    Date 28-11-2007 Project # Sheet # 13 of 13

    Project:

    Site/Type

    Building Checked By Approved By

    13 43.2 1

    13 43.2 1

    26 43.2 1

    26 43.2 1

    26 43.2 1

    26 43.2 1

    76 43.2 1

    18 43.2 1

    18 43.2 1

    19.5 43.2 1

    12.7 60.8 1

    PHAZE WATT HEIGHT (mm) VOLT CMH RPM WEIGHT (Kg)

    1 65 .. 220 9300 420 ..

    1 85 .. 220 16200 290 ..

    900

    ..

    ..

    F12 ..

    1400 ..

    F11 900

    F04

    F05

    F06

    F09

    F08

    F03

    F02

    QTY BLADE (mm) MODEL OF CEILNG FAN

    STANDBY POLICE BATTALION HQ

    LASHKAR GAH

    Designed By

    SENIOR BAR.

    (SP02)AB.WALI M.E.AMIRYAR MAZIN SADIQ

    ..

    ..900

    900

    Ceiling fan Calculation Sheet

    Ceil ing fan Calculation

    LOCATION ROOM NO. V .(m3) AREA (m

    2)

    1400

    SENIOR BAR.

    (SP02)

    F01 900 ..

    900 ..

    900

    ..900

    MODEL BLADE (mm)

    ..

    900

    F10 ..

    900

    Ceil ing fan Detai ls

    900

    UnitedInfrastructure Pro ectsUnitedInfrastructure Pro ectsUnitedInfrastructure Pro ectsUnitedInfrastructure Pro ects

    17 of 182

  • 7/28/2019 (SP02) SENNIOR BARRACK.xls

    2/13

    Date 28-11-2007 Project # Sheet # 12 of 13

    Project:

    Site/Type

    Building Checked By Approved By

    F07 37 9 239.76 399.6 1

    F13 0.15 73.5 11.025 22.491 1

    [HZ] WATT PRSSURE (Pa) DIAMETER (mm) FIXING A. (mm*mm) AIR VOLUME CMH

    50 16 .. 160 224X224 226

    50 46 56 254 287X287 700

    VELOCITY (m/s) (mm H2O) or (Pa) m3/h QTY

    1.5 1.00 or 9.80 1400 2

    VITRO 9 3.5

    TOTAL AIR

    VOLUME(m3)/H

    QTY MODEL OF EXHAUST FAN

    STORAGE FV-15WH1 (05)

    SENIOR BAR. (SP02) DOOR TYPE 0.5X0.6

    CALCULA TION FOR DOOR LOUVER SIZE

    LOCATION MODEL OF LOUVER EFFECTIVE AREA (m2)

    TOTAL AIR

    VOLUME(m3)/H

    MODEL WIEGHT (Kg)

    FV-15WH1 (05) 1.4

    LOCATION ROOM NO.AIR CHANGE

    RATE CFM/SFAREA(SF)

    AIR CHANGE

    VOLUME(F3)/M

    MAZIN SADIQ

    SENIOR BAR. (SP02) VITRO 9

    DETAILS FOR MODEL

    CALCULA TION FOR EXHAUST FAN

    LOCATION ROOM NO.Ventilation for

    washing CMH/m2Area (m2)

    TOTAL AIR

    VOLUME CFM

    Exhaust fan and Louvers Calculation Sheet

    QTY MODEL OF EXHAUST FAN

    STANDBY POLICE BATTALION HQ

    LASHKAR GAH

    Designed By

    SENIOR BAR.

    (SP02)AB.WALI M.E.AMIRYAR

    UnitedInfrastructure Projects

    16 of 182

  • 7/28/2019 (SP02) SENNIOR BARRACK.xls

    3/13

    Date 28-11-2007 Project # Sheet # 11 of 13

    Project:

    Site/TypeBuilding Approved By

    Heating and Cooling Load Calculation - 2001 ASHRAE Fundamentals Handbook

    Temperatures

    Winter outdoor dodb -5 C Floor Area A.flr. 12.7 sq.meters

    Winter indoor didb 21 C Avg. Height Ceil.Ht. 3 meter

    Summer outdoor di 43 C Building Leakage 1 Tight = 1 Medium=2 Loose =3 Note(2)

    Summer indoor do 23.9 C

    Daily Range DR 18.3 C

    Sens. Heat Ratio SHR 0.8 Note (1)

    Windows U (3) SC (3) GLF (4) Area (m2) Qc (KW) Qh(KW)Fuel

    Heat of

    CombustionMJ/kg

    Required quantity for

    24( kg)

    North 5.9 1 0 0.0 0.0 Gasoline 47 2.540953072

    NE 5.9 1 0 0.0 0.0 Diesel 45 2.65388432

    East 5.9 1 0 0.0 0.0 Wood 15 7.96165296

    SE 5.9 1 0 0.0 0.0 Coal 20 5.97123972

    South 5.9 1 0 0.0 0.0 Natural Gas 54 2.211570267

    SW 5.9 1 0 0.0 0.0

    West 5.9 1 0 1.44 0.0 0.2

    NW 5.9 1 0 0.0 0.0

    Horz. 5.9 1 0 0.0 0.0

    Walls U CLTD (5)

    North 0.8 0 0.0 0.0

    NE 0.8 0 0.0 0.0East 0.8 0 0.0 0.0

    SE 0.8 0 0.0 0.0

    South 0.8 0 13.6 0.0 0.3

    SW 0.8 0 0.0 0.0

    West 0.8 0 7 0.0 0.1

    NW 0.8 0 0.0 0.0

    Doors U CLTD (5)

    North 3.3 0 0.0 0.0

    NE 3.3 0 0.0 0.0

    East 3.3 0 2 0.0 0.2

    SE 3.3 0 0.0 0.0

    South 3.3 0 0.0 0.0

    SW 3.3 0 0.0 0.0

    West 3.3 0 0.0 0.0

    NW 3.3 0 0.0 0.0

    Roof/Ceiling U CLTD (5)

    Roof 1 0.45 0 12.7 0.0 0.1

    Roof 2 0.45 0.0 0.0

    Partition U CLTD (5)

    (To Unc. Space) 0 0.0 0.0

    Crawl Space U CLTD (5)

    (or floor garage) 0 0.0 0.0

    Slab R (ins) UP CLTD (6) Perimeter

    0.83 7.4 0.2

    Infiltration ACH Vol Q

    Winter 0.53 38.1 6 0.3

    Summer 0.00 38.1 0 0.0

    People Number Watt /peson

    67 0

    Internal (AVG) KW WattsKitchen/Laundry 0 0.0

    Other (in watts) 0 0.0

    Sensible

    Cool Subtotal KW 0.0

    Heat Subtotal KW 1.4

    Cl.Fac Ht.Fac

    Duct 0 0 0.0 0.0

    Sensible

    Cool Total KW 0.0

    Heat Total KW 1.4

    Net Total

    Cooling KW 0.0

    Heating KW 1.4

    239

    179

    66

    MAZIN SADIQ

    Required quantity for 30

    days (kg)

    76

    80

    Heat Loss Calculation Sheet

    ..

