Date 28-11-2007 Project # Sheet # 13 of 13
Project:
Site/Type
Building Checked By Approved By
13 43.2 1
13 43.2 1
26 43.2 1
26 43.2 1
26 43.2 1
26 43.2 1
76 43.2 1
18 43.2 1
18 43.2 1
19.5 43.2 1
12.7 60.8 1
PHAZE WATT HEIGHT (mm) VOLT CMH RPM WEIGHT (Kg)
1 65 .. 220 9300 420 ..
1 85 .. 220 16200 290 ..
900
..
..
F12 ..
1400 ..
F11 900
F04
F05
F06
F09
F08
F03
F02
QTY BLADE (mm) MODEL OF CEILNG FAN
STANDBY POLICE BATTALION HQ
LASHKAR GAH
Designed By
SENIOR BAR.
(SP02)AB.WALI M.E.AMIRYAR MAZIN SADIQ
..
..900
900
Ceiling fan Calculation Sheet
Ceil ing fan Calculation
LOCATION ROOM NO. V .(m3) AREA (m
2)
1400
SENIOR BAR.
(SP02)
F01 900 ..
900 ..
900
..900
MODEL BLADE (mm)
..
900
F10 ..
900
Ceil ing fan Detai ls
900
UnitedInfrastructure Pro ectsUnitedInfrastructure Pro ectsUnitedInfrastructure Pro ectsUnitedInfrastructure Pro ects
17 of 182
-
7/28/2019 (SP02) SENNIOR BARRACK.xls
2/13
Date 28-11-2007 Project # Sheet # 12 of 13
Project:
Site/Type
Building Checked By Approved By
F07 37 9 239.76 399.6 1
F13 0.15 73.5 11.025 22.491 1
[HZ] WATT PRSSURE (Pa) DIAMETER (mm) FIXING A. (mm*mm) AIR VOLUME CMH
50 16 .. 160 224X224 226
50 46 56 254 287X287 700
VELOCITY (m/s) (mm H2O) or (Pa) m3/h QTY
1.5 1.00 or 9.80 1400 2
VITRO 9 3.5
TOTAL AIR
VOLUME(m3)/H
QTY MODEL OF EXHAUST FAN
STORAGE FV-15WH1 (05)
SENIOR BAR. (SP02) DOOR TYPE 0.5X0.6
CALCULA TION FOR DOOR LOUVER SIZE
LOCATION MODEL OF LOUVER EFFECTIVE AREA (m2)
TOTAL AIR
VOLUME(m3)/H
MODEL WIEGHT (Kg)
FV-15WH1 (05) 1.4
LOCATION ROOM NO.AIR CHANGE
RATE CFM/SFAREA(SF)
AIR CHANGE
VOLUME(F3)/M
MAZIN SADIQ
SENIOR BAR. (SP02) VITRO 9
DETAILS FOR MODEL
CALCULA TION FOR EXHAUST FAN
LOCATION ROOM NO.Ventilation for
washing CMH/m2Area (m2)
TOTAL AIR
VOLUME CFM
Exhaust fan and Louvers Calculation Sheet
QTY MODEL OF EXHAUST FAN
STANDBY POLICE BATTALION HQ
LASHKAR GAH
Designed By
SENIOR BAR.
(SP02)AB.WALI M.E.AMIRYAR
UnitedInfrastructure Projects
16 of 182
-
7/28/2019 (SP02) SENNIOR BARRACK.xls
3/13
Date 28-11-2007 Project # Sheet # 11 of 13
Project:
Site/TypeBuilding Approved By
Heating and Cooling Load Calculation - 2001 ASHRAE Fundamentals Handbook
Temperatures
Winter outdoor dodb -5 C Floor Area A.flr. 12.7 sq.meters
Winter indoor didb 21 C Avg. Height Ceil.Ht. 3 meter
Summer outdoor di 43 C Building Leakage 1 Tight = 1 Medium=2 Loose =3 Note(2)
Summer indoor do 23.9 C
Daily Range DR 18.3 C
Sens. Heat Ratio SHR 0.8 Note (1)
Windows U (3) SC (3) GLF (4) Area (m2) Qc (KW) Qh(KW)Fuel
Heat of
CombustionMJ/kg
Required quantity for
24( kg)
North 5.9 1 0 0.0 0.0 Gasoline 47 2.540953072
NE 5.9 1 0 0.0 0.0 Diesel 45 2.65388432
East 5.9 1 0 0.0 0.0 Wood 15 7.96165296
SE 5.9 1 0 0.0 0.0 Coal 20 5.97123972
South 5.9 1 0 0.0 0.0 Natural Gas 54 2.211570267
SW 5.9 1 0 0.0 0.0
West 5.9 1 0 1.44 0.0 0.2
NW 5.9 1 0 0.0 0.0
Horz. 5.9 1 0 0.0 0.0
Walls U CLTD (5)
North 0.8 0 0.0 0.0
NE 0.8 0 0.0 0.0East 0.8 0 0.0 0.0
SE 0.8 0 0.0 0.0
South 0.8 0 13.6 0.0 0.3
SW 0.8 0 0.0 0.0
West 0.8 0 7 0.0 0.1
NW 0.8 0 0.0 0.0
Doors U CLTD (5)
North 3.3 0 0.0 0.0
NE 3.3 0 0.0 0.0
East 3.3 0 2 0.0 0.2
SE 3.3 0 0.0 0.0
South 3.3 0 0.0 0.0
SW 3.3 0 0.0 0.0
West 3.3 0 0.0 0.0
NW 3.3 0 0.0 0.0
Roof/Ceiling U CLTD (5)
Roof 1 0.45 0 12.7 0.0 0.1
Roof 2 0.45 0.0 0.0
Partition U CLTD (5)
(To Unc. Space) 0 0.0 0.0
Crawl Space U CLTD (5)
(or floor garage) 0 0.0 0.0
Slab R (ins) UP CLTD (6) Perimeter
0.83 7.4 0.2
Infiltration ACH Vol Q
Winter 0.53 38.1 6 0.3
Summer 0.00 38.1 0 0.0
People Number Watt /peson
67 0
Internal (AVG) KW WattsKitchen/Laundry 0 0.0
Other (in watts) 0 0.0
Sensible
Cool Subtotal KW 0.0
Heat Subtotal KW 1.4
Cl.Fac Ht.Fac
Duct 0 0 0.0 0.0
Sensible
Cool Total KW 0.0
Heat Total KW 1.4
Net Total
Cooling KW 0.0
Heating KW 1.4
239
179
66
MAZIN SADIQ
Required quantity for 30
days (kg)
76
80
Heat Loss Calculation Sheet
..
