIONS in IEC 60601-1,
Clause 13.1.2 to 13.1.4
(inclusive) do not occur in the
PC and power adapter
M-01Short circuit of any one insulation
that complies with the
requirements for one MEANS OF
PROTECTION as specified in
IEC 60601-1, Clause 8.8
C-04
Page 18 of 148
Project number: 1112024003 Version: 1.00 Short name: ONYX-BE18xDT 12-14-2011
Onyx Healthcare Inc.
F-01
Hazard: Cause: Effect on: Measure: Type of measure:
The HAZARDOUS
SITUATIONS in IEC 60601-1,
Clause 13.1.2 to 13.1.4
(inclusive) do not occur in the
PC and power adapter
M-01Short circuit of any one
CREEPAGE DISTANCE or AIR
CLEARANCE that complies with
the requirements for one MEANS
OF PROTECTION as specified in
IEC 60601-1, Clause 8.9
Electromagnetic energyH-01 C-05
The HAZARDOUS
SITUATIONS in IEC 60601-1,
Clause 13.1.2 to 13.1.4
(inclusive) do not occur in the
PC and power adapter
M-01Open circuit of any one
PROTECTIVE EARTH
CONDUCTOR or internal
PROTECTIVE EARTH
CONNECTION that complies with
the requirements of IEC
60601-1, Clause 8.6
C-06
All components, including
wiring shall be used in
accordance with their specified
ratings.
M-01All components, including wiring,
the failure of which could result in
a HAZARDOUS SITUATION.
C-07
All components, including
wiring, the failure of which
could result in a HAZARDOUS
SITUATION are fixed in place
by UL R/C non-chemical
bounding compound.
M-02
They shall comply with the
applicable safety requirements
of a relevant IEC, UL or ISO
standard;
M-01The reliability of components that
are used as MEANS OF
PROTECTION are not assessed
for the conditions of use in the
PC.
C-08
Where there is no relevant IEC
or ISO standard, the
requirements of IEC 60601-1,
3rd Ed. were applied.
M-02
Page 19 of 148
Project number: 1112024003 Version: 1.00 Short name: ONYX-BE18xDT 12-14-2011
Onyx Healthcare Inc.
F-01
Hazard: Cause: Effect on: Measure: Type of measure:
The humidity preconditioning
treatment is performed in a
humidity cabinet containing air
with a relative humidity of 93 %
± 3 % @ 25°C 48 hr
M-01Storage (humidity preconditioning
treatment)
Electromagnetic energyH-01 C-09
The strength of packing carton
/ fixed frame. The
transportation stimulation for
the verification. All connections
were mechanically secure.
M-01TransportC-10
Said components were
secured in place on pcb by UL
Recognized non-chemical
bounding compound.
M-01Components of PC, unwanted
movement of which could result
in an unacceptableb RISK, is not
mounted securely to prevent such
movement.
C-11
Meet IEC 60601-1, Clause 8.7
LEAKAGE CURRENTS and
PATIENT AUXILIARY
CURRENTS requirements
M-01Too high leakage current, causing
a death or serious injury to a
patient.
C-12
Meet IEC 60601-1, Clause 8.7
LEAKAGE CURRENTS and
PATIENT AUXILIARY
CURRENTS requirements
M-01The LEAKAGE CURRENTS
from, to or between
ACCESSIBLE PARTS other than
PATIENT CONNECTIONS
C-13
Supplied by SELV power
adapter and DC/AC inverter
meet LCC requirements.
M-01ACCESSIBLE PARTS exceed
42.4 V peak a.c. or 60 V d.c. in
NORMAL CONDITION or in
SINGLE FAULT CONDITION.
C-14
The suitable enclosure shall be
provided.
M-01Internal parts, other than contacts
of plugs, connectors and
socket-outlets, that can be
touched by the test pin shown in
IEC 60601-1, Figure 8.
C-15
Page 20 of 148
Project number: 1112024003 Version: 1.00 Short name: ONYX-BE18xDT 12-14-2011
Onyx Healthcare Inc.
F-01
Hazard: Cause: Effect on: Measure: Type of measure:
The HAZARDOUS
SITUATIONS in IEC 60601-1,
Clause 13.1.2 to 13.1.4
(inclusive) do not occur in the
PC and power adapter
M-01Accidental detachment of
conductors and connectors where
breaking free could lead to a
HAZARDOUS SITUATION.
Electromagnetic energyH-01 C-16
Shall compliance with the
following tests: resistance to
moisture, etc. (see IEC
60601-1, Clause 11.6);
dielectric strength (see IEC
60601-1, Clause 8.8.3); and
mechanical strength (see IEC
60601-1, Clause 15.3).
M-01The resistance to heat is not
retained by all types of insulation,
including insulating partition walls,
during the EXPECTED SERVICE
LIFE of the PC.
C-17
Ball pressure test - according
to IEC 60601-1, Clause
8.8.4.1, b) requirements
M-02
Internal cables and wiring is
fixed in place by cable tie to
protect against contact with a
moving part or from friction at
sharp corners and edges
where damage to insulation
M-01Internal cables and wiring is not
adequately protected against
contact with a moving part or
from friction at sharp corners and
edges where damage to
insulation.
C-18
Meet IEC 60601-1-2
requirements
M-01Electromagnetic compatibility of
PC.
C-19
The permissible environmental
conditions for transport and
storage were marked on the
outside of the packaging.
M-01PackingC-20
All wirings are tied together by
cable tie to prevent accidental
detachment.
M-01Wirings and connectors of Panel
PC Monitor supply is not secured
or insulated that accidental
detachment can result in a
HAZARDOUS SITUATION.
C-21
Page 21 of 148
Project number: 1112024003 Version: 1.00 Short name: ONYX-BE18xDT 12-14-2011
Onyx Healthcare Inc.
F-01
Hazard: Cause: Effect on: Measure: Type of measure:
The internal wirings were
secured in place on PCB by UL
R/C non-chemical bounding
component.
M-01Internal cables and wiring were
not adequately protected against
contact from friction at sharp
corners and edges where
damage to insulation could result
in a HAZARDOUS SITUATION.
Electromagnetic energyH-01 C-22
The equipment complied with
the requirements of IEC
60601-1, Clause 11.6.
M-01CleaningC-23
When PC is operated in
worst-case NORMAL USE
including the maximum
ambient operating
temperature, the parts shall not
reach temperatures exceeding
the values given in IEC
60601-1, Table 22 and Table
23.
M-01Excessive temperatures in PC
and/or power supply.
Thermal EnergyH-02 C-01
Compliance with the
mechanical strength tests for
ENCLOSURES (see IEC
60601-1, Clause 15.3)
M-01ENCLOSURES have no the
strength and rigidity necessary to
avoid a fire.
C-02
Page 22 of 148
Project number: 1112024003 Version: 1.00 Short name: ONYX-BE18xDT 12-14-2011
Onyx Healthcare Inc.
F-02Function: Enclosure
F-02
Hazard: Cause: Effect on: Measure: Type of measure:
Meet IEC 60601-1, Clause
9.4.2 requiremets.
M-01FallingMechanical energyH-01 C-01
Meet IEC 60601-1 Clause
9.8.2 and Table 21
requirements.
M-01Suspended massesC-02
Rounding of sharp edges and
corners.
M-01Sharp edges and cornersC-03
When PC is operated in
worst-case NORMAL USE
including the maximum
ambient operating
temperature, the parts shall not
reach temperatures exceeding
the values given in IEC
60601-1, Table 22 and Table
23.
M-01Excessive temperatures in
enclosure
Thermal EnergyH-02 C-01
Page 23 of 148
Project number: 1112024003 Version: 1.00 Short name: ONYX-BE18xDT 12-14-2011
Onyx Healthcare Inc.
F-03Function: Rear Bracket
F-03
Hazard: Cause: Effect on: Measure: Type of measure:
Meet IEC 60601-1 Clause
9.8.2 and Table 21
requirements.
M-01CrackMechanical energyH-01 C-01
Meet IEC 60601-1 Clause
9.8.2 and Table 21
requirements.
M-01Suspended massesC-02
Meet IEC 60601-1 Clause
9.8.2 and Table 21
requirements.
M-01InstabilityC-03
Page 24 of 148
Project number: 1112024003 Version: 1.00 Short name: ONYX-BE18xDT 12-14-2011
Onyx Healthcare Inc.
F-04Function: Signal input
F-04
Hazard: Cause: Effect on: Measure: Type of measure:
Supplied by SELV power
adapter and DC/AC inverter
meet LCC requirements.
M-01ACCESSIBLE PARTS exceed
42.4 V peak a.c. or 60 V d.c. in
NORMAL CONDITION or in
SINGLE FAULT CONDITION.
Electromagnetic energyH-01 C-01
Page 25 of 148
Project number: 1112024003 Version: 1.00 Short name: ONYX-BE18xDT 12-14-2011
Onyx Healthcare Inc.
F-05Function: Signal output
F-05
Hazard: Cause: Effect on: Measure: Type of measure:
Meet IEC 60950-1, Annex
NAD Acoustic tests
requirements
M-01earphoneAcoustic energy (sound)H-01 C-01
Page 26 of 148
Project number: 1112024003 Version: 1.00 Short name: ONYX-BE18xDT 12-14-2011
Onyx Healthcare Inc.
F-06Function: User control and indicator
F-06
Hazard: Cause: Effect on: Measure: Type of measure:
Indicated by an adjacent
indicator light
M-01Switches used to control power to
PC or its parts, including
switches, did not have their "on"
and "off" positions.
OperationalH-01 C-01
Marked with symbols IEC
60417
M-02
Page 27 of 148
Project number: 1112024003 Version: 1.00 Short name: ONYX-BE18xDT 12-14-2011
Onyx Healthcare Inc.
F-07Function: Information
F-07
Hazard: Cause: Effect on: Measure: Type of measure:
PC marked the name or
trademark of Onyx with model
no.
M-01PC did not marke with the name
or trademark of Onyx and with a
MODEL OR TYPE REFERENCE
LabelingH-01 C-01
Meet IEC 60601-1, Clause 7
requirements.
M-01Incomplete instructions for useC-02
Meet IEC 60601-1, Clause 7
requirements.
M-01Inadequate description of
performance characteristics
C-03
Meet IEC 60601-1, Clause 7
requirements.
M-01Inadequate specification of
intended use.
C-04
Meet IEC 60601-1, Clause 7
requirements.
M-01Inadequate disclosure of
limitations
C-05
Meet IEC 60601-1, Clause 7
requirements.
M-01Inadequate specification of
accessories to be used with the
medical device.
Operating instructionsH-02 C-01
Meet IEC 60601-1, Clause 7
requirements.
M-01Inadequate specification of
pre-use checks.
C-02
Meet IEC 60601-1, Clause 7
requirements.
M-01Over-complicated operating
instructions.
C-03
Meet IEC 60601-1, Clause 7
requirements.
M-01Installation instructionSpecification of service and
maintenance
H-03 C-01
Page 28 of 148
Project number: 1112024003 Version: 1.00 Short name: ONYX-BE18xDT 12-14-2011
Onyx Healthcare Inc.
F-08Function: Connection to an external d.c. power source
F-08
Hazard: Cause: Effect on: Measure: Type of measure:
Provided a connector that has
special housing to prevent a
connection with the wrong
polarity is made.
M-01When a connection with the
wrong polarity is made.
Thermal EnergyH-01 C-01
Page 29 of 148
Project number: 1112024003 Version: 1.00 Short name: ONYX-BE18xDT 12-14-2011
Onyx Healthcare Inc.
F-09Function: Display
F-09
Hazard: Cause: Effect on: Measure: Type of measure:
The intensity of visible light
from monitor can be controlled
by the user. The highest
intensity achievable cannot
produce detrimental biological
effects.
M-01Visible LightRadiation energyH-01 C-01
Page 30 of 148
Project number: 1112024003 Version: 1.00 Short name: ONYX-BE18xDT 12-14-2011
Onyx Healthcare Inc.
F-10Function: BIOS (Basic Input/Output System - real time clock)
F-10
Hazard: Cause: Effect on: Measure: Type of measure:
Battery circuits is designed so
that discharging at a rate
exceeding the battery
manufacturer’s
recommendations, and
unintentional charging, are
prevented.
M-01Lithium battery explosionMechanical energyH-01 C-01
Page 31 of 148
Project number: 1112024003 Version: 1.00 Short name: ONYX-BE18xDT 12-14-2011
Onyx Healthcare Inc.
F-11Function: Touch Panel & Plastic Enclosure (TYPE B APPLIED PART)
F-11
Hazard: Cause: Effect on: Measure: Type of measure:
Meet IEC 60601-1, Clause 8.7
LEAKAGE CURRENTS and
PATIENT AUXILIARY
CURRENTS requirements
M-01Too high leakage current, causing
a death or serious injury to a
patient.
Electromagnetic energyH-01 C-01
When PC is operated in
worst-case ABNORMAL USE
including the maximum
ambient operating
temperature, the parts shall not
reach temperatures exceeding
the values given in IEC
60601-1, Table 23 and Table
24.
M-01Excessive temperatures in touch
panel
Thermal EnergyH-02 C-01
Page 32 of 148
12-14-2011
Project number: 1112024003
Project name: 18.5" Bedside Terminal, models xxxx-ONYX-BE18xDT-xxxxxxx
ONYX-BE18xDTShort name:
Version number:
Workable version for evaluation purposeVersion description:
Project manager:
Subst. project manager: James Chen
Steven Chen
Functional designLife cycle phase:
Evaluation of risk (before measures)
1.00
F-01Function: Connect to Mains
F-01
Hazard: Cause: Severity: Probability: Region of risk: Comment:
C-01 Short circuit of any or all
insulation that does not comply
with the requirements of IEC
60601-1, 3rd Ed., Clause. 8.8
Serious Occasional Intolerable regionElectromagnetic energyH-01
C-02 Short circuit of any or all
CREEPAGE DISTANCES or AIR
CLEARANCES that do not
comply with the requirements of
IEC 60601-1, 3rd Ed., Clause 8.9
Serious Occasional Intolerable region
C-03 Open circuit of any or all earth
connections that do not comply
with the requirements of IEC
60601-1, Clause 8.6, including
any functional earth connection.
Critical Remote Intolerable region
C-04 Short circuit of any one insulation
that complies with the
requirements for one MEANS OF
PROTECTION as specified in
IEC 60601-1, Clause 8.8
Critical Occasional Intolerable region
C-05 Short circuit of any one
CREEPAGE DISTANCE or AIR
CLEARANCE that complies with
the requirements for one MEANS
OF PROTECTION as specified in
IEC 60601-1, Clause 8.9
Critical Occasional Intolerable region
Page 33 of 148
Project number: 1112024003 Version: 1.00 Short name: ONYX-BE18xDT 12-14-2011
Onyx Healthcare Inc.
F-01
Hazard: Cause: Severity: Probability: Region of risk: Comment:
C-06 Open circuit of any one
PROTECTIVE EARTH
CONDUCTOR or internal
PROTECTIVE EARTH
CONNECTION that complies with
the requirements of IEC
60601-1, Clause 8.6
Critical Remote Intolerable regionElectromagnetic energyH-01
C-07 All components, including wiring,
the failure of which could result in
a HAZARDOUS SITUATION.
Serious Occasional Intolerable region
C-08 The reliability of components that
are used as MEANS OF
PROTECTION are not assessed
for the conditions of use in the
PC.
Serious Remote Broadly
acceptable
region
C-09 Storage (humidity preconditioning
treatment)
Minor Occasional Broadly
acceptable
region
C-10 Transport Minor Occasional Broadly
acceptable
region
C-11 Components of PC, unwanted
movement of which could result
in an unacceptableb RISK, is not
mounted securely to prevent such
movement.
Minor Occasional Broadly
acceptable
region
C-12 Too high leakage current, causing
a death or serious injury to a
patient.
Critical Occasional Intolerable region
C-13 The LEAKAGE CURRENTS
from, to or between
ACCESSIBLE PARTS other than
PATIENT CONNECTIONS
Critical Occasional Intolerable region
Page 34 of 148
Project number: 1112024003 Version: 1.00 Short name: ONYX-BE18xDT 12-14-2011
Onyx Healthcare Inc.
F-01
Hazard: Cause: Severity: Probability: Region of risk: Comment:
C-14 ACCESSIBLE PARTS exceed
42.4 V peak a.c. or 60 V d.c. in
NORMAL CONDITION or in
SINGLE FAULT CONDITION.
Critical Remote Intolerable regionElectromagnetic energyH-01
C-15 Internal parts, other than contacts
of plugs, connectors and
socket-outlets, that can be
touched by the test pin shown in
IEC 60601-1, Figure 8.
Serious Occasional Intolerable region
C-16 Accidental detachment of
conductors and connectors where
breaking free could lead to a
HAZARDOUS SITUATION.
Serious Remote Broadly
acceptable
region
C-17 The resistance to heat is not
retained by all types of insulation,
including insulating partition walls,
during the EXPECTED SERVICE
LIFE of the PC.
Serious Occasional Intolerable region
C-18 Internal cables and wiring is not
adequately protected against
contact with a moving part or
from friction at sharp corners and
edges where damage to
insulation.
Minor Remote Broadly
acceptable
region
C-19 Electromagnetic compatibility of
PC.
Serious Occasional Intolerable region
C-20 Packing Serious Occasional Intolerable region
C-21 Wirings and connectors of Panel
PC Monitor supply is not secured
or insulated that accidental
detachment can result in a
HAZARDOUS SITUATION.
Serious Occasional Intolerable region
Page 35 of 148
Project number: 1112024003 Version: 1.00 Short name: ONYX-BE18xDT 12-14-2011
Onyx Healthcare Inc.
F-01
Hazard: Cause: Severity: Probability: Region of risk: Comment:
C-22 Internal cables and wiring were
not adequately protected against
contact from friction at sharp
corners and edges where
damage to insulation could result
in a HAZARDOUS SITUATION.
Minor Remote Broadly
acceptable
region
Electromagnetic energyH-01
C-23 Cleaning Minor Occasional Broadly
acceptable
region
C-01 Excessive temperatures in PC
and/or power supply.
Serious Occasional Intolerable regionThermal EnergyH-02
C-02 ENCLOSURES have no the
strength and rigidity necessary to
avoid a fire.
Critical Remote Intolerable region
F-02Function: Enclosure
F-02
Hazard: Cause: Severity: Probability: Region of risk: Comment:
C-01 Falling Serious Occasional Intolerable regionMechanical energyH-01
C-02 Suspended masses Critical Remote Intolerable region
C-03 Sharp edges and corners Minor Occasional Broadly
acceptable
region
C-01 Excessive temperatures in
enclosure
Serious Occasional Intolerable regionThermal EnergyH-02
Page 36 of 148
Project number: 1112024003 Version: 1.00 Short name: ONYX-BE18xDT 12-14-2011
Onyx Healthcare Inc.
F-03Function: Rear Bracket
F-03
Hazard: Cause: Severity: Probability: Region of risk: Comment:
C-01 Crack Serious Occasional Intolerable regionMechanical energyH-01
C-02 Suspended masses Critical Occasional Intolerable region
C-03 Instability Serious Occasional Intolerable region
F-04Function: Signal input
F-04
Hazard: Cause: Severity: Probability: Region of risk: Comment:
C-01 ACCESSIBLE PARTS exceed
42.4 V peak a.c. or 60 V d.c. in
NORMAL CONDITION or in
SINGLE FAULT CONDITION.
Serious Occasional Intolerable regionElectromagnetic energyH-01
F-05Function: Signal output
F-05
Hazard: Cause: Severity: Probability: Region of risk: Comment:
C-01 earphone Serious Occasional Intolerable regionAcoustic energy (sound)H-01
F-06Function: User control and indicator
F-06
Hazard: Cause: Severity: Probability: Region of risk: Comment:
C-01 Switches used to control power to
PC or its parts, including
switches, did not have their "on"
and "off" positions.
Serious Occasional Intolerable regionOperationalH-01
Page 37 of 148
Project number: 1112024003 Version: 1.00 Short name: ONYX-BE18xDT 12-14-2011
Onyx Healthcare Inc.
F-07Function: Information
F-07
Hazard: Cause: Severity: Probability: Region of risk: Comment:
C-01 PC did not marke with the name
or trademark of Onyx and with a
MODEL OR TYPE REFERENCE
Minor Occasional Broadly
acceptable
region
LabelingH-01
C-02 Incomplete instructions for use Serious Occasional Intolerable region
C-03 Inadequate description of
performance characteristics
Serious Occasional Intolerable region
C-04 Inadequate specification of
intended use.
Serious Occasional Intolerable region
C-05 Inadequate disclosure of
limitations
Serious Occasional Intolerable region
C-01 Inadequate specification of
accessories to be used with the
medical device.
Serious Occasional Intolerable regionOperating instructionsH-02
C-02 Inadequate specification of
pre-use checks.
Minor Occasional Broadly
acceptable
region
C-03 Over-complicated operating
instructions.
Minor Occasional Broadly
acceptable
region
C-01 Installation instruction Serious Occasional Intolerable regionSpecification of service and
maintenance
H-03
F-08Function: Connection to an external d.c. power source
F-08
Hazard: Cause: Severity: Probability: Region of risk: Comment:
C-01 When a connection with the
wrong polarity is made.
Serious Remote Broadly
acceptable
region
Thermal EnergyH-01
Page 38 of 148
Project number: 1112024003 Version: 1.00 Short name: ONYX-BE18xDT 12-14-2011
Onyx Healthcare Inc.