    STANDBY POLICE BATTALION HQ

    LASHKAR GAHDesigned By Checked By

    SENIOR BAR.

    (SP02) F12AB.WALI M.E.AMIRYAR

    UnitedInfrastructure Pro ects

    15 of 182

    http://en.wikipedia.org/wiki/Gasolinehttp://en.wikipedia.org/wiki/Dieselhttp://en.wikipedia.org/wiki/Woodhttp://en.wikipedia.org/wiki/Coalhttp://en.wikipedia.org/wiki/Natural_Gashttp://en.wikipedia.org/wiki/Natural_Gashttp://en.wikipedia.org/wiki/Coalhttp://en.wikipedia.org/wiki/Woodhttp://en.wikipedia.org/wiki/Dieselhttp://en.wikipedia.org/wiki/Gasoline
  • 7/28/2019 (SP02) SENNIOR BARRACK.xls

    4/13

    Date 28-11-2007 Project # Sheet # 10 of 13

    Project:

    Site/Type

    Building Approved By

    Heating and Cooling Load Calculation - 2001 ASHRAE Fundamentals Handbook

    Temperatures

    Winter outdoor dodb -5 C Floor Area A.flr. 19.5 sq.meters

    Winter indoor didb 21 C Avg. Height Ceil.Ht. 3 meter

    Summer outdoor di 43 C Building Leakage 1 Tight = 1 Medium=2 Loose =3 Note(2)

    Summer indoor do 23.9 C

    Daily Range DR 18.3 C

    Sens. Heat Ratio SHR 0.8 Note (1)

    Windows U (3) SC (3) GLF (4) Area (m2) Qc (KW) Qh(KW)

    FuelHeat of

    CombustionMJ/kgRequired quantity for

    24( kg)

    North 5.9 1 0 0.0 0.0 Gasoline 47 3.16579297

    NE 5.9 1 0 0.0 0.0 Diesel 45 3.30649488

    East 5.9 1 0 1.44 0.0 0.2 Wood 15 9.91948464

    SE 5.9 1 0 0.0 0.0 Coal 20 7.43961348

    South 5.9 1 0 0.0 0.0 Natural Gas 54 2.7554124

    SW 5.9 1 0 0.0 0.0

    West 5.9 1 0 0.0 0.0

    NW 5.9 1 0 0.0 0.0

    Horz. 5.9 1 0 0.0 0.0

    Walls U CLTD (5)

    North 0.8 0 0.0 0.0

    NE 0.8 0 0.0 0.0

    East 0.8 0 11.5 0.0 0.2

    SE 0.8 0 0.0 0.0

    South 0.8 0 13.6 0.0 0.3

    SW 0.8 0 0.0 0.0

    West 0.8 0 0.0 0.0

    NW 0.8 0 0.0 0.0

    Doors U CLTD (5)

    North 3.3 0 0.0 0.0

    NE 3.3 0 0.0 0.0

    East 3.3 0 0.0 0.0

    SE 3.3 0 0.0 0.0

    South 3.3 0 0.0 0.0

    SW 3.3 0 0.0 0.0

    West 3.3 0 2 0.0 0.2

    NW 3.3 0 0.0 0.0

    Roof/Ceiling U CLTD (5)Roof 1 0.45 0 19.5 0.0 0.2

    Roof 2 0.45 0.0 0.0

    Partition U CLTD (5)

    (To Unc. Space) 0 0.0 0.0

    Crawl Space U CLTD (5)

    (or floor garage) 0 0.0 0.0

    Slab R (ins) UP CLTD (6) Perimeter

    0.83 8.85 0.2

    Infiltration ACH Vol Q

    Winter 0.53 58.5 9 0.4

    Summer 0.00 58.5 0 0.0

    People Number Watt /peson

    67 0

    Internal (AVG) KW WattsKitchen/Laundry 0 0.0

    Other (in watts) 0 0.0

    Sensible

    Cool Subtotal KW 0.0

    Heat Subtotal KW 1.7

    Cl.Fac Ht.Fac

    Duct 0 0 0.0 0.0

    Sensible

    Cool Total KW 0.0

    Heat Total KW 1.7

    Net Total

    Cooling KW 0.0

    Heating KW 1.7

    298

    223

    83

    MAZIN SADIQ

    Required quantity for 30days (kg)

    95

    99

    Heat Loss Calculation Sheet

    ..

    STANDBY POLICE BATTALION HQ

    LASHKAR GAH

    Designed By Checked By

    SENIOR BAR.

    (SP02) F11AB.WALI M.E.AMIRYAR

    UnitedInfrastructure Pro ects

    14 of 182

    http://en.wikipedia.org/wiki/Gasolinehttp://en.wikipedia.org/wiki/Dieselhttp://en.wikipedia.org/wiki/Woodhttp://en.wikipedia.org/wiki/Coalhttp://en.wikipedia.org/wiki/Natural_Gashttp://en.wikipedia.org/wiki/Natural_Gashttp://en.wikipedia.org/wiki/Coalhttp://en.wikipedia.org/wiki/Woodhttp://en.wikipedia.org/wiki/Dieselhttp://en.wikipedia.org/wiki/Gasoline
  • 7/28/2019 (SP02) SENNIOR BARRACK.xls

    5/13

    Date 28-11-2007 Project # Sheet # 9 of 13

    Project:

    Site/Type

    Building Approved By

    Heating and Cooling Load Calculation - 2001 ASHRAE Fundamentals Handbook

    Temperatures

    Winter outdoor dodb -5 C Floor Area A.flr. 18 sq.meters

    Winter indoor didb 21 C Avg. Height Ceil.Ht. 3 meter

    Summer outdoor di 43 C Building Leakage 1 Tight = 1 Medium=2 Loose =3 Note(2)

