South West of England Regional Development Agency Wave Hub Development and Design Phase Final design report June 2006

Transcript of South West of England Regional Development Agency · 2020. 1. 27. · South West of England...

Page 1: South West of England Regional Development Agency · 2020. 1. 27. · South West of England Regional Development Agency Wave Hub Development and Design Phase Final design report June

South West of England RegionalDevelopment Agency

Wave Hub Development and DesignPhase

Final design report

June 2006

Page 2: South West of England Regional Development Agency · 2020. 1. 27. · South West of England Regional Development Agency Wave Hub Development and Design Phase Final design report June

Halcrow Group LimitedAsh House Falcon Road Sowton Exeter EX2 7LBTel +44 (0)1392 444252 Fax +44 (0)1392 444301www.halcrow.com

Halcrow Group Limited has prepared this report in accordance withthe instructions of their client, South West of England RegionalDevelopment Agency, for their sole and specific use. Any otherpersons who use any information contained herein do so at theirown risk.

© Halcrow Group Limited 2006

Contents Amendment Record����������������� ��������� ����� ��������������

������ ������ �������� � ����� ��� ���

�� � ������ � ! !�" �

#� � ������������������ �"!$!�" �%&�

�� � �� ��������� ��!"!�" �%&�

� � � � �

South West of England DevelopmentAgency

Wave Hub Development and Design PhaseFinal Design Report

June 2006

Page 3: South West of England Regional Development Agency · 2020. 1. 27. · South West of England Regional Development Agency Wave Hub Development and Design Phase Final design report June

Executive Summary

����'����&�����(������� ��)��� ������ �*��� ��������+,�� � �����

���*�������� ������� �'����- ���*.����������� �� ���������'����&�������

������*������������� �������� ��������������*����*�/���0��������� ��������

�*������1������2������� ��������������������*�������.��������������

�������� �����������3��4�5�� ��� ��'����- ���*�6 �������/'-6�0��

��� �� �������.��

� �����'����&����������� �7����8��������������������4�������� ���������

������������������� �������.��������4�� �������������� ��������������

��������������� ��� ������� ���)������� ���������������������� .����������� �

�������� ����� ����������������� ������������ �������*��� ���������� �

������ ��� ������9�������� ������ ��� ��������������������������� ����

� ����� .�

����� �� ���� ������� ���4������������ ����'����&����������� �7���������

� ������������� ��������������*������3������5��� .������������� � ��

�������� ���� ������������������ �����*�������:��������8���� ����:��������� 8��

���� ������� ����*���������� ������������ �� ��������8������� ����� �����

���� ������ ������������ � ��������� .�

�������� ����� �������� �������������'-6����������� ��������:������ ��

� ��������� ���.�-)� ������������� ���������� ����������� ��)� ������ �����

�� �������������.����������������������������������*���8�������*�

:���������� ������ 8��� � �*����������������� �������.�

������ ����������� ��� ���������������������������������������������������

����������������������� ����������� �� � ������������������� ��)������

���� *����������������������(�������� ����� �� ���� ������� ��������������

����.�

������� �������� �����������������;'�������*��*����� �����������

� ������� �������������� .�������*���� ������������<4=�����

�� ������ �����##4=�/��������*�"."4=0����'-6�� ��� .����������

�������������� ��� ��� 4=���&�*��8������������������������

��:������ ��� ���������������������.����������� �� �� ���������� �+ ��

Page 4: South West of England Regional Development Agency · 2020. 1. 27. · South West of England Regional Development Agency Wave Hub Development and Design Phase Final design report June

/��+0����� ����*���������� �� ���� � � �������)���������� �������(���

�������.�����7����6 ��� � ��+ ���/76+�0���������� ����������*���*����

��������������� � � ��.�

�������������*����� �������� ����� ���������������� ��������� ���������� �

� ������.������� ������������������ ����������� ������ �����������������

������� ��������������8���������� �� �����(� � ���������� ���������.�

���������� �������� ��)�� ����� ���9��������������<! !�.<4=��� �������

� �����������������:����*��������� �� ������������� ��� ������

�������'-6��� ���������������������������� �������*.�

���������������������;'�������*����������>#?. ������ ��)�������������

������.���������� �������������������� �������������8������������ ���

�������������� ����� �������������������� ������������� ������ ������ .��

@��������������������������*�� �� ���������4��������� .���

��������� ���� ����� � � ���������������������>#""8��������*����

�)����� ���� ����� �� ����������.�

A����4�*�������������� �����������������*����������*������4�����A����� �

� ��;�� � � ��8������ ���5����4��������� �� �������������� � ��7�� �����

�������������� ���������� �� ������ �����.�

���������������������* ������������ �������� ������;�*����".�

����������������� ������� ���������� ��4� �����������

/�0 ����� ��� �������*�����;'�

/�0 7����������� ��� ��� ���$;'�������*������

/�0 �������������� ������� ����������)�� �� ����*�������������*���

�;'�

;��� ���������� �������������������������������������� ����� ���*����

�������.������������ ���������������� ����� �*���������������������

'����&�������� �� ����� .�� *���(����� �����:�������*�����������������

����������4��*������������*�� �����������������.���

Page 5: South West of England Regional Development Agency · 2020. 1. 27. · South West of England Regional Development Agency Wave Hub Development and Design Phase Final design report June

������������������� ��� �������� ��������������� ���)� ������������� ��

������ ��������� ������� ���������������������� �� �������� .�������

����������8������� ����*�������������������������� ���������*�������

������������������� ��������� ��������� .�������������������� ��� ����

�������8������������ ���� ��� ���������������� ����� ����� .������ ������

������ ������� � �� ���������*���������� .����������������� ����������

���� ������ ������������ ������� ��� ������� ����.�

Page 6: South West of England Regional Development Agency · 2020. 1. 27. · South West of England Regional Development Agency Wave Hub Development and Design Phase Final design report June

Contents

1 Introduction 1

2 Basis for Design Development 2��� ���������� ���� �

��� ������������������������������������ �

3 Electrical Design Specification 4��� ��� �����

��� ��������� ���!���"����# �������

��� #�$��� %

�� ��$���&��� %

��% !�����$��$����� '

4 Connection to WPD System 9 �� # ���� ��(�������� )

�� *������ �+

�� ������������� �+

5 Offshore Deployment Area 11%�� ���������� ��������, ���� ��

%�� ���� ����������-� ��

%�� .���� ������ ����������� ���� ��

%� .���� ��# ����������� ���� �%

%�% !"#,�� ����������� �������� �/

%�/ * ����� �0������� ��*������!"#� �/

6 Cable Routing 18/�� 1����� �� �'

/�� #�$��# ���� ���2������� �'

/�� #�$������������� �)

/� #�$��3������ 4.���� ��� .�� ��5 �)

7 Onshore Route and Substation 216�� 3����������7� �������������� ��

6�� ��$8����� 1������ ��

6�� ������� ����# �� �� �

6� 9���� �%

Page 7: South West of England Regional Development Agency · 2020. 1. 27. · South West of England Regional Development Agency Wave Hub Development and Design Phase Final design report June

6�% ,��������"������� �%

6�/ �������� �%

8 Budget Costs 26'�� # ������� # ��"������� �/

'�� .:*# ��� �+

9 Conclusion 34

Appendix A Wave Hub Connection Offer Interpretative Report

Appendix B Decommissioning Study

Appendix C Designer Risk Assessment

Appendix D Electrical Design Philosophy�

Page 8: South West of England Regional Development Agency · 2020. 1. 27. · South West of England Regional Development Agency Wave Hub Development and Design Phase Final design report June

������������

�'����

'&;6��

'7��

����

'-6�

��+�

76+� �

�=6� �

�B6� �

;=� �

�A� �

����'�����- ��� ������ ����������� ���� �*�

'����&����� ����� ����� *�

'���� �7������������ �/����������� �C���4�A�����0�

���� ��������������*����*�

'����� ���*�� ������

����� �� �� ���������� �� ��

7����� ��� �� ��

�����=������� ����

�������������� �

;������������

����������

��������������

'D-&�����#��

'D-&����##��

'D-&����#��

'D-&����# �

'D-&���#��6�

'D-&������6�

'D-&�����#�

'D-&��������

'D-&�����<�

'D-&���<����

'D-&���<�#��

A��������������7������

7������A�����������*�� �������-)������B�*��#�

7������A�����������*�� �������-)������B�*����

7������A�����������*�� �������-)������B�*�� �

7���� �� ��-���� ����������E�A�������

7������A ���������B�*��

�����������D�� ��� ������� �-)�����*�&���B��� �7�� �

�����������D�� ��6 ��� ��D��������B ������ �F�A �����

7���� �� ��-���� ����������E�A �����

7������������A����6��������� ����������

7������6 ���� ��; ��� ���*�������������

Page 9: South West of England Regional Development Agency · 2020. 1. 27. · South West of England Regional Development Agency Wave Hub Development and Design Phase Final design report June

Doc No WGEHDD1885R T6 Date: June 2006 #�Ref: Wave Hub Final Design Report

1 Introduction

����� �� ���� ������� �� ����������'����&�������������*������������� �

������� ��������������*����*�/���0.������� ���������*������1������2�����

������������������������ ��������.�� �����'����&����������� �7����������

����������������� ����� ����� �������������������������� �������.���

����� �����9������ ���4� ������������������������ ������������ ����

� ����� .�&��������������� �� ��������(����� ��� �� ���� ���� �E

�4��������8���:������ ���������'-6������������ ���������������

��:������ ���������� ���*� ���������������8����������(����� �������� �

� �������.�

����������������� ���������������������*����'����&����������� ������

� �������� ������������������ .������������������������������

• ����� ������� ����������������� 8�4�*������� ��� ����� ������ ���

�������

• 6 ����������������������� ��� �

• 7������������ ���� ����������� ��� �������������� ��

• ����� ������������ ���� ����������������:����� .�

• ���������������������������� ��A����� �� ��;�� � � ������.�

Page 10: South West of England Regional Development Agency · 2020. 1. 27. · South West of England Regional Development Agency Wave Hub Development and Design Phase Final design report June

Doc No WGEHDD1885R T6 Date: June 2006 ��Ref: Wave Hub Final Design Report

2 Basis for Design Development

��� ����������������

���������������� ����������� ���������������������

• �� 4=�� ��� �����'7�������� ���&�*���

• C����*� �4���� 4=�������������� ���� ������ ����� �������� �

� ��������� ���*�������������� ��������� ���� ���

• ������ �� �� ���������� �� �� �����������

• ���������� ��� �� ��� ������������������$;=�������� ��

�� ����� ������ ��##4=�

• ������ ���'����- ���*�6 ������/'-60�����*�� �9 ����<�)��4��

• @�*��� ���������*���������������������� � � ���� ��� ����� ��

����������� ����������������)� ������ ��*���������� ��������� ���������� ��

��������������� ������������� �� ������������� 8�����*8����4����(��8���8�

� ��� �� ��������8����)�����*�� ���������*.���������������*������� �

�:����� ������������ ������� ����������������������.�

���� ������������� ������������ ������:����� ������*��������� �

������*�� ��������.���������������� ���������� �����������������������

�����������������*�� ����������� ��� �� ���� ������� ������ ������� ��

�������� ������������������������� ����� ������� �������������.�����������

������� ������*�������������� ������*.�����������������4��� ���

;��������$�������� ������������ �� ��������� ����������������� ����� �

��� ��������������.������������������ ������������������8�����������*�������

���������������*���.�

������������������������� ��� �������*��� �;'����������*�������������

'7��&�*��� 4=������� ����������7�(���=����������*���� ��������;'����

�����)�����������*� ����������������*�*�����������.�������������*�

� ���� ��� �������� ������� �������� ���� �������� ��������������� �

������ ���)�� �� �������*8��������� �����������;'�������*�� ��� .�������

�������� ���������*��� ����������������*��������*����� ��������������*� ��

�� ��������.��

Page 11: South West of England Regional Development Agency · 2020. 1. 27. · South West of England Regional Development Agency Wave Hub Development and Design Phase Final design report June

Doc No WGEHDD1885R T6 Date: June 2006 �Ref: Wave Hub Final Design Report

��� ������������������������������������������

����������������� �������8����4��������� ��������������������������� �����

��4����� �%� �����$.��������������� ������������������������������� �

�������������� ��������� �������4�����4� ��������� �������������$.���

�������4��������� ���������������� ��������� ������������

• D� ����������

• ������ ������

• ������ ���������� �������������

• ���������������� ���:����� �

• A����� 8���� � � ���� �������� �

���� ��)�6������ ���������� �������4��������� ������������ �������

��������.���������� ���*���������4������� ��� ��:�� �������� ������� ����

�����.����������4��������� �������� � ������������������������������ ������

�� ����������������� ��� �������� �������������������� �����.���������4�

�������� ��� �������������� ������� ������������� ���� ���������������4��

� ������� ��������������������� ������������4�.�

� ������ ������������������8������������4��������� ���������� �����������

���� ������� ������ �� ������ ������4��� ����������� � ����� � �.��������

�������� ��������������*�������.��

Page 12: South West of England Regional Development Agency · 2020. 1. 27. · South West of England Regional Development Agency Wave Hub Development and Design Phase Final design report June

