COS Pipeline CDR Agenda – 2 24 July 2001 IntroductionM. McGrath 9:00 Coding EnvironmentP. Greenfield 9:05 Coordination with IDTT. Keyes 9:45 CALCOSP. Hodge10:00 Schedule & resources M. McGrath 10:30

Transcript of SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Pipeline Critical Design Review...

Page 1: SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Pipeline Critical Design Review 23-24 July 2001.

SPACETELESCOPESCIENCEINSTITUTE

Operated for NASA by AURA

COS PipelineCritical Design Review

23-24 July 2001

Page 2: SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Pipeline Critical Design Review 23-24 July 2001.

COS Pipeline CDR Agenda – 123 July 2001

• Introduction M. McGrath 9:00• Data system environment @ SM4 D. Swade 9:10• COS File Structure Overview T. Keyes 9:25• COS Keywords & Associations D. Swade 10:00• BREAK 10:15• Science Data Processing J. Rose 10:45• DADS ingest and distribution A. Farris 11:00• On-the-Fly-Reprocessing (OTFR) M. Swam 11:15• COS and StarView N. Gaffney 11:30• Thermal Vac support R. Henry 11:45

Page 3: SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Pipeline Critical Design Review 23-24 July 2001.

COS Pipeline CDR Agenda – 224 July 2001

• Introduction M. McGrath 9:00• Coding Environment P. Greenfield 9:05• Coordination with IDT T. Keyes 9:45• CALCOS P. Hodge 10:00• Schedule & resources M. McGrath 10:30

Page 4: SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Pipeline Critical Design Review 23-24 July 2001.

COS PIPELINE CDR

24 July 2001

Space Telescope Science Institute

4

Preliminary Design Review held 7 December 2000Preliminary Design Review held 7 December 2000 PDR Review panel: Kriss (chair), Brownsberger, PDR Review panel: Kriss (chair), Brownsberger,

Kutina, ShawKutina, Shaw 18 Request For Actions filed: 13 closed, 5 submitted to 18 Request For Actions filed: 13 closed, 5 submitted to

panel but not yet officially closed panel but not yet officially closed PDR presentation and RFAs on COS calwg web page PDR presentation and RFAs on COS calwg web page http://www.stsci.edu/instruments/cos/devel/coscalwg.htmlhttp://www.stsci.edu/instruments/cos/devel/coscalwg.html CDR package in same locationCDR package in same location

Page 5: SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Pipeline Critical Design Review 23-24 July 2001.

COS PIPELINE CDR

24 July 2001

Space Telescope Science Institute

5

COS Pipeline CDR Review Panel• Ray Kutina – Chair• Tom Brown• Ken Brownsberger• Paul Goudfrooij• Richard Shaw

[email protected]

RFA forms available in front of room

Page 6: SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Pipeline Critical Design Review 23-24 July 2001.

COS PIPELINE CDR

24 July 2001

Space Telescope Science Institute

6

– Nov 2001Nov 2001 Ops bench component data Ops bench component data from Ball from Ball

– Mar 2002 Mar 2002 Ops bench integrated Ops bench integrated instrument data instrument data

from Ballfrom Ball– TV-2mo TV-2mo OPUS beta version to IDTOPUS beta version to IDT– June 2002 (Ball) or June 2002 (Ball) or Thermal VacThermal Vac Oct 2002 (GSFC) ?Oct 2002 (GSFC) ?– Dec 2002 ? Dec 2002 ? SMGTSMGT– Jan 2004 ?Jan 2004 ? SM4 LanuchSM4 Lanuch

Primary Schedule Drivers

Page 7: SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Pipeline Critical Design Review 23-24 July 2001.

COS Pipeline CDR Agenda – 123 July 2001

• Introduction M. McGrath 9:00• Data system environment @ SM4 D. Swade 9:10• COS File Structure Overview T. Keyes 9:25• COS Keywords & Associations D. Swade 9:45• BREAK 10:15• Science Data Processing J. Rose 10:45• Data ingest and distribution A. Farris 11:00• On-the-Fly-Reprocessing (OTFR) M. Swam 11:15• COS and StarView N. Gaffney 11:30• Thermal Vac support R. Henry 11:45

Page 8: SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Pipeline Critical Design Review 23-24 July 2001.

COS Pipeline CDR Agenda – 224 July 2001

• Introduction M. McGrath 9:00• Coding Environment P. Greenfield 9:05• Coordination with IDT T. Keyes 9:45• CALCOS P. Hodge 10:00• Schedule & resources M. McGrath 10:30