    Summer indoor do 23.9 C

    Daily Range DR 18.3 C

    Sens. Heat Ratio SHR 0.8 Note (1)

    Windows U (3) SC (3) GLF (4) Area (m2) Qc (KW) Qh(KW)

    FuelHeat of

    CombustionMJ/kgRequired quantity for

    24( kg)

    North 5.9 1 0 0.0 0.0 Gasoline 47 2.327948732

    NE 5.9 1 0 0.0 0.0 Diesel 45 2.43141312

    East 5.9 1 0 0.0 0.0 Wood 15 7.29423936

    SE 5.9 1 0 0.0 0.0 Coal 20 5.47067952

    South 5.9 1 0 0.0 0.0 Natural Gas 54 2.0261776

    SW 5.9 1 0 0.0 0.0

    West 5.9 1 0 1.44 0.0 0.2

    NW 5.9 1 0 0.0 0.0

    Horz. 5.9 1 0 0.0 0.0

    Walls U CLTD (5)

    North 0.8 0 0.0 0.0

    NE 0.8 0 0.0 0.0

    East 0.8 0 0.0 0.0

    SE 0.8 0 0.0 0.0

    South 0.8 0 0.0 0.0

    SW 0.8 0 0.0 0.0

    West 0.8 0 10.5 0.0 0.2

    NW 0.8 0 0.0 0.0

    Doors U CLTD (5)

    North 3.3 0 0.0 0.0

    NE 3.3 0 0.0 0.0

    East 3.3 0 2 0.0 0.2

    SE 3.3 0 0.0 0.0

    South 3.3 0 0.0 0.0

    SW 3.3 0 0.0 0.0

    West 3.3 0 0.0 0.0

    NW 3.3 0 0.0 0.0

    Roof/Ceiling U CLTD (5)Roof 1 0.45 0 18 0.0 0.2

    Roof 2 0.45 0.0 0.0

    Partition U CLTD (5)

    (To Unc. Space) 0 0.0 0.0

    Crawl Space U CLTD (5)

    (or floor garage) 0 0.0 0.0

    Slab R (ins) UP CLTD (6) Perimeter

    0.83 4 0.1

    Infiltration ACH Vol Q

    Winter 0.53 54 8 0.4

    Summer 0.00 54 0 0.0

    People Number Watt /peson

    67 0

    Internal (AVG) KW WattsKitchen/Laundry 0 0.0

    Other (in watts) 0 0.0

    Sensible

    Cool Subtotal KW 0.0

    Heat Subtotal KW 1.3

    Cl.Fac Ht.Fac

    Duct 0 0 0.0 0.0

    Sensible

    Cool Total KW 0.0

    Heat Total KW 1.3

    Net Total

    Cooling KW 0.0

    Heating KW 1.3

    219

    164

    61

    MAZIN SADIQ

    Required quantity for 30days (kg)

    70

    73

    Heat Loss Calculation Sheet

    ..

    STANDBY POLICE BATTALION HQ

    LASHKAR GAH

    Designed By Checked By

    SENIOR BAR.

    (SP02) F10AB.WALI M.E.AMIRYAR

    UnitedInfrastructure Pro ects

    13 of 182

    http://en.wikipedia.org/wiki/Gasolinehttp://en.wikipedia.org/wiki/Dieselhttp://en.wikipedia.org/wiki/Woodhttp://en.wikipedia.org/wiki/Coalhttp://en.wikipedia.org/wiki/Natural_Gashttp://en.wikipedia.org/wiki/Natural_Gashttp://en.wikipedia.org/wiki/Coalhttp://en.wikipedia.org/wiki/Woodhttp://en.wikipedia.org/wiki/Dieselhttp://en.wikipedia.org/wiki/Gasoline
  • 7/28/2019 (SP02) SENNIOR BARRACK.xls

    6/13

    Date 28-11-2007 Project # Sheet # 8 of 13

    Project:

    Site/Type

    Building Approved By

    Heating and Cooling Load Calculation - 2001 ASHRAE Fundamentals Handbook

    Temperatures

    Winter outdoor dodb -5 C Floor Area A.flr. 18 sq.meters

    Winter indoor didb 21 C Avg. Height Ceil.Ht. 3 meter

    Summer outdoor di 43 C Building Leakage 1 Tight = 1 Medium=2 Loose =3 Note(2)

    Summer indoor do 23.9 C

    Daily Range DR 18.3 C

    Sens. Heat Ratio SHR 0.8 Note (1)

    Windows U (3) SC (3) GLF (4) Area (m2) Qc (KW) Qh(KW)Fuel Heat of

    CombustionMJ/kgRequired quantity for

    24( kg)

    North 5.9 1 0 0.0 0.0 Gasoline 47 2.327948732

    NE 5.9 1 0 0.0 0.0 Diesel 45 2.43141312

    East 5.9 1 0 1.44 0.0 0.2 Wood 15 7.29423936

    SE 5.9 1 0 0.0 0.0 Coal 20 5.47067952

    South 5.9 1 0 0.0 0.0 Natural Gas 54 2.0261776

    SW 5.9 1 0 0.0 0.0

    West 5.9 1 0 0.0 0.0

    NW 5.9 1 0 0.0 0.0

    Horz. 5.9 1 0 0.0 0.0

    Walls U CLTD (5)

    North 0.8 0 0.0 0.0

    NE 0.8 0 0.0 0.0

    East 0.8 0 10.5 0.0 0.2

    SE 0.8 0 0.0 0.0

    South 0.8 0 0.0 0.0

    SW 0.8 0 0.0 0.0

    West 0.8 0 0.0 0.0

    NW 0.8 0 0.0 0.0

    Doors U CLTD (5)

    North 3.3 0 0.0 0.0

    NE 3.3 0 0.0 0.0

    East 3.3 0 0.0 0.0

    SE 3.3 0 0.0 0.0

    South 3.3 0 0.0 0.0

    SW 3.3 0 0.0 0.0

    West 3.3 0 2 0.0 0.2

    NW 3.3 0 0.0 0.0

    Roof/Ceiling U CLTD (5)

    Roof 1 0.45 0 18 0.0 0.2Roof 2 0.45 0.0 0.0

    Partition U CLTD (5)

    (To Unc. Space) 0 0.0 0.0

    Crawl Space U CLTD (5)

    (or floor garage) 0 0.0 0.0

    Slab R (ins) UP CLTD (6) Perimeter

    0.83 4 0.1

    Infiltration ACH Vol Q

    Winter 0.53 54 8 0.4

    Summer 0.00 54 0 0.0

    People Number Watt /peson

    67 0

    Internal (AVG) KW Watts

    Kitchen/Laundry 0 0.0Other (in watts) 0 0.0

    Sensible

    Cool Subtotal KW 0.0

    Heat Subtotal KW 1.3

    Cl.Fac Ht.Fac

    Duct 0 0 0.0 0.0

    Sensible

    Cool Total KW 0.0

    Heat Total KW 1.3

    Net Total

    Cooling KW 0.0

    Heating KW 1.3

    219

    164

    61

    MAZIN SADIQ

    Required quantity for 30days (kg)

    70

    73

    Heat Loss Calculation Sheet

    ..