STANDBY POLICE BATTALION HQ
LASHKAR GAHDesigned By Checked By
SENIOR BAR.
(SP02) F12AB.WALI M.E.AMIRYAR
UnitedInfrastructure Pro ects
15 of 182
http://en.wikipedia.org/wiki/Gasolinehttp://en.wikipedia.org/wiki/Dieselhttp://en.wikipedia.org/wiki/Woodhttp://en.wikipedia.org/wiki/Coalhttp://en.wikipedia.org/wiki/Natural_Gashttp://en.wikipedia.org/wiki/Natural_Gashttp://en.wikipedia.org/wiki/Coalhttp://en.wikipedia.org/wiki/Woodhttp://en.wikipedia.org/wiki/Dieselhttp://en.wikipedia.org/wiki/Gasoline -
7/28/2019 (SP02) SENNIOR BARRACK.xls
4/13
Date 28-11-2007 Project # Sheet # 10 of 13
Project:
Site/Type
Building Approved By
Heating and Cooling Load Calculation - 2001 ASHRAE Fundamentals Handbook
Temperatures
Winter outdoor dodb -5 C Floor Area A.flr. 19.5 sq.meters
Winter indoor didb 21 C Avg. Height Ceil.Ht. 3 meter
Summer outdoor di 43 C Building Leakage 1 Tight = 1 Medium=2 Loose =3 Note(2)
Summer indoor do 23.9 C
Daily Range DR 18.3 C
Sens. Heat Ratio SHR 0.8 Note (1)
Windows U (3) SC (3) GLF (4) Area (m2) Qc (KW) Qh(KW)
FuelHeat of
CombustionMJ/kgRequired quantity for
24( kg)
North 5.9 1 0 0.0 0.0 Gasoline 47 3.16579297
NE 5.9 1 0 0.0 0.0 Diesel 45 3.30649488
East 5.9 1 0 1.44 0.0 0.2 Wood 15 9.91948464
SE 5.9 1 0 0.0 0.0 Coal 20 7.43961348
South 5.9 1 0 0.0 0.0 Natural Gas 54 2.7554124
SW 5.9 1 0 0.0 0.0
West 5.9 1 0 0.0 0.0
NW 5.9 1 0 0.0 0.0
Horz. 5.9 1 0 0.0 0.0
Walls U CLTD (5)
North 0.8 0 0.0 0.0
NE 0.8 0 0.0 0.0
East 0.8 0 11.5 0.0 0.2
SE 0.8 0 0.0 0.0
South 0.8 0 13.6 0.0 0.3
SW 0.8 0 0.0 0.0
West 0.8 0 0.0 0.0
NW 0.8 0 0.0 0.0
Doors U CLTD (5)
North 3.3 0 0.0 0.0
NE 3.3 0 0.0 0.0
East 3.3 0 0.0 0.0
SE 3.3 0 0.0 0.0
South 3.3 0 0.0 0.0
SW 3.3 0 0.0 0.0
West 3.3 0 2 0.0 0.2
NW 3.3 0 0.0 0.0
Roof/Ceiling U CLTD (5)Roof 1 0.45 0 19.5 0.0 0.2
Roof 2 0.45 0.0 0.0
Partition U CLTD (5)
(To Unc. Space) 0 0.0 0.0
Crawl Space U CLTD (5)
(or floor garage) 0 0.0 0.0
Slab R (ins) UP CLTD (6) Perimeter
0.83 8.85 0.2
Infiltration ACH Vol Q
Winter 0.53 58.5 9 0.4
Summer 0.00 58.5 0 0.0
People Number Watt /peson
67 0
Internal (AVG) KW WattsKitchen/Laundry 0 0.0
Other (in watts) 0 0.0
Sensible
Cool Subtotal KW 0.0
Heat Subtotal KW 1.7
Cl.Fac Ht.Fac
Duct 0 0 0.0 0.0
Sensible
Cool Total KW 0.0
Heat Total KW 1.7
Net Total
Cooling KW 0.0
Heating KW 1.7
298
223
83
MAZIN SADIQ
Required quantity for 30days (kg)
95
99
Heat Loss Calculation Sheet
..
STANDBY POLICE BATTALION HQ
LASHKAR GAH
Designed By Checked By
SENIOR BAR.