Doc No WGEHDD1885R T6 Date: June 2006 <�Ref: Wave Hub Final Design Report

3 Electrical Design Specification

��� ���!"���

������� ��������������*����*���� ��������� ������� ���������� ���� ����

������������������������� ������������������������� ������������ ����'����&���

��(��.����������� ��������� �������� ������� ��������������������

��� � �������� ����� ������������������� ������������� ������������

� ����� �� �� ��������� �.�

��������� ������� ������������������������������� ���� ��

• ���� .'D-&��!#��6��7���� �� ��-���� ����������E�A�������

• ���� .'D-&��!��<���7���� �� ��-���� ����������E�A �����

• ���� .'D-&��!���6��7������A ���������B�*��

• ���� .'D-&��!<����7������������A����6��������� �

���������

• ���� .'D-&��!<�#��7������6 ���� ��; ��� ���*����

���������

��� �����"��������#����$�����%��������

��� �����*������������� ��������� 8������������ ������� ������ :�����������

����������'-6������������� ����*�� �������� ���� �����������*.�� ���������8�

�����������������������������*��'������������������������ �� ����� ��

����������.��&������������������� :����������������������������� �����

��:������ ��� ��� �������.����*�����A��� �7������B��/��������*�A��� �

7�����������*08�A��� �7�������� ������� �������A��� �B�.�

� ����� ����������� ������������������8������������*������������������� ��

�������� ��� ���������������������������������.�'������ ����� �����

��� ���������������8���������� ������������ ������� �������� �����������

����� �� ����� ���4�� ��� �������.��� ��� ����� ��������������������

�� ����������������)������������� ��� ���'����&��.�

Page 13: South West of England Regional Development Agency · 2020. 1. 27. · South West of England Regional Development Agency Wave Hub Development and Design Phase Final design report June

Doc No WGEHDD1885R T6 Date: June 2006 $�Ref: Wave Hub Final Design Report

��� %������

����� & ;��#�$���

�� ������� ��������8�������������� ������������ ���������� ��*��������

� ������� ��� ��������������.����������� �������� ����������� ������������

���������8��������� ��������������������������������� ����������

��� �����������������

• -���� �� �����(� � ���������� �&�*��������.�6 �����5�� �����

���������)���������������������� ��� �������� ������������ �

������ ����.�

• ������������ ����� !�� ������ !� ������ 8�����������

� ��� ��� �����76+��������+��������������� ��

• ��������� ��##4=���������������76+������ ��� �����'-6�

���������������������� �.������ �������������� ������� ��� ��

���'-6�������������������� 4������� ������������ ������� �

����� .��

• ������� ��� ������ ���������������������<4=8��������� �������� ���

4=�� ��������

����� �������$���

6�� ������������� ��� ����������� �������

• ���� �� �*�� ���� ��������������.������������������<������������

� ��� ��� �/����'-6������0�

�������� ��� �������'����&���� �����������������������*��������� 8�

�������������������������� ������ ����� ������� �76+�.���������������

����������������+������.������ �� .�'D-&��!<������������������

���� ���� .�

��& �!�����'����

�� �� �������������

&������������������ ���������� ����� �� �� ����������������������

�����������:����� �� ��������������������������� �*��@@!=����� �

������ �*������*�������������(�����:������ �.�������������8�����������

�������������*�������������������������������������� �*����� ������

�������:����*.�

Page 14: South West of England Regional Development Agency · 2020. 1. 27. · South West of England Regional Development Agency Wave Hub Development and Design Phase Final design report June

Doc No WGEHDD1885R T6 Date: June 2006 "�Ref: Wave Hub Final Design Report

�� �� 3�������� � �����

������������� ������������ ������ ��������� 4=.������ ���������� ��

��������������������� ����� ����������� ������������*������ 8����� ����������

���� ������ ��������������:��������������� ������ ����������� �������*�

���������.����������� ������4� ������������ ������ ����������<4=�� ������

��������:����� �:��������������� ������������� ������� ����*��� �����.�

��������� ������� ������������������������������� ���� ��������� �����

� ��� ����� ���� ��

• ���� .'D-&��!#����7������-���������@��4���������

������������� ��������� ����� ���� ������������+�������������������

� ������*������ �����������*��������76+�.�&������� ��������� �����

�� ��8�� �������� ���� ��������������.�������+�� ������<�76+����������

�� ��� � ����������������.�������������������� �������� ��E� ��� ��

����� ��� ���������� ����.�����76+���������������� �������������8�

�������*��������� �.������ ��� ��������������������������*��.������

�� �������������������� ����� ������ ������ ���.�

�� �� 3������� ��������$��� ���

� �������8�������� ����������������+�����������<����������76+�.�

��������������� �� ���������)���������*�����;=�.�� �������4�������

��(������� ������8��'������������������� ��� ��������������������

�������;=��������*8�������� ��<���������$;=������.������������������

��������+������9��E��� � � ���� ���.�.������������ ���������������������

� ������� � �� ��� �.�=���� �������������� ���������*����������

����������������.�

�� � & ;��� ���� ���

����76+5����� ��� �� ������� �������������� �������������������

��� ������������.�������������������� ����� ��� ����������������� ����

������������� ������.��������������������� ���� �8�� ��� ��������

���������������'-6��� ������������������*������ �� ���� ��� ��� ��

� ����*����.�

6�� ��������� �����������:������ ��� �������

• � ����� �����<4=������������4���� ����76+�����������������������

�� �� ��� ������������������ 4�

Page 15: South West of England Regional Development Agency · 2020. 1. 27. · South West of England Regional Development Agency Wave Hub Development and Design Phase Final design report June

Doc No WGEHDD1885R T6 Date: June 2006 ?�Ref: Wave Hub Final Design Report

• B��� �����76+��������������+�

• 7����� ����)�����*�B=�����������*������76+�

�� �% �������� ;��� ���� �����

��������� ������������������76+������������������������� .��&�����8�

���'-6�����������������������:��������������� �� ��� ����� ���� ��

������ ��������������� ����� ���������������� .�����A7��7����������

����� ����������� ������ ������������������� 4���� ��� ��� ��� ���

"."�4=.�������� ���/<.$;'0������������������� � ��76+��*���� �� ��

����� ��������"."�4=� ����� ��� �������� �������� ����� ��� �

�� ��� ������� ���������)�����.�A��������������������������*��� �

� �����##4=���"."�4=������*�����������������������������*.�7����� ����

��������76+����� ���� ���� ��������������� ��������� ��������*�� ��������

������������)�����*�� ��� ����������.�

�� �/ # ��� ��

����� ����������������� ������ ���� �����������*�������������� ���� �

����)�� ����.����������������������� �������������������*�� ���������

��� �� ������ ������� ��������� .�

� �������8�������� ���������������� ��������������������*�����

� ����*��.������������ ��� �������*�� ������ ��� ��� ������+�

���������*���)������������ ������/��� ����� ��� �0.����������

� ��� �������76+���������������� �������*������ ����.���������

��������������������� ����������������������������� ��������������������*�

��� �����A������������8��������� ��� ���������������.�

������������������������������������������������������ �������������

���'-6��� ��� ������� ��� ������ ������8�� ��������������*�� ���� ��������

����� ��� ����� ���� ��������76+.�

�� �6 &� ������� ���$����(������

�� ���� �������� ����������������'����&����������� ��������������

���������� �������������� ������ ���� ��*�� ��������������������

��� ����� ��������� .������������*������������������*����� �������������

���������������*������� �������:������ �8��������������� �������������� �

��� � ������ ��������������:��� �������� ���������.�A �*�

�@@!=���� ���������������� ���� ������������)� ������ :����������

�� ������������.�

Page 16: South West of England Regional Development Agency · 2020. 1. 27. · South West of England Regional Development Agency Wave Hub Development and Design Phase Final design report June

Doc No WGEHDD1885R T6 Date: June 2006 G�Ref: Wave Hub Final Design Report

��( #�����!���!�������

���� ������� ��������� 8���������� ��:����� ���������*�� ��������� ����

����������� ����� ��� �������������� ���

• �<4=����������������4���

• �<! !�.<4=��� �������

• 4=�� ��������������4���� ���� ����������*�'����&���

• �����=������� ����� ������*���������� 4� ��/���(������

�������������*����*0�

������ ����������������������)�����*��� ������� ���4�� �������� 4��

���������=������� ���.��������:����� ��� ��������������������:����*�

����������� (������ ���� ���4������������*�:����*��������'-6����� �

��� ������������� ����.����������*������������������� ������������� �����

��:������ ���� �����������������'-6�������� �������4 � .�

Page 17: South West of England Regional Development Agency · 2020. 1. 27. · South West of England Regional Development Agency Wave Hub Development and Design Phase Final design report June

Doc No WGEHDD1885R T6 Date: June 2006 H�Ref: Wave Hub Final Design Report

4 Connection to WPD System

&�� %�"�����)!��������

6 ��� ����� ���� ������'���� �7������������ ��������� ����� ����

����������� ������������������������� ����.��'���� �7������������ �

/'7�0�� � �����������*��E�������������������������������� ���������

������ �� ������� ��� .������������ ��)���'7��6 ��� �A��������

���� ��� ������� ��������������.���

����� ����� ��7������������6 ��� �A������������ ����*��'����� ��

���������'7��� �����*�C����������$�� ��� ���������������:�� �*�

���������� ��� ������������*�� ����".��'7�������:�� �*������������8������

�����)���*������'����&��������� ������)��� ��&�*��� 4=����������8�

��������� � ������������������)���� ������ �������������4�������� �������

� ����'�������������� .�&����������������������������� ����4���������

6 ��� ��������� ���������� ��*������������ ������ ���

• ����������� ��������� �� ���*���������*�

• ������������������������� �/ ������������4���� ���������������� �0�

• ������������� ������������

• B�����:����� ����� �� �� ����������������������������������*�

������������������:������ ���������*��������� ����� �� ���� 4=��������

����4��������'����&��������� .�'7���������������������'����&����������

'7�������*��������� �� ��� ����� ���8��� �����:����� �����������

�����*�����'7���� �����.������'����&��� ������:����� ��������� ���

���������� �����'7����:������ �.�

'7������������6 ��� �A����������

• 6 ��� ��� 4=E������� �'����&��������

• 6 ��� ���� �=E���������� ������� �����������

Page 18: South West of England Regional Development Agency · 2020. 1. 27. · South West of England Regional Development Agency Wave Hub Development and Design Phase Final design report June

Doc No WGEHDD1885R T6 Date: June 2006 #��Ref: Wave Hub Final Design Report

����&=������� ��������������*�������#��4=��� ����'-6�.���������*������

����� �������� 8����� �� �� �������� ����� ������������������8������

�����������*����� ������ ��� �������� ������:�����.�

�'������������������������� �����������H����*������.�

&�� *�������

'7����:�������������������� ������������� ��������������*���������

������������ �*��� *����� �� � ��&=��:����� .����������� ��

��������� �� ��

• �����)��!�����������/��*!�� ��*0��

• ������������������ ��������� ��������������������B=�

&�� ���������!�����

�� ������*��8� ������� ����� ����'-6������� ��������� 4 � �������

�����'7������������� ������ ��� ��*������� � ������ ���������������

'����&��������� (��� �� �������:����*��������� ����������������

� ��� ��� .�'�� �������������������*��� ������������� �������*���� �

���*���������� ������������� ��������������� ��������������� ����

� �����.��������������������������� ���� ��������'����&������ � �� �

���� ��� .�;����� ������������:��������)��� ������ ���� ��������'����

&������ � �.�� �������� ���� � �����������������������*�������

�)�������������� �� �������������������� �������*�������� �������������

�*����������*����*��������������������������� �����.�������)������������

'����&����*�������������*��������������� ������ ���� � ������

��������� ����8�:����������*�� ����� ����������*.���������� ��4��*�����������

����� ���� ����8��� ��������� ��������8����������������������:������ ��

�������=6.���������� ������� ��������=6�� ����������� 4������)����������

��������������� ���.�

Page 19: South West of England Regional Development Agency · 2020. 1. 27. · South West of England Regional Development Agency Wave Hub Development and Design Phase Final design report June