    STANDBY POLICE BATTALION HQ

    LASHKAR GAH

    Designed By Checked By

    SENIOR BAR.

    (SP02) F09AB.WALI M.E.AMIRYAR

    UnitedInfrastructure Pro ects

    12 of 182

    http://en.wikipedia.org/wiki/Gasolinehttp://en.wikipedia.org/wiki/Dieselhttp://en.wikipedia.org/wiki/Woodhttp://en.wikipedia.org/wiki/Coalhttp://en.wikipedia.org/wiki/Natural_Gashttp://en.wikipedia.org/wiki/Natural_Gashttp://en.wikipedia.org/wiki/Coalhttp://en.wikipedia.org/wiki/Woodhttp://en.wikipedia.org/wiki/Dieselhttp://en.wikipedia.org/wiki/Gasoline
  • 7/28/2019 (SP02) SENNIOR BARRACK.xls

    7/13

    Date 28-11-2007 Project # Sheet # 7 of 13

    Project:

    Site/Type

    Building Approved By

    Heating and Cooling Load Calculation - 2001 ASHRAE Fundamentals Handbook

    Temperatures

    Winter outdoor dodb -5 C Floor Area A.flr. 76 sq.meters

    Winter indoor didb 21 C Avg. Height Ceil.Ht. 3 meter

    Summer outdoor di 43 C Building Leakage 1 Tight = 1 Medium=2 Loose =3 Note(2)

    Summer indoor do 23.9 C

    Daily Range DR 18.3 C

    Sens. Heat Ratio SHR 0.8 Note (1)

    Windows U (3) SC (3) GLF (4) Area (m2) Qc (KW) Qh(KW)Fuel

    Heat of

    CombustionMJ/kg

    Required quantity

    for 24( kg)

    North 5.9 1 0 0.0 0.0 Gasoline 47 8.316089464

    NE 5.9 1 0 0.0 0.0 Diesel 45 8.68569344

    East 5.9 1 0 2.88 0.0 0.4 Wood 15 26.05708032

    SE 5.9 1 0 0.0 0.0 Coal 20 19.54281024

    South 5.9 1 0 0.0 0.0 Natural Gas 54 7.238077867

    SW 5.9 1 0 0.0 0.0

    West 5.9 1 0 2.88 0.0 0.4

    NW 5.9 1 0 0.0 0.0

    Horz. 5.9 1 0 0.0 0.0

    Walls U CLTD (5)

    North 0.8 0 0.0 0.0

    NE 0.8 0 0.0 0.0

    East 0.8 0 18.3 0.0 0.4

    SE 0.8 0 0.0 0.0

    South 0.8 0 0.0 0.0SW 0.8 0 0.0 0.0

    West 0.8 0 18.3 0.0 0.4

    NW 0.8 0 0.0 0.0

    Doors U CLTD (5)

    North 3.3 0 2 0.0 0.2

    NE 3.3 0 0.0 0.0

    East 3.3 0 0.0 0.0

    SE 3.3 0 0.0 0.0

    South 3.3 0 0.0 0.0

    SW 3.3 0 0.0 0.0

    West 3.3 0 0.0 0.0

    NW 3.3 0 0.0 0.0

    Roof/Ceiling U CLTD (5)

    Roof 1 0.45 0 76 0.0 0.9

    Roof 2 0.45 0.0 0.0

    Partition U CLTD (5)

    (To Unc. Space) 0 0.0 0.0

    Crawl Space U CLTD (5)

    (or floor garage) 0 0.0 0.0

    Slab R (ins) UP CLTD (6) Perimeter

    0.83 14.1 0.3

    Infiltration ACH Vol Q

    Winter 0.53 228 34 1.5

    Summer 0.00 228 0 0.0

    People Number Watt /peson

    67 0

    Internal (AVG) KW Watts

    Kitchen/Laundry 0 0.0

    Other (in watts) 0 0.0

    Sensible

    Cool Subtotal KW 0.0

    Heat Subtotal KW 4.5

    Cl.Fac Ht.Fac

    Duct 0 0 0.0 0.0

    Sensible

    Cool Total KW 0.0

    Heat Total KW 4.5

    Net Total

    Cooling KW 0.0

    Heating KW 4.5

    782

    586

    217

    M.E.AMIRYAR

    Required quantity for 30

    days (kg)

    249

    261

    MAZIN SADIQ

    Heat Loss Calculation Sheet

    ..

    STANDBY POLICE BATTALION HQ

    LASHKAR GAH

    Designed By Checked By

    SENIOR BAR.(SP02) F08

    AB.WALI

    UnitedInfrastructure Pro ects

    11 of 182

    http://en.wikipedia.org/wiki/Gasolinehttp://en.wikipedia.org/wiki/Dieselhttp://en.wikipedia.org/wiki/Woodhttp://en.wikipedia.org/wiki/Coalhttp://en.wikipedia.org/wiki/Natural_Gashttp://en.wikipedia.org/wiki/Natural_Gashttp://en.wikipedia.org/wiki/Coalhttp://en.wikipedia.org/wiki/Woodhttp://en.wikipedia.org/wiki/Dieselhttp://en.wikipedia.org/wiki/Gasoline
  • 7/28/2019 (SP02) SENNIOR BARRACK.xls

    8/13

    Date 28-11-2007 Project # Sheet # 6 of 13

    Project:

