SPD general meeting Pixel bus and Pilot MCM Integration CERN October 8, 2002.

22
SPD general meeting Pixel bus and Pilot MCM Integration CERN October 8, 2002

Transcript of SPD general meeting Pixel bus and Pilot MCM Integration CERN October 8, 2002.

Page 1: SPD general meeting Pixel bus and Pilot MCM Integration CERN October 8, 2002.

SPD general meeting

Pixel bus and Pilot MCMIntegration

CERN October 8, 2002

Page 2: SPD general meeting Pixel bus and Pilot MCM Integration CERN October 8, 2002.

8/10/2002 Michel Morel EP/ED 2

1. PIXEL BUS AND PILOT MCM CONNECTIONS

2. PIXEL BUS, PILOT MCM and EXTENDERS CONNECTIONS

3. PIXEL BUS PROTOTYPE PRODUCTION

4. BONDING WIRE TESTS

5. STATUS OF PCB

6. CONCLUSION

Page 3: SPD general meeting Pixel bus and Pilot MCM Integration CERN October 8, 2002.

8/10/2002 Michel Morel EP/ED 3

400µ

240µ

500µ

DETECTOR

PIXEL CHIP

SMDCOMPONENTS

0402

MCM

SMDCOMPONENTS

0402 Digital pilot

LASERDIODE

PIXEL CARRIER

PIXEL CARRIER

EXTENDER 1

EXTENDER 2

GLOB TOP

COOLING TUBE 100µ

1.2mm

350µ

LASER DIODE 500

PIXEL BUS AND PILOT MCM CONNECTIONS

Page 4: SPD general meeting Pixel bus and Pilot MCM Integration CERN October 8, 2002.

8/10/2002 Michel Morel EP/ED 4

400µ

240µ

500µ

DETECTOR

PIXEL CHIP

SMDCOMPONENTS

0402

MCM

SMDCOMPONENTS

0402 Digital pilot

LASERDIODE

PIXEL CARRIER

PIXEL CARRIER

EXTENDER 1

EXTENDER 2

GLOB TOP

COOLING TUBE 100µ

1.2mm

350µ

LASER DIODE 500

PIXEL BUS AND PILOT MCM CONNECTIONS

Page 5: SPD general meeting Pixel bus and Pilot MCM Integration CERN October 8, 2002.

8/10/2002 Michel Morel EP/ED 5

Glob top

400µ

240µ

500µ

DETECTOR

PIXEL CHIPMCM

Analog PilotPIXEL CARRIER

COOLING TUBE

PIXEL BUS AND PILOT MCM CONNECTIONS

500µ

SDM comp

LASER DIODE 500

Page 6: SPD general meeting Pixel bus and Pilot MCM Integration CERN October 8, 2002.

8/10/2002 Michel Morel EP/ED 6

15.0013.00

0.30

PIXEL_BUS

0.30

ANALOGPILOT

PIXEL BUS AND PILOT MCM CONNECTIONS

Top view

LASER DIODE 500

Page 7: SPD general meeting Pixel bus and Pilot MCM Integration CERN October 8, 2002.

8/10/2002 Michel Morel EP/ED 7

PIXEL BUS, PILOT MCM and EXTENDERS CONNECTIONS

Pixel Bus

Pixel chipLadder Pilot MCM

15.00 50.00 50.00

ladders HVTemperature monitoring

Sense +

Sense -

MCM 2.5VSense +

Sense -

Pixel chips 1.8V

Laser diode

Laser diode

Laser diode

Page 8: SPD general meeting Pixel bus and Pilot MCM Integration CERN October 8, 2002.

8/10/2002 Michel Morel EP/ED 8

VDD

Copper

Kapton1(top)

PIXEL__EXTENDERS if VDD=VDDA=VTT=VTTA=1.8V

Cross section

Cover-lay

50µm

100µm

~50µm

Top view

Kapton2 (bottom)

GND

Pixel_carrier

Sense+VDD

12

mm

Sense-GND

I=7A DDP=102mVP(half stave) = 715mWP(half detector) = 42.9W

GND VDD=1.8V

Page 9: SPD general meeting Pixel bus and Pilot MCM Integration CERN October 8, 2002.