F-09Function: Display
F-09
Hazard: Cause: Severity: Probability: Region of risk: Comment:
C-01 Visible Light Minor Occasional Broadly
acceptable
region
Radiation energyH-01
F-10Function: BIOS (Basic Input/Output System - real time clock)
F-10
Hazard: Cause: Severity: Probability: Region of risk: Comment:
C-01 Lithium battery explosion Critical Remote Intolerable regionMechanical energyH-01
F-11Function: Touch Panel & Plastic Enclosure (TYPE B APPLIED PART)
F-11
Hazard: Cause: Severity: Probability: Region of risk: Comment:
C-01 Too high leakage current, causing
a death or serious injury to a
patient.
Critical Remote Intolerable regionElectromagnetic energyH-01
C-01 Excessive temperatures in touch
panel
Serious Occasional Intolerable regionThermal EnergyH-02
Page 39 of 148
12-14-2011
Project number: 1112024003
Project name: 18.5" Bedside Terminal, models xxxx-ONYX-BE18xDT-xxxxxxx
ONYX-BE18xDTShort name:
Version number:
Workable version for evaluation purposeVersion description:
Project manager:
Subst. project manager: James Chen
Steven Chen
Functional designLife cycle phase:
Risk-graph (before measures)
1.00
Both states
P5
P4
9 23 5
P3
2 3 7
P2
P1
S1 S2 S3 S4 S5
Operation state
P5
P4
9 23 5
P3
2 3 7
P2
P1
S1 S2 S3 S4 S5
Page 40 of 148
Project number: 1112024003 Version: 1.00 Short name: ONYX-BE18xDT
12-14-2011
Onyx Healthcare Inc.
Fault state
P5
P4
P3
P2
P1
S1 S2 S3 S4 S5
Intolerable region ALARP region Broadly acceptable reg
Page 41 of 148
12-14-2011
Project number: 1112024003
Project name: 18.5" Bedside Terminal, models xxxx-ONYX-BE18xDT-xxxxxxx
ONYX-BE18xDTShort name:
Version number:
Workable version for evaluation purposeVersion description:
Project manager:
Subst. project manager: James Chen
Steven Chen
Functional designLife cycle phase:
Decision about measures
1.00
Measure:
All components, including wiring shall be used in accordance with their specified
ratings.
Implement: Yes RC-001Measure number:
Cause: Hazard: Function: Evaluation:
All components, including wiring,
the failure of which could result in
a HAZARDOUS SITUATION.
Electromagnetic energy Connect to Mains Efficient
Measure:
All components, including wiring, the failure of which could result in a HAZARDOUS SITUATION are fixed in place by UL R/C non-chemical bounding compound.
Implement: Yes RC-002Measure number:
Cause: Hazard: Function: Evaluation:
All components, including wiring,
the failure of which could result in
a HAZARDOUS SITUATION.
Electromagnetic energy Connect to Mains Efficient
Measure:
All wirings are tied together by cable tie to prevent accidental detachment.
Implement: Yes RC-003Measure number:
Cause: Hazard: Function: Evaluation:
Wirings and connectors of Panel
PC Monitor supply is not secured
or insulated that accidental
detachment can result in a
HAZARDOUS SITUATION.
Electromagnetic energy Connect to Mains Efficient
Page 42 of 148
Project number: 1112024003 Version: 1.00 Short name: ONYX-BE18xDT 12-14-2011
Onyx Healthcare Inc.
Measure:
Ball pressure test - according to IEC 60601-1, Clause 8.8.4.1, b) requirements
Implement: Yes RC-004Measure number:
Cause: Hazard: Function: Evaluation:
The resistance to heat is not
retained by all types of insulation,
including insulating partition walls,
during the EXPECTED SERVICE
LIFE of the PC.
Electromagnetic energy Connect to Mains Efficient
Measure:
Battery circuits is designed so that discharging at a rate exceeding the battery
manufacturer’s recommendations, and unintentional charging, are prevented.
Implement: Yes RC-005Measure number:
Cause: Hazard: Function: Evaluation:
Lithium battery explosion Mechanical energy BIOS (Basic Input/Output System -
real time clock)
Efficient
Measure:
Compliance with the mechanical strength tests for ENCLOSURES (see IEC
60601-1, Clause 15.3)
Implement: Yes RC-006Measure number:
Cause: Hazard: Function: Evaluation:
ENCLOSURES have no the
strength and rigidity necessary to
avoid a fire.
Thermal Energy Connect to Mains Efficient
Page 43 of 148
Project number: 1112024003 Version: 1.00 Short name: ONYX-BE18xDT 12-14-2011
Onyx Healthcare Inc.
Measure:
Indicated by an adjacent indicator light
Implement: Yes RC-007Measure number:
Cause: Hazard: Function: Evaluation:
Switches used to control power to
PC or its parts, including switches,
did not have their "on" and "off"
positions.
Operational User control and indicator Efficient
Measure:
Internal cables and wiring is fixed in place by cable tie to protect against contact with a moving part or from friction at sharp corners and edges where damage to
insulation
Implement: Yes RC-008Measure number:
Cause: Hazard: Function: Evaluation:
Internal cables and wiring is not
adequately protected against
contact with a moving part or from
friction at sharp corners and edges
where damage to insulation.
Electromagnetic energy Connect to Mains Efficient
Measure:
Marked with symbols IEC 60417
Implement: Yes RC-009Measure number:
Cause: Hazard: Function: Evaluation:
Switches used to control power to
PC or its parts, including switches,
did not have their "on" and "off"
positions.
Operational User control and indicator Efficient
Page 44 of 148
Project number: 1112024003 Version: 1.00 Short name: ONYX-BE18xDT 12-14-2011
Onyx Healthcare Inc.
Measure:
Meet IEC 60601-1 Clause 9.8.2 and Table 21 requirements.
Implement: Yes RC-010Measure number:
Cause: Hazard: Function: Evaluation:
Crack Mechanical energy Rear Bracket Efficient
Suspended masses Mechanical energy Enclosure Efficient
Suspended masses Mechanical energy Rear Bracket Efficient
Instability Mechanical energy Rear Bracket Efficient
Measure:
Meet IEC 60601-1, Clause 7 requirements.
Implement: Yes RC-011Measure number:
Cause: Hazard: Function: Evaluation:
Incomplete instructions for use Labeling Information Efficient
Inadequate description of
performance characteristics
Labeling Information Efficient
Inadequate specification of
intended use.
Labeling Information Efficient
Inadequate disclosure of
limitations
Labeling Information Efficient
Inadequate specification of
accessories to be used with the
medical device.
Operating instructions Information Efficient
Inadequate specification of
pre-use checks.
Operating instructions Information Efficient
Over-complicated operating
instructions.
Operating instructions Information Efficient
Installation instruction Specification of service and
maintenance
Information Efficient
Page 45 of 148
Project number: 1112024003 Version: 1.00 Short name: ONYX-BE18xDT 12-14-2011
Onyx Healthcare Inc.
Measure:
Meet IEC 60601-1, Clause 8.7 LEAKAGE CURRENTS and PATIENT AUXILIARY CURRENTS requirements
Implement: Yes RC-012Measure number:
Cause: Hazard: Function: Evaluation:
Too high leakage current, causing
a death or serious injury to a
patient.
Electromagnetic energy Connect to Mains Efficient
Too high leakage current, causing
a death or serious injury to a
patient.
Electromagnetic energy Touch Panel & Plastic Enclosure
(TYPE B APPLIED PART)
Efficient
The LEAKAGE CURRENTS from,
to or between ACCESSIBLE
PARTS other than PATIENT
CONNECTIONS
Electromagnetic energy Connect to Mains Efficient
Measure:
Meet IEC 60601-1, Clause 9.4.2 requiremets.
Implement: Yes RC-013Measure number:
Cause: Hazard: Function: Evaluation:
Falling Mechanical energy Enclosure Efficient
Measure:
Meet IEC 60601-1-2 requirements
Implement: Yes RC-014Measure number:
Cause: Hazard: Function: Evaluation:
Electromagnetic compatibility of
PC.
Electromagnetic energy Connect to Mains Efficient
Measure:
Meet IEC 60950-1, Annex NAD Acoustic tests requirements
Implement: Yes RC-015Measure number:
Cause: Hazard: Function: Evaluation:
earphone Acoustic energy (sound) Signal output Efficient
Page 46 of 148
Project number: 1112024003 Version: 1.00 Short name: ONYX-BE18xDT 12-14-2011
Onyx Healthcare Inc.
Measure:
PC marked the name or trademark of Onyx with model no.
Implement: Yes RC-016Measure number:
Cause: Hazard: Function: Evaluation:
PC did not marke with the name or
trademark of Onyx and with a
MODEL OR TYPE REFERENCE
Labeling Information Efficient
Measure:
Provided a connector that has special housing to prevent a connection with the wrong polarity is made.
Implement: Yes RC-017Measure number:
Cause: Hazard: Function: Evaluation:
When a connection with the wrong
polarity is made.
Thermal Energy Connection to an external d.c.
power source
Efficient
Measure:
Rounding of sharp edges and corners.
Implement: Yes RC-018Measure number:
Cause: Hazard: Function: Evaluation:
Sharp edges and corners Mechanical energy Enclosure Efficient
Measure:
Said components were secured in place on pcb by UL Recognized non -chemical
bounding compound.
Implement: Yes RC-019Measure number:
Cause: Hazard: Function: Evaluation:
Components of PC, unwanted
movement of which could result in
an unacceptableb RISK, is not
mounted securely to prevent such
movement.
Electromagnetic energy Connect to Mains Efficient
Page 47 of 148
Project number: 1112024003 Version: 1.00 Short name: ONYX-BE18xDT 12-14-2011
Onyx Healthcare Inc.
Measure:
Shall compliance with the following tests: resistance to moisture, etc. (see IEC
60601-1, Clause 11.6); dielectric strength (see IEC 60601-1, Clause 8.8.3); and
mechanical strength (see IEC 60601-1, Clause 15.3).
Implement: Yes RC-020Measure number:
Cause: Hazard: Function: Evaluation:
The resistance to heat is not
retained by all types of insulation,
including insulating partition walls,
during the EXPECTED SERVICE
LIFE of the PC.
Electromagnetic energy Connect to Mains Efficient
Measure:
Supplied by SELV power adapter and DC/AC inverter meet LCC requirements.
Implement: Yes RC-021Measure number:
Cause: Hazard: Function: Evaluation:
ACCESSIBLE PARTS exceed
42.4 V peak a.c. or 60 V d.c. in
NORMAL CONDITION or in
SINGLE FAULT CONDITION.
Electromagnetic energy Signal input Efficient
ACCESSIBLE PARTS exceed
42.4 V peak a.c. or 60 V d.c. in
NORMAL CONDITION or in
SINGLE FAULT CONDITION.
Electromagnetic energy Connect to Mains Efficient
Measure:
The equipment complied with the requirements of IEC 60601-1, Clause 11.6.
Implement: Yes RC-022Measure number:
Cause: Hazard: Function: Evaluation:
Cleaning Electromagnetic energy Connect to Mains Efficient
Page 48 of 148
Project number: 1112024003 Version: 1.00 Short name: ONYX-BE18xDT 12-14-2011
Onyx Healthcare Inc.
Measure:
The HAZARDOUS SITUATIONS in IEC 60601-1, Clause 13.1.2 to 13.1.4
(inclusive) do not occur in the PC and power adapter
Implement: Yes RC-023Measure number:
Cause: Hazard: Function: Evaluation:
Short circuit of any one insulation
that complies with the
requirements for one MEANS OF
PROTECTION as specified in IEC
60601-1, Clause 8.8
Electromagnetic energy Connect to Mains Efficient
Short circuit of any one
CREEPAGE DISTANCE or AIR
CLEARANCE that complies with
the requirements for one MEANS
OF PROTECTION as specified in
IEC 60601-1, Clause 8.9
Electromagnetic energy Connect to Mains Efficient
Open circuit of any one
PROTECTIVE EARTH
CONDUCTOR or internal
PROTECTIVE EARTH
CONNECTION that complies with
the requirements of IEC
60601-1, Clause 8.6
Electromagnetic energy Connect to Mains Efficient
Accidental detachment of
conductors and connectors where
breaking free could lead to a
HAZARDOUS SITUATION.
Electromagnetic energy Connect to Mains Efficient
Measure:
The humidity preconditioning treatment is performed in a humidity cabinet containing air with a relative humidity of 93 % ± 3 % @ 25°C 48 hr
Implement: Yes RC-024Measure number:
Cause: Hazard: Function: Evaluation:
Storage (humidity preconditioning
treatment)
Electromagnetic energy Connect to Mains Efficient
Page 49 of 148
Project number: 1112024003 Version: 1.00 Short name: ONYX-BE18xDT 12-14-2011
Onyx Healthcare Inc.
Measure:
The intensity of visible light from monitor can be controlled by the user. The highest intensity achievable cannot produce detrimental biological effects.
Implement: Yes RC-025Measure number:
Cause: Hazard: Function: Evaluation:
Visible Light Radiation energy Display Efficient
Measure:
The internal wirings were secured in place on PCB by UL R/C non-chemical bounding component.
Implement: Yes RC-026Measure number:
Cause: Hazard: Function: Evaluation:
Internal cables and wiring were not
adequately protected against
contact from friction at sharp
corners and edges where damage
to insulation could result in a
HAZARDOUS SITUATION.
Electromagnetic energy Connect to Mains Efficient
Measure:
The limits specified in IEC 60601-1, Clause 8.4 is not be exceeded for ACCESSIBLE PARTS
Implement: Yes RC-027Measure number:
Cause: Hazard: Function: Evaluation:
Short circuit of any or all insulation
that does not comply with the
requirements of IEC 60601-1, 3rd
Ed., Clause. 8.8
Electromagnetic energy Connect to Mains Efficient
Short circuit of any or all
CREEPAGE DISTANCES or AIR
CLEARANCES that do not
comply with the requirements of
IEC 60601-1, 3rd Ed., Clause 8.9
Electromagnetic energy Connect to Mains Efficient
Open circuit of any or all earth
connections that do not comply
with the requirements of IEC
60601-1, Clause 8.6, including any
functional earth connection.
Electromagnetic energy Connect to Mains Efficient
Page 50 of 148
Project number: 1112024003 Version: 1.00 Short name: ONYX-BE18xDT 12-14-2011
Onyx Healthcare Inc.
Measure:
The permissible environmental conditions for transport and storage were marked on the outside of the packaging.
Implement: Yes RC-028Measure number:
Cause: Hazard: Function: Evaluation:
Packing Electromagnetic energy Connect to Mains Efficient
Measure:
The strength of packing carton / fixed frame. The transportation stimulation for
the verification. All connections were mechanically secure.
Implement: Yes RC-029Measure number:
Cause: Hazard: Function: Evaluation:
Transport Electromagnetic energy Connect to Mains Efficient
Measure:
The suitable enclosure shall be provided.
Implement: Yes RC-030Measure number:
Cause: Hazard: Function: Evaluation:
Internal parts, other than contacts
of plugs, connectors and
socket-outlets, that can be touched
by the test pin shown in IEC
60601-1, Figure 8.
Electromagnetic energy Connect to Mains Efficient
Measure:
They shall comply with the applicable safety requirements of a relevant IEC, UL or ISO standard;
Implement: Yes RC-031Measure number:
Cause: Hazard: Function: Evaluation:
The reliability of components that
are used as MEANS OF
PROTECTION are not assessed
for the conditions of use in the PC.
Electromagnetic energy Connect to Mains Efficient
Page 51 of 148
Project number: 1112024003 Version: 1.00 Short name: ONYX-BE18xDT 12-14-2011
Onyx Healthcare Inc.
Measure:
When PC is operated in worst-case NORMAL USE and ABNORMAL USE including the maximum
ambient operating temperature, the parts shall not reach temperatures exceeding
the values given in IEC 60601-1, Table 22, Table 23 and Table 24.
Implement: Yes RC-032Measure number:
Cause: Hazard: Function: Evaluation:
Excessive temperatures in touch
panel
Thermal Energy Touch Panel & Plastic Enclosure
(TYPE B APPLIED PART)
Efficient
Excessive temperatures in
enclosure
Thermal Energy Enclosure Efficient
Excessive temperatures in PC
and/or power supply.
Thermal Energy Connect to Mains Efficient
Measure:
Where there is no relevant IEC or ISO standard, the requirements of IEC 60601-1,
3rd Ed. were applied.
Implement: Yes RC-033Measure number:
Cause: Hazard: Function: Evaluation:
The reliability of components that
are used as MEANS OF
PROTECTION are not assessed
for the conditions of use in the PC.
Electromagnetic energy Connect to Mains Efficient
Page 52 of 148
12-14-2011
Project number: 1112024003
Project name: 18.5" Bedside Terminal, models xxxx-ONYX-BE18xDT-xxxxxxx
ONYX-BE18xDTShort name:
Version number:
Workable version for evaluation purposeVersion description:
Project manager:
Subst. project manager: James Chen
Steven Chen
Functional designLife cycle phase:
Risk control
1.00
Measure State Responsible Planning Actual values Effort Vali-
dation
Re-
leaseRealization Supervising Start End Start End Planned Actual
No.
All components, including wiring
shall be used in accordance with
their specified
ratings.
Ho Hsieh 10-01-2011 12-30-2011 10-12-2011 11-23-2011Finished Yes YesRC-001
All components, including wiring,
the failure of which could result in
a HAZARDOUS SITUATION are
fixed in place by UL R/C
non-chemical bounding
compound.
Hsieh Pan 10-01-2011 12-30-2011 10-12-2011 11-28-2011Finished Yes YesRC-002
All wirings are tied together by
cable tie to prevent accidental
detachment.
Pan Ho 10-08-2011 12-30-2011 10-12-2011 12-06-2011Finished Yes YesRC-003
Ball pressure test - according to
IEC 60601-1, Clause 8.8.4.1, b)
requirements
Ho Hsieh 10-01-2011 12-30-2011 10-12-2011 12-07-2011Finished Yes YesRC-004
Battery circuits is designed so that
discharging at a rate exceeding
the battery
manufacturer’s recommendations,
and unintentional charging, are
prevented.
Hsieh Pan 10-01-2011 12-30-2011 10-12-2011 11-29-2011Finished Yes YesRC-005
Compliance with the mechanical
strength tests for ENCLOSURES
(see IEC
60601-1, Clause 15.3)
Pan Ho 10-01-2011 12-31-2011 10-05-2011 11-24-2011Finished Yes YesRC-006
Indicated by an adjacent indicator
light
Ho Hsieh 10-01-2011 12-31-2011 10-05-2011 11-22-2011Finished Yes YesRC-007
Page 53 of 148
Project number: 1112024003 Version: 1.00 Short name: ONYX-BE18xDT 12-14-2011
Onyx Healthcare Inc.
Measure State Responsible Planning Actual values Effort Vali-
dation
Re-
leaseRealization Supervising Start End Start End Planned Actual
No.
Internal cables and wiring is fixed
in place by cable tie to protect
against contact with a moving part
or from friction at sharp corners
and edges where damage to
insulation
Hsieh Pan 10-01-2011 12-31-2011 10-12-2011 11-28-2011Finished Yes YesRC-008
Marked with symbols IEC 60417 Pan Chen 10-01-2011 12-31-2011 10-12-2011 11-29-2011Finished Yes YesRC-009
Meet IEC 60601-1 Clause 9.8.2
and Table 21 requirements.
Ho Hsieh 10-01-2011 12-31-2011 11-09-2011 11-16-2011Finished Yes YesRC-010
Meet IEC 60601-1, Clause 7
requirements.
Hsieh Pan 10-01-2011 12-31-2011 10-06-2011 11-28-2011Finished Yes YesRC-011
Meet IEC 60601-1, Clause 8.7
LEAKAGE CURRENTS and
PATIENT AUXILIARY CURRENTS
requirements
Pan Ho 10-01-2011 12-31-2011 10-12-2011 11-23-2011Finished Yes YesRC-012
Meet IEC 60601-1, Clause 9.4.2
requiremets.
Ho Hsieh 10-01-2011 12-31-2011 10-12-2011 11-29-2011Finished Yes YesRC-013
Meet IEC 60601-1-2 requirements Hsieh Pan 10-01-2011 12-31-2011 10-12-2011 11-23-2011Finished Yes YesRC-014
Meet IEC 60950-1, Annex NAD
Acoustic tests requirements
Pan Ho 10-01-2011 12-31-2011 10-06-2011 11-23-2011Finished Yes YesRC-015
PC marked the name or trademark
of Onyx with model no.
Ho Hsieh 10-01-2011 12-31-2011 10-12-2011 11-28-2011Finished Yes YesRC-016
Provided a connector that has
special housing to prevent a
connection with the wrong polarity
is made.
Hsieh Pan 10-01-2011 12-31-2011 10-07-2011 11-24-2011Finished Yes YesRC-017
Rounding of sharp edges and
corners.
Pan Ho 10-01-2011 12-31-2011 10-06-2011 11-18-2011Finished Yes YesRC-018
Said components were secured in
place on pcb by UL Recognized
non-chemical
bounding compound.
Ho Hsieh 10-01-2011 12-31-2011 10-05-2011 11-28-2011Finished Yes YesRC-019
Shall compliance with the following
tests: resistance to moisture, etc.
(see IEC
60601-1, Clause 11.6); dielectric
strength (see IEC 60601-1, Clause
8.8.3); and
mechanical strength (see IEC
60601-1, Clause 15.3).