(SP02) F11AB.WALI M.E.AMIRYAR
UnitedInfrastructure Pro ects
14 of 182
http://en.wikipedia.org/wiki/Gasolinehttp://en.wikipedia.org/wiki/Dieselhttp://en.wikipedia.org/wiki/Woodhttp://en.wikipedia.org/wiki/Coalhttp://en.wikipedia.org/wiki/Natural_Gashttp://en.wikipedia.org/wiki/Natural_Gashttp://en.wikipedia.org/wiki/Coalhttp://en.wikipedia.org/wiki/Woodhttp://en.wikipedia.org/wiki/Dieselhttp://en.wikipedia.org/wiki/Gasoline -
7/28/2019 (SP02) SENNIOR BARRACK.xls
5/13
Date 28-11-2007 Project # Sheet # 9 of 13
Project:
Site/Type
Building Approved By
Heating and Cooling Load Calculation - 2001 ASHRAE Fundamentals Handbook
Temperatures
Winter outdoor dodb -5 C Floor Area A.flr. 18 sq.meters
Winter indoor didb 21 C Avg. Height Ceil.Ht. 3 meter
Summer outdoor di 43 C Building Leakage 1 Tight = 1 Medium=2 Loose =3 Note(2)
Summer indoor do 23.9 C
Daily Range DR 18.3 C
Sens. Heat Ratio SHR 0.8 Note (1)
Windows U (3) SC (3) GLF (4) Area (m2) Qc (KW) Qh(KW)
FuelHeat of
CombustionMJ/kgRequired quantity for
24( kg)
North 5.9 1 0 0.0 0.0 Gasoline 47 2.327948732
NE 5.9 1 0 0.0 0.0 Diesel 45 2.43141312
East 5.9 1 0 0.0 0.0 Wood 15 7.29423936
SE 5.9 1 0 0.0 0.0 Coal 20 5.47067952
South 5.9 1 0 0.0 0.0 Natural Gas 54 2.0261776
SW 5.9 1 0 0.0 0.0
West 5.9 1 0 1.44 0.0 0.2
NW 5.9 1 0 0.0 0.0
Horz. 5.9 1 0 0.0 0.0
Walls U CLTD (5)
North 0.8 0 0.0 0.0
NE 0.8 0 0.0 0.0
East 0.8 0 0.0 0.0
SE 0.8 0 0.0 0.0
South 0.8 0 0.0 0.0
SW 0.8 0 0.0 0.0
West 0.8 0 10.5 0.0 0.2
NW 0.8 0 0.0 0.0
Doors U CLTD (5)
North 3.3 0 0.0 0.0
NE 3.3 0 0.0 0.0
East 3.3 0 2 0.0 0.2
SE 3.3 0 0.0 0.0
South 3.3 0 0.0 0.0
SW 3.3 0 0.0 0.0
West 3.3 0 0.0 0.0
NW 3.3 0 0.0 0.0
Roof/Ceiling U CLTD (5)Roof 1 0.45 0 18 0.0 0.2
Roof 2 0.45 0.0 0.0
Partition U CLTD (5)
(To Unc. Space) 0 0.0 0.0
Crawl Space U CLTD (5)
(or floor garage) 0 0.0 0.0
Slab R (ins) UP CLTD (6) Perimeter
0.83 4 0.1
Infiltration ACH Vol Q
Winter 0.53 54 8 0.4
Summer 0.00 54 0 0.0
People Number Watt /peson
67 0
Internal (AVG) KW WattsKitchen/Laundry 0 0.0
Other (in watts) 0 0.0
Sensible
Cool Subtotal KW 0.0
Heat Subtotal KW 1.3
Cl.Fac Ht.Fac
Duct 0 0 0.0 0.0
Sensible
Cool Total KW 0.0
Heat Total KW 1.3
Net Total
Cooling KW 0.0
Heating KW 1.3
219
164
61
MAZIN SADIQ
Required quantity for 30days (kg)
70
73
Heat Loss Calculation Sheet
..
STANDBY POLICE BATTALION HQ
LASHKAR GAH
Designed By Checked By
SENIOR BAR.
(SP02) F10AB.WALI M.E.AMIRYAR
UnitedInfrastructure Pro ects
13 of 182
http://en.wikipedia.org/wiki/Gasolinehttp://en.wikipedia.org/wiki/Dieselhttp://en.wikipedia.org/wiki/Woodhttp://en.wikipedia.org/wiki/Coalhttp://en.wikipedia.org/wiki/Natural_Gashttp://en.wikipedia.org/wiki/Natural_Gashttp://en.wikipedia.org/wiki/Coalhttp://en.wikipedia.org/wiki/Woodhttp://en.wikipedia.org/wiki/Dieselhttp://en.wikipedia.org/wiki/Gasoline -
7/28/2019 (SP02) SENNIOR BARRACK.xls
6/13
Date 28-11-2007 Project # Sheet # 8 of 13
Project:
Site/Type
Building Approved By
Heating and Cooling Load Calculation - 2001 ASHRAE Fundamentals Handbook
Temperatures
Winter outdoor dodb -5 C Floor Area A.flr. 18 sq.meters
Winter indoor didb 21 C Avg. Height Ceil.Ht. 3 meter
Summer outdoor di 43 C Building Leakage 1 Tight = 1 Medium=2 Loose =3 Note(2)
Summer indoor do 23.9 C
Daily Range DR 18.3 C
Sens. Heat Ratio SHR 0.8 Note (1)
Windows U (3) SC (3) GLF (4) Area (m2) Qc (KW) Qh(KW)Fuel Heat of
CombustionMJ/kgRequired quantity for
24( kg)
North 5.9 1 0 0.0 0.0 Gasoline 47 2.327948732
NE 5.9 1 0 0.0 0.0 Diesel 45 2.43141312
East 5.9 1 0 1.44 0.0 0.2 Wood 15 7.29423936
SE 5.9 1 0 0.0 0.0 Coal 20 5.47067952
South 5.9 1 0 0.0 0.0 Natural Gas 54 2.0261776
SW 5.9 1 0 0.0 0.0
West 5.9 1 0 0.0 0.0
NW 5.9 1 0 0.0 0.0
Horz. 5.9 1 0 0.0 0.0
Walls U CLTD (5)
North 0.8 0 0.0 0.0
NE 0.8 0 0.0 0.0
East 0.8 0 10.5 0.0 0.2
SE 0.8 0 0.0 0.0
South 0.8 0 0.0 0.0
SW 0.8 0 0.0 0.0
West 0.8 0 0.0 0.0
NW 0.8 0 0.0 0.0
Doors U CLTD (5)
North 3.3 0 0.0 0.0
NE 3.3 0 0.0 0.0
East 3.3 0 0.0 0.0
SE 3.3 0 0.0 0.0
South 3.3 0 0.0 0.0
SW 3.3 0 0.0 0.0
West 3.3 0 2 0.0 0.2
NW 3.3 0 0.0 0.0
Roof/Ceiling U CLTD (5)
Roof 1 0.45 0 18 0.0 0.2Roof 2 0.45 0.0 0.0
Partition U CLTD (5)
(To Unc. Space) 0 0.0 0.0
Crawl Space U CLTD (5)
(or floor garage) 0 0.0 0.0
Slab R (ins) UP CLTD (6) Perimeter
0.83 4 0.1
Infiltration ACH Vol Q
Winter 0.53 54 8 0.4
Summer 0.00 54 0 0.0
People Number Watt /peson
67 0
Internal (AVG) KW Watts
Kitchen/Laundry 0 0.0Other (in watts) 0 0.0
Sensible
Cool Subtotal KW 0.0
Heat Subtotal KW 1.3
Cl.Fac Ht.Fac
Duct 0 0 0.0 0.0
Sensible
Cool Total KW 0.0
Heat Total KW 1.3
Net Total
Cooling KW 0.0
Heating KW 1.3
219
164
61
MAZIN SADIQ
Required quantity for 30days (kg)
70
73
Heat Loss Calculation Sheet
..
