Space Information & Intelligence System
RAF Fylingdales
![Page 2: Space Information & Intelligence System · AGI commercial product, Satellite Tool Kit (STK) • Operational requirements not met due to learning curve – 400+ panels – Too many](https://reader030.fdocuments.in/reader030/viewer/2022020114/5b37ca277f8b9a600a8c9d2f/html5/thumbnails/2.jpg)
Pg 2 of 17AGI www.agi.com
AGI overview
• A software product company
• Industry standard for analysis & visualization
• Offices in US, Europe and Asia
• Founded in 1989• 32,000+ registered
installations• 500+ buying organizations• STK 7.1 released May 2006• STK 8 October 2006
![Page 3: Space Information & Intelligence System · AGI commercial product, Satellite Tool Kit (STK) • Operational requirements not met due to learning curve – 400+ panels – Too many](https://reader030.fdocuments.in/reader030/viewer/2022020114/5b37ca277f8b9a600a8c9d2f/html5/thumbnails/3.jpg)
Pg 3 of 17AGI www.agi.com
Background: RAF Fylingdales
• Phased-array radar located in North York Moors, England
• Part of the Ballistic Missile Early warning System – UK and US
• Secondary role is the detection and tracking of orbiting objects– Project focus area – What can see what & when?
![Page 4: Space Information & Intelligence System · AGI commercial product, Satellite Tool Kit (STK) • Operational requirements not met due to learning curve – 400+ panels – Too many](https://reader030.fdocuments.in/reader030/viewer/2022020114/5b37ca277f8b9a600a8c9d2f/html5/thumbnails/4.jpg)
Pg 4 of 17AGI www.agi.com
Problem
• Aging legacy software (~30 years)• Replacement hardware difficult to
find (eBay)• Original development team retiring• Complicated to use
– Extensive training required
• Two prior unsuccessful upgrade attempts– 100% custom software– 2-year project lifecycle– $6 million over - budget
![Page 5: Space Information & Intelligence System · AGI commercial product, Satellite Tool Kit (STK) • Operational requirements not met due to learning curve – 400+ panels – Too many](https://reader030.fdocuments.in/reader030/viewer/2022020114/5b37ca277f8b9a600a8c9d2f/html5/thumbnails/5.jpg)
Pg 5 of 17AGI www.agi.com
Key derived requirements
Manage database of space objects
Given a point or area on ground, calculate when in view from tracked space objects
Generate actionable reports
Easy-to-use by entry-level operational staff
![Page 6: Space Information & Intelligence System · AGI commercial product, Satellite Tool Kit (STK) • Operational requirements not met due to learning curve – 400+ panels – Too many](https://reader030.fdocuments.in/reader030/viewer/2022020114/5b37ca277f8b9a600a8c9d2f/html5/thumbnails/6.jpg)
Pg 6 of 17AGI www.agi.com
How am I oriented?What is my SNR?Can we all “see” each other?
Who can I “see”?Where am I now?Are there any obstructions?Lighting & weather conditions?Who can “see” me?
Relationships among objects and areasTime-dynamic position and attitude
Where will I be? Where have I been?
Quality of relationships
STK basics
![Page 7: Space Information & Intelligence System · AGI commercial product, Satellite Tool Kit (STK) • Operational requirements not met due to learning curve – 400+ panels – Too many](https://reader030.fdocuments.in/reader030/viewer/2022020114/5b37ca277f8b9a600a8c9d2f/html5/thumbnails/7.jpg)
Pg 7 of 17AGI www.agi.com
Off-the shelf solution?