    Site/Type

    Building Approved By

    Heating and Cooling Load Calculation - 2001 ASHRAE Fundamentals Handbook

    Temperatures

    Winter outdoor dodb -5 C Floor Area A.flr. 26 sq.meters

    Winter indoor didb 21 C Avg. Height Ceil.Ht. 3 meter

    Summer outdoor di 43 C Building Leakage 1 Tight = 1 Medium=2 Loose =3 Note(2)

    Summer indoor do 23.9 C

    Daily Range DR 18.3 C

    Sens. Heat Ratio SHR 0.8 Note (1)

    Windows U (3) SC (3) GLF (4) Area (m2) Qc (KW) Qh(KW)Fuel

    Heat of

    CombustionMJ/kg

    Required quantity

    for 24( kg)North 5.9 1 0 0.0 0.0 Gasoline 47 3.423378179

    NE 5.9 1 0 0.0 0.0 Diesel 45 3.57552832

    East 5.9 1 0 0.0 0.0 Wood 15 10.72658496

    SE 5.9 1 0 0.0 0.0 Coal 20 8.04493872

    South 5.9 1 0 0.0 0.0 Natural Gas 54 2.979606933

    SW 5.9 1 0 0.0 0.0

    West 5.9 1 0 2.88 0.0 0.4

    NW 5.9 1 0 0.0 0.0

    Horz. 5.9 1 0 0.0 0.0

    Walls U CLTD (5)

    North 0.8 0 0.0 0.0

    NE 0.8 0 0.0 0.0

    East 0.8 0 0.0 0.0

    SE 0.8 0 0.0 0.0

    South 0.8 0 0.0 0.0SW 0.8 0 0.0 0.0

    West 0.8 0 14.5 0.0 0.3

    NW 0.8 0 0.0 0.0

    Doors U CLTD (5)

    North 3.3 0 0.0 0.0

    NE 3.3 0 0.0 0.0

    East 3.3 0 2 0.0 0.2

    SE 3.3 0 0.0 0.0

    South 3.3 0 0.0 0.0

    SW 3.3 0 0.0 0.0

    West 3.3 0 0.0 0.0

    NW 3.3 0 0.0 0.0

    Roof/Ceiling U CLTD (5)

    Roof 1 0.45 0 26 0.0 0.3

    Roof 2 0.45 0.0 0.0

    Partition U CLTD (5)

    (To Unc. Space) 0 0.0 0.0

    Crawl Space U CLTD (5)

    (or floor garage) 0 0.0 0.0

    Slab R (ins) UP CLTD (6) Perimeter

    0.83 5.8 0.1

    Infiltration ACH Vol Q

    Winter 0.53 78 11 0.5

    Summer 0.00 78 0 0.0

    People Number Watt /peson

    67 0

    Internal (AVG) KW Watts

    Kitchen/Laundry 0 0.0

    Other (in watts) 0 0.0

    Sensible

    Cool Subtotal KW 0.0

    Heat Subtotal KW 1.9

    Cl.Fac Ht.Fac

    Duct 0 0 0.0 0.0

    Sensible

    Cool Total KW 0.0

    Heat Total KW 1.9

    Net Total

    Cooling KW 0.0

    Heating KW 1.9

    322

    241

    89

    M.E.AMIRYAR

    Required quantity for 30

    days (kg)103

    107

    MAZIN SADIQ

    Heat Loss Calculation Sheet

    ..

    STANDBY POLICE BATTALION HQ

    LASHKAR GAH

    Designed By Checked By

    SENIOR BAR.(SP02) F06

    AB.WALI

    UnitedInfrastructure Pro ects

    10 of 182

    http://en.wikipedia.org/wiki/Gasolinehttp://en.wikipedia.org/wiki/Dieselhttp://en.wikipedia.org/wiki/Woodhttp://en.wikipedia.org/wiki/Coalhttp://en.wikipedia.org/wiki/Natural_Gashttp://en.wikipedia.org/wiki/Natural_Gashttp://en.wikipedia.org/wiki/Coalhttp://en.wikipedia.org/wiki/Woodhttp://en.wikipedia.org/wiki/Dieselhttp://en.wikipedia.org/wiki/Gasoline
  • 7/28/2019 (SP02) SENNIOR BARRACK.xls

    9/13

    Date 28-11-2007 Project # Sheet # 5 of 13

    Project:

    Site/Type

    Building Approved By

    Heating and Cooling Load Calculation - 2001 ASHRAE Fundamentals Handbook

    Temperatures

    Winter outdoor dodb -5 C Floor Area A.flr. 26 sq.meters

    Winter indoor didb 21 C Avg. Height Ceil.Ht. 3 meter

    Summer outdoor di 43 C Building Leakage 1 Tight = 1 Medium=2 Loose =3 Note(2)

    Summer indoor do 23.9 C

    Daily Range DR 18.3 C

    Sens. Heat Ratio SHR 0.8 Note (1)

    Windows U (3) SC (3) GLF (4) Area (m2) Qc (KW) Qh(KW)

    FuelHeat of

    CombustionMJ/kg

    Required quantity

    for 24( kg)North 5.9 1 0 0.0 0.0 Gasoline 47 3.423378179

    NE 5.9 1 0 0.0 0.0 Diesel 45 3.57552832

    East 5.9 1 0 2.88 0.0 0.4 Wood 15 10.72658496

    SE 5.9 1 0 0.0 0.0 Coal 20 8.04493872

    South 5.9 1 0 0.0 0.0 Natural Gas 54 2.979606933

    SW 5.9 1 0 0.0 0.0

    West 5.9 1 0 0.0 0.0

    NW 5.9 1 0 0.0 0.0

    Horz. 5.9 1 0 0.0 0.0

    Walls U CLTD (5)

    North 0.8 0 0.0 0.0

    NE 0.8 0 0.0 0.0

    East 0.8 0 14.5 0.0 0.3

    SE 0.8 0 0.0 0.0

    South 0.8 0 0.0 0.0SW 0.8 0 0.0 0.0

    West 0.8 0 0.0 0.0

    NW 0.8 0 0.0 0.0

    Doors U CLTD (5)

    North 3.3 0 0.0 0.0

    NE 3.3 0 0.0 0.0

    East 3.3 0 0.0 0.0

    SE 3.3 0 0.0 0.0

    South 3.3 0 0.0 0.0

    SW 3.3 0 0.0 0.0

    West 3.3 0 2 0.0 0.2

    NW 3.3 0 0.0 0.0

    Roof/Ceiling U CLTD (5)

