Overview of the presentation
Who is REE?
The challenge of the Demand Side Management
Demand Response experiences
Conclusion
3
Who is Red Eléctrica de España?
• Red Eléctrica was the first company in the world
dedicated exclusively to power transmission and the
operation of electrical systems. A pioneer in its field,
the company occupies a position of leadership today
in these activities.
• Red Eléctrica is the first European TSO establishing
a Demand Side Management Department in
coherence with its commitment of the development of
a smarter electric grid adapted to the next decade
challenges
Red Eléctrica is the Spanish transmission system operator (TSO)
4
Overview of the presentation
Who is REE?
The challenge of the Demand Side Management
Demand Response experiences
Conclusion
5
Spanish energy context
Spanish electric system is still dependant on fossil fuels, but presents a continuous
introduction of energy coming from renewable sources.
2010 generation share
Combined cycles, nuclear and wind
were the most used technologies in
2010.
In recent years has increased the participation of wind and
combined cycles, basically at expense of production based in
coal.
Spanish generation share evolution
10,2%
21,2%
16,0%
0,0%0,0%
18,6%
15,3%
3,5%
15,1%Hidraúlica
Nuclear
Carbón
Fuel-Gas
Fuel-Oil
Ciclo combinado
Eóilca
Solar
Resto RE
10,2%
21,2%
16,0%
0,0%0,0%
18,6%
15,3%
3,5%
15,1%Hidraúlica
Nuclear
Carbón
Fuel-Gas
Fuel-Oil
Ciclo combinado
Eóilca
Solar
Resto RE
10,2%
21,2%
16,0%
0,0%0,0%
18,6%
15,3%
3,5%
15,1%Hidraúlica
Nuclear
Carbón
Fuel-Gas
Fuel-Oil
Ciclo combinado
Eóilca
Solar
Resto RE0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011
Solar
Eóilca
Ciclo combinado
Fuel-Oil
Fuel-Gas
Hidraúlica
Resto RE
Carbón
Nuclear
6
The challenge for the system operation
As a TSO, Red Eléctrica manages a daily load shape which presents high ratio peaks vs off-peak demands.
Low demand level
High wind energy production
High ratio peak vs off-peak
On some occasions wind production is curtailed, when demand is very low and interconnection capabilities are very limited
1
2
2
7
The future of the Electric System
“Smart Grid” is the process “to transform the functionality of the present electricity transmission and distribution grids so that they are able to provide a user-oriented service, enabling the achievement of the 20/20/20 targets and guaranteeing, in an electricity market environment, high security, quality and economic efficiency of electricity supply” (ENTSOE)
Hydro generation
Wind power
REE Control centre
Thermal generation
Transport network
Distribution network
Distribution substation
Transport substation
Residential consumption (low voltage)
Industrial consumption (high voltage)
Storage
Renewable
Energy
Demand Side
Management
Smart meters
Electric
Vehicles
8
Overview of the presentation
Who is REE?
The challenge of the Demand Side Management
SmartGrid Projects
Conclusion
9
PRICE Project: Smartgrid project
using smartmeters deployment in
the Corredor del Henares area
DOMOCELL Project: To develop a smart
system for EV charge in public parking
This process requires projects dealing not only with the technology
development but also with the deployment.
SmartGrid R&D projects
VERDE Project: 40 M€ SEAT VE prototype
and smart integration into the grid
DOMOCELL
Electric vehicle
AGREGA Project: To develop DSM services
through aggregation within medium industry sector
TWENTIES DEMO2 Project: To develop a VPP
Demonstration projects Deployment projects
GAD Project: 30M€ to demonstrate Demand
response services within residential sector
SmartCity Malaga & Barcelona:
ENDESA Smartmeters
deployment
10
Player’s role
From a TSO perspective, the main challenge is to ensure that system operation needs are taken into account.
END USER RETAILER/
AGREGGATOR/ DSO
Resource Information €
11
GAD Project
12
GAD project
Distribuidor
¿What loads? 1
¿What
customers? 2
¿Algorithms? 4
¿Economical
and regulatory
model?
5
¿Architecture? 6
¿What
appliances ? 7
¿System
operation? 3
Targets
13
13
GAD Project. Loads and appliances
Load controller (ORBIS)
User interface (ORBIS)
Plugs and smart lines(ZIV)
Smart appliances (FAGOR – ALTRA)
Transformer equipment (ORBIS)
Smart meter (ZIV)
14
14
Management tools
New tools for demand management (GAD project)
15
15
Some results for REE
For REE, GAD services may become a very relevant operational tool helping to improve efficiency
of spanish electric system
-
20,00
40,00
60,00
80,00
100,00
120,00
0:00
2:00
4:00
6:00
8:00
10:0
0
12:0
0
14:0
0
16:0
0
18:0
0
20:0
0
22:0
0
0:00
2:00
4:00
6:00
8:00
10:0
0
12:0
0
14:0
0
16:0
0
18:0
0
20:0
0
22:0
0
MW Situación Base Respuesta a orden de reducción
Response to
technical signals
Response to
price signals
16
To demonstrate that medium industry can provide a DSM service through aggregation
CECODE
AGREGA Project
17
VERDE Project.
Infraestructura Vehículo Herramientas OS
Herramientas
distribuidor
VERDE project is oriented to develop an electric car as well as
its smart integration into the electric system
18
DOMOCELL
PRICE Project: Smartgrid project
using smartmeters deployment in
the Corredor del Henares area
DOMOCELL Project: To develop a smart
system for EV charge in public parking
VERDE Project: 40 M€ SEAT VE prototype
and smart integration into the grid
Electric vehicle
AGREGA Project: To develop DSM services
through aggregation within medium industry sector
TWENTIES DEMO2 Project: To develop a VPP
Demonstration projects Deployment projects
GAD Project: 30M€ to demonstrate Demand
response services within residential sector
SmartCity Malaga & Barcelona:
ENDESA Smartmeters
deployment
19
The National Meters Substitution Plan implies the substitution of current meters for smart meters with remote management and measurement.
11 years– From 2008 to December 2018
30% (7,8
millones)
Jun. 2008 Dic. 2010 Dic. 2015 Dic. 2018 Dic. 2012
20% (5,2
millones)
20% (5,2
millones)
30% (7,8
millones)
This plan means the substitution of 26 M meters
Towards the future grid…
Dic. 2016 Dic. 2018 Dic. 2014
35% 35% 30% Updated February 2012 IET /290/2012
20
PRICE project
This projects has 4 areas: RED (monitoring and automation), GEN (in house energy effiency), GDI (Distributed generation) and GDE (DSM)
21
PRICE project
The project involve 500.000 inhabitants with 200.000 meters and 1500 distribution grid substation (50% IBDL y 50% GNF)
22
Overview of the presentation
Who is REE?
The challenge of the Demand Side Management
Demand Response experiences
Conclusion
23
Conclusion
Demand side management will have a key role in the future system operation
Higher integration of smaller scale
and intermittent generation from
renewable energies
Forecast and
operation tools
Integration in Control
Center
Electric vehicle
Industrial Demand
Management
Storage
Electricity offer Electricity Demand
Information
24