Hsieh Pan 10-01-2011 12-31-2011 10-12-2011 11-15-2011Finished Yes YesRC-020
Page 54 of 148
Project number: 1112024003 Version: 1.00 Short name: ONYX-BE18xDT 12-14-2011
Onyx Healthcare Inc.
Measure State Responsible Planning Actual values Effort Vali-
dation
Re-
leaseRealization Supervising Start End Start End Planned Actual
No.
Supplied by SELV power adapter
and DC/AC inverter meet LCC
requirements.
Pan Ho 10-01-2011 12-31-2011 10-13-2011 11-24-2011Finished Yes YesRC-021
The equipment complied with the
requirements of IEC 60601-1,
Clause 11.6.
Ho Hsieh 10-01-2011 12-31-2011 10-17-2011 11-25-2011Finished Yes YesRC-022
The HAZARDOUS SITUATIONS in
IEC 60601-1, Clause 13.1.2 to
13.1.4
(inclusive) do not occur in the PC
and power adapter
Hsieh Pan 10-01-2011 12-31-2011 10-12-2011 11-30-2011Finished Yes YesRC-023
The humidity preconditioning
treatment is performed in a
humidity cabinet containing air
with a relative humidity of 93 % ± 3
% @ 25°C 48 hr
Pan Ho 12-01-2011 12-31-2011 10-04-2011 11-23-2011Finished Yes YesRC-024
The intensity of visible light from
monitor can be controlled by the
user. The highest intensity
achievable cannot produce
detrimental biological effects.
Ho Hsieh 10-01-2011 12-31-2011 10-06-2011 11-28-2011Finished Yes YesRC-025
The internal wirings were secured
in place on PCB by UL R/C
non-chemical bounding
component.
Hsieh Pan 10-01-2011 12-31-2011 10-07-2011 11-24-2011Finished Yes YesRC-026
The limits specified in IEC
60601-1, Clause 8.4 is not be
exceeded for ACCESSIBLE
PARTS
Pan Ho 10-01-2011 12-31-2011 10-07-2011 11-29-2011Finished Yes YesRC-027
The permissible environmental
conditions for transport and
storage were marked on the
outside of the packaging.
Ho Hsieh 10-01-2011 12-31-2011 10-03-2011 11-30-2011Finished Yes YesRC-028
The strength of packing carton /
fixed frame. The transportation
stimulation for
the verification. All connections
were mechanically secure.
Hsieh Pan 10-01-2011 12-31-2011 10-05-2011 11-24-2011Finished Yes YesRC-029
The suitable enclosure shall be
provided.
Pan Ho 10-01-2011 12-31-2011 10-06-2011 11-28-2011Finished Yes YesRC-030
Page 55 of 148
Project number: 1112024003 Version: 1.00 Short name: ONYX-BE18xDT 12-14-2011
Onyx Healthcare Inc.
Measure State Responsible Planning Actual values Effort Vali-
dation
Re-
leaseRealization Supervising Start End Start End Planned Actual
No.
They shall comply with the
applicable safety requirements of
a relevant IEC, UL or ISO
standard;
Ho Hsieh 10-01-2011 12-31-2011 10-03-2011 11-28-2011Finished Yes YesRC-031
When PC is operated in
worst-case NORMAL USE
including the maximum
ambient operating temperature,
the parts shall not reach
temperatures exceeding
the values given in IEC 60601-1,
Table 22 and Table 23.
Hsieh Pan 10-01-2011 12-31-2011 10-13-2011 11-28-2011Finished Yes YesRC-032
Where there is no relevant IEC or
ISO standard, the requirements of
IEC 60601-1,
3rd Ed. were applied.
Pan Ho 10-01-2011 12-31-2011 10-05-2011 11-28-2011Finished Yes YesRC-033
Page 56 of 148
12-14-2011
Subst. project manager:
Project manager:
Life cycle phase:
Version description:
Project name:
Version number:
Short name:Project number:
Release protocols of measures
1112024003
1.00
18.5" Bedside Terminal, models xxxx-ONYX-BE18xDT-xxxxxxxWorkable version for evaluation purpose
Functional design
Steven Chen
James Chen
ONYX-BE18xDT
Measure number: RC-001
Measure text:
All components, including wiring shall be used in accordance with their specified
ratings.
State of measure:
Responsible
Implementation: Supervising: Owen HsiehMike Ho
Finished
Plan:
Start: End:10-1-2011 12-30-2011
Actual values:
Start: End:10-12-2011 11-23-2011
Effort:
Planned: Actual:
Validation:
Validated through:
Is validated:
Validated on:Steven Chen
Yes
12-09-2011
Release:
Release through: James ChenIs released:
Release on:
Yes
12-9-2011
All components, including wiring shall be used in accordance with their specified ratings.
Decided tasks:
Where safety is involved, components shall comply either with the requirements of IEC 60601-1 or with the
safety aspects of the relevant IEC component standards.
Comment:
Assigned functions, hazards, causes:
Connect to Mains Electromagnetic energy All components, including wiring, the
failure of which could result in a
HAZARDOUS SITUATION.
Realization team:
James Chen
Steve Chen
Mike Ho
Owen Hsieh
Peter Pan
Procedure for evidence of efficiency for measures: References:
Page 57 of 148
Onyx Healthcare Inc.
12-14-2011Project number: Version: Short name:1112024003 1.00 ONYX-BE18xDT
Measure number: RC-001
Evaluation and testing of components shall be conducted as follows:
- a component that has been demonstrated to comply with a standard
harmonized with the relevant IEC component standard shall be checked
for correct application and use in accordance with its rating. It shall be
subjected to the applicable tests of IEC 60601-1 as part of the equipment
with the exception of those tests which are part of the relevant IEC
component standard;
- a component that has not been demonstrated to comply with a relevant
standard as above shall be checked for correct application and use in
accordance with its specified rating. It shall be subjected to the applicable
tests of IEC 60601-1, as part of the equipment, and to the applicable
tests of the component standard, under the conditions occurring in the
equipment;
- where no relevant IEC component standard exists, or where
components are used in circuits not in accordance with their specified
ratings, the components shall be tested under the conditions occurring in
the equipment. The number of samples required for test is, in general,
the same as required by an equivalent standard.
QD2-001, QD2-004 and QD2-005
Limits of acceptance for procedure of evidence: References:
see above QD2-001, QD2-004 and QD2-005
Procedure for verification: References:
see above QD2-001, QD2-004 and QD2-005
References:Limits of acceptance for verification:
see above QD2-001, QD2-004 and QD2-005
References:Procedure for validation:
see above QD2-001, QD2-004 and QD2-005
References:Limits of acceptance for validation:
see above QD2-001, QD2-004 and QD2-005
Page 58 of 148
Onyx Healthcare Inc.
12-14-2011Project number: Version: Short name:1112024003 1.00 ONYX-BE18xDT
Measure number: RC-002
Measure text:
All components, including wiring, the failure of which could result in a HAZARDOUS SITUATION are fixed in place
by UL R/C non-chemical bounding compound.
State of measure:
Responsible
Implementation: Supervising: Peter PanOwen Hsieh
Finished
Plan:
Start: End:10-1-2011 12-30-2011
Actual values:
Start: End:10-12-2011 11-28-2011
Effort:
Planned: Actual:
Validation:
Validated through:
Is validated:
Validated on:Steven Chen
Yes
12-09-2011
Release:
Release through:
Is released:
Release on:James ChenYes
12-9-2011
All components, including wiring, the failure of which could result in a HAZARDOUS SITUATION are fixed in
place by UL R/C non-chemical bounding compound.
Decided tasks:
Conductors shall be provided with a means (for example, barriers or fixing), or be so terminated, that they and
their terminators (for example, ring terminals and flat quick-connect terminals) cannot, in normal use, become
so displaced that CLEARANCES or CREEPAGE DISTANCES are reduced to less than the values specified in
IEC 60601-1.
Comment:
Assigned functions, hazards, causes:
Connect to Mains Electromagnetic energy All components, including wiring, the
failure of which could result in a
HAZARDOUS SITUATION.
Realization team:
James Chen
Steve Chen
Mike Ho
Owen Hsieh
Peter Pan
Procedure for evidence of efficiency for measures: References:
Having used the unjointed probe, which was in the shape of the standard
test finger and which incorporated a force gauge, a steady force of 10 N
for internal parts was applied for a period of 5 seconds.
QD2-001 and QM2-011
Limits of acceptance for procedure of evidence: References:
During the application of the test force, clearances behind earthed or
unearthed conductive accessable parts were not reduced to a level that
would result in an energy hazard.
QD2-001 and QM2-011
Procedure for verification: References:
See above QD2-001 and QM2-011
Page 59 of 148
Onyx Healthcare Inc.
12-14-2011Project number: Version: Short name:1112024003 1.00 ONYX-BE18xDT
Measure number: RC-002
References:Limits of acceptance for verification:
See above QD2-001 and QM2-011
References:Procedure for validation:
See above QD2-001 and QM2-011
References:Limits of acceptance for validation:
See above QD2-001 and QM2-011
Page 60 of 148
Onyx Healthcare Inc.
12-14-2011Project number: Version: Short name:1112024003 1.00 ONYX-BE18xDT
Measure number: RC-003
Measure text:
All wirings are tied together by cable tie to prevent accidental detachment.
State of measure:
Responsible
Implementation: Supervising: Mike HoPeter Pan
Finished
Plan:
Start: End:10-8-2011 12-30-2011
Actual values:
Start: End:10-12-2011 12-06-2011
Effort:
Planned: Actual:
Validation:
Validated through:
Is validated:
Validated on:Steven Chen
Yes
12-09-2011
Release:
Release through:
Is released:
Release on:Steven ChenYes
12-9-2011
Tied together by cable tie.
Decided tasks:
Conductors shall be provided with a means (for example, barriers or fixing), or be so terminated, that they and
their terminators (for example, ring terminals and flat quick-connect terminals) cannot, in normal use, become
so displaced that CLEARANCES or CREEPAGE DISTANCES are reduced to less than the values specified in
IEC 60601-1.
Comment:
Assigned functions, hazards, causes:
Connect to Mains Electromagnetic energy Wirings and connectors of Panel PC
Monitor supply is not secured or
insulated that accidental detachment
can result in a HAZARDOUS
SITUATION.
Realization team:
James Chen
Steve Chen
Mike Ho
Owen Hsieh
Peter Pan
Procedure for evidence of efficiency for measures: References:
Having used the unjointed probe, which was in the shape of the standard
test finger and which incorporated a force gauge, a steady force of 10 N
for internal parts was applied for a period of 5 seconds.
QD2-001 and QM2-011
Limits of acceptance for procedure of evidence: References:
During the application of the test force, clearances behind earthed or
unearthed conductive accessable parts were not reduced to a level that
would result in an energy hazard.
QD2-001 and QM2-011
Procedure for verification: References:
See above QD2-001 and QM2-011
Page 61 of 148
Onyx Healthcare Inc.
12-14-2011Project number: Version: Short name:1112024003 1.00 ONYX-BE18xDT
Measure number: RC-003
References:Limits of acceptance for verification:
See above QD2-001 and QM2-011
References:Procedure for validation:
See above QD2-001 and QM2-011
References:Limits of acceptance for validation:
See above QD2-001 and QM2-011
Page 62 of 148
Onyx Healthcare Inc.
12-14-2011Project number: Version: Short name:1112024003 1.00 ONYX-BE18xDT
Measure number: RC-004
Measure text:
Ball pressure test - according to IEC 60601-1, Clause 8.8.4.1, b) requirements
State of measure:
Responsible
Implementation: Supervising: Owen HsiehMike Ho
Finished
Plan:
Start: End:10-1-2011 12-30-2011
Actual values:
Start: End:10-12-2011 12-07-2011
Effort:
Planned: Actual:
Validation:
Validated through:
Is validated:
Validated on:Steven Chen
Yes
12-09-2011
Release:
Release through:
Is released:
Release on:James ChenYes
12-9-2011
Compliance is checked by subjecting the part to the ball-pressure test according to IEC 60695-10-2 and IEC
60601-1, Clause 8.8.4.1, b)
Decided tasks:
Thermoplastic parts on which parts at HAZARDOUS VOLTAGE are directly mounted shall be resistant to
abnormal heat.
Comment:
Assigned functions, hazards, causes:
Connect to Mains Electromagnetic energy The resistance to heat is not retained
by all types of insulation, including
insulating partition walls, during the
EXPECTED SERVICE LIFE of the
PC.
Realization team:
James Chen
Steve Chen
Mike Ho
Owen Hsieh
Peter Pan
Procedure for evidence of efficiency for measures: References:
A sample of each external part of insulating material indicated in the table
was tested using the test apparatus shown in Fig. 21 of IEC 60601-1, 3rd
Edition. (In this apparatus, a steel ball of 5 mm diameter exerts a force of
20 N when pressed against a surface). The apparatus and a fire (or
sand) brick were placed in an air-circulating oven. Once the apparatus
and brick attained the oven temperature, the sample was placed in the
oven on top of the brick. The steel ball was then positioned such that the
apparatus was balanced on the surface of the sample. After 1 h, it was
removed and the diameter of the impression made by the ball was
measured.
The specified oven temperature was the higher of the following:
a. the sum of the specified ambient and the temperature rise of relevant
part during the Temperature Test; AND
b. 75°C ± 2°C (test per Clause 8.8.4.1a), OR 125°C ± 2°C (test per
Clause 8.8.4.1b)
IEC 60601-1, 3rd Edition, Clause 8.8.4.1
Page 63 of 148
Onyx Healthcare Inc.
12-14-2011Project number: Version: Short name:1112024003 1.00 ONYX-BE18xDT
Measure number: RC-004
Limits of acceptance for procedure of evidence: References:
The results were less 2 mm.
Cracks were not visible to the naked eye.
IEC 60601-1, 3rd Edition, Clause 8.8.4.1
Procedure for verification: References:
see above IEC 60601-1, 3rd Edition, Clause 8.8.4.1
References:Limits of acceptance for verification:
see above IEC 60601-1, 3rd Edition, Clause 8.8.4.1
References:Procedure for validation:
see above IEC 60601-1, 3rd Edition, Clause 8.8.4.1
References:Limits of acceptance for validation:
see above IEC 60601-1, 3rd Edition, Clause 8.8.4.1
Page 64 of 148
Onyx Healthcare Inc.
12-14-2011Project number: Version: Short name:1112024003 1.00 ONYX-BE18xDT
Measure number: RC-005
Measure text:
Battery circuits is designed so that discharging at a rate exceeding the battery
manufacturer’s recommendations, and unintentional charging, are prevented.
State of measure:
Responsible
Implementation: Supervising: Peter PanOwen Hsieh
Finished
Plan:
Start: End:10-1-2011 12-30-2011
Actual values:
Start: End:10-12-2011 11-29-2011
Effort:
Planned: Actual:
Validation:
Validated through:
Is validated:
Validated on:Steven ChenYes
12-09-2011
Release:
Release through: James ChenIs released:
Release on:
Yes
12-9-2011
Battery circuits is designed so that discharging at a rate exceeding the battery manufacturer’s
recommendations, and unintentional charging, are prevented.
Decided tasks:
Equipment containing batteries shall be designed to reduce the risk of fire, explosion and chemical leaks under
normal conditions and after a single fault in the equipment, including a fault in circuitry within the equipment
battery pack.
Comment:
Assigned functions, hazards, causes:
BIOS (Basic Input/Output System -
real time clock)
Mechanical energy Lithium battery explosion
Realization team:
James Chen
Steve Chen
Mike Ho
Owen Hsieh
Peter Pan
Procedure for evidence of efficiency for measures: References:
The non-rechargeable battery cell was subjected to the test detailed
below.
The unit was connected to rated input voltage and operated at maximum
normal load. The following conditions were imposed one at a time.
1) Unintentional charging of a non-rechargeable battery cell. The battery
was charged while briefly subjected to the simulation of any single
component failure that was likely to occur in the charging circuit
and that would result in unintentional charging of the battery. To minimize
testing time, the failure was chosen that causes the highest charging
current. The battery was then charged for a single period of 7 h with that
simulated failure in place.
2) Excessive discharging rate for any battery (pack or cell). The battery
was subjected to rapid discharge by open-circuiting or short-circuiting any
current-limiting or voltage-limiting components in the load circuit of the
battery under test.
3) Reversing - The connections of the battery were reversed and the
equipment was energized. The battery was examined for emission of
flames, toxic gases, molten metal, risk of explosion.
IEC 60601-1, Clause 8.8.3 and 15.4.3
Page 65 of 148
Onyx Healthcare Inc.
12-14-2011Project number: Version: Short name:1112024003 1.00 ONYX-BE18xDT
Measure number: RC-005
Limits of acceptance for procedure of evidence: References:
These tests shall not result in any of the following:
- chemical leaks caused by cracking, rupturing or bursting of the battery
jacket, if such leakage could adversely affect required insulation ; or
- spillage of liquid from any pressure relief device in the battery, unless
such spillage is contained by the equipment without risk of damage to the
insulation or harm to the USER; or
- explosion of the battery, if such explosion could result in injury to a
USER; or
- emission of flame or expulsion of molten metal to the outside of the
equipment ENCLOSURE.
After completion of the tests, the equipment is subjected to the electric
strength tests of IEC 60601-1, Clause 8.8.3
IEC 60601-1, Clause 8.8.3 and 15.4.3
Procedure for verification: References:
see above IEC 60601-1, Clause 8.8.3 and 15.4.3
References:Limits of acceptance for verification:
see above IEC 60601-1, Clause 8.8.3 and 15.4.3
References:Procedure for validation:
see above IEC 60601-1, Clause 8.8.3 and 15.4.3
References:Limits of acceptance for validation:
see above IEC 60601-1, Clause 8.8.3 and 15.4.3
Page 66 of 148
Onyx Healthcare Inc.
12-14-2011Project number: Version: Short name:1112024003 1.00 ONYX-BE18xDT
Measure number: RC-006
Measure text:
Compliance with the mechanical strength tests for ENCLOSURES (see IEC
60601-1, Clause 15.3)
State of measure:
Responsible
Implementation: Supervising: Mike HoPeter Pan
Finished
Plan:
Start: End:10-1-2011 12-31-2011
Actual values:
Start: End:10-5-2011 11-24-2011
Effort:
Planned: Actual:
Validation:
Validated through:
Is validated:
Validated on:Steven Chen
Yes
12-09-2011
Release:
Release through:
Is released:
Release on:James ChenYes
12-9-2011
The suitable plastic enclosure is provided.
Decided tasks:
The monitor or its parts shall have adequate mechanical strength and shall not result in an unacceptable RISK
due to moulding stress or when subjected to mechanical stress caused by pushing, impact, dropping, and
rough handling.
Comment:
Assigned functions, hazards, causes:
Connect to Mains Thermal Energy ENCLOSURES have no the strength
and rigidity necessary to avoid a fire.
Realization team:
James Chen
Steve Chen
Mike Ho
Owen Hsieh
Peter Pan
Procedure for evidence of efficiency for measures: References:
Compliance is checked by application of the tests in Table 28. The tests
are not applied to handles, levers, knobs, the face of cathode ray tubes
(see 9.5.2), or to transparent or translucent covers of indicating or
measuring devices unless with the handle, lever, knob, or cover removed
there is an unacceptable RISK of electric shock.
IEC 60601-1, Clause 15.3
Limits of acceptance for procedure of evidence: References:
There was no cracking of the enclosure.
There were no live parts that became accessible.
IEC 60601-1, Clause 15.3
Procedure for verification: References:
Page 67 of 148
Onyx Healthcare Inc.
12-14-2011Project number: Version: Short name:1112024003 1.00 ONYX-BE18xDT
Measure number: RC-006
Force (15.3.2) - A sample of the unit was subjected to inward directed
force of 250 N plus or minus 10 N for a period of 5 seconds applied to
different parts of the enclosure via a test tool providing contact over a
circular plane surface 30 mm in diameter as indicated in Table 15.3.
Note: not applied to the bottom of a product having a mass of greater
than 18 kg.
Impact (15.3.3) - The impact resistance of an enclosure was tested by
application of an impact conveyed via a solid steel 50mm (approx) ball of
mass 500 g plus or minus 25 g, fall freely from 1.3 meter height. The unit
was rigidly supported and the impact was applied to the locations
indicated in Table 15.3.
IEC 60601-1, Clause 15.3
References:Limits of acceptance for verification:
see above IEC 60601-1, Clause 15.3
References:Procedure for validation:
see above IEC 60601-1, Clause 15.3
References:Limits of acceptance for validation:
see above IEC 60601-1, Clause 15.3
Page 68 of 148
Onyx Healthcare Inc.
12-14-2011Project number: Version: Short name:1112024003 1.00 ONYX-BE18xDT
Measure number: RC-007
Measure text:
Indicated by an adjacent indicator light
State of measure:
Responsible
Implementation: Supervising: Owen HsiehMike Ho
Finished
Plan:
Start: End:10-1-2011 12-31-2011
Actual values:
Start: End:10-5-2011 11-22-2011
Effort:
Planned: Actual:
Validation:
Validated through: Steven ChenIs validated:
Validated on:
Yes
12-09-2011
Release:
Release through:
Is released:
Release on:James ChenYes
12-9-2011
The colours of indicator lights and their meanings shall comply with Table 2 of IEC 60601-1.
Decided tasks:
It is important for an OPERATOR and SERVICE PERSONNEL to be able to determine the functional status of
ME EQUIPMENT. In NORMAL USE, the OPERATOR needs to be able to distinguish between ME
EQUIPMENT in stand-by and ME EQUIPMENT in a fully functional state.