    Roof 1 0.45 0 26 0.0 0.3

    Roof 2 0.45 0.0 0.0

    Partition U CLTD (5)

    (To Unc. Space) 0 0.0 0.0

    Crawl Space U CLTD (5)

    (or floor garage) 0 0.0 0.0

    Slab R (ins) UP CLTD (6) Perimeter

    0.83 5.8 0.1

    Infiltration ACH Vol Q

    Winter 0.53 78 11 0.5

    Summer 0.00 78 0 0.0

    People Number Watt /peson

    67 0

    Internal (AVG) KW Watts

    Kitchen/Laundry 0 0.0

    Other (in watts) 0 0.0

    Sensible

    Cool Subtotal KW 0.0

    Heat Subtotal KW 1.9

    Cl.Fac Ht.Fac

    Duct 0 0 0.0 0.0

    Sensible

    Cool Total KW 0.0

    Heat Total KW 1.9

    Net Total

    Cooling KW 0.0

    Heating KW 1.9

    322

    241

    89

    M.E.AMIRYAR

    Required quantity for 30

    days (kg)103

    107

    MAZIN SADIQ

    Heat Loss Calculation Sheet

    ..

    STANDBY POLICE BATTALION HQ

    LASHKAR GAH

    Designed By Checked By

    SENIOR BAR.(SP02) F05

    AB.WALI

    UnitedInfrastructure Pro ects

    9 of 182

    http://en.wikipedia.org/wiki/Gasolinehttp://en.wikipedia.org/wiki/Dieselhttp://en.wikipedia.org/wiki/Woodhttp://en.wikipedia.org/wiki/Coalhttp://en.wikipedia.org/wiki/Natural_Gashttp://en.wikipedia.org/wiki/Natural_Gashttp://en.wikipedia.org/wiki/Coalhttp://en.wikipedia.org/wiki/Woodhttp://en.wikipedia.org/wiki/Dieselhttp://en.wikipedia.org/wiki/Gasoline
  • 7/28/2019 (SP02) SENNIOR BARRACK.xls

    10/13

    Date 28-11-2007 Project # Sheet # 4 of 13

    Project:

    Site/Type

    Building Approved By

    Heating and Cooling Load Calculation - 2001 ASHRAE Fundamentals Handbook

    Temperatures

    Winter outdoor dodb -5 C Floor Area A.flr. 26 sq.meters

    Winter indoor didb 21 C Avg. Height Ceil.Ht. 3 meter

    Summer outdoor di 43 C Building Leakage 1 Tight = 1 Medium=2 Loose =3 Note(2)

    Summer indoor do 23.9 C

    Daily Range DR 18.3 C

    Sens. Heat Ratio SHR 0.8 Note (1)

    Windows U (3) SC (3) GLF (4) Area (m2) Qc (KW) Qh(KW)

    FuelHeat of

    CombustionMJ/kg

    Required quantity

    for 24( kg)North 5.9 1 0 0.0 0.0 Gasoline 47 3.423378179

    NE 5.9 1 0 0.0 0.0 Diesel 45 3.57552832

    East 5.9 1 0 0.0 0.0 Wood 15 10.72658496

    SE 5.9 1 0 0.0 0.0 Coal 20 8.04493872

    South 5.9 1 0 0.0 0.0 Natural Gas 54 2.979606933

    SW 5.9 1 0 0.0 0.0

    West 5.9 1 0 2.88 0.0 0.4

    NW 5.9 1 0 0.0 0.0

    Horz. 5.9 1 0 0.0 0.0

    Walls U CLTD (5)

    North 0.8 0 0.0 0.0

    NE 0.8 0 0.0 0.0

    East 0.8 0 0.0 0.0

    SE 0.8 0 0.0 0.0

    South 0.8 0 0.0 0.0

    SW 0.8 0 0.0 0.0

    West 0.8 0 14.5 0.0 0.3

    NW 0.8 0 0.0 0.0

    Doors U CLTD (5)

    North 3.3 0 0.0 0.0

    NE 3.3 0 0.0 0.0

    East 3.3 0 2 0.0 0.2

    SE 3.3 0 0.0 0.0

    South 3.3 0 0.0 0.0

    SW 3.3 0 0.0 0.0

    West 3.3 0 0.0 0.0

    NW 3.3 0 0.0 0.0

    Roof/Ceiling U CLTD (5)

    Roof 1 0.45 0 26 0.0 0.3

    Roof 2 0.45 0.0 0.0Partition U CLTD (5)

    (To Unc. Space) 0 0.0 0.0

    Crawl Space U CLTD (5)

    (or floor garage) 0 0.0 0.0

    Slab R (ins) UP CLTD (6) Perimeter

    0.83 5.8 0.1

    Infiltration ACH Vol Q

    Winter 0.53 78 11 0.5

    Summer 0.00 78 0 0.0

    People Number Watt /peson

    67 0

    Internal (AVG) KW Watts

    Kitchen/Laundry 0 0.0

    Other (in watts) 0 0.0

    Sensible

    Cool Subtotal KW 0.0

    Heat Subtotal KW 1.9

    Cl.Fac Ht.Fac

    Duct 0 0 0.0 0.0

    Sensible

    Cool Total KW 0.0

    Heat Total KW 1.9

    Net Total

    Cooling KW 0.0

    Heating KW 1.9

    322

    241

    89

    M.E.AMIRYAR

    Required quantity for 30

    days (kg)

    103

    107

    MAZIN SADIQ

    Heat Loss Calculation Sheet

    ..