STANDBY POLICE BATTALION HQ
LASHKAR GAH
Designed By Checked By
SENIOR BAR.
(SP02) F09AB.WALI M.E.AMIRYAR
UnitedInfrastructure Pro ects
12 of 182
http://en.wikipedia.org/wiki/Gasolinehttp://en.wikipedia.org/wiki/Dieselhttp://en.wikipedia.org/wiki/Woodhttp://en.wikipedia.org/wiki/Coalhttp://en.wikipedia.org/wiki/Natural_Gashttp://en.wikipedia.org/wiki/Natural_Gashttp://en.wikipedia.org/wiki/Coalhttp://en.wikipedia.org/wiki/Woodhttp://en.wikipedia.org/wiki/Dieselhttp://en.wikipedia.org/wiki/Gasoline -
7/28/2019 (SP02) SENNIOR BARRACK.xls
7/13
Date 28-11-2007 Project # Sheet # 7 of 13
Project:
Site/Type
Building Approved By
Heating and Cooling Load Calculation - 2001 ASHRAE Fundamentals Handbook
Temperatures
Winter outdoor dodb -5 C Floor Area A.flr. 76 sq.meters
Winter indoor didb 21 C Avg. Height Ceil.Ht. 3 meter
Summer outdoor di 43 C Building Leakage 1 Tight = 1 Medium=2 Loose =3 Note(2)
Summer indoor do 23.9 C
Daily Range DR 18.3 C
Sens. Heat Ratio SHR 0.8 Note (1)
Windows U (3) SC (3) GLF (4) Area (m2) Qc (KW) Qh(KW)Fuel
Heat of
CombustionMJ/kg
Required quantity
for 24( kg)
North 5.9 1 0 0.0 0.0 Gasoline 47 8.316089464
NE 5.9 1 0 0.0 0.0 Diesel 45 8.68569344
East 5.9 1 0 2.88 0.0 0.4 Wood 15 26.05708032
SE 5.9 1 0 0.0 0.0 Coal 20 19.54281024
South 5.9 1 0 0.0 0.0 Natural Gas 54 7.238077867
SW 5.9 1 0 0.0 0.0
West 5.9 1 0 2.88 0.0 0.4
NW 5.9 1 0 0.0 0.0
Horz. 5.9 1 0 0.0 0.0
Walls U CLTD (5)
North 0.8 0 0.0 0.0
NE 0.8 0 0.0 0.0
East 0.8 0 18.3 0.0 0.4
SE 0.8 0 0.0 0.0
South 0.8 0 0.0 0.0SW 0.8 0 0.0 0.0
West 0.8 0 18.3 0.0 0.4
NW 0.8 0 0.0 0.0
Doors U CLTD (5)
North 3.3 0 2 0.0 0.2
NE 3.3 0 0.0 0.0
East 3.3 0 0.0 0.0
SE 3.3 0 0.0 0.0
South 3.3 0 0.0 0.0
SW 3.3 0 0.0 0.0
West 3.3 0 0.0 0.0
NW 3.3 0 0.0 0.0
Roof/Ceiling U CLTD (5)
Roof 1 0.45 0 76 0.0 0.9
Roof 2 0.45 0.0 0.0
Partition U CLTD (5)
(To Unc. Space) 0 0.0 0.0
Crawl Space U CLTD (5)
(or floor garage) 0 0.0 0.0
Slab R (ins) UP CLTD (6) Perimeter
0.83 14.1 0.3
Infiltration ACH Vol Q
Winter 0.53 228 34 1.5
Summer 0.00 228 0 0.0
People Number Watt /peson
67 0
Internal (AVG) KW Watts
Kitchen/Laundry 0 0.0
Other (in watts) 0 0.0
Sensible
Cool Subtotal KW 0.0
Heat Subtotal KW 4.5
Cl.Fac Ht.Fac
Duct 0 0 0.0 0.0
Sensible
Cool Total KW 0.0
Heat Total KW 4.5
Net Total
Cooling KW 0.0
Heating KW 4.5
782
586
217
M.E.AMIRYAR
Required quantity for 30
days (kg)
249
261
MAZIN SADIQ
Heat Loss Calculation Sheet
..