Doc No WGEHDD1885R T6 Date: June 2006 ##�Ref: Wave Hub Final Design Report

5 Offshore Deployment Area

(�� �������������������� "����

����� ����� ��������������� � �����*������������������������ �����

� ���� ��� �������������������������������� �����������������������

���'����&���� ��������&�*��8�� �� ��������C��:��*.��

'��������������*������ ������� �� ��� ������������� ��� ��� 8�&�*���

� ���������������� ������ ������������)���*������������*�� � ���� ���

������������� �� ����������������������.������������������� ����������

&�*������������� �����)�����*�$�E"����������� �����������������8�� �����

�����#�� ����������������8����������������*��)�����������8����� �����@� �

����8������ ��4 � �����4�8�� ���������4 � ����������������������� ��

��� ���.��

6 ������*8�C��:��*8���������������������������� �� ��� ��������������� ����

��� ���������������� ��� ��� 8���������������������� ���� ��� ��

������*�� ���� ������ ���������� ���������������������������������.�

����� ���*8����������� �������������������������8������ ��� ��������� ���

�����*��������������������� .�������)���*�������������������

�� ����*�������� �������������� �������������������� ��� ��������������

�������C��:��*.�������������� ���� �������C��:��*����8������ ���������

���������������+,���������������������������������������� �����

������������ ������� �� � ��������.��

����&�*���������������������������� ������ ����������������������������

����������������� �������'����&������������������� ������ �����

������ ��� ������ �������������� � ������ �������.�

(�� ����������������+��

�������������*��������� ����������'-6�����*�� ����� ����)<�4��

����*�� ����������� ���������������� ����� �!����E�4����������.��� ���

������8������ ����� ��������������������� ���������)� ��������������

���8�'-6�����*����������8�� ������������� ������4��*�'-6����������8�������

����� ���������������������������� �*�(����������� 8��������*�� ������

Page 20: South West of England Regional Development Agency · 2020. 1. 27. · South West of England Regional Development Agency Wave Hub Development and Design Phase Final design report June

Doc No WGEHDD1885R T6 Date: June 2006 #��Ref: Wave Hub Final Design Report

����������� ���������9�.������������:������������������'-6�����*��� �������

��� ������*�.�

�� ���������������� ����������*�� ��������9��� ������)��������� �

������������������ �� ��� ����� 8��������������������*�����8�

����� ������ ��� ��� �� ��������*���������� ����������������������

������������������ �������������*�� �����.��������������������� �������

����������*�� ��������� ���*��������� ������������*������������������� �

������� ������������������*�� � ���� ���� ���� ���� �����������

���� .�

(�� ,������������������������"����

�����:�� �*8������������������C������ ������4��������� �� ����� �8�

� ��� ���������� ����������������� ���������� ��� ���� ����������

���������'����&���������� ����� ����*������������� ���� ���� �������

�� ���.�-���*�� ����� ������������������������������������������

������ ����������.��

�������4������� ��:�� ������������������C������ ������4��������� �������

����������� ���������� �� ������� �����*������� ������������ ����������

� ��� 8��������������� ������<4��-C-��������*��������������� ���

�����*�����8��������������� ��������$.#.����������������������������������*��*�

���;6��� ������� �������� �%� ���*����".���7������ ��*�� ����� ������

� ��� �� ���� ���������������������������*���4������ ������:��������

��������I�������������E���� ��4��������������������������������

� ��������������������������� ��������������������������� ���������������

�� ��������� ������� ������������*���4.���

�������������������������������� ���*����� ����;A����� � �������/���#0.�

� ������ ����� ���������� ���-�������������������� ��4��*����������������

�������������*������������#8������������������������ ��������*��*�������

������ ���*���C��*.�

Page 21: South West of England Regional Development Agency · 2020. 1. 27. · South West of England Regional Development Agency Wave Hub Development and Design Phase Final design report June

Doc No WGEHDD1885R T6 Date: June 2006 # �Ref: Wave Hub Final Design Report

-��!���(��.�%�����,����������������������#�����!�� "����

��������8��������� ��������� �*���������������������'����&�������F�

� ���� ����

• ����'����*��� �������� ������������4��/������������#.��� ��#. �

����08��

• ����-����*����;A�������� ��4 � �����4�8��

• ���������*����������������� ����������� ���� ������/�J ?��0�� ��

����4�8��

• ����C����*����#�� ������������������ ����������4�.��

-)���� �����;A������8����������������������������������������������� *�

��� ����� �� ���� �� ������� ��������������������������������������� �� �

�������� .������ ���'D-&��K��#�� ��������������� ��������������� ��

���� �� ������.�

��������������� �����������������4�������������� �������� �� ���� ��

����� ����������������*��� ������ ���������.�

Page 22: South West of England Regional Development Agency · 2020. 1. 27. · South West of England Regional Development Agency Wave Hub Development and Design Phase Final design report June

Doc No WGEHDD1885R T6 Date: June 2006 #<�Ref: Wave Hub Final Design Report

-��!���(��.�*����!���� ��������������!�������������������������#����

�!���"����

������������������ �������*�����������*��������������������� ���

����*�� ������)��������������� �����C-�� ���'����������8���������

���������4*������������������ ��.������������ 8����'��&����:����� ����

����� �� �����'��� ������������*�� ����8�4���� ���� ����������4��*�

������ 8��� ����� ��������������� ����������������� 8�� ����������������*���

'-6�� ���� ���)� �.��������������*�������'����&�������� �����'����

&������������:����� ������� �� �������� ������ ��'D-&������.�

Page 23: South West of England Regional Development Agency · 2020. 1. 27. · South West of England Regional Development Agency Wave Hub Development and Design Phase Final design report June

Doc No WGEHDD1885R T6 Date: June 2006 #$�Ref: Wave Hub Final Design Report

-��!���(��.�,��������%�������/��"�����"������0��!�!����11(�2�3!������

����4�����������"����������������#�����!�� "����

(�& ,�������%������������������

7�������� ������ �������*�������������� ����� ������.����������������������

��� ����� � "�� �� ��������� �� �������- ���*���8�������������)� ������

������ �������� ��������*�� ��������� ��� *�'����- ���*�6 ������

/'-60������ �� �����������3����*�L ��5��)� �� ������$�����������������

����� ��������� �������*����'-6�.�������� ������������������������

�)<4������*�� ���������� ��������@���������/��@�08�/������� ����0�

������ �� ���� ��� �� �� ��� ������ �����������.������������*���������

��:������������� *�����*�� ���� � �������� �.�

��������*�� ��������� ����� �� ���������� ��������<4���*��4������ ����� �

����������'����&���� ��'-6���� �/� ����� ����� ��0�������������*���� ��

� �����������������������5�9 ���������� ������ �������������� �� ��.�

���������������)�����*�#4������������� � �'�'�������� �����

��������.�������������������'-6�����*���������������*��������#����� ��

���� ����������*�������� ����������������������(������� ��� ��� ��� ��

����E��� �.���� �������*8��������*����'-6������� ������ ��� ������8�� �

��������������*�L ��������������������.��

Page 24: South West of England Regional Development Agency · 2020. 1. 27. · South West of England Regional Development Agency Wave Hub Development and Design Phase Final design report June

Doc No WGEHDD1885R T6 Date: June 2006 #"�Ref: Wave Hub Final Design Report

���� ������ �������*����4� ����:������ ������� �� ��� ������ ����������

� ������������B�������� ��� ��E# #� �����;��4� ����A�������'����

� ��������- ���*��������.������������������������������� ������������� ������

�������� ����:������ ��� �� ����� �������� �*�&����������������

�� ��C������ ������4��������� .������������ ��*����4� ��������������� �

� ������ ��'&-&��K����� ��������������� ���� �������������4������ �

�������� �����������������*�� �����.��

(�( #$%� ��!�����������������������

����'-6����*�������� ��������E�����������8���������� ���������'����

&����*������)����������8�� �������������������*��� ������������������ �����

��)� ��.�������� ��������*������������������� ����������� ��/�������*�

���������08���*� ��������������/���� �� ���(������������������������

���08����� ����� �����������/���� �� ��������������������0.�'-6�� �����*�

�4���� ������������8��������*� ������8������ ���� ���8� �������� �� �

����*8�� ������*�� ������ ������*�.��������������������������� ���������

������������������������ �����*����������������������76+.�� �����*��� ���������

���� ��������)�����76+�������*���$;'�� ��������������.������ ���

'D-&����##8��#��� ���# �����������������������*������������*������

�������������'����&������.�

������ �����'����&��������������� ���� �����*�����������G�������)������

������������ ��� ����������'-6��������������� �����������G.�

C����� �������������������������������������'����&��������������

����*�� ���������������� ���.���������������� �*����A��� �7������B��

����A��� �7�����������*5��7��������������8������A��� �����������A �@������

7������������8�� ��A��� �7�������� ��*����������7���@�*�������.�����

�����������������������������*�����)���������������� ��������� ����".�������

���������������� ��� ���������������� ����������8���� ���� ���� ��������8�

������������������ �� ������:�� �*����.��

��������� ���������������;�������6����������� �*�� ���������� ��

��4�����������'-6���������:��������������������*���������� ������ ������4�

�������� ���������� � �����������������*�� ������'����&������.�����

������*������������� ������������������ ��������������������������� ��

��������� ����'����&���C������ ������4��������� .�

(�5 *��������6����������*��������#$%��

������(��*���'-6������������������������*������� ����� � �����������

��� ������� .��������������)� ������������������������������

Page 25: South West of England Regional Development Agency · 2020. 1. 27. · South West of England Regional Development Agency Wave Hub Development and Design Phase Final design report June

Doc No WGEHDD1885R T6 Date: June 2006 #?�Ref: Wave Hub Final Design Report

�������'����&������� �� ������� ����������� ���������������������

����*������� ������� ������ ������� ��� �����������������������*8���

��� �����*������������ ����� �����������'����&�������������������

������ ������������'-6���������� ������ ��*���4��*���� ������ �.�

�������*���������������������� ������ ������� ������ ������4���

��*�.��

������� �����*�������������������������)����������� ����������

� ��� ���)�����������'����&������.�B���� ������� ������� �� �������

� ������������ ������������ �#�� �#���*����������� �.�������������� �������

���'������������*������ ������ ��#"�*������������������;����������

A�����.��

������'-6��������������������� �����*�� ������������'����&����������� �

� �������� �������������������'-6�������������� 4 � 8������������� ������

�� ����������������������������� ������������� ��������� ���� ��

���� �.��

����� �������*���������������� �� ��������������������� ��*�'-6���� ��

�*��������� .������������

• ���:������)���������������� �� ����$��)�$��8��������#���� ��

�����������$�.�

• ���*�� ������������������#��8������������� �����������/���������

�������������0���$�.��

������ �����B�������� ��� ��������� ��*�� ����� ������������6�������

&�77A��+7-�EB��-! .��.�� ������ �����*����������������*�������4� �����

'����&�������������8�� ������������������������ ������� .�

���������� �������/'����- ���*�6 �������;�� ���*�������*�F�

'D-&��#?HG�����������������'-6�� �� ������ ������ ������

��������*������������ ��*����������� ��� ���� ������� ���� ��

� ������� �.��������������������������������� ��������������� ����

� ����� ����������� ������������ ��� �.���������� ����������*���� �

������������������������� ��������������'-6�������������*� ��������

� ����������������������������4�� ����.��������� ���� ���� ��� ����

�*������ ������ �� ���������������������� ��������.�

Page 26: South West of England Regional Development Agency · 2020. 1. 27. · South West of England Regional Development Agency Wave Hub Development and Design Phase Final design report June

Doc No WGEHDD1885R T6 Date: June 2006 #G�Ref: Wave Hub Final Design Report

6 Cable Routing

5�� 3�"���!��

������ ����������������������������� ���������������� ����� �����

&�*��������� ���������� ������������� ���� ����� ������� �����������

����� � �����*�� ���������������4������������� ���)�������.������������

$������������������������������*��������4 � �����4��� ������� ��������

��� ����� �������*��������������������� ��.�� ������������*�����������*�

���������������������*���*8��������8�����E��� 8�� ����� ��������������

��������� ������������������ ����������������.������������8���������� ��*�

�������������� ������������������ �������������8�� ���������*����������

������������������������� �������������������������� �����/=�������� ��

767�����0�� ��� ��� �� ���� ������� �.������������������������������*��

��������������������������������*��� �� �������������������������������

��E��9������������ ����� ������������������������������������ ����

������������� �� ��� ��� *�����������*������������E����� ��� ��� ��

���������� ��� *�����������*� �������������� ��� �� ���������.�

5�� %�����%��������7!�������

������������������������*�� ������<4��-C-� ����������� ���(���� �

��������$4������ ���������������.������������������������� �� �

����� ��'D-&����#������������������ ������������������������������ �

� ��� �� ��������� .���������������������� ��������*����������������

����������� 8�� �������������#.$4����� E�����*�������� .��������E����� �

��������������4��*�������4����������������������������������� ����� ����������

�������*�����������*����.����������������� ���������� ������� �������

���� �������*�����������*��� ���� �����'��� ������������*�� ����������

������������������������������������������ ������������� ������������.�����

����������������������������)�����*������4����������������� ��������

�� ����������������� ���������������� ���� ����������� �� �����

�������'����&�����������)����������� �������� ����$4�.�

���������*��������������������������������������������*� ��� ������ ��� ����

���� ���������������������������������������� ���� �������������� *�����

������� ������������������������������� ��8������ ������ �������� ������

����������������������� ����$����������.��

Page 27: South West of England Regional Development Agency · 2020. 1. 27. · South West of England Regional Development Agency Wave Hub Development and Design Phase Final design report June