    STANDBY POLICE BATTALION HQ

    LASHKAR GAH

    Designed By Checked By

    SENIOR BAR.(SP02) F04

    AB.WALI

    UnitedInfrastructure Pro ects

    8 of 182

    http://en.wikipedia.org/wiki/Gasolinehttp://en.wikipedia.org/wiki/Dieselhttp://en.wikipedia.org/wiki/Woodhttp://en.wikipedia.org/wiki/Coalhttp://en.wikipedia.org/wiki/Natural_Gashttp://en.wikipedia.org/wiki/Natural_Gashttp://en.wikipedia.org/wiki/Coalhttp://en.wikipedia.org/wiki/Woodhttp://en.wikipedia.org/wiki/Dieselhttp://en.wikipedia.org/wiki/Gasoline
  • 7/28/2019 (SP02) SENNIOR BARRACK.xls

    11/13

    Date 28-11-2007 Project # Sheet # 3 of 13

    Project:

    Site/Type

    Building Approved By

    Heating and Cooling Load Calculation - 2001 ASHRAE Fundamentals Handbook

    Temperatures

    Winter outdoor dodb -5 C Floor Area A.flr. 26 sq.meters

    Winter indoor didb 21 C Avg. Height Ceil.Ht. 3 meter

    Summer outdoor di 43 C Building Leakage 1 Tight = 1 Medium=2 Loose =3 Note(2)

    Summer indoor do 23.9 C

    Daily Range DR 18.3 C

    Sens. Heat Ratio SHR 0.8 Note (1)

    Windows U (3) SC (3) GLF (4) Area (m2) Qc (KW) Qh(KW)

    FuelHeat of

    CombustionMJ/kg

    Required quantity

    for 24( kg)North 5.9 1 0 0.0 0.0 Gasoline 47 3.423378179

    NE 5.9 1 0 0.0 0.0 Diesel 45 3.57552832

    East 5.9 1 0 2.88 0.0 0.4 Wood 15 10.72658496

    SE 5.9 1 0 0.0 0.0 Coal 20 8.04493872

    South 5.9 1 0 0.0 0.0 Natural Gas 54 2.979606933

    SW 5.9 1 0 0.0 0.0

    West 5.9 1 0 0.0 0.0

    NW 5.9 1 0 0.0 0.0

    Horz. 5.9 1 0 0.0 0.0

    Walls U CLTD (5)

    North 0.8 0 0.0 0.0

    NE 0.8 0 0.0 0.0

    East 0.8 0 14.5 0.0 0.3

    SE 0.8 0 0.0 0.0

    South 0.8 0 0.0 0.0

    SW 0.8 0 0.0 0.0

    West 0.8 0 0.0 0.0

    NW 0.8 0 0.0 0.0

    Doors U CLTD (5)

    North 3.3 0 0.0 0.0

    NE 3.3 0 0.0 0.0

    East 3.3 0 0.0 0.0

    SE 3.3 0 0.0 0.0

    South 3.3 0 0.0 0.0

    SW 3.3 0 0.0 0.0

    West 3.3 0 2 0.0 0.2

    NW 3.3 0 0.0 0.0

    Roof/Ceiling U CLTD (5)

    Roof 1 0.45 0 26 0.0 0.3

    Roof 2 0.45 0.0 0.0Partition U CLTD (5)

    (To Unc. Space) 0 0.0 0.0

    Crawl Space U CLTD (5)

    (or floor garage) 0 0.0 0.0

    Slab R (ins) UP CLTD (6) Perimeter

    0.83 5.8 0.1

    Infiltration ACH Vol Q

    Winter 0.53 78 11 0.5

    Summer 0.00 78 0 0.0

    People Number Watt /peson

    67 0

    Internal (AVG) KW Watts

    Kitchen/Laundry 0 0.0

    Other (in watts) 0 0.0

    Sensible

    Cool Subtotal KW 0.0

    Heat Subtotal KW 1.9

    Cl.Fac Ht.Fac

    Duct 0 0 0.0 0.0

    Sensible

    Cool Total KW 0.0

    Heat Total KW 1.9

    Net Total

    Cooling KW 0.0

    Heating KW 1.9

    322

    241

    89

    M.E.AMIRYAR

    Required quantity for

    30 days (kg)103

    107

    MAZIN SADIQ

    Heat Loss Calculation Sheet

    ..

    STANDBY POLICE BATTALION HQ

    LASHKAR GAH

    Designed By Checked By

    SENIOR BAR.(SP02) F03

    AB.WALI

    UnitedInfrastructure Pro ects

    7 of 182

    http://en.wikipedia.org/wiki/Gasolinehttp://en.wikipedia.org/wiki/Dieselhttp://en.wikipedia.org/wiki/Woodhttp://en.wikipedia.org/wiki/Coalhttp://en.wikipedia.org/wiki/Natural_Gashttp://en.wikipedia.org/wiki/Natural_Gashttp://en.wikipedia.org/wiki/Coalhttp://en.wikipedia.org/wiki/Woodhttp://en.wikipedia.org/wiki/Dieselhttp://en.wikipedia.org/wiki/Gasoline
  • 7/28/2019 (SP02) SENNIOR BARRACK.xls

    12/13

    Date 28-11-2007 Project # Sheet # 2 of 13

    Project:Site/Type

    Building Approved By

    Heating and Cooling Load Calculation - 2001 ASHRAE Fundamentals Handbook

    Temperatures

    Winter outdoor dodb -5 C Floor Area A.flr. 13 sq.meters

    Winter indoor didb 21 C Avg. Height Ceil.Ht. 3 meter

    Summer outdoor di 43 C Building Leakage 1 Tight = 1 Medium=2 Loose =3 Note(2)

    Summer indoor do 23.9 C

    Daily Range DR 18.3 C

    Sens. Heat Ratio SHR 0.8 Note (1)

    Windows U (3) SC (3) GLF (4) Area (m2) Qc (KW) Qh(KW)Fuel

    Heat of

    CombustionMJ/kg

    Required quantity

    for 24( kg)

    North 5.9 1 0 0.0 0.0 Gasoline 47 2.558390706

    NE 5.9 1 0 0.0 0.0 Diesel 45 2.67209696

    East 5.9 1 0 0.0 0.0 Wood 15 8.01629088

    SE 5.9 1 0 0.0 0.0 Coal 20 6.01221816

    South 5.9 1 0 0.0 0.0 Natural Gas 54 2.226747467

    SW 5.9 1 0 0.0 0.0

    West 5.9 1 0 1.44 0.0 0.2

    NW 5.9 1 0 0.0 0.0

    Horz. 5.9 1 0 0.0 0.0

    Walls U CLTD (5)

    North 0.8 0 13.6 0.0 0.3

    NE 0.8 0 0.0 0.0East 0.8 0 0.0 0.0

    SE 0.8 0 0.0 0.0

    South 0.8 0 0.0 0.0

    SW 0.8 0 0.0 0.0

    West 0.8 0 7 0.0 0.1

    NW 0.8 0 0.0 0.0

    Doors U CLTD (5)

    North 3.3 0 0.0 0.0

    NE 3.3 0 0.0 0.0

    East 3.3 0 2 0.0 0.2

    SE 3.3 0 0.0 0.0

    South 3.3 0 0.0 0.0

    SW 3.3 0 0.0 0.0

    West 3.3 0 0.0 0.0

    NW 3.3 0 0.0 0.0

    Roof/Ceiling U CLTD (5)