STANDBY POLICE BATTALION HQ
LASHKAR GAH
Designed By Checked By
SENIOR BAR.(SP02) F08
AB.WALI
UnitedInfrastructure Pro ects
11 of 182
http://en.wikipedia.org/wiki/Gasolinehttp://en.wikipedia.org/wiki/Dieselhttp://en.wikipedia.org/wiki/Woodhttp://en.wikipedia.org/wiki/Coalhttp://en.wikipedia.org/wiki/Natural_Gashttp://en.wikipedia.org/wiki/Natural_Gashttp://en.wikipedia.org/wiki/Coalhttp://en.wikipedia.org/wiki/Woodhttp://en.wikipedia.org/wiki/Dieselhttp://en.wikipedia.org/wiki/Gasoline -
7/28/2019 (SP02) SENNIOR BARRACK.xls
8/13
Date 28-11-2007 Project # Sheet # 6 of 13
Project:
Site/Type
Building Approved By
Heating and Cooling Load Calculation - 2001 ASHRAE Fundamentals Handbook
Temperatures
Winter outdoor dodb -5 C Floor Area A.flr. 26 sq.meters
Winter indoor didb 21 C Avg. Height Ceil.Ht. 3 meter
Summer outdoor di 43 C Building Leakage 1 Tight = 1 Medium=2 Loose =3 Note(2)
Summer indoor do 23.9 C
Daily Range DR 18.3 C
Sens. Heat Ratio SHR 0.8 Note (1)
Windows U (3) SC (3) GLF (4) Area (m2) Qc (KW) Qh(KW)Fuel
Heat of
CombustionMJ/kg
Required quantity
for 24( kg)North 5.9 1 0 0.0 0.0 Gasoline 47 3.423378179
NE 5.9 1 0 0.0 0.0 Diesel 45 3.57552832
East 5.9 1 0 0.0 0.0 Wood 15 10.72658496
SE 5.9 1 0 0.0 0.0 Coal 20 8.04493872
South 5.9 1 0 0.0 0.0 Natural Gas 54 2.979606933
SW 5.9 1 0 0.0 0.0
West 5.9 1 0 2.88 0.0 0.4
NW 5.9 1 0 0.0 0.0
Horz. 5.9 1 0 0.0 0.0
Walls U CLTD (5)
North 0.8 0 0.0 0.0
NE 0.8 0 0.0 0.0
East 0.8 0 0.0 0.0
SE 0.8 0 0.0 0.0
South 0.8 0 0.0 0.0SW 0.8 0 0.0 0.0
West 0.8 0 14.5 0.0 0.3
NW 0.8 0 0.0 0.0
Doors U CLTD (5)
North 3.3 0 0.0 0.0
NE 3.3 0 0.0 0.0
East 3.3 0 2 0.0 0.2
SE 3.3 0 0.0 0.0
South 3.3 0 0.0 0.0
SW 3.3 0 0.0 0.0
West 3.3 0 0.0 0.0
NW 3.3 0 0.0 0.0
Roof/Ceiling U CLTD (5)
Roof 1 0.45 0 26 0.0 0.3
Roof 2 0.45 0.0 0.0
Partition U CLTD (5)
(To Unc. Space) 0 0.0 0.0
Crawl Space U CLTD (5)
(or floor garage) 0 0.0 0.0
Slab R (ins) UP CLTD (6) Perimeter
0.83 5.8 0.1
Infiltration ACH Vol Q
Winter 0.53 78 11 0.5
Summer 0.00 78 0 0.0
People Number Watt /peson
67 0
Internal (AVG) KW Watts
Kitchen/Laundry 0 0.0
Other (in watts) 0 0.0
Sensible
Cool Subtotal KW 0.0
Heat Subtotal KW 1.9
Cl.Fac Ht.Fac
Duct 0 0 0.0 0.0
Sensible
Cool Total KW 0.0
Heat Total KW 1.9
Net Total
Cooling KW 0.0
Heating KW 1.9
322
241
89
M.E.AMIRYAR
Required quantity for 30
days (kg)103
107
MAZIN SADIQ
Heat Loss Calculation Sheet
..
STANDBY POLICE BATTALION HQ
LASHKAR GAH
Designed By Checked By
SENIOR BAR.(SP02) F06
AB.WALI
UnitedInfrastructure Pro ects
10 of 182
http://en.wikipedia.org/wiki/Gasolinehttp://en.wikipedia.org/wiki/Dieselhttp://en.wikipedia.org/wiki/Woodhttp://en.wikipedia.org/wiki/Coalhttp://en.wikipedia.org/wiki/Natural_Gashttp://en.wikipedia.org/wiki/Natural_Gashttp://en.wikipedia.org/wiki/Coalhttp://en.wikipedia.org/wiki/Woodhttp://en.wikipedia.org/wiki/Dieselhttp://en.wikipedia.org/wiki/Gasoline -
7/28/2019 (SP02) SENNIOR BARRACK.xls
9/13
Date 28-11-2007 Project # Sheet # 5 of 13
Project:
Site/Type
Building Approved By
Heating and Cooling Load Calculation - 2001 ASHRAE Fundamentals Handbook
Temperatures
Winter outdoor dodb -5 C Floor Area A.flr. 26 sq.meters
Winter indoor didb 21 C Avg. Height Ceil.Ht. 3 meter
Summer outdoor di 43 C Building Leakage 1 Tight = 1 Medium=2 Loose =3 Note(2)
Summer indoor do 23.9 C
Daily Range DR 18.3 C
Sens. Heat Ratio SHR 0.8 Note (1)
Windows U (3) SC (3) GLF (4) Area (m2) Qc (KW) Qh(KW)
FuelHeat of
CombustionMJ/kg
Required quantity
for 24( kg)North 5.9 1 0 0.0 0.0 Gasoline 47 3.423378179
NE 5.9 1 0 0.0 0.0 Diesel 45 3.57552832
East 5.9 1 0 2.88 0.0 0.4 Wood 15 10.72658496
SE 5.9 1 0 0.0 0.0 Coal 20 8.04493872
South 5.9 1 0 0.0 0.0 Natural Gas 54 2.979606933
SW 5.9 1 0 0.0 0.0
West 5.9 1 0 0.0 0.0
NW 5.9 1 0 0.0 0.0
Horz. 5.9 1 0 0.0 0.0
Walls U CLTD (5)
North 0.8 0 0.0 0.0
NE 0.8 0 0.0 0.0
East 0.8 0 14.5 0.0 0.3
SE 0.8 0 0.0 0.0
South 0.8 0 0.0 0.0SW 0.8 0 0.0 0.0
West 0.8 0 0.0 0.0
NW 0.8 0 0.0 0.0
Doors U CLTD (5)
North 3.3 0 0.0 0.0
NE 3.3 0 0.0 0.0
East 3.3 0 0.0 0.0
SE 3.3 0 0.0 0.0
South 3.3 0 0.0 0.0
SW 3.3 0 0.0 0.0
West 3.3 0 2 0.0 0.2
NW 3.3 0 0.0 0.0
Roof/Ceiling U CLTD (5)
Roof 1 0.45 0 26 0.0 0.3
Roof 2 0.45 0.0 0.0
Partition U CLTD (5)
(To Unc. Space) 0 0.0 0.0
Crawl Space U CLTD (5)
(or floor garage) 0 0.0 0.0
Slab R (ins) UP CLTD (6) Perimeter
0.83 5.8 0.1
Infiltration ACH Vol Q
Winter 0.53 78 11 0.5
Summer 0.00 78 0 0.0
People Number Watt /peson
67 0
Internal (AVG) KW Watts
Kitchen/Laundry 0 0.0
Other (in watts) 0 0.0
Sensible
Cool Subtotal KW 0.0
Heat Subtotal KW 1.9
Cl.Fac Ht.Fac
Duct 0 0 0.0 0.0
Sensible
Cool Total KW 0.0
Heat Total KW 1.9
Net Total
Cooling KW 0.0
Heating KW 1.9
322
241
89
M.E.AMIRYAR
Required quantity for 30
days (kg)103
107
MAZIN SADIQ
Heat Loss Calculation Sheet
..
