Southern California Eelgrass Mitigation Policy NMFS, USFWS, and CDFG (1991) Effective compensation for impacts (90% success) Basis for consistent recommendations Streamlined environmental review Allows for flexibility and modifications Improved monitoring and understanding

description

Southern California Eelgrass Mitigation Policy. NMFS, USFWS, and CDFG (1991) Effective compensation for impacts (90% success) Basis for consistent recommendations Streamlined environmental review Allows for flexibility and modifications Improved monitoring and understanding. - PowerPoint PPT Presentation

Transcript of Southern California Eelgrass Mitigation Policy

Page 1: Southern California Eelgrass  Mitigation Policy

Southern California Eelgrass Mitigation Policy

NMFS, USFWS, and CDFG (1991) Effective compensation for impacts (90% success) Basis for consistent recommendations Streamlined environmental review Allows for flexibility and modifications Improved monitoring and understanding

Page 2: Southern California Eelgrass  Mitigation Policy

III. Purpose and Need – Why statewide policy?

Resource value: biological, physical and economic Vulnerable to human development Consistent statewide strategy and standards Internal and external coordination Streamlining Regulatory certainty

Page 3: Southern California Eelgrass  Mitigation Policy

IV. Draft Policy – General Description

No net loss of habitatConsistency with case-by-case considerationsFollowing successful model of Southern CA

policyRecognizes regional differencesInternal guidance and appendices

Page 4: Southern California Eelgrass  Mitigation Policy

V. Draft Policy – Specific Elements

A. Avoiding and minimizing impactsB. Surveying C. Assessing impacts D. Mitigating for impacts E. Modifying provisions of the policy

Page 5: Southern California Eelgrass  Mitigation Policy

A. Impact Avoidance and Minimization

Case-by-case basisShading• Stepwise key

Turbidity• Flowchart • Light monitoring

Circulation Patterns

Page 6: Southern California Eelgrass  Mitigation Policy

B. Eelgrass Surveys

Survey Metrics• Spatial distribution• Area extent• Percent bottom cover• Shoot density• Frequency of occurrence

Page 7: Southern California Eelgrass  Mitigation Policy

Contiguous boundary around plants and outward a distance of 10 m, excluding gaps within the bed >20 m between plants

Eelgrass Bed Definition

Example Eelgrass Bed eelgrass 10 m boundary

Page 8: Southern California Eelgrass  Mitigation Policy

B. Eelgrass Surveys (cont.)Techniques• Diver transects• Boundary mapping• Acoustic surveys• Aerial surveys

Methods• Pre- and post-construction• During active growing season• Valid for 60 days or beginning of next growing season

Page 9: Southern California Eelgrass  Mitigation Policy

C. Assessing Impacts

Type of effect: direct vs indirect

Pre- and post- surveys of project and reference sites

Page 10: Southern California Eelgrass  Mitigation Policy

D. Mitigating for Impacts

Site SelectionMitigation ratioTechniquesMonitoringDelaySuccess

Page 11: Southern California Eelgrass  Mitigation Policy

Mitigation Ratios “The Five-Step Wetland Mitigation Calculator” (King and Price

2004)• Objective, standardized ratios• Standard metrics• Likelihood of success based on history of transplanting within

regions

Compensation ratio 1.2:1 for all regions

Initial target mitigation ratio• Southern California 1.38:1• Central California 1.2:1• San Francisco 3.01:1• Northern California 4.82:1

Page 12: Southern California Eelgrass  Mitigation Policy

Mitigation MonitoringMitigation site and reference site0 months: document transplants, establish

baseline at reference site6 months: confirm survival and/or recruitment12, 24, 36, 48, 60 months: evaluate mitigation

site and compare to reference site

Page 13: Southern California Eelgrass  Mitigation Policy

Success CriteriaArea and density criteria• 6 month: 50% survival or 1 seedling/4m2

• 12 month: 40% area and 20% density• 24 months: 85% area and 70% density• 36, 48, 60 months: 100% area and 85% density

Supplemental Mitigation Area

Page 14: Southern California Eelgrass  Mitigation Policy

Mitigation DelayTo offset loss of eelgrass habitat value that

accumulates over timeMitigation calculator used to determine

increases in mitigation planting

Page 15: Southern California Eelgrass  Mitigation Policy

E. Modifying ProvisionsComprehensive management strategiesLocalized, temporary impacts• Less than 10 m2

• Eelgrass fully restored within 1 yearRegion-specific modificationsMitigation banking

Page 16: Southern California Eelgrass  Mitigation Policy

VI. Next Steps

Public comment• [email protected]• Closes 7/7

Public meetings• Eureka (6/15)• Oakland (6/27)• Long Beach (6/26)

Revise and finalize