    Roof 1 0.45 0 13 0.0 0.2

    Roof 2 0.45 0.0 0.0

    Partition U CLTD (5)

    (To Unc. Space) 0 0.0 0.0

    Crawl Space U CLTD (5)

    (or floor garage) 0 0.0 0.0

    Slab R (ins) UP CLTD (6) Perimeter

    0.83 7.4 0.2

    Infiltration ACH Vol Q

    Winter 0.53 39 6 0.3

    Summer 0.00 39 0 0.0

    People Number Watt /peson

    67 0

    Internal (AVG) KW WattsKitchen/Laundry 0 0.0

    Other (in watts) 0 0.0

    Sensible

    Cool Subtotal KW 0.0

    Heat Subtotal KW 1.4

    Cl.Fac Ht.Fac

    Duct 0 0 0.0 0.0

    Sensible

    Cool Total KW 0.0

    Heat Total KW 1.4

    Net Total

    Cooling KW 0.0

    Heating KW 1.4

    ..

    STANDBY POLICE BATTALION HQLASHKAR GAH

    Designed By Checked By

    SENIOR BAR.

    (SP02) F02

    240

    180

    67

    AB.WALI

    Required quantity for 30

    days (kg)

    77

    80

    M.E.AMIRYAR MAZIN SADIQ

    Heat Loss Calculation Sheet

    UnitedInfrastructure Proects

    6 of 182

    http://en.wikipedia.org/wiki/Gasolinehttp://en.wikipedia.org/wiki/Dieselhttp://en.wikipedia.org/wiki/Woodhttp://en.wikipedia.org/wiki/Coalhttp://en.wikipedia.org/wiki/Natural_Gashttp://en.wikipedia.org/wiki/Natural_Gashttp://en.wikipedia.org/wiki/Coalhttp://en.wikipedia.org/wiki/Woodhttp://en.wikipedia.org/wiki/Dieselhttp://en.wikipedia.org/wiki/Gasoline
  • 7/28/2019 (SP02) SENNIOR BARRACK.xls

    13/13

    Date 28-11-2007 Project # Sheet # 1 of 13

    Project:Site/Type

    Building Approved By

    Heating and Cooling Load Calculation - 2001 ASHRAE Fundamentals Handbook

    Temperatures

    Winter outdoor dodb -5 C Floor Area A.flr. 13 sq.meters

    Winter indoor didb 21 C Avg. Height Ceil.Ht. 3 meter

    Summer outdoor di 43 C Building Leakage 1 Tight = 1 Medium=2 Loose =3 Note(2)

    Summer indoor do 23.9 C

    Daily Range DR 18.3 C

    Sens. Heat Ratio SHR 0.8 Note (1)

    Windows U (3) SC (3) GLF (4) Area (m2) Qc (KW) Qh(KW)Fuel

    Heat of

    CombustionMJ/kg

    Required quantity

    for 24( kg)

    North 5.9 1 0 0.0 0.0 Gasoline 47 2.558390706

    NE 5.9 1 0 0.0 0.0 Diesel 45 2.67209696

    East 5.9 1 0 1.44 0.0 0.2 Wood 15 8.01629088

    SE 5.9 1 0 0.0 0.0 Coal 20 6.01221816

    South 5.9 1 0 0.0 0.0 Natural Gas 54 2.226747467

    SW 5.9 1 0 0.0 0.0

    West 5.9 1 0 0.0 0.0

    NW 5.9 1 0 0.0 0.0

    Horz. 5.9 1 0 0.0 0.0

    Walls U CLTD (5)

    North 0.8 0 13.6 0.0 0.3

    NE 0.8 0 0.0 0.0East 0.8 0 7 0.0 0.1

    SE 0.8 0 0.0 0.0

    South 0.8 0 0.0 0.0

    SW 0.8 0 0.0 0.0

    West 0.8 0 0.0 0.0

    NW 0.8 0 0.0 0.0

    Doors U CLTD (5)

    North 3.3 0 0.0 0.0

    NE 3.3 0 0.0 0.0

    East 3.3 0 0.0 0.0

    SE 3.3 0 0.0 0.0

    South 3.3 0 0.0 0.0

    SW 3.3 0 0.0 0.0

    West 3.3 0 2 0.0 0.2

    NW 3.3 0 0.0 0.0

    Roof/Ceiling U CLTD (5)

    Roof 1 0.45 0 13 0.0 0.2

    Roof 2 0.45 0.0 0.0

    Partition U CLTD (5)

    (To Unc. Space) 0 0.0 0.0

    Crawl Space U CLTD (5)

    (or floor garage) 0 0.0 0.0

    Slab R (ins) UP CLTD (6) Perimeter

    0.83 7.4 0.2

    Infiltration ACH Vol Q

    Winter 0.53 39 6 0.3

    Summer 0.00 39 0 0.0

    People Number Watt /peson

    67 0

    Internal (AVG) KW WattsKitchen/Laundry 0 0.0

    Other (in watts) 0 0.0

    Sensible

    Cool Subtotal KW 0.0

    Heat Subtotal KW 1.4

    Cl.Fac Ht.Fac

    Duct 0 0 0.0 0.0

    Sensible

    Cool Total KW 0.0

    Heat Total KW 1.4

    Net Total

    Cooling KW 0.0

    Heating KW 1.4

    240

    180

    67

    AB.WALI

    Required quantity for 30

    days (kg)

    77

    80

    M.E.AMIRYAR MAZIN SADIQ

    Heat Loss Calculation Sheet

    ..

    STANDBY POLICE BATTALION HQLASHKAR GAH

    Designed By Checked By

    SENIOR BAR.

    (SP02) F01

    UnitedInfrastructure Proects

    5 of 182

    http://en.wikipedia.org/wiki/Gasolinehttp://en.wikipedia.org/wiki/Dieselhttp://en.wikipedia.org/wiki/Woodhttp://en.wikipedia.org/wiki/Coalhttp://en.wikipedia.org/wiki/Natural_Gashttp://en.wikipedia.org/wiki/Natural_Gashttp://en.wikipedia.org/wiki/Coalhttp://en.wikipedia.org/wiki/Woodhttp://en.wikipedia.org/wiki/Dieselhttp://en.wikipedia.org/wiki/Gasoline