STANDBY POLICE BATTALION HQ
LASHKAR GAH
Designed By Checked By
SENIOR BAR.(SP02) F05
AB.WALI
UnitedInfrastructure Pro ects
9 of 182
http://en.wikipedia.org/wiki/Gasolinehttp://en.wikipedia.org/wiki/Dieselhttp://en.wikipedia.org/wiki/Woodhttp://en.wikipedia.org/wiki/Coalhttp://en.wikipedia.org/wiki/Natural_Gashttp://en.wikipedia.org/wiki/Natural_Gashttp://en.wikipedia.org/wiki/Coalhttp://en.wikipedia.org/wiki/Woodhttp://en.wikipedia.org/wiki/Dieselhttp://en.wikipedia.org/wiki/Gasoline -
7/28/2019 (SP02) SENNIOR BARRACK.xls
10/13
Date 28-11-2007 Project # Sheet # 4 of 13
Project:
Site/Type
Building Approved By
Heating and Cooling Load Calculation - 2001 ASHRAE Fundamentals Handbook
Temperatures
Winter outdoor dodb -5 C Floor Area A.flr. 26 sq.meters
Winter indoor didb 21 C Avg. Height Ceil.Ht. 3 meter
Summer outdoor di 43 C Building Leakage 1 Tight = 1 Medium=2 Loose =3 Note(2)
Summer indoor do 23.9 C
Daily Range DR 18.3 C
Sens. Heat Ratio SHR 0.8 Note (1)
Windows U (3) SC (3) GLF (4) Area (m2) Qc (KW) Qh(KW)
FuelHeat of
CombustionMJ/kg
Required quantity
for 24( kg)North 5.9 1 0 0.0 0.0 Gasoline 47 3.423378179
NE 5.9 1 0 0.0 0.0 Diesel 45 3.57552832
East 5.9 1 0 0.0 0.0 Wood 15 10.72658496
SE 5.9 1 0 0.0 0.0 Coal 20 8.04493872
South 5.9 1 0 0.0 0.0 Natural Gas 54 2.979606933
SW 5.9 1 0 0.0 0.0
West 5.9 1 0 2.88 0.0 0.4
NW 5.9 1 0 0.0 0.0
Horz. 5.9 1 0 0.0 0.0
Walls U CLTD (5)
North 0.8 0 0.0 0.0
NE 0.8 0 0.0 0.0
East 0.8 0 0.0 0.0
SE 0.8 0 0.0 0.0
South 0.8 0 0.0 0.0
SW 0.8 0 0.0 0.0
West 0.8 0 14.5 0.0 0.3
NW 0.8 0 0.0 0.0
Doors U CLTD (5)
North 3.3 0 0.0 0.0
NE 3.3 0 0.0 0.0
East 3.3 0 2 0.0 0.2
SE 3.3 0 0.0 0.0
South 3.3 0 0.0 0.0
SW 3.3 0 0.0 0.0
West 3.3 0 0.0 0.0
NW 3.3 0 0.0 0.0
Roof/Ceiling U CLTD (5)
Roof 1 0.45 0 26 0.0 0.3
Roof 2 0.45 0.0 0.0Partition U CLTD (5)
(To Unc. Space) 0 0.0 0.0
Crawl Space U CLTD (5)
(or floor garage) 0 0.0 0.0
Slab R (ins) UP CLTD (6) Perimeter
0.83 5.8 0.1
Infiltration ACH Vol Q
Winter 0.53 78 11 0.5
Summer 0.00 78 0 0.0
People Number Watt /peson
67 0
Internal (AVG) KW Watts
Kitchen/Laundry 0 0.0
Other (in watts) 0 0.0
Sensible
Cool Subtotal KW 0.0
Heat Subtotal KW 1.9
Cl.Fac Ht.Fac
Duct 0 0 0.0 0.0
Sensible
Cool Total KW 0.0
Heat Total KW 1.9
Net Total
Cooling KW 0.0
Heating KW 1.9
322
241
89
M.E.AMIRYAR
Required quantity for 30
days (kg)
103
107
MAZIN SADIQ
Heat Loss Calculation Sheet
..
