Special Assessment

Single Point of Disruption on Natural Gas Infrastructure

Amir Najafzadeh, Senior Engineer, System AnalysisSPPDecember, 2016

Page 2: Special Assessment Single Point of Disruption on Natural ... 6b natural gas point of... · •Generation impacted by fuel supply interruption: Pipeline segment outages Disruption

RELIABILITY | ACCOUNTABILITY2

• Generation impacted by fuel supply interruption: Pipeline segment outages Disruption of LNG transport operations Natural gas storage disruptions – 600+ facilities

• Aliso Canyon outage affecting generation capacity

• Argonne National Laboratory analysis on critical or significant Underground Natural Gas Storage, pipeline and Liquefied Natural Gas

Assessment Scope and Drivers

Presenter
Presentation Notes
(1)Depleted, (2) Salt Caverns, (3) Aquifers More than 15 UGS with than 1000 customer impact
Page 3: Special Assessment Single Point of Disruption on Natural ... 6b natural gas point of... · •Generation impacted by fuel supply interruption: Pipeline segment outages Disruption

RELIABILITY | ACCOUNTABILITY3

I• Identify key

natural gas infrastructure facilities

• Determine the amount of generation capacity impacted

Development Approach

II• Evaluate the

resource adequacy impacts

• Consider contribution of dual-fuel generation

III• Conduct an

assessment leveraging available power system studies

IV• Provide

actionable recommendations

Presenter
Presentation Notes
II: Duel fuel and Assessment Area III: Transmission Planning and Operations Studies IV: help state and federal officials fully understand the risks to electric reliability and can develop appropriate mitigation policies and strategies.
Page 4: Special Assessment Single Point of Disruption on Natural ... 6b natural gas point of... · •Generation impacted by fuel supply interruption: Pipeline segment outages Disruption

RELIABILITY | ACCOUNTABILITY4

• Approximately 30 members participating on the Advisory Group

• Various sectors represented: National Laboratories US and Canadian Natural Gas Associations Regional and FERC Staff Power pools, and utilities Independent System Operators and Regional Transmission Organizations

Advisory GroupComposition

Page 5: Special Assessment Single Point of Disruption on Natural ... 6b natural gas point of... · •Generation impacted by fuel supply interruption: Pipeline segment outages Disruption

RELIABILITY | ACCOUNTABILITY5

1. Underground Natural Gas Facilities2. Pipeline Disruption Major Pipeline Cluster of Units

3. Compressor Source of Fuel4. LNG Facilities

Identify key natural gas infrastructure facilities

Page 6: Special Assessment Single Point of Disruption on Natural ... 6b natural gas point of... · •Generation impacted by fuel supply interruption: Pipeline segment outages Disruption

RELIABILITY | ACCOUNTABILITY6

• Resource Adequacy• Power System Analysis (Deliverability and Capacity Transfer)• Existing Assessments Larger PCs/BAs Cross boundary PC/BA affected ERO-RAPA and NERC to form a question set

Analysis Method

Page 7: Special Assessment Single Point of Disruption on Natural ... 6b natural gas point of... · •Generation impacted by fuel supply interruption: Pipeline segment outages Disruption

RELIABILITY | ACCOUNTABILITY7

• Comprehensive assessment of natural gas facilities and their impacts on electric sector

• Provide actionable recommendations

End Goal

Presenter
Presentation Notes
that help state and federal officials fully understand the risks to electric reliability and can develop appropriate mitigation policies and strategies.
Page 8: Special Assessment Single Point of Disruption on Natural ... 6b natural gas point of... · •Generation impacted by fuel supply interruption: Pipeline segment outages Disruption

RELIABILITY | ACCOUNTABILITY8

Pipelines, Storage, and LNG Facilities

Page 9: Special Assessment Single Point of Disruption on Natural ... 6b natural gas point of... · •Generation impacted by fuel supply interruption: Pipeline segment outages Disruption

RELIABILITY | ACCOUNTABILITY9

Schedule

- NERC BOT- Publish Report

- Draft report provided to PC/OC

May 2017March 2017

- Review PCs/TPsExisting Studies

Nov 2016

- Finalize scope - Form advisory group - Acquire data from Argonne

National Laboratory

Sep 2016

Report Development

Page 10: Special Assessment Single Point of Disruption on Natural ... 6b natural gas point of... · •Generation impacted by fuel supply interruption: Pipeline segment outages Disruption

RELIABILITY | ACCOUNTABILITY10

Amir NajafzadehSenior Engineer, System Analysis404-446-9677 office | 404-330-4137 [email protected]

Page 11: Special Assessment Single Point of Disruption on Natural ... 6b natural gas point of... · •Generation impacted by fuel supply interruption: Pipeline segment outages Disruption

RELIABILITY | ACCOUNTABILITY11

• The US used about 25 Tcf in 2014

• Over 550 active Natural Gas Storage (NGS) facilities

• 15 NGS facilities with over 2 million Mcf/d deliverability

By the Numbers

-0.5%0.0%0.5%1.0%1.5%2.0%2.5%3.0%3.5%4.0%4.5%

- 2 4 6 8

10 12

GW

Natural Gas Capacity Growth (Year 5)

Capacity Growth Percentage Growth

• 10-15 NGS facilities identified for closer evaluation by NERC and Argonne National Labs (i.e., potential Aliso Canyon-like impacts)

• Over 30 GW of natural gas capacity growth within 5 years

Page 12: Special Assessment Single Point of Disruption on Natural ... 6b natural gas point of... · •Generation impacted by fuel supply interruption: Pipeline segment outages Disruption

RELIABILITY | ACCOUNTABILITY12

Underground Natural Gas Storage Facilities