8/10/2002 Michel Morel EP/ED 9

EXTENDERS WITH CABLES

1m

Cable AWG 10:• diameter 2.79mm• area 4.6mm²• weight 41.49 g/m• Rmax 0.4/100m

Ddp at 7A = 56mVP(half stave) = 392mWP(half detector) = 24W

Page 10: SPD general meeting Pixel bus and Pilot MCM Integration CERN October 8, 2002.

8/10/2002 Michel Morel EP/ED 10

Pixel_bus prototype production

EpoxyAl

Cu (base)

LASER DIODE 500

Page 11: SPD general meeting Pixel bus and Pilot MCM Integration CERN October 8, 2002.

8/10/2002 Michel Morel EP/ED 11

EpoxyAl

Cu (base)

300µm

Pixel_bus prototype production

Page 12: SPD general meeting Pixel bus and Pilot MCM Integration CERN October 8, 2002.

8/10/2002 Michel Morel EP/ED 12

Epoxy (5)Al

Cu (base)

!

Pixel_bus prototype production

Page 13: SPD general meeting Pixel bus and Pilot MCM Integration CERN October 8, 2002.

8/10/2002 Michel Morel EP/ED 13

Epoxy

Al

Cu (base)

Kapton

Pixel_bus prototype production

Page 14: SPD general meeting Pixel bus and Pilot MCM Integration CERN October 8, 2002.

8/10/2002 Michel Morel EP/ED 14

Epoxy

Al

Cu (base)

300µm

Kapton

300µm

Pixel_bus prototype production

Page 15: SPD general meeting Pixel bus and Pilot MCM Integration CERN October 8, 2002.

8/10/2002 Michel Morel EP/ED 15

Epoxy

Al

Cu (base)

300µm

Kapton

!

Cu xCu y

Pixel_bus prototype production

Page 16: SPD general meeting Pixel bus and Pilot MCM Integration CERN October 8, 2002.

8/10/2002 Michel Morel EP/ED 16

PIXEL BUS CROSS SECTION

Glue 5µ

Kapton 8µ

Liquid Polyimide 8µm

280µm

Cu 5µ +Ni/Au (1µm)

Cu 10µ + Ni/Au (1µm)1) AGND 50µm

2) VDDA 30µm

3) Horizontal lines

4) vertical lines

5) VDD 15µm

6) GND 50µm

7) Resistors + capacitors pads+ Fastor

Aluminium

Page 17: SPD general meeting Pixel bus and Pilot MCM Integration CERN October 8, 2002.

8/10/2002 Michel Morel EP/ED 17

Cu (base)

BONDING WIRE TESTS

Page 18: SPD general meeting Pixel bus and Pilot MCM Integration CERN October 8, 2002.

8/10/2002 Michel Morel EP/ED 18

Cu (base)

9~10g

BONDING WIRE TESTS

Page 19: SPD general meeting Pixel bus and Pilot MCM Integration CERN October 8, 2002.

8/10/2002 Michel Morel EP/ED 19

Cu (base)

Al

BONDING WIRE TESTS

Al (99%) + Si (1%)

1g!

Page 20: SPD general meeting Pixel bus and Pilot MCM Integration CERN October 8, 2002.

8/10/2002 Michel Morel EP/ED 20

Status of PCB

• Pixel_carrier_B.

• Pixel carrier interface.

• Pilot MCM.

• Pilot MCM daughter card.

Page 21: SPD general meeting Pixel bus and Pilot MCM Integration CERN October 8, 2002.

8/10/2002 Michel Morel EP/ED 21

Pilot MCM daughter card

Page 22: SPD general meeting Pixel bus and Pilot MCM Integration CERN October 8, 2002.

8/10/2002 Michel Morel EP/ED 22

CONCLUSION

• Power supplies modifications should be finalized ASAP.• PIXEL BUS in production: 10 normal, 10 mirror.• First mirror bus mounted on PIXEL interface end of October• PILOT MCM will be assembled this month (October 2002) and mounted on the daughter card interface.