Southside Green - Team 3

14
April 10 through 12, 2014 Study Area B – Team 3 Study Area A Study Area B Study Area C http://www.southsidegreen.com Contributors Fred Bonci Alexander Bishop Eric French James Wesley Morar Joe Stavish Paul Alessio Thomas Bates Max Heckman Ryan Quin Brad Hazelwood

Transcript of Southside Green - Team 3

Page 1: Southside Green -  Team 3

April 10 through 12, 2014

Study Area B – Team 3

Study Area A

Study Area B

Study Area C

http://www.southsidegreen.com

ContributorsFred BonciAlexander BishopEric FrenchJames Wesley MorarJoe StavishPaul AlessioThomas BatesMax HeckmanRyan QuinBrad Hazelwood

Page 2: Southside Green -  Team 3

April 10 through 12, 2014

Study Area B - Goals

http://www.southsidegreen.com

• Reduce impervious Surface by 50%• Within that 30% landscape surface• Collect, store, treat water from street, ROW,

and adjacent structures• Allow for conveyance from Southside slopes• Make it visible and aesthetic• Priority to pedestrians

Page 3: Southside Green -  Team 3

April 10 through 12, 2014

Study Area B – Design Achievements

http://www.southsidegreen.com

• Reduces Impervious Area by 47%• Implements 30% Landscaped Area• Provides storage for 1 inch per hour rain event• Model Analysis indicates near 100% capture of CSO overflows for

the typical year– 1.67 million gallons per year

• Additional runoff is conveyed downstream. Does not enter combined sewer.

Page 4: Southside Green -  Team 3

April 10 through 12, 2014

Study Area BFull Plan

http://www.southsidegreen.com

Page 5: Southside Green -  Team 3

April 10 through 12, 2014

Study Area BPlan

http://www.southsidegreen.com

Page 6: Southside Green -  Team 3

April 10 through 12, 2014

Study Area BPlan

http://www.southsidegreen.com

Page 7: Southside Green -  Team 3

April 10 through 12, 2014

Study Area BPlan

http://www.southsidegreen.com

Page 8: Southside Green -  Team 3

April 10 through 12, 2014

Study Area BPlan

http://www.southsidegreen.com

Page 9: Southside Green -  Team 3

April 10 through 12, 2014

Study Area BPlan

http://www.southsidegreen.com

Page 10: Southside Green -  Team 3

April 10 through 12, 2014

Study Area BPlan

http://www.southsidegreen.com

Page 11: Southside Green -  Team 3

April 10 through 12, 2014

Study Area BSection

http://www.southsidegreen.com

Page 12: Southside Green -  Team 3

April 10 through 12, 2014

Study Area BSection

http://www.southsidegreen.com

Page 13: Southside Green -  Team 3

April 10 through 12, 2014

Study Area BExisitng Perspective

http://www.southsidegreen.com

Page 14: Southside Green -  Team 3

April 10 through 12, 2014

Study Area BProposed Perspective

http://www.southsidegreen.com