Doc No WGEHDD1885R T6 Date: June 2006 #H�Ref: Wave Hub Final Design Report

5�� %��������"���"����

,�*������������ �����������������*������� ������� ��������������� �

� ���4�������48���������� �����������*�� ��������@�*8�� ���)� �������4*�

����� ������������������.�&� ��8���������������������������������������/����

#���������������������0�� ������������*�� ��������@�*��������������������

�������������� � �*�����������������������4*����E��������� ���������������8�

�������8��������� ������������*�� ��� ���4.������ ������ �������������"��

�����.��

������������������� �����)�����*�#������������������ ��� ������������

������ �����.������������������������������������� ����� ������������� �

������������.�D��� ���� �������������E���8����������������������� ���������

���������.������������ �������� ����������� ��������������������� �.�

5�& %�����/�������8,���������,����9�

A�� ������ ����� ���������������� ����;�� �B��'����/;B'0����4�� ��

������������ ��������*��� �������� ����� ��� ��������� ���������� ���

��� ����� ������� ���������(��.�����������������������������������������

�� ��&�*���@���������*������� ������������������������ ����������������

������������������*.�������������������*������������� ������������ ��

����������������������� ��������������������.�

������*�����������*�� ���)�����*��������� �������� ������������

���� �� ����������������� ��������������� ����������� �������)�����*�

$��������������������� ���� ������ ������ �����������;B'����4.�C�

��������������4������������������� �������� �� ����.�

A�� ������ ����� ������������� ��&�*���@������ ��������� ������

�������� ���������� ����.�'�������������������� �������������������

����������������������*������������������� ���������������������������

��� ������������� �������.�� � �������������������������������

� ����������������������������������������� ����� �������������� �����4�.�

'�������������������������8�� �����)�����*���� �������������������

���������)��������������������� �������� ������ ������������������ ����

����� ��.�'������ ��������������������������������������� ����

���� ���� ��������/�����������:���������� �� �����������������������0�

� ��������������������������.������������������ ����������������������

������������� ��������������� �� ���� ����������������� ������4*�������.�

����������������������� ��������������������������.�

Page 28: South West of England Regional Development Agency · 2020. 1. 27. · South West of England Regional Development Agency Wave Hub Development and Design Phase Final design report June

Doc No WGEHDD1885R T6 Date: June 2006 ���Ref: Wave Hub Final Design Report

���� ��������� ������������������������8������������������������

��������������������������������������*��������.����� �������������������)��

�������������� ���������������� ����������������������� � ������ �������

��.���������� �������� ����������������������� � ��� ���������������� ��

����� ��������� ������� ������4�� �!�����*�����*���������������.��

��������������������������/������� ���0�����������8��� �������������������������

��������������� ���������� ���� �E��������������.���������� ��������������

���������������4� ����������;&'����4.�

Page 29: South West of England Regional Development Agency · 2020. 1. 27. · South West of England Regional Development Agency Wave Hub Development and Design Phase Final design report June

Doc No WGEHDD1885R T6 Date: June 2006 �#�Ref: Wave Hub Final Design Report

7 Onshore Route and Substation

0�� /�����������:���"��"��� ��!���

6���� 7� ������������ �

� �������� ������������ ������ �������4�8�������� ���������

� ����� ���������E��� ����� ��� ���������������������48����

�� �������� ������ �/������ ��������0������������������ ��������� ���� �����

��*� ��������������� ��&�*���@���������;B'����48��� ��������

� ������� �������������� ��.�������� �������������������������*������

� ������������8�� ���������� ��� ������� ����4������ ��������������E

��� ������ ���� �������������������� ���������/������� ���� ��������

�������������� �������������� �E�)������������������������������ ������ ��

������*���� ��� ��� ��� �0�� ��������*�����������*��� ��&�*���@������

���;B'����4.�

6���� 7� ������ ��;����� ���� �

� ���������� ��� ������� ���4������ ��������������E��� ����� ��

� ������������4����������������������� ����������/������ �$�0���������������

��� ����������8�������� ����� ������*����������*��� ����������������� �����

� �������� E������������� ����� ��������8���������������8�������� ������.�

����������� ������ ��*��� ���� ���� �������!��������������������4���

����)�����*�#����������� �������.�

��4��������������� ��������� ���� ���������� ���������������������:������

������ ������������ �����������:�������� �����������������.������ �����*�

��������� ���� �������� ������ ��*��� �*���������������8����������������������

��������������������������������������� �� .�

D�� ���������������������������������/#����������� �������0�� ����

����������E��� ������ ����������� ��������� ���� ���/�.�.���������

������������� ������������ ��������0.�

6���� # �������

�� �������������������������� ���4� ������������������E��� ����8�

� ����� �����������������������8������������������ �����������������������

����� ����� ��� � ��� ��������������� ������������ ��� ��� ���

Page 30: South West of England Regional Development Agency · 2020. 1. 27. · South West of England Regional Development Agency Wave Hub Development and Design Phase Final design report June

Doc No WGEHDD1885R T6 Date: June 2006 ���Ref: Wave Hub Final Design Report

� ��������4.�������*���������������������� ���� �������������� �� ������ �

�� �������������������� ��*���.������������������������������������������

��������������������������� ���� ��������������������*����� ��������������

E��������� ����:��������������������� ���������������*.�

6��� 9 ����� �����

�����������������������������8������� ��*�� ����������������*�����������

��� ���������������� 8������ �������� ��� �����������E��� ����������

� �������� �������� ������� ����������� ����������������� ��������� ����

������ �.������� ��� ������������:������������������ ���� ������������

��� ���������� ����������� ��������������� ������ ���!�����������

�����4�����������:�������������������������8�������������� ������.�

6���% 3����������������� ���$������

������������������ ��������� �����E� �������������������� ����� �������

�� �������$���� ������������������������������������������������������

������������������� �&�*���@��������������������������������� �������E

��� ����� �.������)���������������� ��� ��������������� ���� �:���

������/�.�.�������������� �!������ �0��������������� ����*���������� ��� ����8�

����������� ����������4��*��� ��������������������*���������*����������

���� ���������������:�� �*����������� �������������.���������� ��

��� �:������*��������������� �� ������� �������������� ������ �����

������������������� ��� ��������� ����������� ���������E�������� ����������

����� �� ������������ ���������� ����������������������:������������ ��

����.�6����� ������������ ������������� ����������4��������������4���

������.�;������������������������ �����������������:���������� �������

��4��� ���������������������������������������������������� � ���

� ����� �*.�

��������������9 ������� �� ������������ ��������������� � ������ ��

'D-&�����#�� ��� ������������������������ �� ����� ������� ������ ��

'D-&������.�

0�� �!�4������3!������

������*�������������� �������4������������� ������ ��'D-&���

���6.�

��������� �����������������������������)� ������������� �����������/����

���� �?.#.�0.����������� �8�����������������������*�����������8���������������

Page 31: South West of England Regional Development Agency · 2020. 1. 27. · South West of England Regional Development Agency Wave Hub Development and Design Phase Final design report June

Doc No WGEHDD1885R T6 Date: June 2006 � �Ref: Wave Hub Final Design Report

���� ���������8����� ��������� ���������������������������'����&���

����� �.�

����������� ��������� ���9�������������������������������������������������

���'����&��.��������������� � ��� ������������ �� ���������� �����������

����'7��� �������� ���*�� �������� ���������.��������� �������������

����������'����&������ � ������� �*��������� ������� ��8������ �����9��

������������������������� � ������������ 4 � 8�� ��������������

���� �� �������������� ������ �� ����*��� �����.������� ��������������

����������� �� ������� ���� ������ ����� �*.�

-���������� ������ ����������������� ��/���� �������0�� �������

• 6�������������������8������������������������'����&����������������

� ����� ������

• 6���������� ��� ��8����������������������������������� ����

• A���������������4���

• ��� �������/�����).�"��)�$�0������������� ��� ���� ���������

���������������"$� ���� ������� ��������� ������������ �

�� ���������

• ������������ ��� ��� ������ ����������������������� ��������������

��� � ��� ����������� ��

• ���������� ����������*�� �� ���������� ��������� ��/���� ���

����0��

� 7����:����*����

� 6����������4������

� ;���� �����

� 6 ������

� ;������.������������� �� ���������������������������������

����������������������������� ��� ���:����� ���

������ ����� � � ���

� '�4���!������������������*����������������

������������������*���������������������'���'������� �� ��������

����� ������� ��� ���������������4.������������*����������������������

�����������������������.�

Page 32: South West of England Regional Development Agency · 2020. 1. 27. · South West of England Regional Development Agency Wave Hub Development and Design Phase Final design report June

Doc No WGEHDD1885R T6 Date: June 2006 �<�Ref: Wave Hub Final Design Report

������� ������������������������������4����*�� ������������ ��������

��������������*�������������� ����������.��'�����������4������*��������

������ ��� ������������������������8��������������������*��� ������

������ ������� ����*� ���������� ����������.��

���������� ����������������� �� �������������� �� � �������4��������� �*�

������ �������������*�� �������������� �.�&������������������������

�������8�����������E� ��*��������� ����������� ��� ����� ��������

���������.�

������ ���������*������������*�����*�� �������� ����� ������E��� �

������ ��� ���� ��������� ������������� �������� ��)�������������� ��

�������� �� �������.�

0�� �""�����������%��!��

����������������������)�����*��$���� ��� ���� ������������������� ��

��������8��������������� �����4�� ���� � ������.������������ ����������

��������� ��������� ���������������� ��*��������� ��� �� ���� �����

����� �������� ���������� ���������������������������������*���������� �� ��

���������� .�������������������E������������4�� ������ �������� ��

��������������������� ����������������4����������������.������������������

������������� ���������� ��������������������� �8�����������:�������

��� � � ���������������������������������������� ��������������������

������������ ����������������������� ���� �� ��.������������������

� ���������������������4�������������������*� ������������������������������

���������� .�

7����� ��� �������������������� ����� ������� ������������������������

��� � � �����:������ ������������������������ ��������*������������������.�

���������4� �������������� ����� ���� ������� � ���������������������

������������������9��������������48������������� ������������� ������ ������

��4��������.�

�������� ��������������� �� �����������������������*����8�������������

���������)��� ������������.�������(������������� �� � �����4������8���

�*������ ���*�����8��)��� ����� ��������8�������������� �������������

��� ����������.�

Page 33: South West of England Regional Development Agency · 2020. 1. 27. · South West of England Regional Development Agency Wave Hub Development and Design Phase Final design report June

Doc No WGEHDD1885R T6 Date: June 2006 �$�Ref: Wave Hub Final Design Report

0�& -�"���

������*��� �� ������������)��� ��'7�����E��� ����������.�����

���� �� ��������� �� ���������������)����������� � ��������� �8�������

���� �� ��� �8� ����������������������������� ����������������������

��������:�����.�������� ������� �� ������������������ ������ �� ����� �.�

0�( ����������$��������

����� ��'D-&�������������� ������������������ ���� ���������������������

��������*���� ��������� �� ������ ����4��� �����'����&�������������

���������������� .���������������������� ����� �� ������� ��������#��.�

0�5 �����"���

���������� ��������������������������� �8����� �8�����8������ ��8������� ��

� ����������� �� ������ � ������� .�

Page 34: South West of England Regional Development Agency · 2020. 1. 27. · South West of England Regional Development Agency Wave Hub Development and Design Phase Final design report June

Doc No WGEHDD1885R T6 Date: June 2006 �"�Ref: Wave Hub Final Design Report

8 Budget Costs

;�� %���!"���%���$��������

����� ����� ����������� �����(��� ���� ��� �����*��������� 8�����������*�

� ������ ������������������������ ��� ���� � �.��-���������

�:����� ���� �����*������*����������� �������� � � �����������������������*�

����� �� ���������������� �������������������������� ���������������

� ������������ ����������*�����.�����������)�*���� ������ �� �������������

��������� ���������8��������������������������������� �����(��� ������� .��

6 ��:�� �*8������������������ ��������� �����*���� ����� .��

���������������������������:����� ��� � �*���������������*����������*�

�)����� ������ ���������I�������������� ����*� �������������������� �����

����� ����������� ������� �������� ����� .�

���������������� ��������� ������� �������� ����� ����4� �������� ��

����)�� �� ���������*8�������)�����*�� ������ �� ����������������:���������

���'-6����������.��+������*8�������� ������ ���������������������� ����

���� ��������.�

������� ��� �������������� �������� ��������������� ������������;'�

������*��*�������� ��)�� �� ����������������������������������

• 7����������)E��*���+������ ��� ����� ������ ��� ��� �� ��������

��������� � �������76+�������� ��� ��������� ��������*����� ��

���)�����*����������������������������������� ����� ��� �

�� ������������� ��)���$���#�;'���������*.����������� �����+�

� ��� �������������������������������������*����� ��� ���

� ����76+.�

• ��9�������� ��������������� �;'�� ���������;'��������)�� �� �

������*�

• � �������������� ��� � ���*����� ���������� �� ���������������

�������������:����*��������'-6��� ���� ���4.���������*����

Page 35: South West of England Regional Development Agency · 2020. 1. 27. · South West of England Regional Development Agency Wave Hub Development and Design Phase Final design report June