Comment:
Assigned functions, hazards, causes:
User control and indicator Operational Switches used to control power to PC
or its parts, including switches, did
not have their "on" and "off" positions.
Realization team:
James Chen
Steve Chen
Mike Ho
Owen Hsieh
Peter Pan
Procedure for evidence of efficiency for measures: References:
QD2-001 and QM2-011 IEC 60601-1, Clause 7.8.1 and 15.4.4
Limits of acceptance for procedure of evidence: References:
QD2-001 and QM2-011 IEC 60601-1, Clause 7.8.1 and 15.4.4
Procedure for verification: References:
QD2-001 and QM2-011 IEC 60601-1, Clause 7.8.1 and 15.4.4
References:Limits of acceptance for verification:
QD2-001 and QM2-011 IEC 60601-1, Clause 7.8.1 and 15.4.4
Page 69 of 148
Onyx Healthcare Inc.
12-14-2011Project number: Version: Short name:1112024003 1.00 ONYX-BE18xDT
Measure number: RC-007
References:Procedure for validation:
QD2-001 and QM2-011 IEC 60601-1, Clause 7.8.1 and 15.4.4
References:Limits of acceptance for validation:
QD2-001 and QM2-011 IEC 60601-1, Clause 7.8.1 and 15.4.4
Page 70 of 148
Onyx Healthcare Inc.
12-14-2011Project number: Version: Short name:1112024003 1.00 ONYX-BE18xDT
Measure number: RC-008
Measure text:
Internal cables and wiring is fixed in place by cable tie to protect against contact with a moving part or from friction
at sharp corners and edges where damage to insulation
State of measure:
Responsible
Implementation: Supervising: Peter PanOwen Hsieh
Finished
Plan:
Start: End:10-1-2011 12-31-2011
Actual values:
Start: End:10-12-2011 11-28-2011
Effort:
Planned: Actual:
Validation:
Validated through:
Is validated:
Validated on:Steven Chen
Yes
12-09-2011
Release:
Release through:
Is released:
Release on:James ChenYes
12-9-2011
The internal wirings were secured in place on PCB by UL R/C non-chemical bounding component.
Decided tasks:
Wireways shall be smooth and free from sharp edges. Wires shall be protected so that they do not come into
contact with burrs, cooling fins, moving parts, etc., which could cause damage to the insulation of conductors.
Holes in metal, through which insulated wires pass, shall have smooth well-rounded surfaces or shall be
provided with bushings.
Comment:
Assigned functions, hazards, causes:
Connect to Mains Electromagnetic energy Internal cables and wiring is not
adequately protected against contact
with a moving part or from friction at
sharp corners and edges where
damage to insulation.
Realization team:
James Chen
Steve Chen
Mike Ho
Owen Hsieh
Peter Pan
Procedure for evidence of efficiency for measures: References:
QD2-001, QD2-010, QM2-011 and QD2-009 QQ1-001
Limits of acceptance for procedure of evidence: References:
QD2-001, QD2-010, QM2-011 and QD2-009 QQ1-001
Procedure for verification: References:
QD2-001, QD2-010, QM2-011 and QD2-009 QQ1-001
Page 71 of 148
Onyx Healthcare Inc.
12-14-2011Project number: Version: Short name:1112024003 1.00 ONYX-BE18xDT
Measure number: RC-008
References:Limits of acceptance for verification:
QD2-001, QD2-010, QM2-011 and QD2-009 QQ1-001
References:Procedure for validation:
QD2-001, QD2-010, QM2-011 and QD2-009 QQ1-001
References:Limits of acceptance for validation:
QD2-001, QD2-010, QM2-011 and QD2-009 QQ1-001
Page 72 of 148
Onyx Healthcare Inc.
12-14-2011Project number: Version: Short name:1112024003 1.00 ONYX-BE18xDT
Measure number: RC-009
Measure text:
Marked with symbols IEC 60417
State of measure:
Responsible
Implementation: Supervising: James ChenPeter Pan
Finished
Plan:
Start: End:10-1-2011 12-31-2011
Actual values:
Start: End:10-12-2011 11-29-2011
Effort:
Planned: Actual:
Validation:
Validated through:
Is validated:
Validated on:Steven Chen
Yes
12-09-2011
Release:
Release through:
Is released:
Release on:James ChenYes
12-9-2011
- marked with symbols IEC 60417,
- ndicated by an adjacent indicator light
Decided tasks:
Switches used to control power to ME EQUIPMENT or its parts, including mains switches, shall have their "on"
and "off" positions
Comment:
Assigned functions, hazards, causes:
User control and indicator Operational Switches used to control power to PC
or its parts, including switches, did
not have their "on" and "off" positions.
Realization team:
James Chen
Steve Chen
Mike Ho
Owen Hsieh
Peter Pan
Procedure for evidence of efficiency for measures: References:
Compliance with the requirements is checked by inspection and by
application of the tests and criteria in 7.1.2 and 7.1.3 of IEC 60601-1.
IEC 60601-1, Clause 7.4.1, 7.4.2, 7.8.1
and 15.4.4
Limits of acceptance for procedure of evidence: References:
The colours of indicator lights and their meanings shall comply with Table
2 of IEC 60601-1.
IEC 60601-1, Clause 7.4.1, 7.4.2, 7.8.1
and 15.4.4
Procedure for verification: References:
see above IEC 60601-1, Clause 7.4.1, 7.4.2, 7.8.1
and 15.4.4
Page 73 of 148
Onyx Healthcare Inc.
12-14-2011Project number: Version: Short name:1112024003 1.00 ONYX-BE18xDT
Measure number: RC-009
References:Limits of acceptance for verification:
see above IEC 60601-1, Clause 7.4.1, 7.4.2, 7.8.1
and 15.4.4
References:Procedure for validation:
see above IEC 60601-1, Clause 7.4.1, 7.4.2, 7.8.1
and 15.4.4
References:Limits of acceptance for validation:
see above IEC 60601-1, Clause 7.4.1, 7.4.2, 7.8.1
and 15.4.4
Page 74 of 148
Onyx Healthcare Inc.
12-14-2011Project number: Version: Short name:1112024003 1.00 ONYX-BE18xDT
Measure number: RC-010
Measure text:
Meet IEC 60601-1 Clause 9.8.2 and Table 21 requirements.
State of measure:
Responsible
Implementation: Supervising: Owen HsiehMike Ho
Finished
Plan:
Start: End:10-1-2011 12-31-2011
Actual values:
Start: End:11-9-2011 11-16-2011
Effort:
Planned: Actual:
Validation:
Validated through:
Is validated:
Validated on:Steven Chen
Yes
12-09-2011
Release:
Release through:
Is released:
Release on:James ChenYes
12-9-2011
The construction of the support, suspension or actuation system shall be designed based upon Table 21 of IEC
60601-1 and the TOTAL LOAD.
Decided tasks:
Where ME EQUIPMENT parts are designed to support loads, then a mechanical fault could not constitute an
unacceptable RISK.
Comment:
Assigned functions, hazards, causes:
Enclosure Mechanical energy Suspended masses
Rear Bracket Mechanical energy Crack
Rear Bracket Mechanical energy Suspended masses
Rear Bracket Mechanical energy Instability
Realization team:
James Chen
Steve Chen
Mike Ho
Owen Hsieh
Peter Pan
Procedure for evidence of efficiency for measures: References:
The suspension system parts indicated in the table below (chain, cable,
band, spring, belt, jack screw nut, pneumatic, hydraulic hoses, or the like)
employed to support a load, were defeated by convenient means (cut or
removed suddenly), thereby causing the maximum normal load to fall
from the most adverse position permitted by the construction of the
equipment and to activate a safety device. The travel after such defeat
was measured as well as other observed results that could affect the risk
of possible injury.
IEC 60601-1, Clause 9.8.2
Limits of acceptance for procedure of evidence: References:
There was no evidence of damage to a safety catch or other restraining
means that would affect its ability to perform its intended function .
IEC 60601-1, Clause 9.8.2
Page 75 of 148
Onyx Healthcare Inc.
12-14-2011Project number: Version: Short name:1112024003 1.00 ONYX-BE18xDT
Measure number: RC-010
Procedure for verification: References:
see above IEC 60601-1, Clause 9.8.2
References:Limits of acceptance for verification:
see above IEC 60601-1, Clause 9.8.2
References:Procedure for validation:
see above IEC 60601-1, Clause 9.8.2
References:Limits of acceptance for validation:
see above IEC 60601-1, Clause 9.8.2
Page 76 of 148
Onyx Healthcare Inc.
12-14-2011Project number: Version: Short name:1112024003 1.00 ONYX-BE18xDT
Measure number: RC-011
Measure text:
Meet IEC 60601-1, Clause 7 requirements.
State of measure:
Responsible
Implementation: Supervising: Peter PanOwen Hsieh
Finished
Plan:
Start: End:10-1-2011 12-31-2011
Actual values:
Start: End:10-6-2011 11-28-2011
Effort:
Planned: Actual:
Validation:
Validated through:
Is validated:
Validated on:Steven Chen
Yes
12-09-2011
Release:
Release through:
Is released:
Release on:James ChenYes
12-9-2011
For Ward Terminal to be well designed, its markings and ACCOMPANYING DOCUMENTS should be clear,
consistent, and help to reduce potential use erro.
Decided tasks:
Additional markings are permitted, provided that they do not give rise to misunderstanding. Where symbols are
used, they shall conform to ISO 7000 or IEC 60417 where appropriate symbols exist. Sufficient information
shall be provided to the USER concerning any condition necessary to ensure that , when used as prescribed by
the manufacturer, the equipment is unlikely to present a hazard within the meaning of IEC 60601-1.
Comment:
Assigned functions, hazards, causes:
Information Labeling Incomplete instructions for use
Information Labeling Inadequate description of
performance characteristics
Information Labeling Inadequate specification of intended
use.
Information Labeling Inadequate disclosure of limitations
Information Operating instructions Inadequate specification of
accessories to be used with the
medical device.
Information Operating instructions Inadequate specification of pre-use
checks.
Information Operating instructions Over-complicated operating
instructions.
Information Specification of service and
maintenance
Installation instruction
Realization team:
James Chen
Steve Chen
Mike Ho
Owen Hsieh
Peter Pan
Procedure for evidence of efficiency for measures: References:
Each specified marking was rubbed by hand, without undue pressure,
first for 15 s with a cloth rag soaked with distilled water, then for 15 s with
a cloth rag soaked in methylated spirit at ambient temperature, and then
for 15 s with a cloth rag soaked with isopropyl alcohol.
IEC 60601-1, 3rd Edition, Clause 7.1.3b
Page 77 of 148
Onyx Healthcare Inc.
12-14-2011Project number: Version: Short name:1112024003 1.00 ONYX-BE18xDT
Measure number: RC-011
Limits of acceptance for procedure of evidence: References:
The markings worked and did not curl at the edges. The markings were
clearly readable.
IEC 60601-1, 3rd Edition, Clause 7.1.3b
Procedure for verification: References:
see above IEC 60601-1, 3rd Edition, Clause 7.1.3b
References:Limits of acceptance for verification:
see above IEC 60601-1, 3rd Edition, Clause 7.1.3b
References:Procedure for validation:
see above IEC 60601-1, 3rd Edition, Clause 7.1.3b
References:Limits of acceptance for validation:
see above IEC 60601-1, 3rd Edition, Clause 7.1.3b
Page 78 of 148
Onyx Healthcare Inc.
12-14-2011Project number: Version: Short name:1112024003 1.00 ONYX-BE18xDT
Measure number: RC-012
Measure text:
Meet IEC 60601-1, Clause 8.7 LEAKAGE CURRENTS and PATIENT AUXILIARY CURRENTS requirements
State of measure:
Responsible
Implementation: Supervising: Mike HoPeter Pan
Finished
Plan:
Start: End:10-1-2011 12-31-2011
Actual values:
Start: End:10-12-2011 11-23-2011
Effort:
Planned: Actual:
Validation:
Validated through:
Is validated:
Validated on:Steven Chen
Yes
12-09-2011
Release:
Release through:
Is released:
Release on:James ChenYes
12-9-2011
Meet IEC 60601-1, Clause 8.7 LEAKAGE CURRENTS and PATIENT AUXILIARY CURRENTS requirements.
Decided tasks:
The electrical isolation providing protection against electric shock shall be of such quality that currents flowing
through it are limited to the values specified in IEC 60601-1, Clause 8.7.3.
Comment:
Assigned functions, hazards, causes:
Connect to Mains Electromagnetic energy Too high leakage current, causing a
death or serious injury to a patient.
Connect to Mains Electromagnetic energy The LEAKAGE CURRENTS from, to
or between ACCESSIBLE PARTS
other than PATIENT CONNECTIONS
Touch Panel & Plastic Enclosure
(TYPE B APPLIED PART)
Electromagnetic energy Too high leakage current, causing a
death or serious injury to a patient.
Realization team:
James Chen
Steve Chen
Mike Ho
Owen Hsieh
Peter Pan
Procedure for evidence of efficiency for measures: References:
Testing was conducted after thermal stabilization and was repeated
Humidity Preconditioning. Following the humidity conditioning (see
Humidity Conditioning Test for further details), the equipment was located
in an environment with a temperature approximately equal to t where t is
the temperature of the humidity cabinet and a relative humidity between
45% and 65% and was conducted 1 hour after the end of the humidity
preconditioning treatment. In Normal Condition and in the specified
Single Fault Conditions (IEC
60601-1, 3rd Ed., 8.7.2)
With the Equipment energized in stand-by and fully operating and with
any switch in the Mains Part in any position. With the equipment
connected to a supply source with the highest rated supply frequency and
110% of the highest rated Mains Voltage as indicated in the RESULTS
table.
IEC 60601-1, 3rd Edition, Clause 8.7
Page 79 of 148
Onyx Healthcare Inc.
12-14-2011Project number: Version: Short name:1112024003 1.00 ONYX-BE18xDT
Measure number: RC-012
Limits of acceptance for procedure of evidence: References:
IEC 60601-1, 3rd Ed. Table 3 and Table 4 IEC 60601-1, 3rd Edition, Clause 8.7
Procedure for verification: References:
see above IEC 60601-1, 3rd Edition, Clause 8.7
References:Limits of acceptance for verification:
see above IEC 60601-1, 3rd Edition, Clause 8.7
References:Procedure for validation:
see above IEC 60601-1, 3rd Edition, Clause 8.7
References:Limits of acceptance for validation:
see above IEC 60601-1, 3rd Edition, Clause 8.7
Page 80 of 148
Onyx Healthcare Inc.
12-14-2011Project number: Version: Short name:1112024003 1.00 ONYX-BE18xDT
Measure number: RC-013
Measure text:
Meet IEC 60601-1, Clause 9.4.2 requiremets.
State of measure:
Responsible
Implementation: Supervising: Owen HsiehMike Ho
Finished
Plan:
Start: End:10-1-2011 12-31-2011
Actual values:
Start: End:10-12-2011 11-29-2011
Effort:
Planned: Actual:
Validation:
Validated through: Steven ChenIs validated:
Validated on: Yes
12-09-2011
Release:
Release through:
Is released:
Release on:James ChenYes
12-9-2011
The equipment did not overbalance.
Decided tasks:
PC or its parts shall not overbalance when placed in any transport position of NORMAL USE on a plane inclined
at an angle of 10° from the horizontal plane.
Comment:
Assigned functions, hazards, causes:
Enclosure Mechanical energy Falling
Realization team:
James Chen
Steve Chen
Mike Ho
Owen Hsieh
Peter Pan
Procedure for evidence of efficiency for measures: References:
10° Incline (9.4.2.1) - The equipment was placed in any normal use
transport position on a plane inclined 10° from the horizontal. Prior to
testing the equipment was prepared as noted in accordance with Clause
9.4.2.2.
IEC 60601-1, 3rd Edition, Clause 9.4.2
Limits of acceptance for procedure of evidence: References:
The equipment did not overbalance. IEC 60601-1, 3rd Edition, Clause 9.4.2
Procedure for verification: References:
see above IEC 60601-1, 3rd Edition, Clause 9.4.2
References:Limits of acceptance for verification:
see above IEC 60601-1, 3rd Edition, Clause 9.4.2
Page 81 of 148
Onyx Healthcare Inc.
12-14-2011Project number: Version: Short name:1112024003 1.00 ONYX-BE18xDT
Measure number: RC-013
References:Procedure for validation:
see above IEC 60601-1, 3rd Edition, Clause 9.4.2
References:Limits of acceptance for validation:
see above IEC 60601-1, 3rd Edition, Clause 9.4.2
Page 82 of 148
Onyx Healthcare Inc.
12-14-2011Project number: Version: Short name:1112024003 1.00 ONYX-BE18xDT
Measure number: RC-014
Measure text:
Meet IEC 60601-1-2 requirements
State of measure:
Responsible
Implementation: Supervising: Peter PanOwen Hsieh
Finished
Plan:
Start: End:10-1-2011 12-31-2011
Actual values:
Start: End:10-12-2011 11-23-2011
Effort:
Planned: Actual:
Validation:
Validated through:
Is validated:
Validated on:Steven Chen
Yes
12-09-2011
Release:
Release through:
Is released:
Release on:James ChenYes
12-9-2011
Meet IEC 60601-1-2 requirements
Decided tasks:
Electromagnetic emission requirements are necessary for the protection of:
- safety services (e.g. police, fire and ambulance communications);
- other ME EQUIPMENT and ME SYSTEMS;
- non-ME EQUIPMENT (e.g. computers);
- telecommunications (e.g. radio/TV, telephone, radio-navigation).
Comment:
Assigned functions, hazards, causes:
Connect to Mains Electromagnetic energy Electromagnetic compatibility of PC.
Realization team:
James Chen
Steve Chen
Mike Ho
Owen Hsieh
Peter Pan
Procedure for evidence of efficiency for measures: References:
IEC 60601-1-2 EMC Test Report (Report No.
T111031202-E)
Limits of acceptance for procedure of evidence: References:
IEC 60601-1-2 EMC Test Report (Report No.
T111031202-E)
Procedure for verification: References:
IEC 60601-1-2 EMC Test Report (Report No.
T111031202-E)
Page 83 of 148
Onyx Healthcare Inc.
12-14-2011Project number: Version: Short name:1112024003 1.00 ONYX-BE18xDT
Measure number: RC-014
References:Limits of acceptance for verification:
IEC 60601-1-2 EMC Test Report (Report No.
T111031202-E)
References:Procedure for validation:
IEC 60601-1-2 EMC Test Report (Report No.
T111031202-E)
References:Limits of acceptance for validation:
IEC 60601-1-2 EMC Test Report (Report No.
T111031202-E)
Page 84 of 148
Onyx Healthcare Inc.
12-14-2011Project number: Version: Short name:1112024003 1.00 ONYX-BE18xDT
Measure number: RC-015
Measure text:
Meet IEC 60950-1, Annex NAD Acoustic tests requirements
State of measure:
Responsible
Implementation: Supervising: Mike HoPeter Pan
Finished
Plan:
Start: End:10-1-2011 12-31-2011
Actual values:
Start: End:10-6-2011 11-23-2011
Effort:
Planned: Actual:
Validation:
Validated through:
Is validated:
Validated on:Steven Chen
Yes
12-09-2011
Release:
Release through:
Is released:
Release on:James ChenYes
12-9-2011
The equipment having acoustic outputs at communication receivers and similar devices used for voice
elecommunication, regardless of transmission medium (e.g., TELECOMMUNICATION NETWORK, CABLE
DISTRIBUTION NETWORK, wireless network), shall demonstrate that the equipment complies with the
appropriate acoustics requirements related to
short duration impulses and long duration disturbances as described in NAD.3 and NAD.4. of IEC 60950-1.
Decided tasks:
These requirements apply to equipment that is intended to be connected directly or indirectly to a
ELECOMMUNICATION NETWORK or CABLE DISTRIBUTION SYSTEM or other transmission medium, and
that contains an earpiece or receiver that is held against or in the ear. The effect on human hearing of impulsive
noise or of disturbances that are less than 0,5 s in duration shall be evaluated under NAD.3. The effect of
longer disturbances, such as those that might be produced during tone-type dialing, shall be evaluated under
NAD.4.
Comment:
Assigned functions, hazards, causes:
Signal output Acoustic energy (sound) earphone
Realization team:
James Chen
Steve Chen
Mike Ho
Owen Hsieh
Peter Pan
Procedure for evidence of efficiency for measures: References:
Page 85 of 148
Onyx Healthcare Inc.
12-14-2011Project number: Version: Short name:1112024003 1.00 ONYX-BE18xDT
Measure number: RC-015
The headset of the equipment was placed according to the general setup
page and operating for the exchange of calls (such as talking state with
the handset raised). A short duration peak applied to the tip and ring by
applying digital codes to the receive input of the device. This may be
performed by using an
analog test set to drive a reference codec, or by use of a digital code
generator. The analog level shall be set to switch between the maximum
positive and the maximum negative values for the reference codec. The
switching rate shall be through the range of 100 Hz to 3400 Hz for narrow
band and 100 Hz to 6800 Hz for wideband. The duration of the ON codes
shall be a number of complete cycles approximating but exceeding 500
ms. The ON codes must be followed by a quiet interval of at least 500 ms
before repeating the codes. For equipment not intended to be directly
connected to the Telecommunication Network, such as equipment used
with specialized PBX or Key systems and the like, the short duration peak
was applied
between the tip and ring terminals of the system.