• All functional requirements met by AGI commercial product, Satellite Tool Kit (STK)
• Operational requirements not met due to learning curve– 400+ panels– Too many choices
![Page 8: Space Information & Intelligence System · AGI commercial product, Satellite Tool Kit (STK) • Operational requirements not met due to learning curve – 400+ panels – Too many](https://reader030.fdocuments.in/reader030/viewer/2022020114/5b37ca277f8b9a600a8c9d2f/html5/thumbnails/8.jpg)
Pg 8 of 17AGI www.agi.com
Solution architecture
• Embed STK geometry engine & 3D/2D displays
• Custom code supports specialized workflow
• Use 80% COTS & 20% custom– COTS portion does all of the
work– Custom code supports
workflows
Custom code (VB)
3D 2D
STK
Embedded technology marketed as “4DX”
![Page 9: Space Information & Intelligence System · AGI commercial product, Satellite Tool Kit (STK) • Operational requirements not met due to learning curve – 400+ panels – Too many](https://reader030.fdocuments.in/reader030/viewer/2022020114/5b37ca277f8b9a600a8c9d2f/html5/thumbnails/9.jpg)
Pg 9 of 17AGI www.agi.com
RAF Technical Analysis Prototype
![Page 10: Space Information & Intelligence System · AGI commercial product, Satellite Tool Kit (STK) • Operational requirements not met due to learning curve – 400+ panels – Too many](https://reader030.fdocuments.in/reader030/viewer/2022020114/5b37ca277f8b9a600a8c9d2f/html5/thumbnails/10.jpg)
Pg 10 of 17AGI www.agi.com
RAFTAP Features
• Manage terrain & imagery
• Search, sort, group & propagate objects
• Generate actionable reports
![Page 11: Space Information & Intelligence System · AGI commercial product, Satellite Tool Kit (STK) • Operational requirements not met due to learning curve – 400+ panels – Too many](https://reader030.fdocuments.in/reader030/viewer/2022020114/5b37ca277f8b9a600a8c9d2f/html5/thumbnails/11.jpg)
Pg 11 of 17AGI www.agi.com
Project Timeline
Q1Q2 Q4 Q2 Q3 Q4Q1
2004 2005 20052006
RAFTAP Operational
Test
RAFTAP Development
& DeliveryProof of concept
Q3
Initial exposure &
testing of STK
![Page 12: Space Information & Intelligence System · AGI commercial product, Satellite Tool Kit (STK) • Operational requirements not met due to learning curve – 400+ panels – Too many](https://reader030.fdocuments.in/reader030/viewer/2022020114/5b37ca277f8b9a600a8c9d2f/html5/thumbnails/12.jpg)
Pg 12 of 17AGI www.agi.com
Obstacles/Risks
• Long-distance deliverable– Atlantic ocean prevents frequent site visits– Time zones discourage spontaneous communication
• Language– Oxford vs. Webster
• Trust– Previous unsuccessful attempts– RAF contracting with a foreign country
• Mutual Ignorance
![Page 13: Space Information & Intelligence System · AGI commercial product, Satellite Tool Kit (STK) • Operational requirements not met due to learning curve – 400+ panels – Too many](https://reader030.fdocuments.in/reader030/viewer/2022020114/5b37ca277f8b9a600a8c9d2f/html5/thumbnails/13.jpg)
Pg 13 of 17AGI www.agi.com
Mitigations
• Solid face-to-face relationship – Local AGI rep, UK national– Regular interactions with RAF
technical staff
• Early prototypes– Static and functional– Reduced mutual ignorance
• AGI willingness to invest– Free initial proofs of concept– Firm, fixed-pricing
![Page 14: Space Information & Intelligence System · AGI commercial product, Satellite Tool Kit (STK) • Operational requirements not met due to learning curve – 400+ panels – Too many](https://reader030.fdocuments.in/reader030/viewer/2022020114/5b37ca277f8b9a600a8c9d2f/html5/thumbnails/14.jpg)
Pg 14 of 17AGI www.agi.com
What went right
• Rapid, iterative UI prototyping via Webex• Frequent, interim code drops• Customer participation
– Willing to accept partial deliverables– Not afraid to work hands-on with AGI
• Customer accepted the unknown– Customers shouldn’t be expected to have all the
answers– Experimenting with prototypes revealed unknown
requirements
![Page 15: Space Information & Intelligence System · AGI commercial product, Satellite Tool Kit (STK) • Operational requirements not met due to learning curve – 400+ panels – Too many](https://reader030.fdocuments.in/reader030/viewer/2022020114/5b37ca277f8b9a600a8c9d2f/html5/thumbnails/15.jpg)
Pg 15 of 17AGI www.agi.com
Result
• Provided a customized application using COTS as core– User documentation– Source code for custom gui
• Training– User training– RAF developer training
• Classroom• Code walk-through
“With AGI’s software technology, [our mission] has been propelled into the 21st century.“-SSgt. Alan Reeves, RAF
![Page 16: Space Information & Intelligence System · AGI commercial product, Satellite Tool Kit (STK) • Operational requirements not met due to learning curve – 400+ panels – Too many](https://reader030.fdocuments.in/reader030/viewer/2022020114/5b37ca277f8b9a600a8c9d2f/html5/thumbnails/16.jpg)
Pg 16 of 17AGI www.agi.com
Benefits
• Higher-fidelity analysis, less time– Collection, analysis & dissemination
reduced from 48 hours to 2 hours.• 95% reduction
• Simplified for novice user– Training: 30 min. vs. weeks– 1.5 hrs. to test vs. 2-days
• Affordable– < 10% of previous budget overrun
• Sustainable– Supported, COTS software– VB developers readily available