Doc No WGEHDD1885R T6 Date: June 2006 �?�Ref: Wave Hub Final Design Report

��:������������ ��������� �8����� �� �� ���������������'-6�8�

� ������ �������� ��������� ����(���������� ������ ������ ���.�

����'-6����������������������������� �� ��� ����� ���� �.��'��������

'����&���������������������������� �5�� ������*������� ��������� �

76+����������������������������)�����*�� ��� ������������ ������� ������

�� �������� �� ����� ����*.������������������������:����������� �������.��

������������ ��������� ������������ ����'����&���� �����'-6�������

���������������� ������������������ �����.����������� ��������

� ��������

• 7�������<4=���������������������+8������ ����������������������

���76+�� �!�������������� ������ 8������ �� ��

���� ���� �� ���������'-6�

• 7����������� �������������������������:�������������

���������.������������� ����� �������������� ������������������ �

�)�� ��������� ��������.������������������������������������

������������������������ �� �*�� �����*���.�

• 7������ ������76+������������������ ���������������� �����

����� ����������.�������������������)�� ������� ����������

����� .�

• 7������������������ ����������������

C� ���� �������� 4����*������������ ���� �������G.#.��A�� � �������� �

�������������4� �������.�

�������� ��������������*����*�� �������������3������5��� �����������*����

��������� ������� �����������������)���� ������3���� �����58�� ��� �

��������������������������*� ���� ������ ������*���� ��.������� ����� �

����)����� ����(����������� 8��� ����� �� ��� �� ���� ����������

����� �������

B��������� ���*� ��>H8H�"8����

@������������� >#�8�H?8����

+���������� ���*�� >#$8�H�8����

������� ����� �� �������� ������ ������������������ �������*��������������.�

Page 36: South West of England Regional Development Agency · 2020. 1. 27. · South West of England Regional Development Agency Wave Hub Development and Design Phase Final design report June

Doc No WGEHDD1885R T6 Date: June 2006 �G�Ref: Wave Hub Final Design Report

• � E������������� ���������� ���������8���������*��������� �

������ �8��������������)������������������ �� ��� ������*�

������������� ����������� ���������������� �.�

• ����� ����� ������� �������� ���������� �� ����������� ����

������ ��� � ���:����� ������

• ��� �����������������������)�� ������ ����� �� ��������� ���

����������� ��� ��� ���� ��� ����� ������� ��

• ����� �������������������������������.��6��������������������� ��

���� �����������4����������� ��������������������� �������� �

���� �������������������/� ��������-����� �����������������4��

���0�� �������������� �� �������4����������.��6���� �*������

����������������������:��� ����������.����������������������

���������������*������� ��������<8������ ���� �� ���������>�.��

����� .�

������������� ��������������������*�� ������ ��� ����*�� ��������� ������

� ����*��������������*������������4��������������������������������*�

��������������������4� ������ �������.��6����������������)�����*��������

� �������:���4�*�� �������������� ���.�������� ������������� �� ���������*�>#.��

����� .�

'���������*�������� �������)������������ � ��� ������*����?���� ����

�����������4��*������������������������������������������������������ �����

�����8�������������������������������������������*�� ����� .����������������

�� ������ ��������������� ���������� �������� ������ ����� *�� ����

������������.��A������8��������� �������G.#�����������*� ����������������

�� ���*�������� ����������������������� ���� �������.�

Page 37: South West of England Regional Development Agency · 2020. 1. 27. · South West of England Regional Development Agency Wave Hub Development and Design Phase Final design report June

� Doc

No

WG

EH

DD

1885

RT

6D

ate:

June

2006

�H�

Ref

:Wav

eH

ubF

inal

Des

ign

Rep

ort

/�����;����

����

�����

�"���!��

�������"���

,����

���

"������

���"

���"���

%���$

����

����

%�

�����

��

������!

"�!��

�"���"

�����

/�<�

'%<�8(*

=��

��"�9�

-��

������"�"��

������

'%<>����

�����

�?111�

���

#�@������ ��

��8�

�*��<�4=

�������

�����������+�������������5�

� ��� ��

���;

=��

<E��*�

C ��

<�#�8#���

C������� ����

���4�����

�������������� �

� ������<4

=�

��@������

���*���

����;'�

���;

=��

<E��*�

�C�M

�##�

4=�N

�#�C

�<4=

�������

����

<�#"8����

C������� ����

C��)�

� �� �������*�

&���������� ������ ���<

��

76+�

�@������

����;'�N

�������76+�

���;

=��

<E��*�

<�C�M

�##�

4=�

<�#?8 ���

���

��������<

������������

� ��������*�

<������ � ������

��������

���� ���� ��������*�

���;

=��

<E��*�

<�C�M

�##�

4=�

G�#?8$���

���

��������<

������������

� ��������*.�;

�����

��������

��:�

��������)����

���.�

������*�N������

�� �*�

$�@������

���)�� ������� ��;'�

��;

=��

"E��*�

<�C�M

�##�

4=�N

����C�

�<4=

�������

�����

<�#H8����

-:������ �������� �������� .�

&���������� ������ ���$

��N

�"

��76+�����)�� �� .�

"����$������

��������

���� ���� ��������*�

��;

=��

"E��*�

<�C�M

�##�

4=�N

���C

�����������

G�#H8#���

;���������������:��������

�)����

��� ���� ��������*�

N������ �� �*��

?�@������

���)�� ������� ��;'�

���������� ����:���������

"."�4=

�� ��� �

��;

=��

"E��*�

�C�M

�##�

4=8�#

�C�M

�"."�4=

�N���

C������������

<�#H8<���

-:������ �������� �������� �

����� E�� �����76+���� ��

���������

G�6������ ��;'��*�����

��;

=��

"E��*�

"�C�M

�##�

4=�

G��#8?���

�����

������

� ������������� �

� �����(����*�� ����� �

�.�

H�6������ ��;'��*��������

������ �� ����:�

������"."�

4=�� ��� �

��;

=��

"E��*�

$�C�M

�##�

4=�N

�#�C

���

"."4

=�

G���8#���

Page 38: South West of England Regional Development Agency · 2020. 1. 27. · South West of England Regional Development Agency Wave Hub Development and Design Phase Final design report June

Doc No WGEHDD1885R T6 Date: June 2006 t �Ref: Wave Hub Final Design Report

������4�� ������� ����� ��������������������� ������� �� ������

G.�.������������� ����������������� ������������� �� ��������

� � �� �*����.�

���� ���"������ ?111��

#� A ����������� ��� ����������4�� �$��

�� 6���������� ������ ��� �G��

� A ������� �������� ��������������� $���

<� 7����� ��� � ���:����� �/������ ��0� �$��

$� ;�� ������������������������ <8$���

"� ����� �� �� ���������� �+ ��� #8?���

?� <�C.�7����6 ��� �+ ������������������� <H���

G� A�������� ������ � <����

H� D����6 ��� ���������� ����4� #���

#�� � ������*��:����� �/��*�8��A=8��������8����

�:����� 0�� ���*����� ����� �

"���

� �A��B� #?8 ���

/�����;����!��������%���!"���%����

;�� ,@*�%����

�����*����������������AN;����������������������������.�������������

����� ������������*�������������*8����������*�� ��;�� �� �����*����������'����

&������ � �� ������������������� � � ������������� �I���

��� � � ��������*������� ����������������� ��������������������I��*����

����� �I�� �������8�����*8�� ��� �� �� ��:����*��� ����� .��������*�

������������������� �����������������'����&�������� ������ *.�

� ������� � � ���� ������� ������������������������ �� �������G. .��

����� ��������������� �����*������������������ ������ ��������/��������

��)������� ������G. 0�������� ������ ����*�"��O��������.��&�����������

������� ��������� �������� 4� �� ��������� �� ������� ���������4��*�

������� ���������� ������� ���� ��������������.��������������4��*��

���������*���������������������������������������� ��������������������

�� ������.��������������������� ��:�� �������� ��� �� ����������������*�

Page 39: South West of England Regional Development Agency · 2020. 1. 27. · South West of England Regional Development Agency Wave Hub Development and Design Phase Final design report June

Doc No WGEHDD1885R T6 Date: June 2006 t #Ref: Wave Hub Final Design Report

��� ��� E�������������*.��- ��� �� ���� ��� ������������������ ��������

��������� ��������������������������)�� ����������������������

����������������4������������)����� ��.�

���� �����*��������������������� �������� ������������� �� ��������������

����� �� ���������������;����*��������������8����� � ������������������

��������� �������*.�������������� � �������*� � ������ ����������� ��

������������������ �� ����� � � ����������������.�

������(���������������� �� ���������������������������������������� ����*�

���������*��������������� ��������������*������� ��� ���������������������

�� ������������������������� ���� ����*����.�&� ��8�����<��� �������8���

����������� ����������� �������������� ���������� ������� �.���������������

��*�������������������������8�������� 8� �� ������������������������������E

������ ��������� ������������:����� �.��

��������� �������� �� ������� *������ ���� ������ �������*�� ��

������ �� ������* �������������4� ��/��*���0������ �*�� �����������

��:�����.�6 ��������������������� ��������� ��������������� ����

��:������ ���������!���������� ������ ��*����/���0�� ��� �������

���8�� � ����=&�����������8������� �������������� ���������� ����

��*� ��� �������� ������� ������ ��� ���� �������*�9 ��.�6 ����� �

�������� ���;6���������������������������������������� ���� �������*8����

������� ����� ���������;6���� ����������:������ � ��������

�������.������������������ �������������������������� � �������������8�

������������� �����������>#������*���.��

B���� ������������� ����� ���������8��������������� ���� ����� � � ���

�������������������� �������G.<.��� �����������*����� ��� �� ���� ��� ��

���������� �������8��������������������������*����� �� ��� �������������

���� �� ��������� 8�� ��� ������ �������������� �������������������

��������� ���������������� ��������� ���� �������������������� �����

������� ���������� �*����.�

Page 40: South West of England Regional Development Agency · 2020. 1. 27. · South West of England Regional Development Agency Wave Hub Development and Design Phase Final design report June

Doc No WGEHDD1885R T6 Date: June 2006 t �Ref: Wave Hub Final Design Report

��0 ��� ;���� �� <6������� ����������� �������(�������������� �0������� ������������������

��!"#������������������ $����� ��$����� ��������������� ;����

/�����;���4��!�������������������!�������������������"��"����8����/-�9�

%������� 3����$���������%���8?9�

6����

'&;6������ # ?8$��� � ����������������� ��������������C�8��� �� 8����������8������� ���� �����.�

��4������8�7�8�;��4�� �� ��8���� � ��������������4�� ����������)�������������� ���������� .��� �����������8�������������� ��� ���� ��!�)����� �����.�

@����;������� ��8���� � ������������� ��������������'&;6�������������.�

� ���� ��� #$8?$�� 7�������������*�� ��� ��� �*.��-)���������������������������������������:����� .�

���� ������ ��������� ���� ��

#$8���� � ���������� ����8��� ����� ������������������ ��� ��� ����'-6��������.�

A���������������� ���� ��������� ��������

<H8 $�� � �������������8�������*8�����8��������8����� ���� �8���������8��� � ���������8���� � �8������8��������� .�

� � �

6 ���������������F�A ������������

�8���� � ����������� ��� �� ������ ������������������ ������������8�:��*�������� ������8������� ��� ��������� � � ��8�� ����4����� ��������.�

6 ���������������F�� �����������������

$8���� � ���������������� ��� ��������� � � ��8�������������8������������ � � ���� ������8��������:����� �� ����������.�

6 ���������������F�&=������ ��� ����� � � ���

$8���� ����������&����=�����;�� � � ���� ���.��-)�������+���*��:����� ������������� �� ��� ����.�

6 ���������������P&�-� #�8���� P����*8�&������ ������*�� ��- ��� �� ��������8��:����� �� ����� � �.�

� � �

- ��� �� ���� ��� �� G8$��� -������� �����:������ ��������� ����� �� ��� �� ���� ��� ��������������� ��.�

� ��������������;�� � � ���

�8GG�� � ���������� ��� ������� � � ����� ������ �����*�8����E����������� ����� �8�76+����� � ��� ��������������*.�

� ����+ ����������;�� � � ���/�� ��������0�

H8"G�� ;� ��� ��� ��������������*�8�����:����� �� �������� ��������:����� .�

����������� �/� �����0� ?8H$�� � ������������������������ �������������� �����*��� �*�����$8�#��� ��#$.�

+ ����������;�(��������� �G8$?$� � ���������������������� ������������(�����������76+8���+�� ���������������.��C.@���������� �� ���������������������������� �� ����������������������������������.������������������*������������ � �� �*��� ��� ������ ��������.�

/,/� ��66<� �%,�/�

&��A�;(� �

Page 41: South West of England Regional Development Agency · 2020. 1. 27. · South West of England Regional Development Agency Wave Hub Development and Design Phase Final design report June

Doc No WGEHDD1885R T6 Date: June 2006 t Ref: Wave Hub Final Design Report

/�����;�&�<�������������������!�������������������"��"����

%������� 3����$���������%���8?9�

6����

6 ���������������F�A ������������

�8��� � ����������� ��� �� ������ ������������������ ������������8�:��*�������� ������8������� ��� ��������� � � ��8�� ����4����� ��������.�

6 ���������������F�� �����������������

$8��� � ���������������� ��� ��������� � � ��8�������������8������������ � � ���� ������8��������:����� �� ����������.�

6 ���������������F�&=������ ��� ����� � � ���

$8��� ����������&����=�����;�� � � ���� ���.��-)�������+���*��:����� ������������� �� ��� ����.�

6 ���������������P&�-� #�8��� P����*8�&������ ������*�� ��- ��� �� ��������8��:����� �� ����� � �.�

- ��� �� ���� ��� �� $8��� -������� �����:������ ��������� ����� �� ��� �� ���� ��� ��������������� ��.�������� ����������������*���� ����� �������� �� ��� ��� ������ ��*�������A=������������ �����������.����������������������������*������ ��*���.�

� ��������������;�� � � ���

�8GG� � ���������� ��� ������� � � ����� ������ �����*�8����E����������� ����� �8�76+����� � ��� ��������������*.�

� ����+ ����������;�� � � ���/�� ��������0�

H8"G� ;� ��� ��� ��������������*�8�����:����� �� �������� ��������:����� .�

;��� ������������� �/� �����0�

?8H$� � ������������������������ �������������� �����*��� �*�����$8�#��� ��#$.�

+������ �!��������� ������� ���� ���:����� �

<8��� @����� ���O�����������������*����

+ ����������;�(��������� �G8$?$ � ���������������������� ������������(�����������76+8���+�� ���������������.��C.@���������� �� ���������������������������� �� ����������������������������������.������������������*������������ � �� �*��� ��� ������ ��������.�

/,/� ��66<� �%,�/� �55A1;( �

Page 42: South West of England Regional Development Agency · 2020. 1. 27. · South West of England Regional Development Agency Wave Hub Development and Design Phase Final design report June

Doc No WGEHDD1885R T6 Date: June 2006 t <Ref: Wave Hub Final Design Report

9 Conclusion

����� �� ���� ������� ���4������������ ����'����&����������� �7���������

� ������������� ��������������*������3������5��� .������������� � ��

�������� ���� ������������������ �����*�������:�������������� ������� ����*�

��������� ������������ �� ��������8������� ����� ��������� ������ ������

������ � ��������� .�

�������� ����� �������� �������������'-6����������� ��������:������ ��

� ��������� ���.��-)� ������������� ���������� ����������� ��)� ������ �����

�� ������������������������������������������������*������ � �*����

������������� �������.�

������ ����������� ��� �����������������������������������������������������

������������� ����������� �� � ������������������� ��)���������� *���

�������������������(�������� ����� �� ���� ������� .�

������� �������� �����������������;'�������*��*����� �����������

� ������� �������������� .������*���� ������������<4=��������

��������*����� ������ ��##4=����'-6�� ��� .���������������������

� ��� ��� 4=���&�*��.��������+����� ����*��������8� ���� � � ���

�)�����8�� �����������76+�������������� ����.�

�������������*����� �������� ����� ���������������� ��������� ���������� �

� ������.����������� ������������������� ����������������������������

������� ��������������8���������� �� �����(� � ���������� ���������.�

���������� �������� ��)�� ����� ���9��������������<! !�.<4=��� �������

� �����������������:����*��������� �� ������������� ��� ������

�������'-6��� �����.�

������� ������ ��������������� �����8��������'-6�� ���

• 6 ��� ��'-6�

• +��� 4��##�4=������������ ���76+��*����������

• ��*������ ���� �������� ����������76+�

Page 43: South West of England Regional Development Agency · 2020. 1. 27. · South West of England Regional Development Agency Wave Hub Development and Design Phase Final design report June

Doc No WGEHDD1885R T6 Date: June 2006 t $Ref: Wave Hub Final Design Report

• 76+�������� ���

• ##4=������������4���

• $;=���� ������8�##!�<4=�

• �<4=������������4���

• ��*������ ����

• ����).�#���F��������<4=�������

• ��+������� ������� �� ����

• ����).��$4�����<4=�������

• A ���������������������������

• 6���������� ��� ���

• �<4=������������4���

• ��;=���� ��������<! !�.<4=�

• 4=������ �������� �������������������4���

• �.<4=���������� 4� �������� ���������=6�

• �����=���6��� ����

• 4=������������4���

• 4=�� ��� ��'7�� 4=�&�*��������� �/�*�'7�0�

-����76+���������������������������������������� ��� ��'-6�.�

����� �� ���� ������������ ��������� *�� ��������� ���������� �

���������� ����������������������.������������������������������������ ��

������� �� ������������ 8�����������*�� ������ �������������� �������

�������*����� ����� ��������������������������.������������ ����� ��������

�����)�����*������� ���������:����8���������������8����*��������� � � ���

����� ������� ���������� �������*������� ��������������.�

� ������������������������ �����'����&���� �������������� �8���������

� ��� ����������� ����������������������� ���������.��;�����������

����������� ����� �������� ���:������������������������� ������������

�������� ���������������� �.��� ������������� ��� � ����� ������

��������*��������������������������� ���� �����������:������ ����

�������������������������� �����)������.�

���������������������� �����������)����������������������>#?. ������ .�

&�������������)�������������������� ����� *�������������� �

� ������ ��������� ��������������� �����������*������ ��������������

����������������������� �� ���������*�����G�O.���

Page 44: South West of England Regional Development Agency · 2020. 1. 27. · South West of England Regional Development Agency Wave Hub Development and Design Phase Final design report June

Appendix A – Wave Hub Connection OfferInterpretative Report (WGEHDD1714R)

Page 45: South West of England Regional Development Agency · 2020. 1. 27. · South West of England Regional Development Agency Wave Hub Development and Design Phase Final design report June

���� ������� ��

������������� � ��������������������������� ������������������������������� �� �

������� ������������� ��������������� ������������������ �������������������

������������ ����� ���� ������������������ �����������

��������� ����������!���������� ����� �"����#�

��� $ �������%& ������� ����������'�������()�"�����(**+,���������� ����������

��!������� ����� �"���������(*-./��� ����� ����00�.�

���� 1�������� ����,���������� ������������!������� ����� �"�������� �2.�

�� ����� ���������������� ������ 3�

��������������������04�5� ����� ��*4�6��������������������������7����2�!�����

� �*(�6�����(**)���/�����������������3���� ����� ������������������ �(*�6��������

�������8� ������

���� ������ ������������������������������

������� ��������� ������ ���

��������� ����� ����������"���������!!������� ������4�����������#�

�������������������� ������������������

������ ����������� ������*4�6�����(**)���

.��������9*����������*(�-���(**)���

�����!�� /���!��������:�8�/�

�� ����� �� • /������ ������������ ����� �"�����������00�.�

�� ����� �

• ������� ������!���� 3���!����������������� �� ����� 3�

����7;���<(**�� ������������� ������ 3�� �����

����� ��� �����������40(�.���!��� ���������������

������������� ���� ��������������=����� ��!����

• ���������!��������!������������ �4>�!� ������!�����

��������������� ����������"���,��������������!���

�!� ����������������"����

��������� • ������� ������� ���?�� ��� ����� ��@���� 3�44�.������

• ������� ����� �44<*�A�.��� ���!����������+*�./�� �

����40(<00�.��������������� ���������� ���!��� ��

Page 46: South West of England Regional Development Agency · 2020. 1. 27. · South West of England Regional Development Agency Wave Hub Development and Design Phase Final design report June

• ������� ����A**.�������������� ��������!������!�

• ������� �������������=����� �����!������!�

��������������� (0*.��� 3��������������� 3�4+�./��� ������ �����)+/��

�� ����� �

���3��

B4A,)4)�40������./���4C�+D��

8� ��������������C������������� ����� ����!����

:��������� ;���!��������)�!� ������!�������� ����������"��������������

������ ���������!���� ����3�!!� 3�����������

6������ 3�� �� �������������������"���,������ ��������������� ������������!� ���������

�������� ����������������������!!������� �/��� ��@�/,����������������!�@�!�!���!� ��

���)+/,�� ������ �����4+�./��&�����������������������������������������(+D�����

�������������������������������� �2.�����������>*/��4>�A�./���� �����������

������� 3���� ����!���� 3�� ����������=������/��� �������,�������������(���0������������

������������ ����������= ������������>*/������������������ ��������������������������

(*�6�����(**),������ 3�������!���� ����� ���������������������������� ��� ������(#�

���������!"#���$ � ����� �������������������� � ���

������ ����������� ������(*�6�����(**)�

.��������9*����������(4�-���(**)��

��������������� (0*.��� 3��������������� 3�4>�A�./��� ������ �����>*/��

�� ����� ����3�� B4A,)04�*>������./���4C�+D��

8� ��������������C����������������� ����� ����!����

��������������������#�

• ���������!��!��������� ��� ������������������������������� ����� ��� �

��� �3������

• ���������� ��������� �� � =�� �����������!� �������������������

�� �����������!� ������������������������������������������������

�� ��������������!���� ��������������������������������������� �����

����,��������������� ������� ���������������� � =�� �����������!� ���

������������������������ ���������������� ����������������������!�?�����

�������������/�����3���������� �������� ���������������!� ���� �����

"���,�������!!� ��������������������������!� ��������������������#�

o �����������=��� �����������������

o ������ �����������!� ������������������!���������������������

Page 47: South West of England Regional Development Agency · 2020. 1. 27. · South West of England Regional Development Agency Wave Hub Development and Design Phase Final design report June

%

• ���������!�����������:��������� ��7� ������ ����� ������� ����� �

����������:���������� ����� �����!�� ������� ������ ���� ������� �� ����

����� ��� ���������3 ��������!!� �����������7� ������ ����� ����

���������

$ �������������!!� ������ ,������������������������������������!������������2.�

��������������������� ����������!�����00�.���������&�������� ����� ��������������������

������!����!�,���� ����������������������� ��������@�!������BA+*����������!���������

2.��������������� ��������� �������!���� ����������00�.�������

������� �������

���������!�� ������������������������ 3������ �#�

• /3�������������������������������������������������� �������������

• ��!������� ����� �����%2��������/������ ��'�������������*(�-���(**)��

������!!� ��!� ��������������������� ����3�������������������

• /���� ��� �������������������������������������� ������

• /���� ����!����������������������������� ������

���%� ������ �������������%%&���������

������� ��������� ������ ���

��������� ����� ����������"���������!!������� ������0�����#�

�������%���� ����� ������� ��%%&���������������

������ ���������� ������04�5� ����(**)��.��������9*����������*4�-���(**)��

�����!�� /���!��������:�8�/�

�� ����� �� • ����00�.������������������������������ ������������

��� ��� �������3���� ���!���������������������������

��������������� �� ��!���� 3����������

• ������� ����� ������� 3�� ��� ��=����� 3������ �����00�.�

��������������������� ������00�.�����������������

• ������� ����������� 3�� ������� 3�������������������00�.������

���������������

• ��!���� ��������; 3� ��� 3�8���!!� ����� �����

��!������ ��� ������3������������ ,��!��� ���� ����!� ���

�������� �

• ��!���� ��������; 3� ��� 3�8���!!� ����� �����

�������� �� ������� 3��

• ����& ��������� ���������������,�����/������ ��3��!� ��

� ������3� ���� �������������!��������!������������ �4>�

Page 48: South West of England Regional Development Agency · 2020. 1. 27. · South West of England Regional Development Agency Wave Hub Development and Design Phase Final design report June

'

!� ������!�������������������� ����������"���E����������

����!�����!� ���������� ����� ������/3��!� ���

��������� • ������� ������00�.�������������� �������00�.��������� �

������������������ �

• ������� �� ����!� ���� �������� 3���!�����������������

00�.�������������

• /������ ������3��� ����� ���� ���!����������� ��������

���00�.�������������

• ������� ����!���� 3��� ���� ����!� ��� 3����� 3�

• ������� �� ����!� ���� �������� 3������������ ,�

� ������� 3�� ��� ��=����� 3�

• ;@�� ��� ������������� 3������!�� ��������������� �

��!��� ��

• & ��������� ��������!� ������ ����������������!� � ���

• ��� ���� 3������!!����� � 3����������B0C*������./�<����

��������������� 00�.,�0���������#�

• �@�������������(*-./�

• �!�������������4**�./�

�� ����� �

���3��

B4*),9*)�4*������./����4C�+D���������������� ����!� ��#�

• 4*D�� �������� �������� ����� �"����

• A+D�4���������������!!� ��!� ��������������

• A+D��������� �3������ �

�� ����� ����� ;���!��������4(=4>�!� ������!�������� ����������"��������������

������ ���������!���� ����3�!!� 3�����������

&�������� ����� ��������� �����!������������ �(A�!� �������

������ ����� ������/3��!� �,��������������������� ���

���3����

������ ����� ������/3��!� �������!��������������!����3 � 3�� ����� � 3����

�������������������� ����� �"�����������3��!� ������� �������������� �������� ����

���������!�����������������2��������& ��! �������3��� ����!���� 3����'���������

Page 49: South West of England Regional Development Agency · 2020. 1. 27. · South West of England Regional Development Agency Wave Hub Development and Design Phase Final design report June

(

��������������������#�

• ���������!��!����� ���� ���������������3��!� ��#�

o /������ �/3��!� ������ ����������������������������!��� ��

�������������,����������!!� ��!� ����������� ����� �

�����

o �� ����� �/3��!� ������� 3�����������!��� ���� ����� �����

�� ����� ��������������������� ������!,��������� �3������ �

o 8���� ��������:��������� ���:((��������;����������:�����,�F�������

� ���� �� �����8�3������ ��������� ������ �������������������� ,�

!�� �� � ���� ���� ���,��������� �3������ �

• ���������!��!������ ��!��������3� ���� 3������� ������������� ����� ��

�������� ��3��!� �������� �!�������������� ���7����� ������7����

$ ����������������� �� ��,���������������������������������������

�� ����� �� ������������������������� ��������� �� 3���� ��3��!� ��

������7���

• ���������!��!����3� �������������� ����������������������������������

� �:�8�/��� �����������!!� ��!� ����������� ����� ������

• ���������!��!��������� ��� ������������������������������� ����� ��� �

��� �3������

• ���������!��!��������� ����!���������������������� ����� ��� ���

� �3������/�������� ����� �������������3�������� �4**��,������������

!���� 3����!� ����������������������������������������������

• �������������� �������;�,�����!�������� �������!� ���������!� �����

�������������� ����� ������������ � =��!���� ��������� ��; 3� ��� 3�

8���!!� ����� �����������������������������������!�� ���������������

�����������3�����������������!������������������������ 3� ��� 3���!���

• &�����������!����������������������������� ��������� �����!�� �� � ���

���������� �����00�.������������,������ ���!� ��!������!���������

���������������� ���

• ���������� ��������� �� � =�� �����������!� �������������������

�� �����������!� �����������������!������ ������ ������������!�������

�����!���� ��������������������������������������� ���������,�����

���������� ������� ���������������� � =�� �����������!� ������������

������������ �� ���������������������������������������!�?������������

������������������������������� �����������������������#�

o �� =�� ������������#� B4*A,C*(�A+�

o �� ������������#� � B(,(*0�)+�

Page 50: South West of England Regional Development Agency · 2020. 1. 27. · South West of England Regional Development Agency Wave Hub Development and Design Phase Final design report June

)

������ �������������� ���������������!� ������������������������������������������

�� ����� ������������� �����!� �!����

������!!� ��������������������������!� ��������������������#�

• �����������=��� �����������������

• ������������������!������ �����������!� ��

:��������4������������������� ����� �"������!������(�����#�

��� ����4��������������!��� �����������������������������!�#�

• 00�.��������������������� ��� �������3���� ���!���

• ���������������!!������ ������������������ ��!���� 3���!�

• �� �������� 3����� ������� 3�� ��� ��=����� 3�

• �� ������������� �����00�.����������������� ������� 3�� ��� ��=����� 3�

• ���� 3������ �00�.�������������� ��!���� 3��� ���

• ����� 3������!�

�� ����(����� ����������� ������ ���!� ����������������� 3#�

• 00�.�������������

• � ��=����� 3�� ��� ������� 3�

• �������� �� ��!���� 3���!��

• ���������� 3�

• �������

$ �������������!!� ������ ,������������������������ ����� �"��������� ����������

������������������ ����00�.���������������!����������� 3����������������������"����

������ ��������1�������������!�������� ������������� ������������ �����"��������� ���

�������� ,������� ����� ����3����������������������@�!������B4,+**�G./��������

�!���������� ���������������������������� �� ������� ����� �/3��!� ���

������� �������

���������!�� ������������������������ 3������ �#�

• /3�������������������������������������������������� �������������

• ��!������� ����� ������� ����� �"����:��������������������*4�-���

(**)��������!!� ��!� ��������������������� ����3��������������������

• ��!������� ����� �����2��������& ��! ����� �:�8�/�������������

• ����2��������& ��! ����� ���� ����� �"����:�������������������� ���

���������!����!��

Page 51: South West of England Regional Development Agency · 2020. 1. 27. · South West of England Regional Development Agency Wave Hub Development and Design Phase Final design report June

*

• /���� ��� �������������������������������������� �����

• /���� ����!����������������������������� �����

• ������!!� �������:�8�/��� ����������� ����������������)����((��������

�� ����� �������� ����������������49���!��������3 !� ����������� ����� �

�����/3��!� ������ �� �������������������

Page 52: South West of England Regional Development Agency · 2020. 1. 27. · South West of England Regional Development Agency Wave Hub Development and Design Phase Final design report June

Appendix B – Decommissioning Plan

Page 53: South West of England Regional Development Agency · 2020. 1. 27. · South West of England Regional Development Agency Wave Hub Development and Design Phase Final design report June

Abbott Risk Consulting Ltd

Report No ARC-059-006-R1Revision 1May 2006

Page 1 of 46

SWRDA Wave Hub -Decommissioning Plan

Prepared for: Halcrow Group LtdAsh HouseSowtonEXETEREX2 7LB

Prepared by: Abbott Risk Consulting Ltd19c East King StreetHelensburghArgyll & ButeG84 7QQ

Report No: ARC-059-006-R1

Revision: 0

Date: May 2006

Page 54: South West of England Regional Development Agency · 2020. 1. 27. · South West of England Regional Development Agency Wave Hub Development and Design Phase Final design report June

Abbott Risk Consulting Ltd

Report No ARC-059-006Revision 1May 2006

Page 2 of 46

APPROVAL AND REVISION RECORD

RevNo.

Date Prepared Reviewed Approved Revision Notes

0 May 06 D Cantello/E Wood

T Lambert J Abbott First Issue

1 22 May06

D Cantello T Lambert J Abbott Client comments -Incorporated

Page 55: South West of England Regional Development Agency · 2020. 1. 27. · South West of England Regional Development Agency Wave Hub Development and Design Phase Final design report June

Abbott Risk Consulting Ltd

Report No ARC-059-006Revision 1May 2006

Page 3 of 46

Contents

Approval and Revision Record................................................................................................................2

Contents..................................................................................................................................................3

Glossary ..................................................................................................................................................4

1.0 Introduction ............................................................................................................................6

2.0 Background information.........................................................................................................62.1 Wave Hub Concept................................................................................................................62.2 Layout of Facilities .................................................................................................................72.3 Environmental Conditions....................................................................................................122.4 Weather ...............................................................................................................................122.5 Sea Conditions ....................................................................................................................122.6 Onshore environment ..........................................................................................................132.7 Offshore environment ..........................................................................................................142.8 Legislative Requirements ....................................................................................................15

3.0 Description of Items to be Decommissioned .......................................................................19

4.0 Inventory of Materials ..........................................................................................................21

5.0 Removal and Disposal Options ...........................................................................................235.1 Onshore Infrastructure.........................................................................................................255.2 Offshore infrastructure .........................................................................................................255.3 Cable ...................................................................................................................................265.4 WECs...................................................................................................................................27

6.0 Selected Removal and Disposal Option..............................................................................286.1 Onshore Infrastructure.........................................................................................................286.2 Offshore infrastructure .........................................................................................................306.3 Cable ...................................................................................................................................306.4 WECs...................................................................................................................................31

7.0 Hazard Identification & Risk Assessment............................................................................317.1 Environmental Issues ..........................................................................................................32

8.0 Waste management.............................................................................................................34

9.0 Stakeholders Issues ............................................................................................................34

10.0 Licenses Associated with the Disposal Option....................................................................34

11.0 Pre and Post Decommissioning Monitoring and Maintenance............................................3511.1 Pre decommissioning ..........................................................................................................3511.2 Post decommissioning.........................................................................................................35

12.0 Supporting Studies ..............................................................................................................35

13.0 Costs....................................................................................................................................36

14.0 Programme ..........................................................................................................................38

15.0 References ..........................................................................................................................41

APPENDICES

Appendix A: Developer’s Decommissioning Plans – Scope of Work ...................................................41

Appendix B: HIRA Tables .....................................................................................................................45

Page 56: South West of England Regional Development Agency · 2020. 1. 27. · South West of England Regional Development Agency Wave Hub Development and Design Phase Final design report June

Abbott Risk Consulting Ltd

Report No ARC-059-006Revision 1May 2006

Page 4 of 46

Glossary

AtN Aids to Navigation. Those aids, including visual marks, lights,buoyage, electronic devices etc. provided for the mariner to assistin the safe navigation of the vessel

BAT Best Available Technique

BPEO Best Practicable Environmental Option

CD Chart Datum. By international agreement, Chart Datum is a levelso low that the tide will not frequently fall below it. In the UK, thisis normally approximately the level of Lowest Astronomical Tide.

Defra Department for Environment, Food and Rural Affairs

DfT Department for Transport

DTi Department for Trade and Industry

EIA Environmental Impact Assessment

GLA General Lighthouse Authority. The general name given to thoseauthorities with responsibilities for Aids to Navigation in specificgeographical areas. In the waters around the UK and Republic ofIreland, these authorities are: Trinity House, Northern LighthouseBoard and the Commissioners for Irish Lights

HIRA Hazard Identification and Risk Assessment

Hs Significant Wave Height

IMO International Maritime Organisation

MCA Maritime & Coastguard Agency

MHWN Mean High Water Neaps

MHWS Mean High Water Springs

MLWN Mean Low Water Neaps

MLWS Mean Low Water Springs

MSL Mean Sea Level. The average level of the sea surface over aperiod (normally 18.6 years)

ODN Ordnance Datum, Newlyn

ORCU Offshore Renewable Consents Unit

OSGB Ordnance Survey Great Britain

OSPAR Oslo and Paris (Convention on the protection of the marineenvironment of the NE Atlantic)

PCU Power Connection Units

RNLI Royal National Lifeboat Institution

RSPB Royal Society for the Protection of Birds

Page 57: South West of England Regional Development Agency · 2020. 1. 27. · South West of England Regional Development Agency Wave Hub Development and Design Phase Final design report June

Abbott Risk Consulting Ltd

Report No ARC-059-006Revision 1May 2006

Page 5 of 46

SSSI Site of Special Scientific Interest

SWRDA South West Regional Development Agency

TDU Terminal Distribution Unit

TidalStream

A distinction is drawn between tidal streams, which areastronomical in origin, and currents, which are independent ofastronomical conditions and which, in the waters around theBritish Isles, are mainly of meteorological origin

UNCLOS United Nations Convention on the Law Of the Sea

WEC Wave Energy Converter

WPD Western Power Distribution

Page 58: South West of England Regional Development Agency · 2020. 1. 27. · South West of England Regional Development Agency Wave Hub Development and Design Phase Final design report June

Abbott Risk Consulting Ltd

Report No ARC-059-006Revision 1May 2006

Page 6 of 46

1.0 Introduction

This report has been prepared by ARC Ltd for Halcrow acting on behalf of SouthWest of England Regional Development Agency (SWRDA) and presents the initialDecommissioning Plan for the Wave Hub Facility and associated Wave EnergyConverters (WECs).

The report forms part of the consent requirements for the commissioning of theWave Hub facility as required by the Department of Trade and Industry (DTi) inaccordance with the Energy Act 2004. This report has been prepared in conjunctionwith the Environmental and Social Impact Assessment report.

2.0 Background information

2.1 Wave Hub Concept

The concept of the Wave Hub project proposed by SWRDA is to support andencourage developers of Wave Energy Converter (WEC) devices through the finaldemonstration and pre-commercialisation stage of development, allowing them toinstall and operate arrays of WECs in commercial scale conditions over a numberof years. It is intended that WECs will remain connected to the Wave Hub for aspecified period in order to achieve the developer’s aims and then be removed fromthe site to enable other WECs to be connected.

To achieve this aim SWRDA will provide the Wave Hub infrastructure andestablish an operating company such that several different WEC developmentcompanies can install WECs or arrays of WECs in a context of lower risk andreduced complexity.

The proposed facility is for a fixed, offshore seabed infrastructure which willsupport the deployment of developers WEC devices. The WECs will all be locatedin a deployment area of 4km x 2km and each WEC (or small array of WECs) willbe connected to one of four seabed based Power Connection Units (PCUs) by anumbilical cable at 11kV. The PCUs contain transformer units and switchgear andtransmit electrical power from the WECS at 24kV to a single, seabed basedTermination and Distribution unit (TDU). This combines the power output from allWECs on the system into a single 24kV cable which will conduct electricity fromthe offshore infrastructure to a new onshore substation facility at Hayle, adjacent tothe Hayle Western Power Distribution (WPD) electricity sub station, allowingconnection to the regional and national electricity supply.

The Wave Hub concept is shown in Figure 2.1.