The equipment was checked for self generated acoustic impulses such
as those produced by operation of the hook switch or by dialing.
IEC 60950-1, Annex NAD
Limits of acceptance for procedure of evidence: References:
The peak acoustic pressure did not exceed 136 dB ERP IEC 60950-1, Annex NAD
Procedure for verification: References:
see above IEC 60950-1, Annex NAD
References:Limits of acceptance for verification:
see above IEC 60950-1, Annex NAD
References:Procedure for validation:
see above IEC 60950-1, Annex NAD
References:Limits of acceptance for validation:
see above IEC 60950-1, Annex NAD
Page 86 of 148
Onyx Healthcare Inc.
12-14-2011Project number: Version: Short name:1112024003 1.00 ONYX-BE18xDT
Measure number: RC-016
Measure text:
PC marked the name or trademark of Onyx with model no.
State of measure:
Responsible
Implementation: Supervising: Owen HsiehMike Ho
Finished
Plan:
Start: End:10-1-2011 12-31-2011
Actual values:
Start: End:10-12-2011 11-28-2011
Effort:
Planned: Actual:
Validation:
Validated through:
Is validated:
Validated on:Steven Chen
Yes
12-09-2011
Release:
Release through:
Is released:
Release on:James ChenYes
12-9-2011
Marked the name or trademark and with model no.
Decided tasks:
Identification
Comment:
Assigned functions, hazards, causes:
Information Labeling PC did not marke with the name or
trademark of Onyx and with a
MODEL OR TYPE REFERENCE
Realization team:
James Chen
Steve Chen
Mike Ho
Owen Hsieh
Peter Pan
Procedure for evidence of efficiency for measures: References:
Meet IEC 60601-1 3rd Ed. Clause 7.2.2 requirements IEC 60601-1 3rd Ed. Clause 7.2.2
Limits of acceptance for procedure of evidence: References:
see above IEC 60601-1 3rd Ed. Clause 7.2.2
Procedure for verification: References:
see above IEC 60601-1 3rd Ed. Clause 7.2.2
References:Limits of acceptance for verification:
see above IEC 60601-1 3rd Ed. Clause 7.2.2
Page 87 of 148
Onyx Healthcare Inc.
12-14-2011Project number: Version: Short name:1112024003 1.00 ONYX-BE18xDT
Measure number: RC-016
References:Procedure for validation:
see above IEC 60601-1 3rd Ed. Clause 7.2.2
References:Limits of acceptance for validation:
see above IEC 60601-1 3rd Ed. Clause 7.2.2
Page 88 of 148
Onyx Healthcare Inc.
12-14-2011Project number: Version: Short name:1112024003 1.00 ONYX-BE18xDT
Measure number: RC-017
Measure text:
Provided a connector that has special housing to prevent a connection with the wrong polarity is made.
State of measure:
Responsible
Implementation: Supervising: Peter PanOwen Hsieh
Finished
Plan:
Start: End:10-1-2011 12-31-2011
Actual values:
Start: End:10-7-2011 11-24-2011
Effort:
Planned: Actual:
Validation:
Validated through:
Is validated:
Validated on:Steven Chen
Yes
12-09-2011
Release:
Release through:
Is released:
Release on:James ChenYes
12-9-2011
Provided a connector that has special housing to prevent a connection with the wrong polarity is made.
Decided tasks:
No HAZARDOUS SITUATION, other than absence of ESSENTIAL PERFORMANCE, shall develop when a
connection with the wrong polarity is made.
Comment:
Assigned functions, hazards, causes:
Connection to an external d.c.
power source
Thermal Energy When a connection with the wrong
polarity is made.
Realization team:
James Chen
Steve Chen
Mike Ho
Owen Hsieh
Peter Pan
Procedure for evidence of efficiency for measures: References:
QD2-001, QD2-009 and QD2-010 QQ1-001
Limits of acceptance for procedure of evidence: References:
QD2-001, QD2-009 and QD2-010 QQ1-001
Procedure for verification: References:
QD2-001, QD2-009 and QD2-010 QQ1-001
References:Limits of acceptance for verification:
QD2-001, QD2-009 and QD2-010 QQ1-001
Page 89 of 148
Onyx Healthcare Inc.
12-14-2011Project number: Version: Short name:1112024003 1.00 ONYX-BE18xDT
Measure number: RC-017
References:Procedure for validation:
QD2-001, QD2-009 and QD2-010 QQ1-001
References:Limits of acceptance for validation:
QD2-001, QD2-009 and QD2-010 QQ1-001
Page 90 of 148
Onyx Healthcare Inc.
12-14-2011Project number: Version: Short name:1112024003 1.00 ONYX-BE18xDT
Measure number: RC-018
Measure text:
Rounding of sharp edges and corners.
State of measure:
Responsible
Implementation: Supervising: Mike HoPeter Pan
Finished
Plan:
Start: End:10-1-2011 12-31-2011
Actual values:
Start: End:10-6-2011 11-18-2011
Effort:
Planned: Actual:
Validation:
Validated through:
Is validated:
Validated on:Steven Chen
Yes
12-09-2011
Release:
Release through:
Is released:
Release on:James ChenYes
12-9-2011
Rounding of sharp edge and corner.
Decided tasks:
Rough surfaces, sharp corners and edges of Bedside Terminal that could result in an unacceptable RISK.
Comment:
Assigned functions, hazards, causes:
Enclosure Mechanical energy Sharp edges and corners
Realization team:
James Chen
Steve Chen
Mike Ho
Owen Hsieh
Peter Pan
Procedure for evidence of efficiency for measures: References:
Accessible edges or corners of the unit, except those required for proper
functioning of the equipment, were subjected to this test. Surfaces
described below were judged using the Sharp Edge Tester . The curved
face of the tester head was covered with three layers of tape: bottom
layer 1.6 mm black vinyl foam tape; middle layer 0.8 mm white vinyl foam
tape; outer layer 0.08 mm (3 mil) Teflon tape skived. The tape-covered
head of the tester was positioned on the edge to check for sharpness.
The arm of the tester was calibrated so that a 6.7 N force was present at
the center of the head when the arm was between stops. This force was
applied on the sharp edge. The tester was immediately moved 50.5 mm
along the edge and then back to its starting position without removing the
tester so that total distance traveled was 101 mm. The time of travel was
no longer than 5 seconds nor less than 2 seconds.
IEC 60601-1, Clause 9.3
Limits of acceptance for procedure of evidence: References:
The edges and corners were considered to be rounded and smooth. IEC 60601-1, Clause 9.3
Page 91 of 148
Onyx Healthcare Inc.
12-14-2011Project number: Version: Short name:1112024003 1.00 ONYX-BE18xDT
Measure number: RC-018
Procedure for verification: References:
see above IEC 60601-1, Clause 9.3
References:Limits of acceptance for verification:
see above IEC 60601-1, Clause 9.3
References:Procedure for validation:
see above IEC 60601-1, Clause 9.3
References:Limits of acceptance for validation:
see above IEC 60601-1, Clause 9.3
Page 92 of 148
Onyx Healthcare Inc.
12-14-2011Project number: Version: Short name:1112024003 1.00 ONYX-BE18xDT
Measure number: RC-019
Measure text:
Said components were secured in place on pcb by UL Recognized non -chemical
bounding compound.
State of measure:
Responsible
Implementation: Supervising: Owen HsiehMike Ho
Finished
Plan:
Start: End:10-1-2011 12-31-2011
Actual values:
Start: End:10-5-2011 11-28-2011
Effort:
Planned: Actual:
Validation:
Validated through:
Is validated:
Validated on:Steven Chen
Yes
12-09-2011
Release:
Release through:
Is released:
Release on:James ChenYes
12-9-2011
Said components were secured in place on pcb by UL Recognized non-chemical bounding compound.
Decided tasks:
Components of power supply, unwanted movement of which could result in an unacceptable RISK, shall be
mounted securely to prevent such movement.
Comment:
Assigned functions, hazards, causes:
Connect to Mains Electromagnetic energy Components of PC, unwanted
movement of which could result in an
unacceptableb RISK, is not mounted
securely to prevent such movement.
Realization team:
James Chen
Steve Chen
Mike Ho
Owen Hsieh
Peter Pan
Procedure for evidence of efficiency for measures: References:
Having used the unjointed probe, which was in the shape of the standard
test finger and which incorporated a force gauge, a steady force of 10 N
for internal parts was applied for a period of 5 seconds.
QD2-001, QD2-010, QM2-011 and
QD2-009
Limits of acceptance for procedure of evidence: References:
During the application of the test force, clearances behind earthed or
unearthed conductive accessable parts were not reduced to a level that
would result in an energy hazard.
QD2-001, QD2-010, QM2-011 and
QD2-009
Procedure for verification: References:
see above QD2-001, QD2-010, QM2-011 and
QD2-009
Page 93 of 148
Onyx Healthcare Inc.
12-14-2011Project number: Version: Short name:1112024003 1.00 ONYX-BE18xDT
Measure number: RC-019
References:Limits of acceptance for verification:
see above QD2-001, QD2-010, QM2-011 and
QD2-009
References:Procedure for validation:
see above QD2-001, QD2-010, QM2-011 and
QD2-009
References:Limits of acceptance for validation:
see above QD2-001, QD2-010, QM2-011 and
QD2-009
Page 94 of 148
Onyx Healthcare Inc.
12-14-2011Project number: Version: Short name:1112024003 1.00 ONYX-BE18xDT
Measure number: RC-020
Measure text:
Shall compliance with the following tests: resistance to moisture, etc. (see IEC
60601-1, Clause 11.6); dielectric strength (see IEC 60601-1, Clause 8.8.3); and
mechanical strength (see IEC 60601-1, Clause 15.3).
State of measure:
Responsible
Implementation: Supervising: Peter PanOwen Hsieh
Finished
Plan:
Start: End:10-1-2011 12-31-2011
Actual values:
Start: End:10-12-2011 11-15-2011
Effort:
Planned: Actual:
Validation:
Validated through:
Is validated:
Validated on:Steven Chen
Yes
12-09-2011
Release:
Release through:
Is released:
Release on:James ChenYes
12-9-2011
Shall compliance with the following tests: resistance to moisture, etc. (see IEC 60601-1, clause 11.6); dielectric
strength (see IEC 60601-1, clause 8.8.3); and mechanical strength (see IEC 60601-1, clause 15.3).
Decided tasks:
The resistance to heat shall retained by all types of insulation, including insulating partition walls, during the
EXPECTED SERVICE LIFE of the PC.
Comment:
Assigned functions, hazards, causes:
Connect to Mains Electromagnetic energy The resistance to heat is not retained
by all types of insulation, including
insulating partition walls, during the
EXPECTED SERVICE LIFE of the
PC.
Realization team:
James Chen
Steve Chen
Mike Ho
Owen Hsieh
Peter Pan
Procedure for evidence of efficiency for measures: References:
A sample of each external part of insulating material indicated in the table
was tested using the test apparatus shown in Fig. 21 of IEC 60601-1, 3rd
Edition. (In this apparatus, a steel ball of 5 mm diameter exerts a force of
20 N when pressed against a surface). The apparatus and a fire (or
sand) brick were placed in an air-circulating oven. Once the apparatus
and brick attained the oven temperature, the sample was placed in the
oven on top of the brick. The steel ball was then positioned such that the
apparatus was balanced on the surface of the sample. After 1 h, it was
removed and the diameter of the impression made by the ball was
measured. The specified oven temperature was the higher of the
following:
a. the sum of the specified ambient and the temperature rise of relevant
part during the Temperature Test; AND
b. 75°C ± 2°C (test per Clause 8.8.4.1a), OR 125°C ± 2°C (test per
Clause 8.8.4.1b)
IEC 60601-1, 3rd Edition, Clause 8.8.4.1
Page 95 of 148
Onyx Healthcare Inc.
12-14-2011Project number: Version: Short name:1112024003 1.00 ONYX-BE18xDT
Measure number: RC-020
Limits of acceptance for procedure of evidence: References:
The results were less 2 mm.
Cracks were not visible to the naked eye.
IEC 60601-1, 3rd Edition, Clause 8.8.4.1
Procedure for verification: References:
see above IEC 60601-1, 3rd Edition, Clause 8.8.4.1
References:Limits of acceptance for verification:
see above IEC 60601-1, 3rd Edition, Clause 8.8.4.1
References:Procedure for validation:
see above IEC 60601-1, 3rd Edition, Clause 8.8.4.1
References:Limits of acceptance for validation:
see above IEC 60601-1, 3rd Edition, Clause 8.8.4.1
Page 96 of 148
Onyx Healthcare Inc.
12-14-2011Project number: Version: Short name:1112024003 1.00 ONYX-BE18xDT
Measure number: RC-021
Measure text:
Supplied by SELV power adapter and DC/AC inverter meet LCC requirements.
State of measure:
Responsible
Implementation: Supervising: Mike HoPeter Pan
Finished
Plan:
Start: End:10-1-2011 12-31-2011
Actual values:
Start: End:10-13-2011 11-24-2011
Effort:
Planned: Actual:
Validation:
Validated through:
Is validated:
Validated on:Steven Chen
Yes
12-09-2011
Release:
Release through:
Is released:
Release on:James ChenYes
12-9-2011
Supplied by SELV power adapter and DC/AC inverter meet LCC requirements
Decided tasks:
ACCESSIBLE PARTS (output connector) shall not exceed 42.4 V peak a.c. or 60 V d.c. in NORMAL
CONDITION or in SINGLE FAULT CONDITION.
Comment:
Assigned functions, hazards, causes:
Connect to Mains Electromagnetic energy ACCESSIBLE PARTS exceed 42.4 V
peak a.c. or 60 V d.c. in NORMAL
CONDITION or in SINGLE FAULT
CONDITION.
Signal input Electromagnetic energy ACCESSIBLE PARTS exceed 42.4 V
peak a.c. or 60 V d.c. in NORMAL
CONDITION or in SINGLE FAULT
CONDITION.
Realization team:
James Chen
Steve Chen
Mike Ho
Owen Hsieh
Peter Pan
Procedure for evidence of efficiency for measures: References:
A short of the operational or basic insulation indicated in the table was
made. The voltage present at the accessible parts/circuitry was
measured, recorded and compared to 42.4 V pk ac and 60 V dc.
QD2-001, QD2-010, QM2-011 and
QD2-009
Limits of acceptance for procedure of evidence: References:
The voltage did not exceed 42.4 V peak ac or 60 V dc. QD2-001, QD2-010, QM2-011 and
QD2-009
Procedure for verification: References:
Page 97 of 148
Onyx Healthcare Inc.
12-14-2011Project number: Version: Short name:1112024003 1.00 ONYX-BE18xDT
Measure number: RC-021
see above QD2-001, QD2-010, QM2-011 and
QD2-009
References:Limits of acceptance for verification:
see above QD2-001, QD2-010, QM2-011 and
QD2-009
References:Procedure for validation:
see above QD2-001, QD2-010, QM2-011 and
QD2-009
References:Limits of acceptance for validation:
see above QD2-001, QD2-010, QM2-011 and
QD2-009
Page 98 of 148
Onyx Healthcare Inc.
12-14-2011Project number: Version: Short name:1112024003 1.00 ONYX-BE18xDT
Measure number: RC-022
Measure text:
The equipment complied with the requirements of IEC 60601-1, Clause 11.6.
State of measure:
Responsible
Implementation: Supervising: Owen HsiehMike Ho
Finished
Plan:
Start: End:10-1-2011 12-31-2011
Actual values:
Start: End:10-17-2011 11-25-2011
Effort:
Planned: Actual:
Validation:
Validated through:
Is validated:
Validated on:Steven Chen
Yes
12-09-2011
Release:
Release through:
Is released:
Release on:James ChenYes
12-9-2011
The equipment complied ]with the requirements of IEC 60601-1, Clause 11.6.
Decided tasks:
The monitor and their parts, including ACCESSORIES, shall be capable of withstanding, without damage or
deterioration of safety provisions, the cleaning or disinfection PROCESSES specified in the instructions for use.
Comment:
Assigned functions, hazards, causes:
Connect to Mains Electromagnetic energy Cleaning
Realization team:
James Chen
Steve Chen
Mike Ho
Owen Hsieh
Peter Pan
Procedure for evidence of efficiency for measures: References:
The equipment was cleaned/disinfected as specified in the instructions
for use. After an adequate cooling and drying period, the unit was
subjected to Leakage Current and Dielectric Voltage Withstand Tests as
noted below. The effect of multiple cleanings/disinfections over the
expected service life of the equipment was considered.
IEC 60601-1, 3rd Edition, Clause 11.6
Limits of acceptance for procedure of evidence: References:
The equipment complied with the requirements of IEC 60601-1, Clause
11.6.
The equipment did not show signs of wetting of uninsulated live parts.
There were no dielectric breakdown and/or leakage current test
non-compliances.
IEC 60601-1, 3rd Edition, Clause 11.6)
Procedure for verification: References:
see above IEC 60601-1, 3rd Edition, Clause 11.6)
Page 99 of 148
Onyx Healthcare Inc.
12-14-2011Project number: Version: Short name:1112024003 1.00 ONYX-BE18xDT
Measure number: RC-022
References:Limits of acceptance for verification:
see above IEC 60601-1, 3rd Edition, Clause 11.6)
References:Procedure for validation:
see above IEC 60601-1, 3rd Edition, Clause 11.6)
References:Limits of acceptance for validation:
see above IEC 60601-1, 3rd Edition, Clause 11.6)
Page 100 of 148
Onyx Healthcare Inc.
12-14-2011Project number: Version: Short name:1112024003 1.00 ONYX-BE18xDT
Measure number: RC-023
Measure text:
The HAZARDOUS SITUATIONS in IEC 60601-1, Clause 13.1.2 to 13.1.4
(inclusive) do not occur in the PC and power adapter
State of measure:
Responsible
Implementation: Supervising: Peter PanOwen Hsieh
Finished
Plan:
Start: End:10-1-2011 12-31-2011
Actual values:
Start: End:10-12-2011 11-30-2011
Effort:
Planned: Actual:
Validation:
Validated through:
Is validated:
Validated on:Steven Chen
Yes
12-09-2011
Release:
Release through:
Is released:
Release on:James ChenYes
12-9-2011
Meet Clause 13 of IEC 60601-1, 3rd Ed. requirements.
Decided tasks:
HAZARDOUS SITUATIONS and fault conditions.
Comment:
Assigned functions, hazards, causes:
Connect to Mains Electromagnetic energy Short circuit of any one insulation that
complies with the requirements for
one MEANS OF PROTECTION as
specified in IEC 60601-1, Clause 8.8
Connect to Mains Electromagnetic energy Short circuit of any one CREEPAGE
DISTANCE or AIR CLEARANCE that
complies with the requirements for
one MEANS OF PROTECTION as
specified in
IEC 60601-1, Clause 8.9
Connect to Mains Electromagnetic energy Open circuit of any one
PROTECTIVE EARTH
CONDUCTOR or internal
PROTECTIVE EARTH
CONNECTION that complies with the
requirements of IEC
60601-1, Clause 8.6
Connect to Mains Electromagnetic energy Accidental detachment of conductors
and connectors where breaking free
could lead to a HAZARDOUS
SITUATION.
Realization team:
James Chen
Steve Chen
Mike Ho
Owen Hsieh
Peter Pan
Procedure for evidence of efficiency for measures: References:
Page 101 of 148
Onyx Healthcare Inc.
12-14-2011Project number: Version: Short name:1112024003 1.00 ONYX-BE18xDT
Measure number: RC-023
The device was operated until ultimate results were obtained. All final
results were recorded. If required, final temperatures were measured and
recorded. The normal conditions were also applied in the least
favorable combination.
- The unit was positioned in the same way as for the Temperature Test
- Failure of Components - The components were short circuited or
opened, one at a time.
- The load current was then increased by 5 % with the supply voltage
maintained at its original value. When steady thermal conditions were
again established, the load was again increased. These steps were
continued until the overload protector operated or until thermal stability
was reached.
- For each fault condition, the Dielectric Voltage Withstand Test was
repeated immediately following the conclusion of the test.
IEC 60601-1, 3rd Edition, Clause 13
Limits of acceptance for procedure of evidence: References:
1. Self-resetting thermal cutouts did not operate.
2. The setting of any thermostat, thermal cutout or overload release did
not change due to heating, vibration or other causes.
3. The measured temperatures did not exceed those allowable.
4. In each case the hazardous situations described in Clauses 13.1.2 to
13.1.4 of IEC 60601-1, 3rd ED. did not occur.
5. See Table 11 of IEC 60601-1, 3rd ED. for Temperatures obtained
during the indicated Abnormal Operation tests.
IEC 60601-1, 3rd Edition, Clause 13
Procedure for verification: References:
see above IEC 60601-1, 3rd Edition, Clause 13
References:Limits of acceptance for verification:
see above IEC 60601-1, 3rd Edition, Clause 13
References:Procedure for validation:
see above IEC 60601-1, 3rd Edition, Clause 13
References:Limits of acceptance for validation:
see above IEC 60601-1, 3rd Edition, Clause 13
Page 102 of 148
Onyx Healthcare Inc.
