Special-Tipper · ing of railway wagons, high rollcontainers, tipping semi-trailer and much more....

8
Special-Tipper Type overview Z4 Silo Skip loader High Skip loader Smelter Skip loader Hook lift Dumper

Transcript of Special-Tipper · ing of railway wagons, high rollcontainers, tipping semi-trailer and much more....

Page 1: Special-Tipper · ing of railway wagons, high rollcontainers, tipping semi-trailer and much more. The first smelter-tipper was used in a steel mill in the 1950s. Since then, there

Special-Tipper

Type overview

Z4 Silo Skip loader

High Skip loader

Smelter Skip loader

Hook lift Dumper

Page 2: Special-Tipper · ing of railway wagons, high rollcontainers, tipping semi-trailer and much more. The first smelter-tipper was used in a steel mill in the 1950s. Since then, there

Seite 2

Meeting demands of the market

and finding solutions in the shortest time is one of our specialties.

The high-lift tipper for 2-, 3- and 4-axle chassis empties the contain-

ers in dumping heights up to 4 m. This results in a problem-free load-

ing of railway wagons, high rollcontainers, tipping semi-trailer and

much more.

The first smelter-tipper was used in a steel mill in the 1950s. Since

then, there has been an ongoing development. The largest of its

class was a smelter tipper with 120 to total weight and 60 to load

capacity. The majority of the units are today at 20-30 to load capac-

ity and can also be built on heavy-duty vehicles.

Silo skip loaders and hooklifts round off a special spectrum. Thanks

to the universally applicable equipment, in addition to DIN contain-

ers, silo transports up to 22.5 m³ can be carried out. This versatility

ensures a high utilization of your vehicle.

Please ask us. We show what we are capable of.

We live progress ..

....because progress is not to be stopped.

Page 3: Special-Tipper · ing of railway wagons, high rollcontainers, tipping semi-trailer and much more. The first smelter-tipper was used in a steel mill in the 1950s. Since then, there

Silo Skip loader Z4 4

Exchangable System 4

Dumper 4

High Skip Loader 5

Half Pipe Tipper 5

Smelter Skip Loader 5

Seite 3

Table of contents

Page 4: Special-Tipper · ing of railway wagons, high rollcontainers, tipping semi-trailer and much more. The first smelter-tipper was used in a steel mill in the 1950s. Since then, there

TAK Z4

Seite 4

TAK Z4 Exchangable System/Dumper

GRK 21/70 ION

TAK Z4

Exchange-

able System

GWE

Page 5: Special-Tipper · ing of railway wagons, high rollcontainers, tipping semi-trailer and much more. The first smelter-tipper was used in a steel mill in the 1950s. Since then, there

Smelter Skip Loader High Skip Loader/Half Pipe Skip Loader

Seite 5

Smelter Skip

Loader

High Skip Loader

Dumper

Half Pipe Skip

Loader

Page 6: Special-Tipper · ing of railway wagons, high rollcontainers, tipping semi-trailer and much more. The first smelter-tipper was used in a steel mill in the 1950s. Since then, there

GSRK

Seite 6

Rear apron

optional

GSRK

Acsent

Page 7: Special-Tipper · ing of railway wagons, high rollcontainers, tipping semi-trailer and much more. The first smelter-tipper was used in a steel mill in the 1950s. Since then, there

Corporate Mission

Corrosion protection

Durability of our Corrosion-Protection

Epoxy Enamel

Zinc Dust Primer

Electric ArcZincing

Em

oti

on

D

esi

gn

Futu

re

Ori

en

tati

on

Inn

ova

tio

n

SustainabilityResponsibilty

Ima

ge

Ecology

Pro

gre

ss

Your Wish

Page 8: Special-Tipper · ing of railway wagons, high rollcontainers, tipping semi-trailer and much more. The first smelter-tipper was used in a steel mill in the 1950s. Since then, there

Phone: +49 6894 - 9203-0

Fax: +49 6894 - 9203- 119

E-Mail: [email protected]

Geistkircherstraße 14

66386 St. Ingbert

Germany