STANDBY POLICE BATTALION HQ
LASHKAR GAH
Designed By Checked By
SENIOR BAR.(SP02) F04
AB.WALI
UnitedInfrastructure Pro ects
8 of 182
http://en.wikipedia.org/wiki/Gasolinehttp://en.wikipedia.org/wiki/Dieselhttp://en.wikipedia.org/wiki/Woodhttp://en.wikipedia.org/wiki/Coalhttp://en.wikipedia.org/wiki/Natural_Gashttp://en.wikipedia.org/wiki/Natural_Gashttp://en.wikipedia.org/wiki/Coalhttp://en.wikipedia.org/wiki/Woodhttp://en.wikipedia.org/wiki/Dieselhttp://en.wikipedia.org/wiki/Gasoline -
7/28/2019 (SP02) SENNIOR BARRACK.xls
11/13
Date 28-11-2007 Project # Sheet # 3 of 13
Project:
Site/Type
Building Approved By
Heating and Cooling Load Calculation - 2001 ASHRAE Fundamentals Handbook
Temperatures
Winter outdoor dodb -5 C Floor Area A.flr. 26 sq.meters
Winter indoor didb 21 C Avg. Height Ceil.Ht. 3 meter
Summer outdoor di 43 C Building Leakage 1 Tight = 1 Medium=2 Loose =3 Note(2)
Summer indoor do 23.9 C
Daily Range DR 18.3 C
Sens. Heat Ratio SHR 0.8 Note (1)
Windows U (3) SC (3) GLF (4) Area (m2) Qc (KW) Qh(KW)
FuelHeat of
CombustionMJ/kg
Required quantity
for 24( kg)North 5.9 1 0 0.0 0.0 Gasoline 47 3.423378179
NE 5.9 1 0 0.0 0.0 Diesel 45 3.57552832
East 5.9 1 0 2.88 0.0 0.4 Wood 15 10.72658496
SE 5.9 1 0 0.0 0.0 Coal 20 8.04493872
South 5.9 1 0 0.0 0.0 Natural Gas 54 2.979606933
SW 5.9 1 0 0.0 0.0
West 5.9 1 0 0.0 0.0
NW 5.9 1 0 0.0 0.0
Horz. 5.9 1 0 0.0 0.0
Walls U CLTD (5)
North 0.8 0 0.0 0.0
NE 0.8 0 0.0 0.0
East 0.8 0 14.5 0.0 0.3
SE 0.8 0 0.0 0.0
South 0.8 0 0.0 0.0
SW 0.8 0 0.0 0.0
West 0.8 0 0.0 0.0
NW 0.8 0 0.0 0.0
Doors U CLTD (5)
North 3.3 0 0.0 0.0
NE 3.3 0 0.0 0.0
East 3.3 0 0.0 0.0
SE 3.3 0 0.0 0.0
South 3.3 0 0.0 0.0
SW 3.3 0 0.0 0.0
West 3.3 0 2 0.0 0.2
NW 3.3 0 0.0 0.0
Roof/Ceiling U CLTD (5)
Roof 1 0.45 0 26 0.0 0.3
Roof 2 0.45 0.0 0.0Partition U CLTD (5)
(To Unc. Space) 0 0.0 0.0
Crawl Space U CLTD (5)
(or floor garage) 0 0.0 0.0
Slab R (ins) UP CLTD (6) Perimeter
0.83 5.8 0.1
Infiltration ACH Vol Q
Winter 0.53 78 11 0.5
Summer 0.00 78 0 0.0
People Number Watt /peson
67 0
Internal (AVG) KW Watts
Kitchen/Laundry 0 0.0
Other (in watts) 0 0.0
Sensible
Cool Subtotal KW 0.0
Heat Subtotal KW 1.9
Cl.Fac Ht.Fac
Duct 0 0 0.0 0.0
Sensible
Cool Total KW 0.0
Heat Total KW 1.9
Net Total
Cooling KW 0.0
Heating KW 1.9
322
241
89
M.E.AMIRYAR
Required quantity for
30 days (kg)103
107
MAZIN SADIQ
Heat Loss Calculation Sheet
..
STANDBY POLICE BATTALION HQ
LASHKAR GAH
Designed By Checked By
SENIOR BAR.(SP02) F03
AB.WALI
UnitedInfrastructure Pro ects
7 of 182
http://en.wikipedia.org/wiki/Gasolinehttp://en.wikipedia.org/wiki/Dieselhttp://en.wikipedia.org/wiki/Woodhttp://en.wikipedia.org/wiki/Coalhttp://en.wikipedia.org/wiki/Natural_Gashttp://en.wikipedia.org/wiki/Natural_Gashttp://en.wikipedia.org/wiki/Coalhttp://en.wikipedia.org/wiki/Woodhttp://en.wikipedia.org/wiki/Dieselhttp://en.wikipedia.org/wiki/Gasoline -
7/28/2019 (SP02) SENNIOR BARRACK.xls
12/13
Date 28-11-2007 Project # Sheet # 2 of 13
Project:Site/Type
Building Approved By
Heating and Cooling Load Calculation - 2001 ASHRAE Fundamentals Handbook
Temperatures
Winter outdoor dodb -5 C Floor Area A.flr. 13 sq.meters
Winter indoor didb 21 C Avg. Height Ceil.Ht. 3 meter
Summer outdoor di 43 C Building Leakage 1 Tight = 1 Medium=2 Loose =3 Note(2)
Summer indoor do 23.9 C
Daily Range DR 18.3 C
Sens. Heat Ratio SHR 0.8 Note (1)
Windows U (3) SC (3) GLF (4) Area (m2) Qc (KW) Qh(KW)Fuel
Heat of
CombustionMJ/kg
Required quantity
for 24( kg)
North 5.9 1 0 0.0 0.0 Gasoline 47 2.558390706
NE 5.9 1 0 0.0 0.0 Diesel 45 2.67209696
East 5.9 1 0 0.0 0.0 Wood 15 8.01629088
SE 5.9 1 0 0.0 0.0 Coal 20 6.01221816
South 5.9 1 0 0.0 0.0 Natural Gas 54 2.226747467
SW 5.9 1 0 0.0 0.0
West 5.9 1 0 1.44 0.0 0.2
NW 5.9 1 0 0.0 0.0
Horz. 5.9 1 0 0.0 0.0
Walls U CLTD (5)
North 0.8 0 13.6 0.0 0.3
NE 0.8 0 0.0 0.0East 0.8 0 0.0 0.0
SE 0.8 0 0.0 0.0
South 0.8 0 0.0 0.0
SW 0.8 0 0.0 0.0
West 0.8 0 7 0.0 0.1
NW 0.8 0 0.0 0.0
Doors U CLTD (5)
North 3.3 0 0.0 0.0
NE 3.3 0 0.0 0.0
East 3.3 0 2 0.0 0.2
SE 3.3 0 0.0 0.0
South 3.3 0 0.0 0.0
SW 3.3 0 0.0 0.0
West 3.3 0 0.0 0.0
NW 3.3 0 0.0 0.0
Roof/Ceiling U CLTD (5)
Roof 1 0.45 0 13 0.0 0.2
Roof 2 0.45 0.0 0.0
Partition U CLTD (5)
(To Unc. Space) 0 0.0 0.0
Crawl Space U CLTD (5)
(or floor garage) 0 0.0 0.0
Slab R (ins) UP CLTD (6) Perimeter
0.83 7.4 0.2
Infiltration ACH Vol Q
Winter 0.53 39 6 0.3
Summer 0.00 39 0 0.0
People Number Watt /peson
67 0
Internal (AVG) KW WattsKitchen/Laundry 0 0.0
Other (in watts) 0 0.0
Sensible
Cool Subtotal KW 0.0
Heat Subtotal KW 1.4
Cl.Fac Ht.Fac
Duct 0 0 0.0 0.0
Sensible
Cool Total KW 0.0
Heat Total KW 1.4
Net Total
Cooling KW 0.0
Heating KW 1.4
..