12-14-2011Project number: Version: Short name:1112024003 1.00 ONYX-BE18xDT
Measure number: RC-024
Measure text:
The humidity preconditioning treatment is performed in a humidity cabinet containing air with a relative humidity of
93 % ± 3 % @ 25°C 48 hr
State of measure:
Responsible
Implementation: Supervising: Mike HoPeter Pan
Finished
Plan:
Start: End:12-1-2011 12-31-2011
Actual values:
Start: End:10-4-2011 11-23-2011
Effort:
Planned: Actual:
Validation:
Validated through:
Is validated:
Validated on:Steven Chen
Yes
12-09-2011
Release:
Release through:
Is released:
Release on:James ChenYes
12-9-2011
The humidity preconditioning treatment is performed in a humidity cabinet containing air with a relative humidity
of 93 % ± 3 % @ 25°C 48 hr
Decided tasks:
Storage (humidity preconditioning treatment)
Comment:
Assigned functions, hazards, causes:
Connect to Mains Electromagnetic energy Storage (humidity preconditioning
treatment)
Realization team:
James Chen
Steve Chen
Mike Ho
Owen Hsieh
Peter Pan
Procedure for evidence of efficiency for measures: References:
PC or its parts shall be set up complete. Covers used during transport
and storage are detached. This treatment is applied only to those power
supply parts which are influenced by the climatic conditions
that are simulated by the test. Parts that can be detached without the use
of a TOOL are detached but are treated simultaneously with the major
part. ACCESS COVERS that can be opened or detached without the use
of a TOOL are opened and detached.
A humidity chamber having relative humidity of 90 to 96 % was set to any
convenient Temperature T between 20 and 32°C. The unit, before being
placed in the chamber was brought to a temperature between T and T +
4°C and kept at this temperature a minimum of 4 h. Then the sample was
placed in the humidity chamber and kept there for the time specified in
Table 5.7 of IEC 60601-1, 3rd Ed. (minimum 48 h). During this time the
temperature of the air in the chamber was maintained at T ± 2°C.
Immediately after the treatment and while still in the chamber, the sample
was subjected to Dielectric Voltage Withstand Test. Then the unit was
removed from the chamber, placed in normal environment (temperature
approximately T, humidity 45-65%). Immediately following the humidity
preconditioning treatment, the power supply was subjected to a repeat of
the dielectric withstand and leakage current tests.
IEC 60601-1, 3rd Edition, Clause 5.7
Page 103 of 148
Onyx Healthcare Inc.
12-14-2011Project number: Version: Short name:1112024003 1.00 ONYX-BE18xDT
Measure number: RC-024
Limits of acceptance for procedure of evidence: References:
There was no dielectric breakdown IEC 60601-1, 3rd Edition, Clause 5.7
Procedure for verification: References:
see above IEC 60601-1, 3rd Edition, Clause 5.7
References:Limits of acceptance for verification:
see above IEC 60601-1, 3rd Edition, Clause 5.7
References:Procedure for validation:
see above IEC 60601-1, 3rd Edition, Clause 5.7
References:Limits of acceptance for validation:
see above IEC 60601-1, 3rd Edition, Clause 5.7
Page 104 of 148
Onyx Healthcare Inc.
12-14-2011Project number: Version: Short name:1112024003 1.00 ONYX-BE18xDT
Measure number: RC-025
Measure text:
The intensity of visible light from monitor can be controlled by the user. The highest intensity achievable cannot
produce detrimental biological effects.
State of measure:
Responsible
Implementation: Supervising: Owen HsiehMike Ho
Finished
Plan:
Start: End:10-1-2011 12-31-2011
Actual values:
Start: End:10-6-2011 11-28-2011
Effort:
Planned: Actual:
Validation:
Validated through:
Is validated:
Validated on:Steven Chen
Yes
12-11-2011
Release:
Release through:
Is released:
Release on:James ChenYes
12-11-2011
Computer monitors emit electromagnetic radiation in a broad range of frequencies. Although the
electromagnetic radiation field intensities are measurable, they are not substantially above background office
levels. The effect on health from the use of monitors has been studied for many years , and the research
continues. The present consensus of experts is that there are no data to suggest a health risk from exposure to
the electromagnetic fields associated with the use of monitors.
Decided tasks:
PC users have expressed concerns about the possible health effects from the electromagnetic radiation that
monitors produce. The concerns generally center around adverse pregnancy outcome (spontaneous abortion or
birth defects). It has been postulated that these effects are due to electromagnetic radiation exposure from
monitors. The biological effects of exposure to VLF and ELF fields similar to those produced by monitors have
been studied for many years, and the research continues today. Cancer and reproductive outcomes are the
topics studied most intensively. Current available scientific information does not identify a health risk from
exposure to the electromagnetic fields associated with the use of computer monitors.
Comment:
Assigned functions, hazards, causes:
Display Radiation energy Visible Light
Realization team:
James Chen
Steve Chen
Mike Ho
Owen Hsieh
Peter Pan
Procedure for evidence of efficiency for measures: References:
https://ehs.mit.edu/site/content/radiation-computer-monitors https://ehs.mit.edu/site/content/radiation-c
omputer-monitors
Limits of acceptance for procedure of evidence: References:
see above see above
Page 105 of 148
Onyx Healthcare Inc.
12-14-2011Project number: Version: Short name:1112024003 1.00 ONYX-BE18xDT
Measure number: RC-025
Procedure for verification: References:
see above see above
References:Limits of acceptance for verification:
see above see above
References:Procedure for validation:
see above see above
References:Limits of acceptance for validation:
see above see above
Page 106 of 148
Onyx Healthcare Inc.
12-14-2011Project number: Version: Short name:1112024003 1.00 ONYX-BE18xDT
Measure number: RC-026
Measure text:
The internal wirings were secured in place on PCB by UL R/C non-chemical bounding component.
State of measure:
Responsible
Implementation: Supervising: Peter PanOwen Hsieh
Finished
Plan:
Start: End:10-1-2011 12-31-2011
Actual values:
Start: End:10-7-2011 11-24-2011
Effort:
Planned: Actual:
Validation:
Validated through:
Is validated:
Validated on:Steven Chen
Yes
12-11-2011
Release:
Release through:
Is released:
Release on:James ChenYes
12-11-2011
Internal cables and wiring shall adequately protected against contact from friction at sharp corners and edges
where damage to insulation could result in a HAZARDOUS SITUATION.
Decided tasks:
The internal wirings were secured in place on PCB by UL R/C non-chemical bounding component.
Comment:
Assigned functions, hazards, causes:
Connect to Mains Electromagnetic energy Internal cables and wiring were not
adequately protected against contact
from friction at sharp corners and
edges where damage to insulation
could result in a HAZARDOUS
SITUATION.
Realization team:
James Chen
Steve Chen
Mike Ho
Owen Hsieh
Peter Pan
Procedure for evidence of efficiency for measures: References:
Having used the unjointed probe, which was in the shape of the standard
test finger and which incorporated a force gauge, a steady force of 10 N
for internal parts was applied for a period of 5 seconds.
QD2-001, QD2-010, QM2-011 and
QD2-009
Limits of acceptance for procedure of evidence: References:
During the application of the test force, clearances behind earthed or
unearthed conductive accessable parts were not reduced to a level that
would result in an energy hazard.
QD2-001, QD2-010, QM2-011 and
QD2-009
Procedure for verification: References:
see above QD2-001, QD2-010, QM2-011 and
QD2-009
Page 107 of 148
Onyx Healthcare Inc.
12-14-2011Project number: Version: Short name:1112024003 1.00 ONYX-BE18xDT
Measure number: RC-026
References:Limits of acceptance for verification:
see above QD2-001, QD2-010, QM2-011 and
QD2-009
References:Procedure for validation:
see above QD2-001, QD2-010, QM2-011 and
QD2-009
References:Limits of acceptance for validation:
see above QD2-001, QD2-010, QM2-011 and
QD2-009
Page 108 of 148
Onyx Healthcare Inc.
12-14-2011Project number: Version: Short name:1112024003 1.00 ONYX-BE18xDT
Measure number: RC-027
Measure text:
The limits specified in IEC 60601-1, Clause 8.4 is not be exceeded for ACCESSIBLE PARTS
State of measure:
Responsible
Implementation: Supervising: Mike HoPeter Pan
Finished
Plan:
Start: End:10-1-2011 12-31-2011
Actual values:
Start: End:10-7-2011 11-29-2011
Effort:
Planned: Actual:
Validation:
Validated through:
Is validated:
Validated on:Steven Chen
Yes
12-11-2011
Release:
Release through:
Is released:
Release on:James ChenYes
12-11-2011
The insulation that is relied upon as a MEANS OF PROTECTION, including REINFORCED INSULATION shall
be subject to testing.
Decided tasks:
Insulation
Comment:
Assigned functions, hazards, causes:
Connect to Mains Electromagnetic energy Short circuit of any or all insulation
that does not comply with the
requirements of IEC 60601-1, 3rd
Ed., Clause. 8.8
Connect to Mains Electromagnetic energy Short circuit of any or all CREEPAGE
DISTANCES or AIR CLEARANCES
that do not comply with the
requirements of IEC 60601-1, 3rd
Ed., Clause 8.9
Connect to Mains Electromagnetic energy Open circuit of any or all earth
connections that do not comply with
the requirements of IEC 60601-1,
Clause 8.6, including any functional
earth connection.
Realization team:
James Chen
Steve Chen
Mike Ho
Owen Hsieh
Peter Pan
Procedure for evidence of efficiency for measures: References:
A short of the operational or basic insulation indicated in the table was
made. The voltage present at the accessible parts/circuitry was
measured, recorded and compared to 42.4 V pk ac and 60 V dc.
QD2-001, QD2-010, QM2-011, QD2-009,,
IEC 60601-1, 3rd Edition, Clause 8.4.2
and 8.11.1
Limits of acceptance for procedure of evidence: References:
Page 109 of 148
Onyx Healthcare Inc.
12-14-2011Project number: Version: Short name:1112024003 1.00 ONYX-BE18xDT
Measure number: RC-027
The voltage did not exceed 42.4 V peak ac or 60 V dc. QD2-001, QD2-010, QM2-011, QD2-009,,
IEC 60601-1, 3rd Edition, Clause 8.4.2
and 8.11.1
Procedure for verification: References:
see above QD2-001, QD2-010, QM2-011, QD2-009,,
IEC 60601-1, 3rd Edition, Clause 8.4.2
and 8.11.1
References:Limits of acceptance for verification:
see above QD2-001, QD2-010, QM2-011, QD2-009,,
IEC 60601-1, 3rd Edition, Clause 8.4.2
and 8.11.1
References:Procedure for validation:
see above QD2-001, QD2-010, QM2-011, QD2-009,,
IEC 60601-1, 3rd Edition, Clause 8.4.2
and 8.11.1
References:Limits of acceptance for validation:
see above QD2-001, QD2-010, QM2-011, QD2-009,,
IEC 60601-1, 3rd Edition, Clause 8.4.2
and 8.11.1
Page 110 of 148
Onyx Healthcare Inc.
12-14-2011Project number: Version: Short name:1112024003 1.00 ONYX-BE18xDT
Measure number: RC-028
Measure text:
The permissible environmental conditions for transport and storage were marked on the outside of the packaging.
State of measure:
Responsible
Implementation: Supervising: Owen HsiehMike Ho
Finished
Plan:
Start: End:10-1-2011 12-31-2011
Actual values:
Start: End:10-3-2011 11-30-2011
Effort:
Planned: Actual:
Validation:
Validated through:
Is validated:
Validated on:Steven Chen
Yes
12-11-2011
Release:
Release through:
Is released:
Release on:James ChenYes
12-11-2011
The permissible environmental conditions for transport and storage were marked on the outside of the
packaging.
Decided tasks:
Packing
Comment:
Assigned functions, hazards, causes:
Connect to Mains Electromagnetic energy Packing
Realization team:
James Chen
Steve Chen
Mike Ho
Owen Hsieh
Peter Pan
Procedure for evidence of efficiency for measures: References:
QD2-001 and QM2-007 QQ1-001
Limits of acceptance for procedure of evidence: References:
QD2-001 and QM2-007 QQ1-001
Procedure for verification: References:
QD2-001 and QM2-007 QQ1-001
References:Limits of acceptance for verification:
QD2-001 and QM2-007 QQ1-001
References:Procedure for validation:
QD2-001 and QM2-007 QQ1-001
Page 111 of 148
Onyx Healthcare Inc.
12-14-2011Project number: Version: Short name:1112024003 1.00 ONYX-BE18xDT
Measure number: RC-028
References:Limits of acceptance for validation:
QD2-001 and QM2-007 QQ1-001
Page 112 of 148
Onyx Healthcare Inc.
12-14-2011Project number: Version: Short name:1112024003 1.00 ONYX-BE18xDT
Measure number: RC-029
Measure text:
The strength of packing carton / fixed frame. The transportation stimulation for
the verification. All connections were mechanically secure.
State of measure:
Responsible
Implementation: Supervising: Peter PanOwen Hsieh
Finished
Plan:
Start: End:10-1-2011 12-31-2011
Actual values:
Start: End:10-5-2011 11-24-2011
Effort:
Planned: Actual:
Validation:
Validated through:
Is validated:
Validated on:Steven Chen
Yes
12-11-2011
Release:
Release through:
Is released:
Release on:James ChenYes
12-11-2011
The strength of packing carton / fixed frame. The transportation stimulation for the verification. All connections
were mechanically secure.
Decided tasks:
Transport
Comment:
Assigned functions, hazards, causes:
Connect to Mains Electromagnetic energy Transport
Realization team:
James Chen
Steve Chen
Mike Ho
Owen Hsieh
Peter Pan
Procedure for evidence of efficiency for measures: References:
QD2-001 and QM2-007 QQ1-001
Limits of acceptance for procedure of evidence: References:
QD2-001 and QM2-007 QQ1-001
Procedure for verification: References:
QD2-001 and QM2-007 QQ1-001
References:Limits of acceptance for verification:
QD2-001 and QM2-007 QQ1-001
Page 113 of 148
Onyx Healthcare Inc.
12-14-2011Project number: Version: Short name:1112024003 1.00 ONYX-BE18xDT
Measure number: RC-029
References:Procedure for validation:
QD2-001 and QM2-007 QQ1-001
References:Limits of acceptance for validation:
QD2-001 and QM2-007 QQ1-001
Page 114 of 148
Onyx Healthcare Inc.
12-14-2011Project number: Version: Short name:1112024003 1.00 ONYX-BE18xDT
Measure number: RC-030
Measure text:
The suitable enclosure shall be provided.
State of measure:
Responsible
Implementation: Supervising: Mike HoPeter Pan
Finished
Plan:
Start: End:10-1-2011 12-31-2011
Actual values:
Start: End:10-6-2011 11-28-2011
Effort:
Planned: Actual:
Validation:
Validated through:
Is validated:
Validated on:Steven Chen
Yes
12-11-2011
Release:
Release through:
Is released:
Release on:James ChenYes
12-11-2011
Compliance is checked by the mechanical strength tests for ENCLOSURES (see 15.3).
Decided tasks:
ENCLOSURES shall have the strength and rigidity necessary to avoid a fire that could occur as a result of a
total or partial collapse caused by reasonably foreseeable misuse.
Comment:
Assigned functions, hazards, causes:
Connect to Mains Electromagnetic energy Internal parts, other than contacts of
plugs, connectors and socket-outlets,
that can be touched by the test pin
shown in IEC 60601-1, Figure 8.
Realization team:
James Chen
Steve Chen
Mike Ho
Owen Hsieh
Peter Pan
Procedure for evidence of efficiency for measures: References:
- Force (15.3.2) - A sample of the unit was subjected to inward directed
force of 250 N plus or minus 10 N for a period of 5 seconds applied to
different parts of the enclosure via a test tool providing contact over a
circular plane surface 30 mm in diameter as indicated in Table 15.3.
Note: not applied to the bottom of a product having a mass of greater
than 18 kg.
- Impact (15.3.3) - The impact resistance of an enclosure was tested by
application of an impact conveyed via a solid steel 50 mm (approx) ball of
mass 500 g plus or minus 25 g, fall freely from 1,3 meter height. The unit
was rigidly supported and the impact was applied to the locations
indicated in Table 15.3.
IEC 60601-1, 3rd Edition, Clause 15.3
Limits of acceptance for procedure of evidence: References:
There was no cracking of the enclosure.
There were no live parts that became accessible.
IEC 60601-1, 3rd Edition, Clause 15.3
Page 115 of 148
Onyx Healthcare Inc.
12-14-2011Project number: Version: Short name:1112024003 1.00 ONYX-BE18xDT
Measure number: RC-030
Procedure for verification: References:
see above IEC 60601-1, 3rd Edition, Clause 15.3
References:Limits of acceptance for verification:
see above IEC 60601-1, 3rd Edition, Clause 15.3
References:Procedure for validation:
see above IEC 60601-1, 3rd Edition, Clause 15.3
References:Limits of acceptance for validation:
see above IEC 60601-1, 3rd Edition, Clause 15.3
Page 116 of 148
Onyx Healthcare Inc.
12-14-2011Project number: Version: Short name:1112024003 1.00 ONYX-BE18xDT
Measure number: RC-031
Measure text:
They shall comply with the applicable safety requirements of a relevant IEC, UL or ISO standard;
State of measure:
Responsible
Implementation: Supervising: Owen HsiehMike Ho
Finished
Plan:
Start: End:10-1-2011 12-31-2011
Actual values:
Start: End:10-3-2011 11-28-2011
Effort:
Planned: Actual:
Validation:
Validated through:
Is validated:
Validated on:Steven Chen
Yes
12-11-2011
Release:
Release through:
Is released:
Release on:James ChenYes
12-11-2011
They shall comply with the applicable safety requirements of a relevant IEC, UL or ISO standard;
Decided tasks:
The reliability of components that are used as MEANS OF PROTECTION shall be assessed for the conditions
of use in the monitor and power supply.
Comment:
Assigned functions, hazards, causes:
Connect to Mains Electromagnetic energy The reliability of components that are
used as MEANS OF PROTECTION
are not assessed for the conditions of
use in the PC.
Realization team:
James Chen
Steve Chen
Mike Ho
Owen Hsieh
Peter Pan
Procedure for evidence of efficiency for measures: References:
Evaluation and testing of components shall be conducted as follows:
- a component that has been demonstrated to comply with a standard
harmonized with the relevant IEC component standard shall be checked
for correct application and use in accordance with its rating. It shall be
subjected to the applicable tests of IEC 60601-1 as part of the equipment
with the exception of those tests which are part of the relevant IEC
component standard;
- a component that has not been demonstrated to comply with a relevant
standard as above shall be checked for correct application and use in
accordance with its specified rating. It shall be subjected to the applicable
tests of IEC 60601-1, as part of the equipment, and to the applicable
tests of the component standard, under the conditions occurring in the
equipment;
- where no relevant IEC component standard exists, or where
components are used in circuits not in accordance with their specified
ratings, the components shall be tested under the conditions occurring in
the equipment. The number of samples required for test is, in general,
the same as required by an quivalent standard.
QD2-001, QD2-010, QM2-011, QD2-009
and IEC 60601-1, Clause 4.8
Page 117 of 148
Onyx Healthcare Inc.
12-14-2011Project number: Version: Short name:1112024003 1.00 ONYX-BE18xDT
Measure number: RC-031
Limits of acceptance for procedure of evidence: References:
see above QD2-001, QD2-010, QM2-011, QD2-009
and IEC 60601-1, Clause 4.8
Procedure for verification: References:
see above QD2-001, QD2-010, QM2-011, QD2-009
and IEC 60601-1, Clause 4.8
References:Limits of acceptance for verification:
see above QD2-001, QD2-010, QM2-011, QD2-009
and IEC 60601-1, Clause 4.8
References:Procedure for validation:
see above QD2-001, QD2-010, QM2-011, QD2-009
and IEC 60601-1, Clause 4.8
References:Limits of acceptance for validation:
see above QD2-001, QD2-010, QM2-011, QD2-009
and IEC 60601-1, Clause 4.8
Page 118 of 148
Onyx Healthcare Inc.
12-14-2011Project number: Version: Short name:1112024003 1.00 ONYX-BE18xDT
Measure number: RC-032
Measure text:
When PC is operated in worst-case NORMAL USE including the maximum
ambient operating temperature, the parts shall not reach temperatures exceeding
the values given in IEC 60601-1, Table 22 and Table 23.
State of measure:
Responsible
Implementation: Supervising: Peter PanOwen Hsieh
Finished
Plan:
Start: End:10-1-2011 12-31-2011
Actual values:
Start: End:10-13-2011 11-28-2011
Effort:
Planned: Actual:
Validation:
Validated through:
Is validated:
Validated on:Steven Chen
Yes
12-11-2011
Release:
Release through:
Is released:
Release on:James ChenYes
12-11-2011
When PC and power supply is operated in worst-case NORMAL USE including the maximum ambient
operating temperature, the parts shall not reach temperatures exceeding the values given in IEC 60601-1,
Table 22 and Table 23.
Decided tasks:
Excessive temperatures in PC and/or power supply.
Comment:
Assigned functions, hazards, causes:
Connect to Mains Thermal Energy Excessive temperatures in PC and/or
power supply.
Enclosure Thermal Energy Excessive temperatures in enclosure
Touch Panel & Plastic Enclosure
(TYPE B APPLIED PART)
Thermal Energy Excessive temperatures in touch
panel
Realization team:
James Chen
Steve Chen
Mike Ho
Owen Hsieh
Peter Pan
Procedure for evidence of efficiency for measures: References:
The sample was placed in a test corner. The test corner consisted of two
walls at right angles, and a floor, all of dull black painted plywood of 20
mm thickness. The linear dimensions of the test corner were at least 115
percent of the linear dimensions of the unit. The unit was positioned as
near to the walls as possible and to the floor. The power supply is
operated until THERMAL STABILITY is reached.
IEC 60601-1, 3rd Edition, Clause 11
Limits of acceptance for procedure of evidence: References:
see above IEC 60601-1, 3rd Edition, Clause 11
Page 119 of 148
Onyx Healthcare Inc.
12-14-2011Project number: Version: Short name:1112024003 1.00 ONYX-BE18xDT
Measure number: RC-032
Procedure for verification: References:
see above IEC 60601-1, 3rd Edition, Clause 11
References:Limits of acceptance for verification:
see above IEC 60601-1, 3rd Edition, Clause 11
References:Procedure for validation:
see above IEC 60601-1, 3rd Edition, Clause 11
References:Limits of acceptance for validation:
see above IEC 60601-1, 3rd Edition, Clause 11
Page 120 of 148
Onyx Healthcare Inc.
12-14-2011Project number: Version: Short name:1112024003 1.00 ONYX-BE18xDT
Measure number: RC-033
Measure text:
Where there is no relevant IEC or ISO standard, the requirements of IEC 60601-1,
3rd Ed. were applied.
State of measure:
Responsible
Implementation: Supervising: Mike HoPeter Pan
Finished
Plan:
Start: End:10-1-2011 12-31-2011
Actual values:
Start: End:10-5-2011 11-28-2011
Effort:
Planned: Actual:
Validation:
Validated through:
Is validated:
Validated on:Steven Chen
Yes
12-11-2011
Release:
Release through:
Is released:
Release on:James ChenYes
12-11-2011
Where there is no relevant IEC or ISO standard, the requirements of IEC 60601-1 3rd Ed. were applied.
Decided tasks:
The reliability of components that are used as MEANS OF PROTECTION are not assessed for the conditions
of use in the PC.
Comment:
Assigned functions, hazards, causes:
Connect to Mains Electromagnetic energy The reliability of components that are
used as MEANS OF PROTECTION
are not assessed for the conditions of
use in the PC.
Realization team:
James Chen
Steve Chen
Mike Ho
Owen Hsieh
Peter Pan
Procedure for evidence of efficiency for measures: References:
QD2-001, QD2-010, QM2-011 and QD2-009 IEC 60601-1, Clause 4.8
Limits of acceptance for procedure of evidence: References:
QD2-001, QD2-010, QM2-011 and QD2-009 IEC 60601-1, Clause 4.8
Procedure for verification: References:
QD2-001, QD2-010, QM2-011 and QD2-009 IEC 60601-1, Clause 4.8
References:Limits of acceptance for verification:
QD2-001, QD2-010, QM2-011 and QD2-009 IEC 60601-1, Clause 4.8
Page 121 of 148
Onyx Healthcare Inc.
12-14-2011Project number: Version: Short name:1112024003 1.00 ONYX-BE18xDT
Measure number: RC-033
References:Procedure for validation:
QD2-001, QD2-010, QM2-011 and QD2-009 IEC 60601-1, Clause 4.8
References:Limits of acceptance for validation:
QD2-001, QD2-010, QM2-011 and QD2-009 IEC 60601-1, Clause 4.8
Page 122 of 148
12-14-2011
Project number: 1112024003
Project name: 18.5" Bedside Terminal, models xxxx-ONYX-BE18xDT-xxxxxxx
ONYX-BE18xDTShort name:
Version number:
Workable version for evaluation purposeVersion description:
Project manager:
Subst. project manager: James Chen
Steven Chen
Functional designLife cycle phase:
New evaluation after measures
1.00
F-01Function: Connect to Mains
F-01
Hazard: Cause: Severity: Probability: Region of risk: Comment:
C-01 Short circuit of any or all
insulation that does not comply
with the requirements of IEC
60601-1, 3rd Ed., Clause. 8.8
Serious Remote Broadly
acceptable
region
Electromagnetic energyH-01
C-02 Short circuit of any or all
CREEPAGE DISTANCES or AIR
CLEARANCES that do not
comply with the requirements of
IEC 60601-1, 3rd Ed., Clause 8.9
Serious Remote Broadly
acceptable
region
C-03 Open circuit of any or all earth
connections that do not comply
with the requirements of IEC
60601-1, Clause 8.6, including
any functional earth connection.
Critical Improbable Broadly
acceptable
region
C-04 Short circuit of any one insulation
that complies with the
requirements for one MEANS OF
PROTECTION as specified in
IEC 60601-1, Clause 8.8
Critical Improbable Broadly
acceptable
region
C-05 Short circuit of any one
CREEPAGE DISTANCE or AIR
CLEARANCE that complies with
the requirements for one MEANS
OF PROTECTION as specified in
IEC 60601-1, Clause 8.9
Critical Improbable Broadly
acceptable
region
C-06 Open circuit of any one
PROTECTIVE EARTH
CONDUCTOR or internal
Critical Improbable Broadly
acceptable
region
Page 123 of 148
Project number: 1112024003 Version: 1.00 Short name: ONYX-BE18xDT 12-14-2011
Onyx Healthcare Inc.
F-01
Hazard: Cause: Severity: Probability: Region of risk: Comment:
PROTECTIVE EARTH
CONNECTION that complies with
the requirements of IEC
60601-1, Clause 8.6
C-07 All components, including wiring,
the failure of which could result in
a HAZARDOUS SITUATION.
Serious Remote Broadly
acceptable
region
C-08 The reliability of components that
are used as MEANS OF
PROTECTION are not assessed
for the conditions of use in the
PC.
Serious Improbable Broadly
acceptable
region
C-09 Storage (humidity preconditioning
treatment)
Minor Remote Broadly
acceptable
region
C-10 Transport Minor Remote Broadly
acceptable
region
C-11 Components of PC, unwanted
movement of which could result
in an unacceptableb RISK, is not
mounted securely to prevent such
movement.
Minor Remote Broadly
acceptable
region
C-12 Too high leakage current, causing
a death or serious injury to a
patient.
Critical Improbable Broadly
acceptable
region
C-13 The LEAKAGE CURRENTS
from, to or between
ACCESSIBLE PARTS other than
PATIENT CONNECTIONS
Critical Improbable Broadly
acceptable
region
C-14 ACCESSIBLE PARTS exceed
42.4 V peak a.c. or 60 V d.c. in
NORMAL CONDITION or in
SINGLE FAULT CONDITION.
Critical Improbable Broadly
acceptable
region
C-15 Internal parts, other than contacts
of plugs, connectors and
socket-outlets, that can be
Serious Remote Broadly
acceptable
region
Page 124 of 148
Project number: 1112024003 Version: 1.00 Short name: ONYX-BE18xDT 12-14-2011
Onyx Healthcare Inc.
F-01
Hazard: Cause: Severity: Probability: Region of risk: Comment:
touched by the test pin shown in
IEC 60601-1, Figure 8.
C-16 Accidental detachment of
conductors and connectors where
breaking free could lead to a
HAZARDOUS SITUATION.
Serious Improbable Broadly
acceptable
region
C-17 The resistance to heat is not
retained by all types of insulation,
including insulating partition walls,
during the EXPECTED SERVICE
LIFE of the PC.
Serious Remote Broadly
acceptable
region
C-18 Internal cables and wiring is not
adequately protected against
contact with a moving part or
from friction at sharp corners and
edges where damage to
insulation.
Minor Remote Broadly
acceptable
region
C-19 Electromagnetic compatibility of
PC.
Serious Remote Broadly
acceptable
region
C-20 Packing Serious Remote Broadly
acceptable
region
C-21 Wirings and connectors of Panel
PC Monitor supply is not secured
or insulated that accidental
detachment can result in a
HAZARDOUS SITUATION.
Serious Remote Broadly
acceptable
region
C-22 Internal cables and wiring were
not adequately protected against
contact from friction at sharp
corners and edges where
damage to insulation could result
in a HAZARDOUS SITUATION.
Minor Remote Broadly
acceptable
region
C-23 Cleaning Minor Remote Broadly
acceptable
region
Page 125 of 148
Project number: 1112024003 Version: 1.00 Short name: ONYX-BE18xDT 12-14-2011
Onyx Healthcare Inc.
F-01
Hazard: Cause: Severity: Probability: Region of risk: Comment:
C-01 Excessive temperatures in PC
and/or power supply.
Serious Remote Broadly
acceptable
region
Thermal EnergyH-02
C-02 ENCLOSURES have no the
strength and rigidity necessary to
avoid a fire.
Critical Improbable Broadly
acceptable
region
F-02Function: Enclosure
F-02
Hazard: Cause: Severity: Probability: Region of risk: Comment:
C-01 Falling Serious Remote Broadly
acceptable
region
Mechanical energyH-01
C-02 Suspended masses Critical Improbable Broadly
acceptable
region
C-03 Sharp edges and corners Minor Remote Broadly
acceptable
region
C-01 Excessive temperatures in
enclosure
Serious Remote Broadly
acceptable
region
Thermal EnergyH-02
Page 126 of 148
Project number: 1112024003 Version: 1.00 Short name: ONYX-BE18xDT 12-14-2011
Onyx Healthcare Inc.
F-03Function: Rear Bracket
F-03
Hazard: Cause: Severity: Probability: Region of risk: Comment:
C-01 Crack Serious Remote Broadly
acceptable
region
Mechanical energyH-01
C-02 Suspended masses Critical Improbable Broadly
acceptable
region
C-03 Instability Serious Remote Broadly
acceptable
region
F-04Function: Signal input
F-04
Hazard: Cause: Severity: Probability: Region of risk: Comment:
C-01 ACCESSIBLE PARTS exceed
42.4 V peak a.c. or 60 V d.c. in
NORMAL CONDITION or in
SINGLE FAULT CONDITION.
Serious Remote Broadly
acceptable
region
Electromagnetic energyH-01
F-05Function: Signal output
F-05
Hazard: Cause: Severity: Probability: Region of risk: Comment:
C-01 earphone Serious Remote Broadly
acceptable
region
Acoustic energy (sound)H-01
F-06Function: User control and indicator
F-06
Hazard: Cause: Severity: Probability: Region of risk: Comment:
C-01 Switches used to control power to
PC or its parts, including
switches, did not have their "on"
and "off" positions.
Serious Remote Broadly
acceptable
region
OperationalH-01
Page 127 of 148
Project number: 1112024003 Version: 1.00 Short name: ONYX-BE18xDT 12-14-2011
Onyx Healthcare Inc.
F-07Function: Information
F-07
Hazard: Cause: Severity: Probability: Region of risk: Comment:
C-01 PC did not marke with the name
or trademark of Onyx and with a
MODEL OR TYPE REFERENCE
Minor Remote Broadly
acceptable
region
LabelingH-01
C-02 Incomplete instructions for use Serious Remote Broadly
acceptable
region
C-03 Inadequate description of
performance characteristics
Serious Remote Broadly
acceptable
region
C-04 Inadequate specification of
intended use.
Serious Remote Broadly
acceptable
region
C-05 Inadequate disclosure of
limitations
Serious Remote Broadly
acceptable
region
C-01 Inadequate specification of
accessories to be used with the
medical device.
Serious Remote Broadly
acceptable
region
Operating instructionsH-02
C-02 Inadequate specification of
pre-use checks.
Minor Remote Broadly
acceptable
region
C-03 Over-complicated operating
instructions.
Minor Remote Broadly
acceptable
region
C-01 Installation instruction Serious Remote Broadly
acceptable
region
Specification of service and
maintenance
H-03
F-08Function: Connection to an external d.c. power source
F-08
Hazard: Cause: Severity: Probability: Region of risk: Comment:
C-01 When a connection with the
wrong polarity is made.
Serious Improbable Broadly
acceptable
region
Thermal EnergyH-01
Page 128 of 148
Project number: 1112024003 Version: 1.00 Short name: ONYX-BE18xDT 12-14-2011
Onyx Healthcare Inc.
F-09Function: Display
F-09
Hazard: Cause: Severity: Probability: Region of risk: Comment:
C-01 Visible Light Minor Remote Broadly
acceptable
region
Radiation energyH-01
F-10Function: BIOS (Basic Input/Output System - real time clock)
F-10
Hazard: Cause: Severity: Probability: Region of risk: Comment:
C-01 Lithium battery explosion Critical Improbable Broadly
acceptable
region
Mechanical energyH-01
F-11Function: Touch Panel & Plastic Enclosure (TYPE B APPLIED PART)
F-11
Hazard: Cause: Severity: Probability: Region of risk: Comment:
C-01 Too high leakage current, causing
a death or serious injury to a
patient.
<not yet
evaluated>Electromagnetic energyH-01
C-01 Excessive temperatures in touch
panel
<not yet
evaluated>Thermal EnergyH-02
Page 129 of 148
12-14-2011
Project number: 1112024003
Project name: 18.5" Bedside Terminal, models xxxx-ONYX-BE18xDT-xxxxxxx
ONYX-BE18xDTShort name:
Version number:
Workable version for evaluation purposeVersion description:
Project manager:
Subst. project manager: James Chen
Steven Chen
Functional designLife cycle phase:
Risk-graph (after measures)
1.00
Both states
P5
P4
P3
11 22
P2
3 11
P1
S1 S2 S3 S4 S5
Operation state
P5
P4
P3
11 22
P2
3 11
P1
S1 S2 S3 S4 S5
Page 130 of 148
Project number: 1112024003 Version: 1.00 Short name: ONYX-BE18xDT
12-14-2011
Onyx Healthcare Inc.
Fault state
P5
P4
P3
P2
P1
S1 S2 S3 S4 S5
Intolerable region ALARP region Broadly acceptable reg
Page 131 of 148
12-14-2011
Project number: 1112024003
Project name: 18.5" Bedside Terminal, models xxxx-ONYX-BE18xDT-xxxxxxx
ONYX-BE18xDTShort name:
Version number:
Workable version for evaluation purposeVersion description:
Project manager:
Subst. project manager: James Chen
Steven Chen
Functional designLife cycle phase:
Graph before and after
1.00
before measures after measures
Both states
P5
P4
9 23 5P3
2 3 7P2
P1
S1 S2 S3 S4 S5
Both states
P5
P4
P3
11 22P2
3 11P1
S1 S2 S3 S4 S5
Operation state
P5
P4
9 23 5P3
2 3 7P2
P1
S1 S2 S3 S4 S5
Operation state
P5
P4
P3
11 22P2
3 11P1
S1 S2 S3 S4 S5
Page 132 of 148
Project number: 1112024003 Version: 1.00 Short name: ONYX-BE18xDT
12-14-2011
Onyx Healthcare Inc.
before measures after measures
Fault state
P5
P4
P3
P2
P1
S1 S2 S3 S4 S5
Fault state
P5
P4
P3
P2
P1
S1 S2 S3 S4 S5
Intolerable region ALARP region Broadly acceptable reg
Page 133 of 148
12-14-2011
Project number: 1112024003
Project name: 18.5" Bedside Terminal, models xxxx-ONYX-BE18xDT-xxxxxxx
ONYX-BE18xDTShort name:
Version number:
Workable version for evaluation purposeVersion description:
Project manager:
Subst. project manager: James Chen
Steven Chen
Functional designLife cycle phase:
Release protocol of this version
1.00
Version is not yet closed.
Page 134 of 148
12-14-2011
Project number: 1112024003
Project name: 18.5" Bedside Terminal, models xxxx-ONYX-BE18xDT-xxxxxxx
ONYX-BE18xDTShort name:
Version number:
Workable version for evaluation purposeVersion description:
Project manager:
Subst. project manager: James Chen
Steven Chen
Functional designLife cycle phase:
Post-production information
1.00
Corrective measure Date Result of post-production information Evidence
Page 135 of 148
12-14-2011
Project number: 1112024003
Project name: 18.5" Bedside Terminal, models xxxx-ONYX-BE18xDT-xxxxxxx
ONYX-BE18xDTShort name:
Version number:
Workable version for evaluation purposeVersion description:
Project manager:
Subst. project manager: James Chen
Steven Chen
Functional designLife cycle phase:
Summary of risk control
1.00
F-01Function: Connect to Mains
F-01
Hazard Cause Has effect on Risk before
measures
Measure imple-
ment
released Risk after
measures
M-01 The limits specified in IEC
60601-1, Clause 8.4 is not be exceeded
for ACCESSIBLE PARTS
Yes YesS3 / P3
Intolerable
S3 / P2
Broadly
acceptable
Short circuit of any or all
insulation that does not
comply with the
requirements of IEC
60601-1, 3rd Ed.,
Clause. 8.8
C-01Electromagnetic
energy
H-01
H-01H-01H-01C-01C-01C-01M-01 The limits specified in IEC
60601-1, Clause 8.4 is not be exceeded
for ACCESSIBLE PARTS
Yes YesS3 / P3
Intolerable
S3 / P2
Broadly
acceptable
Short circuit of any or all
CREEPAGE
DISTANCES or AIR
CLEARANCES that do
not comply with the
requirements of IEC
60601-1, 3rd Ed.,
Clause 8.9
C-02
C-02C-02C-02M-01 The limits specified in IEC
60601-1, Clause 8.4 is not be exceeded
for ACCESSIBLE PARTS
Yes YesS4 / P2
Intolerable
S4 / P1
Broadly
acceptable
Open circuit of any or
all earth connections
that do not comply with
the requirements of IEC
60601-1, Clause 8.6,
including any functional
earth connection.
C-03
C-03C-03C-03
Page 136 of 148
Project number: 1112024003 Version: Short name: ONYX-BE18xDT 12-14-2011
Onyx Healthcare Inc.
1.00
F-01
Hazard Cause Has effect on Risk before
measures
Measure imple-
ment
released Risk after
measures
M-01 The HAZARDOUS SITUATIONS
in IEC 60601-1, Clause 13.1.2 to 13.1.4
(inclusive) do not occur in the PC and
power adapter
Yes YesS4 / P3
Intolerable
S4 / P1
Broadly
acceptable
Short circuit of any one
insulation that complies
with the requirements
for one MEANS OF
PROTECTION as
specified in IEC
60601-1, Clause 8.8
C-04Electromagnetic
energy
H-01
H-01H-01H-01C-04C-04C-04M-01 The HAZARDOUS SITUATIONS
in IEC 60601-1, Clause 13.1.2 to 13.1.4
(inclusive) do not occur in the PC and
power adapter
Yes YesS4 / P3
Intolerable
S4 / P1
Broadly
acceptable
Short circuit of any one
CREEPAGE
DISTANCE or AIR
CLEARANCE that
complies with the
requirements for one
MEANS OF
PROTECTION as
specified in
IEC 60601-1, Clause
8.9
C-05
C-05C-05C-05M-01 The HAZARDOUS SITUATIONS
in IEC 60601-1, Clause 13.1.2 to 13.1.4
(inclusive) do not occur in the PC and
power adapter
Yes YesS4 / P2
Intolerable
S4 / P1
Broadly
acceptable
Open circuit of any one
PROTECTIVE EARTH
CONDUCTOR or
internal
PROTECTIVE EARTH
CONNECTION that
complies with the
requirements of IEC
60601-1, Clause 8.6
C-06
C-06C-06C-06M-01 All components, including wiring
shall be used in accordance with their
specified
ratings.
Yes YesS3 / P3
Intolerable
S3 / P2
Broadly
acceptable
All components,
including wiring, the
failure of which could
result in a
HAZARDOUS
SITUATION.
C-07
C-07C-07C-07Page 137 of 148
Project number: 1112024003 Version: Short name: ONYX-BE18xDT 12-14-2011
Onyx Healthcare Inc.
1.00
F-01
Hazard Cause Has effect on Risk before
measures
Measure imple-
ment
released Risk after
measures
M-02 All components, including wiring,
the failure of which could result in a
HAZARDOUS SITUATION are fixed in
place by UL R/C non-chemical bounding
compound.
Yes YesS3 / P3
Intolerable
S3 / P2
Broadly
acceptable
All components,
including wiring, the
failure of which could
result in a
HAZARDOUS
SITUATION.
C-07Electromagnetic
energy
H-01
H-01H-01H-01C-07C-07C-07M-01 They shall comply with the
applicable safety requirements of a
relevant IEC, UL or ISO standard;
Yes YesS3 / P2
Broadly
acceptable
S3 / P1
Broadly
acceptable
The reliability of
components that are
used as MEANS OF
PROTECTION are not
assessed for the
conditions of use in the
PC.
C-08
C-08C-08C-08M-02 Where there is no relevant IEC or
ISO standard, the requirements of IEC
60601-1,
3rd Ed. were applied.
Yes YesS3 / P2
Broadly
acceptable
S3 / P1
Broadly
acceptable
M-01 The humidity preconditioning
treatment is performed in a humidity
cabinet containing air with a relative
humidity of 93 % ± 3 % @ 25°C 48 hr
Yes YesS2 / P3
Broadly
acceptable
S2 / P2
Broadly
acceptable
Storage (humidity
preconditioning
treatment)
C-09
C-09C-09C-09 M-01 The strength of packing carton /
fixed frame. The transportation
stimulation for
the verification. All connections were
mechanically secure.
Yes YesS2 / P3
Broadly
acceptable
S2 / P2
Broadly
acceptable
TransportC-10
C-10C-10C-10 M-01 Said components were secured in
place on pcb by UL Recognized
non-chemical
bounding compound.
Yes YesS2 / P3
Broadly
acceptable
S2 / P2
Broadly
acceptable
Components of PC,
unwanted movement of
which could result in an
unacceptableb RISK, is
not mounted securely to
prevent such
movement.
C-11
C-11C-11C-11Page 138 of 148
Project number: 1112024003 Version: Short name: ONYX-BE18xDT 12-14-2011
Onyx Healthcare Inc.