STANDBY POLICE BATTALION HQLASHKAR GAH
Designed By Checked By
SENIOR BAR.
(SP02) F02
240
180
67
AB.WALI
Required quantity for 30
days (kg)
77
80
M.E.AMIRYAR MAZIN SADIQ
Heat Loss Calculation Sheet
UnitedInfrastructure Proects
6 of 182
http://en.wikipedia.org/wiki/Gasolinehttp://en.wikipedia.org/wiki/Dieselhttp://en.wikipedia.org/wiki/Woodhttp://en.wikipedia.org/wiki/Coalhttp://en.wikipedia.org/wiki/Natural_Gashttp://en.wikipedia.org/wiki/Natural_Gashttp://en.wikipedia.org/wiki/Coalhttp://en.wikipedia.org/wiki/Woodhttp://en.wikipedia.org/wiki/Dieselhttp://en.wikipedia.org/wiki/Gasoline -
7/28/2019 (SP02) SENNIOR BARRACK.xls
13/13
Date 28-11-2007 Project # Sheet # 1 of 13
Project:Site/Type
Building Approved By
Heating and Cooling Load Calculation - 2001 ASHRAE Fundamentals Handbook
Temperatures
Winter outdoor dodb -5 C Floor Area A.flr. 13 sq.meters
Winter indoor didb 21 C Avg. Height Ceil.Ht. 3 meter
Summer outdoor di 43 C Building Leakage 1 Tight = 1 Medium=2 Loose =3 Note(2)
Summer indoor do 23.9 C
Daily Range DR 18.3 C
Sens. Heat Ratio SHR 0.8 Note (1)
Windows U (3) SC (3) GLF (4) Area (m2) Qc (KW) Qh(KW)Fuel
Heat of
CombustionMJ/kg
Required quantity
for 24( kg)
North 5.9 1 0 0.0 0.0 Gasoline 47 2.558390706
NE 5.9 1 0 0.0 0.0 Diesel 45 2.67209696
East 5.9 1 0 1.44 0.0 0.2 Wood 15 8.01629088
SE 5.9 1 0 0.0 0.0 Coal 20 6.01221816
South 5.9 1 0 0.0 0.0 Natural Gas 54 2.226747467
SW 5.9 1 0 0.0 0.0
West 5.9 1 0 0.0 0.0
NW 5.9 1 0 0.0 0.0
Horz. 5.9 1 0 0.0 0.0
Walls U CLTD (5)
North 0.8 0 13.6 0.0 0.3
NE 0.8 0 0.0 0.0East 0.8 0 7 0.0 0.1
SE 0.8 0 0.0 0.0
South 0.8 0 0.0 0.0
SW 0.8 0 0.0 0.0
West 0.8 0 0.0 0.0
NW 0.8 0 0.0 0.0
Doors U CLTD (5)
North 3.3 0 0.0 0.0
NE 3.3 0 0.0 0.0
East 3.3 0 0.0 0.0
SE 3.3 0 0.0 0.0
South 3.3 0 0.0 0.0
SW 3.3 0 0.0 0.0
West 3.3 0 2 0.0 0.2
NW 3.3 0 0.0 0.0
Roof/Ceiling U CLTD (5)
Roof 1 0.45 0 13 0.0 0.2
Roof 2 0.45 0.0 0.0
Partition U CLTD (5)
(To Unc. Space) 0 0.0 0.0
Crawl Space U CLTD (5)
(or floor garage) 0 0.0 0.0
Slab R (ins) UP CLTD (6) Perimeter
0.83 7.4 0.2
Infiltration ACH Vol Q
Winter 0.53 39 6 0.3
Summer 0.00 39 0 0.0
People Number Watt /peson
67 0
Internal (AVG) KW WattsKitchen/Laundry 0 0.0
Other (in watts) 0 0.0
Sensible
Cool Subtotal KW 0.0
Heat Subtotal KW 1.4
Cl.Fac Ht.Fac
Duct 0 0 0.0 0.0
Sensible
Cool Total KW 0.0
Heat Total KW 1.4
Net Total
Cooling KW 0.0
Heating KW 1.4
240
180
67
AB.WALI
Required quantity for 30
days (kg)
77
80
M.E.AMIRYAR MAZIN SADIQ
Heat Loss Calculation Sheet
..
STANDBY POLICE BATTALION HQLASHKAR GAH
Designed By Checked By
SENIOR BAR.
(SP02) F01
UnitedInfrastructure Proects
5 of 182
http://en.wikipedia.org/wiki/Gasolinehttp://en.wikipedia.org/wiki/Dieselhttp://en.wikipedia.org/wiki/Woodhttp://en.wikipedia.org/wiki/Coalhttp://en.wikipedia.org/wiki/Natural_Gashttp://en.wikipedia.org/wiki/Natural_Gashttp://en.wikipedia.org/wiki/Coalhttp://en.wikipedia.org/wiki/Woodhttp://en.wikipedia.org/wiki/Dieselhttp://en.wikipedia.org/wiki/Gasoline