1.00
F-01
Hazard Cause Has effect on Risk before
measures
Measure imple-
ment
released Risk after
measures
M-01 Meet IEC 60601-1, Clause 8.7
LEAKAGE CURRENTS and PATIENT
AUXILIARY CURRENTS requirements
Yes YesS4 / P3
Intolerable
S4 / P1
Broadly
acceptable
Too high leakage
current, causing a
death or serious injury
to a patient.
C-12Electromagnetic
energy
H-01
H-01H-01H-01C-12C-12C-12 M-01 Meet IEC 60601-1, Clause 8.7
LEAKAGE CURRENTS and PATIENT
AUXILIARY CURRENTS requirements
Yes YesS4 / P3
Intolerable
S4 / P1
Broadly
acceptable
The LEAKAGE
CURRENTS from, to or
between ACCESSIBLE
PARTS other than
PATIENT
CONNECTIONS
C-13
C-13C-13C-13M-01 Supplied by SELV power adapter
and DC/AC inverter meet LCC
requirements.
Yes YesS4 / P2
Intolerable
S4 / P1
Broadly
acceptable
ACCESSIBLE PARTS
exceed 42.4 V peak
a.c. or 60 V d.c. in
NORMAL CONDITION
or in SINGLE FAULT
CONDITION.
C-14
C-14C-14C-14M-01 The suitable enclosure shall be
provided.
Yes YesS3 / P3
Intolerable
S3 / P2
Broadly
acceptable
Internal parts, other
than contacts of plugs,
connectors and
socket-outlets, that can
be touched by the test
pin shown in IEC
60601-1, Figure 8.
C-15
C-15C-15C-15M-01 The HAZARDOUS SITUATIONS
in IEC 60601-1, Clause 13.1.2 to 13.1.4
(inclusive) do not occur in the PC and
power adapter
Yes YesS3 / P2
Broadly
acceptable
S3 / P1
Broadly
acceptable
Accidental detachment
of conductors and
connectors where
breaking free could lead
to a HAZARDOUS
SITUATION.
C-16
C-16C-16C-16
Page 139 of 148
Project number: 1112024003 Version: Short name: ONYX-BE18xDT 12-14-2011
Onyx Healthcare Inc.
1.00
F-01
Hazard Cause Has effect on Risk before
measures
Measure imple-
ment
released Risk after
measures
M-01 Shall compliance with the
following tests: resistance to moisture,
etc. (see IEC
60601-1, Clause 11.6); dielectric
strength (see IEC 60601-1, Clause
8.8.3); and
mechanical strength (see IEC 60601-1,
Clause 15.3).
Yes YesS3 / P3
Intolerable
S3 / P2
Broadly
acceptable
The resistance to heat
is not retained by all
types of insulation,
including insulating
partition walls, during
the EXPECTED
SERVICE LIFE of the
PC.
C-17Electromagnetic
energy
H-01
H-01H-01H-01C-17C-17C-17M-02 Ball pressure test - according to
IEC 60601-1, Clause 8.8.4.1, b)
requirements
Yes YesS3 / P3
Intolerable
S3 / P2
Broadly
acceptable
M-01 Internal cables and wiring is fixed
in place by cable tie to protect against
contact with a moving part or from
friction at sharp corners and edges
where damage to insulation
Yes YesS2 / P2
Broadly
acceptable
S2 / P2
Broadly
acceptable
Internal cables and
wiring is not adequately
protected against
contact with a moving
part or from friction at
sharp corners and
edges where damage
to insulation.
C-18
C-18C-18C-18M-01 Meet IEC 60601-1-2 requirements Yes YesS3 / P3
Intolerable
S3 / P2
Broadly
acceptable
Electromagnetic
compatibility of PC.
C-19
C-19C-19C-19 M-01 The permissible environmental
conditions for transport and storage
were marked on the outside of the
packaging.
Yes YesS3 / P3
Intolerable
S3 / P2
Broadly
acceptable
PackingC-20
C-20C-20C-20 M-01 All wirings are tied together by
cable tie to prevent accidental
detachment.
Yes YesS3 / P3
Intolerable
S3 / P2
Broadly
acceptable
Wirings and connectors
of Panel PC Monitor
supply is not secured or
insulated that accidental
detachment can result
in a HAZARDOUS
SITUATION.
C-21
C-21C-21C-21Page 140 of 148
Project number: 1112024003 Version: Short name: ONYX-BE18xDT 12-14-2011
Onyx Healthcare Inc.
1.00
F-01
Hazard Cause Has effect on Risk before
measures
Measure imple-
ment
released Risk after
measures
M-01 The internal wirings were secured
in place on PCB by UL R/C
non-chemical bounding component.
Yes YesS2 / P2
Broadly
acceptable
S2 / P2
Broadly
acceptable
Internal cables and
wiring were not
adequately protected
against contact from
friction at sharp corners
and edges where
damage to insulation
could result in a
HAZARDOUS
SITUATION.
C-22Electromagnetic
energy
H-01
H-01H-01H-01C-22C-22C-22M-01 The equipment complied with the
requirements of IEC 60601-1, Clause
11.6.
Yes YesS2 / P3
Broadly
acceptable
S2 / P2
Broadly
acceptable
CleaningC-23
C-23C-23C-23 M-01 When PC is operated in
worst-case NORMAL USE including the
maximum
ambient operating temperature, the
parts shall not reach temperatures
exceeding
the values given in IEC 60601-1, Table
22 and Table 23.
Yes YesS3 / P3
Intolerable
S3 / P2
Broadly
acceptable
Excessive temperatures
in PC and/or power
supply.
C-01Thermal EnergyH-02
H-02H-02H-02C-01C-01C-01M-01 Compliance with the mechanical
strength tests for ENCLOSURES (see
IEC
60601-1, Clause 15.3)
Yes YesS4 / P2
Intolerable
S4 / P1
Broadly
acceptable
ENCLOSURES have no
the strength and rigidity
necessary to avoid a
fire.
C-02
C-02C-02C-02
Page 141 of 148
Project number: 1112024003 Version: Short name: ONYX-BE18xDT 12-14-2011
Onyx Healthcare Inc.
1.00
F-02Function: Enclosure
F-02
Hazard Cause Has effect on Risk before
measures
Measure imple-
ment
released Risk after
measures
M-01 Meet IEC 60601-1, Clause 9.4.2
requiremets.
Yes YesS3 / P3
Intolerable
S3 / P2
Broadly
acceptable
FallingC-01Mechanical
energy
H-01
H-01H-01H-01C-01C-01C-01 M-01 Meet IEC 60601-1 Clause 9.8.2
and Table 21 requirements.
Yes YesS4 / P2
Intolerable
S4 / P1
Broadly
acceptable
Suspended massesC-02
C-02C-02C-02 M-01 Rounding of sharp edges and
corners.
Yes YesS2 / P3
Broadly
acceptable
S2 / P2
Broadly
acceptable
Sharp edges and
corners
C-03
C-03C-03C-03 M-01 When PC is operated in
worst-case NORMAL USE including the
maximum
ambient operating temperature, the
parts shall not reach temperatures
exceeding
the values given in IEC 60601-1, Table
22 and Table 23.
Yes YesS3 / P3
Intolerable
S3 / P2
Broadly
acceptable
Excessive temperatures
in enclosure
C-01Thermal EnergyH-02
H-02H-02H-02C-01C-01C-01F-03Function: Rear Bracket
F-03
Hazard Cause Has effect on Risk before
measures
Measure imple-
ment
released Risk after
measures
M-01 Meet IEC 60601-1 Clause 9.8.2
and Table 21 requirements.
Yes YesS3 / P3
Intolerable
S3 / P2
Broadly
acceptable
CrackC-01Mechanical
energy
H-01
H-01H-01H-01C-01C-01C-01 M-01 Meet IEC 60601-1 Clause 9.8.2
and Table 21 requirements.
Yes YesS4 / P3
Intolerable
S4 / P1
Broadly
acceptable
Suspended massesC-02
C-02C-02C-02 M-01 Meet IEC 60601-1 Clause 9.8.2
and Table 21 requirements.
Yes YesS3 / P3
Intolerable
S3 / P2
Broadly
acceptable
InstabilityC-03
C-03C-03C-03Page 142 of 148
Project number: 1112024003 Version: Short name: ONYX-BE18xDT 12-14-2011
Onyx Healthcare Inc.
1.00
F-04Function: Signal input
F-04
Hazard Cause Has effect on Risk before
measures
Measure imple-
ment
released Risk after
measures
M-01 Supplied by SELV power adapter
and DC/AC inverter meet LCC
requirements.
Yes YesS3 / P3
Intolerable
S3 / P2
Broadly
acceptable
ACCESSIBLE PARTS
exceed 42.4 V peak
a.c. or 60 V d.c. in
NORMAL CONDITION
or in SINGLE FAULT
CONDITION.
C-01Electromagnetic
energy
H-01
H-01H-01H-01C-01C-01C-01F-05Function: Signal output
F-05
Hazard Cause Has effect on Risk before
measures
Measure imple-
ment
released Risk after
measures
M-01 Meet IEC 60950-1, Annex NAD
Acoustic tests requirements
Yes YesS3 / P3
Intolerable
S3 / P2
Broadly
acceptable
earphoneC-01Acoustic energy
(sound)
H-01
H-01H-01H-01C-01C-01C-01F-06Function: User control and indicator
F-06
Hazard Cause Has effect on Risk before
measures
Measure imple-
ment
released Risk after
measures
M-01 Indicated by an adjacent indicator
light
Yes YesS3 / P3
Intolerable
S3 / P2
Broadly
acceptable
Switches used to
control power to PC or
its parts, including
switches, did not have
their "on" and "off"
positions.
C-01OperationalH-01
H-01H-01H-01C-01C-01C-01M-02 Marked with symbols IEC 60417 Yes YesS3 / P3
Intolerable
S3 / P2
Broadly
acceptable
Page 143 of 148
Project number: 1112024003 Version: Short name: ONYX-BE18xDT 12-14-2011
Onyx Healthcare Inc.
1.00
F-07Function: Information
F-07
Hazard Cause Has effect on Risk before
measures
Measure imple-
ment
released Risk after
measures
M-01 PC marked the name or
trademark of Onyx with model no.
Yes YesS2 / P3
Broadly
acceptable
S2 / P2
Broadly
acceptable
PC did not marke with
the name or trademark
of Onyx and with a
MODEL OR TYPE
REFERENCE
C-01LabelingH-01
H-01H-01H-01C-01C-01C-01 M-01 Meet IEC 60601-1, Clause 7
requirements.
Yes YesS3 / P3
Intolerable
S3 / P2
Broadly
acceptable
Incomplete instructions
for use
C-02
C-02C-02C-02 M-01 Meet IEC 60601-1, Clause 7
requirements.
Yes YesS3 / P3
Intolerable
S3 / P2
Broadly
acceptable
Inadequate description
of performance
characteristics
C-03
C-03C-03C-03 M-01 Meet IEC 60601-1, Clause 7
requirements.
Yes YesS3 / P3
Intolerable
S3 / P2
Broadly
acceptable
Inadequate
specification of
intended use.
C-04
C-04C-04C-04 M-01 Meet IEC 60601-1, Clause 7
requirements.
Yes YesS3 / P3
Intolerable
S3 / P2
Broadly
acceptable
Inadequate disclosure
of limitations
C-05
C-05C-05C-05 M-01 Meet IEC 60601-1, Clause 7
requirements.
Yes YesS3 / P3
Intolerable
S3 / P2
Broadly
acceptable
Inadequate
specification of
accessories to be used
with the medical device.
C-01Operating
instructions
H-02
H-02H-02H-02C-01C-01C-01 M-01 Meet IEC 60601-1, Clause 7
requirements.
Yes YesS2 / P3
Broadly
acceptable
S2 / P2
Broadly
acceptable
Inadequate
specification of pre-use
checks.
C-02
C-02C-02C-02 M-01 Meet IEC 60601-1, Clause 7
requirements.
Yes YesS2 / P3
Broadly
acceptable
S2 / P2
Broadly
acceptable
Over-complicated
operating instructions.
C-03
C-03C-03C-03 M-01 Meet IEC 60601-1, Clause 7
requirements.
Yes YesS3 / P3
Intolerable
S3 / P2
Broadly
acceptable
Installation instructionC-01Specification of
service and
maintenance
H-03
H-03H-03H-03C-01C-01C-01Page 144 of 148
Project number: 1112024003 Version: Short name: ONYX-BE18xDT 12-14-2011
Onyx Healthcare Inc.
1.00
F-08Function: Connection to an external d.c. power source
F-08
Hazard Cause Has effect on Risk before
measures
Measure imple-
ment
released Risk after
measures
M-01 Provided a connector that has
special housing to prevent a connection
with the wrong polarity is made.
Yes YesS3 / P2
Broadly
acceptable
S3 / P1
Broadly
acceptable
When a connection with
the wrong polarity is
made.
C-01Thermal EnergyH-01
H-01H-01H-01C-01C-01C-01F-09Function: Display
F-09
Hazard Cause Has effect on Risk before
measures
Measure imple-
ment
released Risk after
measures
M-01 The intensity of visible light from
monitor can be controlled by the user.
The highest intensity achievable cannot
produce detrimental biological effects.
Yes YesS2 / P3
Broadly
acceptable
S2 / P2
Broadly
acceptable
Visible LightC-01Radiation energyH-01
H-01H-01H-01C-01C-01C-01F-10Function: BIOS (Basic Input/Output System - real time clock)
F-10
Hazard Cause Has effect on Risk before
measures
Measure imple-
ment
released Risk after
measures
M-01 Battery circuits is designed so that
discharging at a rate exceeding the
battery
manufacturer’s recommendations, and
unintentional charging, are prevented.
Yes YesS4 / P2
Intolerable
S4 / P1
Broadly
acceptable
Lithium battery
explosion
C-01Mechanical
energy
H-01
H-01H-01H-01C-01C-01C-01
Page 145 of 148
Project number: 1112024003 Version: Short name: ONYX-BE18xDT 12-14-2011
Onyx Healthcare Inc.
1.00
F-11Function: Touch Panel & Plastic Enclosure (TYPE B APPLIED PART)
F-11
Hazard Cause Has effect on Risk before
measures
Measure imple-
ment
released Risk after
measures
M-01 Meet IEC 60601-1, Clause 8.7
LEAKAGE CURRENTS and PATIENT
AUXILIARY CURRENTS requirements
Yes YesS4 / P2
Intolerable
not ev. / not ev.
<not ev.>
Too high leakage
current, causing a
death or serious injury
to a patient.
C-01Electromagnetic
energy
H-01
H-01H-01H-01C-01C-01C-01 M-01 When PC is operated in
worst-case ABNORMAL USE including the
maximum
ambient operating temperature, the
parts shall not reach temperatures
exceeding
the values given in IEC 60601-1, Table
23 and Table 24.
Yes YesS3 / P3
Intolerable
not ev. / not ev.
<not ev.>
Excessive temperatures
in touch panel
C-01Thermal EnergyH-02
H-02H-02H-02C-01C-01C-01
Page 146 of 148
12-14-2011
Project number: 1112024003
Project name: 18.5" Bedside Terminal, models xxxx-ONYX-BE18xDT-xxxxxxx
ONYX-BE18xDTShort name:
Version number:
Workable version for evaluation purposeVersion description:
Project manager:
Subst. project manager:
Residual risk evaluation
1.00
The risk management for the product "18.5" Bedside Terminal, models xxxx-ONYX-BE18xDT-xxxxxxx" has been performed
and documented according to the international standard DIN EN ISO 14971.
Residual risk evaluation
Description of project:
The models xxxx-ONYX-BE18xDT-xxxxxxx are 18.5" Bedside Terminal for medical equipment used.
Intended use/purpose
1. 18.5" RISC Mini Bedside Terminal benefits medical staff by providing secure access to electronic patient data with an
optimized hospital workflow. As an aid to professional diagnosis, the terminal can remotely retrieve electronic patient
records, access databases from the bedside and comply with Hospital Information Systems (HIS) requirements. Hospital
administrators will see their medical facilities gain operational efficiencies , increase patient and visitor satisfaction, and
improve their quality of care, while boosting profitability. RISC Mini Bedside Terminal the xxxx-ONYX-BE18xDT-xxxxxxx
(x = 0-9, A-Z, "-" or blank) is a 18.5" multi-function terminal with touchscreen, WiFi, RFID, and smart card reader. The
xxxx-ONYX-BE18xDT-xxxxxxx (x = 0-9, A-Z, "-" or blank) is certified to ANSI/AAMI ES 60601-1 and EN60601-1: 2006
medical standards. The WiFi, and Ethernet (RJ-45) connectivity provides video phone service to help patients
communicate with their families by internet. Identification recognition for both patients and hospital staff is made possible
with RFID and a smart card reader. Two USB ports, an earphone jack and a microphone provide added flexibility.
Additionally, an LED light indicator button help alert hospital staff to important incidents . Equipped with a slim, clean,
hospital-fit design. There is a VESA compliant for mounting the support arm.2. The rated input: 24V dc, 2.91 A (for Ward Terminal Unit); 100-240 V ac, 50/60 Hz, 1.8-0.8 A (for power supply, model
GMPU70A-6 by Eljintek Inc.)
3. The operation temperature/humidity: 0-40 °C, 30%-75% RH and suitable storage from -20°C to 60°C, 10% - 90% RH.
4. This Bedside Terminal intended to be used at any altitudes between 0 to 3,000 m.
5. The Bedside Terminal expected services life was 43,800 hours
6. This Bedside Terminal was judged on the basis of the required creepage and clearances in the Third Edition of the
Standard for Medical Electrical Equipment, IEC 60601-1 3rd Ed., Sub. clause 8.9 which covers the end-use product for
which the component was designed.
7. This Bedside Terminal was tested on a 20 A branch circuit. If used on a branch circuit greater than this, additional
evaluation was necessary.
8. This Bedside Terminal has not been evaluated for patient connected applications .
9. This Bedside Terminal has been evaluated as a Class I , continuous operation, ordinary equipment and has not been
evaluated for use in the presence of a flammable anesthetic mixture with air, oxygen, or nitrous oxide. An additional
evaluation shall be made if the power supply is intended for use in other than Class I equipment.
10. This Bedside Terminal shall be installed assembled maintained or repair .
11. This Bedside Terminal incorporates the UL R/C and IEC 6060-1-1 certified power adapter, model
GMPU70A-6 by ELJINTEK INC. This power is used in the conditions of overvoltage category II, Pollution Degree II.
12. This Bedside Terminal does not deliverer the energy to or extract the energy from the patient .
13. This Bedside Terminal does not deliver the substances to or extract the substances from the patient .
14. No any biological materials processed by the Ward Terminal for subsequent re -use.
15. This Bedside Terminal does not supply sterile or intended to be sterilized by the user , or other applicable
microbiological controls.
16. This Bedside Terminal is not intended to be routinely cleaned and disinfected by the user .
17. This Bedside Terminal is not intended to modify the patient environment .
18. This Bedside Terminal does not take any measurements.
19. This Bedside Terminal is not intended for use in conjunction with medicines or other medical technologies .
20. This Bedside Terminal has no unwanted outputs of energy.
21. This Bedside Terminal is susceptible to environmental influences (ambient, emc).
22. This Bedside Terminal influences the environment (emi).
Page 147 of 148
Project number: 1112024003 Version: 1.00 Short name: ONYX-BE18xDT 12-14-2011
Onyx Healthcare Inc.
23. This Bedside Terminal does not provided the essential consumables or accessories .
24. This Bedside Terminal is no need to maintenance and/or calibration.
25. This Bedside Terminal contain ssoftware, but the failure of the software does not lead to an unacceptable RISK.
26. This Bedside Terminal has a restricted shelf-life.
27. This Bedside Terminal has no any delayed and/or long-term use effects.
28. This Bedside Terminal does not subject mechanical forces.
29. This Bedside Terminal is not intended for single use.
30. No need to safe decommissioning or disposal of the Bedside Terminal .
31. Installation or use of the Bedside Terminal is required special training .
32. This Bedside Terminal has no output wire to connection end-product.
33. This Bedside Terminal is not used by person with special needs.
34. This Bedside Terminal did not use an alarm system.
35. This Bedside Terminal did not hold data critical to patient care .
36. The least favourable working conditions are: maximum normal load and placed in a test corner.
37. Allowable maximum time for the part can be touched.
Location Touch time
Touch Panel Surface < 1min
Plastic Enclosure < 1min
Metal Enclosure < 1sec
Adapter Plastic Enclosure 10 sec - 1 min
Identification of known or predictable hazards and evaluation of the risks:
1. All reasonable hazards and their cause were identified and the resulting risks have been evaluated. All of the data
have been documented in the enclosed tables before the required measures for the risk diminution have been defined
and a final evaluation has been carried out.
2. The aim of this analysis is to improve the security of the product. The assessment is based on the companies'
security policy which was implemented for the product in the definition of the risk graph. There areas were defined:
"broadly acceptable" and "intolerable".
3. The definite acceptance of the product can only be carried out when the evaluation are located mainly in the "broadly
acceptable" region.
4. The product is not marketable according to the safety philosophy of our company if it does contain evaluations in the
"intolerable" region after implementation of the measures.
Residual risk, evaluation:
1) In this risk analysis the "present state" of the device has been evaluated.
2) Having carried out the evaluation of the product, the risk of appearance of a not acceptable fault is quit low.
3) The product construction, its function as well as the application does - under normal conditions- not represent any risk
for the user.
Page 148 of 148