Page 59: South West of England Regional Development Agency · 2020. 1. 27. · South West of England Regional Development Agency Wave Hub Development and Design Phase Final design report June

Abbott Risk Consulting Ltd

Report No ARC-059-006Revision 1May 2006

Page 7 of 46

Figure 2-1 Wave Hub Design Concept

2.2 Layout of Facilities

2.2.1 Onshore Infrastructure

2.2.1.1 Access Road and Compound

The onshore site encompasses an existing 250m non-tarmacadam access track thatleads from Hayle Harbour to the proposed location of the site compound which ispositioned adjacent to an existing transformer station on the lee side of high sanddunes that border Hayle Beach. It is assumed that over the project life this accesstrack will be replaced by new road as part of the wider site redevelopment and will,therefore, not be decommissioned.

A car parking area and the turning head, designed to accommodate vehicles up tothe size of a fire truck will be adjacent to the workshop area.

To the north of the compound, is an area defined as an approximate temporaryworks location which will be used for the drill pit and storage. This is the pointwhere the cable exits the dunes to enter the substation.

2.2.1.2 Substation Building

The onshore infrastructure comprises a new substation which will be situatedadjacent to the existing substation facility at Hayle operated by WPD. The onshoreinfrastructure consists of a single storey substation building on a concrete slabwithin which trenches will be provided for the Wave Hub cabling. The building

Page 60: South West of England Regional Development Agency · 2020. 1. 27. · South West of England Regional Development Agency Wave Hub Development and Design Phase Final design report June

Abbott Risk Consulting Ltd

Report No ARC-059-006Revision 1May 2006

Page 8 of 46

will accommodate all associated electrical facilities for the Wave Hub. Thefacilities will include:

� Power quality room.

� Circuit breaker room.

� Metering room.

� Control room with space for WEC developers’ transmission equipment.

� Mess room with associated facilities for the various operators who will bemonitoring equipment or providing maintenance on an occasional basis.

� ROV workshop and garage.

At the north end of the building, there will be an outdoor area which willaccommodate:

� Cable splitting chamber.

� Cable sealing ends.

� Outdoor 24kV circuit breaker.

� 24kV/33kV transformer.

Since this equipment includes exposed high voltage conductors, the area will bebounded by fencing of the same height as that of the main WPD compound.Security fencing matching the existing WPD sub-station has been proposed.

A low voltage electrical supply will provide for building services and power forcommunications. A water supply will be provided from the local main and a septictank will be installed at the substation for foul drainage. Surface water run-off willbe drained to a swale adjacent to the access road.

Page 61: South West of England Regional Development Agency · 2020. 1. 27. · South West of England Regional Development Agency Wave Hub Development and Design Phase Final design report June

Abbott Risk Consulting Ltd

Report No ARC-059-006Revision 1May 2006

Page 9 of 46

Figure 2-2

Figure 2-2 Onshore Infrastructure Location Plan

2.2.2 Cable

The indicative cable route is approximately 25km in length and is shown in Figure2-3 Cable Corridor and Route The cable will pass through a horizontally drilledand lined duct beneath the dunes between the substation and the beach, thusavoiding large scale excavation of the sensitive dune area. It will be buried up to3m below the beach level. Offshore the cable will be buried to the maximumpractical depth, between 1 and 3m below the seabed surface where sufficientsediment makes this possible, such as in St Ives Bay. Elsewhere, where there isinsufficient sediment to allow burial, the cable will be surface-laid. The cable willbe held in place by its own weight. There will be no rock protection over the cablewhere it will lie on the seabed’s surface.

Page 62: South West of England Regional Development Agency · 2020. 1. 27. · South West of England Regional Development Agency Wave Hub Development and Design Phase Final design report June

Abbott Risk Consulting Ltd

Report No ARC-059-006Revision 1May 2006

Page 10 of 46

Figure 2-3 Cable Corridor and Route

2.2.3 Offshore Infrastructure

Wave Hub’s offshore infrastructure (i.e. the PCUs and TDU), the WECs and allassociated moorings / anchoring systems will be positioned within a 4km by 2kmdeployment area situated in approximately 50m of water and within 12 nauticalmiles offshore as shown in Figure 2-3 Cable Corridor and Route.

Page 63: South West of England Regional Development Agency · 2020. 1. 27. · South West of England Regional Development Agency Wave Hub Development and Design Phase Final design report June

Abbott Risk Consulting Ltd

Report No ARC-059-006Revision 1May 2006

Page 11 of 46

The Ordnance Survey grid references and latitudes / longitudes for the four cornersof the deployment area for the Wave Hub deployment area are:

North-east corner: OSGB N59694 E142066 / WGS84 N50o22’50’’ W5o37’56’’;

North-west corner: OSGB N59918, E144053 / WGS84 N50o22’59’’, W5o36’06’’;

South-west corner: OSGB N55943, E144501 / WGS84 N50o20’52’’, W5o35’34’’;

South-east corner: OSGB N55793, E142514 / WGS84 N50o20’42’’, W5o37’14’’.

The deployment area will be an Area to be Avoided (ATBA). The deployment areawill be demarcated by appropriate navigation aids as required by Trinity House. Itis probable that there will be a requirement for four Class 2, three metre diameter,steel or plastic cardinal buoys 500 -1000 metres to the north, east, south and west ofthe deployment area, and four special marks buoys of similar dimensions andconstruction delineating the corners of the deployment area. All 8 buoys will haveassociated moorings.

Figure 2.4 provides an example layout for WEC devices within the deploymentarea.

Figure 2-3 Example Layout of WECs

Different developers will be able to connect either individual WECs or arrays ofWECs to a PCU (i.e. a PCU array) at any one time. Developers will be able to buildup the number of WECs in a PCU array and to replace WECs with larger scaledevices.

Page 64: South West of England Regional Development Agency · 2020. 1. 27. · South West of England Regional Development Agency Wave Hub Development and Design Phase Final design report June

Abbott Risk Consulting Ltd

Report No ARC-059-006Revision 1May 2006

Page 12 of 46

The Wave Hub will have a maximum output of 20MW. This output effectivelylimits the scale and/or number of WECs and WEC arrays that can be connected tothe Wave Hub.

2.3 Environmental Conditions

The baseline environmental conditions at the Wave Hub site have beensummarised from the information provided in the EIA.

2.4 Weather

To be provided.

2.5 Sea Conditions

The baseline conditions for water levels, offshore wave conditions, tidal streamsand currents have been summarised from the EIA and are presented in Tables 2.1 to2.3 below.

Table 2-1 Water Level Data

Typical Water Levels Water Level (m)(ODN)

Mean High Water Spring (MHWS) +3.3

Mean Low Water Spring (MLWS) -2.5

Extreme Water Levels

1 in 2 year return period +3.7

1 in 50 year return period +3.8

1 in 100 year return period +3.9

Figures above include predicted sea level rise of 5mm/yr (Defra, 2004) for a 20 yearperiod.

Figures exclude surge 1 in 50 yr return period surge at St Ives = 1.0m (Pugh, 1987)

Page 65: South West of England Regional Development Agency · 2020. 1. 27. · South West of England Regional Development Agency Wave Hub Development and Design Phase Final design report June

Abbott Risk Consulting Ltd

Report No ARC-059-006Revision 1May 2006

Page 13 of 46

Table 2-2 Wave Conditions

Typical Wave Conditions Hs (m) T (s)

Typical summer surf

(38% prob of occurrence between 1May and 31 Aug, 45 days/ 122 days)

1 7

Mean wave climate 1.6 5.4

Classic surf

(0.3% prob of occurrence, approx 1day per year)

4 16

Extreme Wave Conditions (all directions)

1 in 1 year return period 10.4 12.1

1 in 50 year return period 13.8 13.9

1 in 100 year return period 14.4 14.1

Table 2-3 Tidal Stream

Tidal Stream m/s

Typical Tidal Stream (which typically run parallel to the coast) 1.0 to 1.2

Extreme Tidal Stream: 1 in 50 year return period 1.6

2.6 Onshore environment

The onshore site is located in an industrial area beside the Hayle estuary, to thenorth of Hayle town. It comprises a ‘bowl’ in which a current substation anddisused power station are situated, surrounded by a high crest of dunes, behindwhich lie the estuary and a wide sandy beach.

The proposed sub-station and access track are located in a former sand pit that wasworked during the late-19th and early-20th centuries, which created a distinctive‘bowl’ shape within the sand dunes. From the 1930s onwards the area wasdeveloped into a power station which was subsequently demolished during the late-1970s to early-1980s. During this period made ground materials were depositedacross much of the site, including the area of the proposed sub-station and accesstrack. Further dumping of materials in recent years has resulted in a number oflarge spoil heaps within the site compound.

In the site of the substation, intrusive ground investigation works have revealed thepresence of deep (>5m) variable made ground materials, comprising principally ofgravelly sands with pieces of concrete and other man-made materials includingplastic, electrical wire, timber and metal. These are underlain by dune sands andgravels to bedrock at approximately 10m below ground level. Slightly elevatedlevels of arsenic, copper and hydrocarbons were encountered in a number ofsamples of the made ground, these elevated levels are above the threshold for

Page 66: South West of England Regional Development Agency · 2020. 1. 27. · South West of England Regional Development Agency Wave Hub Development and Design Phase Final design report June

Abbott Risk Consulting Ltd

Report No ARC-059-006Revision 1May 2006

Page 14 of 46

waste to be classified as inert and thus the materials may be considered stable non-reactive for disposal purposes to landfill.

The cable duct running 10-12m below the dunes is in an area of uniformly gradedsands well above the level of base rock encountered (at between 7m at MHW and>15m MLW).

Groundwater levels were recorded at depth (10m below ground level) in theproposed site compound area and at a depth greater than the cable duct beneath thesand dunes.

The Wave Hub substation site itself is of little ecological value, although the dunesaround it constitute a fragile habitat. The estuary is of significant importance fornature conservation, particularly migrating birds, and is designated as a Site ofSpecial Scientific Interest (SSSI) and an RSPB Nature Reserve. The beach in frontof the dunes is covered by two county-level designations: Area of Great ScientificValue, and Cornwall Nature Conservation Site.

The beaches of St Ives Bay are very popular for recreation and water sports,particularly surfing, and the dunes host a number of caravan parks and holidaycottages that cater for thousands of tourists. The site itself is of low visual amenity,being a disused power station in an industrial area. The overall landscape, however,is of high value, including wide sandy beaches, St Ives Bay, the Hayle estuary andthe extensive sand dune systems to the north. There are no sites of heritage orarchaeological importance in or very close to the site.

2.7 Offshore environment

Offshore, the Wave Hub site extends from St Ives Bay to the 12 nautical mile limit.The area is of importance to marine life, particularly cetaceans (whales, dolphinsand porpoises), basking sharks, fish (the area supports spawning and nurserygrounds for several important commercial species) and the marine communitiesinhabiting the rocky outcrops amongst the sediments of St Ives Bay. St Ives Bayand the Hayle estuary are designated as a Special Marine Area, in recognition oftheir national importance for marine and estuarine life.

The area also supports a range of fisheries of importance to the local economy,including a shellfish industry that is the mainstay of the Hayle port, and thelucrative Dover sole fishery exploited by trawlers in the deeper waters (>30m). Thearea is also popular to recreational users including sailing, diving and angling. Interms of landscape value, the sea is one of the few remaining ‘wild’ vistas in thecountry, and the coastline on either side of St Ives Bay is designated as both anArea of Outstanding Natural Beauty and Heritage Coast. There are a large numberof wrecks, some of which are designated as Protected Wrecks, within the area.There are no known sites of archaeological or palaeontological importance in thenearshore.

Page 67: South West of England Regional Development Agency · 2020. 1. 27. · South West of England Regional Development Agency Wave Hub Development and Design Phase Final design report June

Abbott Risk Consulting Ltd

Report No ARC-059-006Revision 1May 2006

Page 15 of 46

Part of the intended wave hub site area lies in a designated Ministry of Defencemilitary exercise area, and coastal shipping lanes pass close to, and through, theintended area. There are no known sites of contamination, and no licensed offshoredumping or aggregate extraction areas. The bathing waters of St Ives Bayconsistently score highly for water quality.

Sediments in the offshore and transition zone (60m to 10m charted depth) arecomprised of patchy and thin, typically less than 1m, layers of sands and gravelswhich overlie mudstone/ shale bedrock and which become increasingly intermittenttowards the offshore zone (40m charted depth). Since no major features have beenobserved it is speculated that little change has occurred on the seabed over the last100 years. Due to the depth of water, sediment movement is limited except duringstorm conditions.

St Ives Bay is believed to be a sediment sink. However, since sediment inputs fromthe River Hayle and from offshore are limited the system can be considered as a‘closed’ sediment system. The beaches are comprised mainly of sand. The beachprofile demonstrates typical seasonal changes with lowering of beach levels and thecreation of an inter-tidal bar during winter. Beach levels can reduce by up to 1.8mfollowing storms. The dunes to the west of the proposed cable landfall are erodingand this could potentially extend eastwards in future. Rapid accretion occurs in thechannel at the mouth of the estuary, which was previously dredged and sluiced tomaintain a shipping channel. The alignment of the channel appears to be stable.

2.8 Legislative Requirements

The decommissioning plan must satisfy the requirement of the licence agreementsissued by the Crown Estate, all UK applicable legislation and internationalobligations.

Current guidelines for decommissioning of offshore structures are contained insuch documents as:

� MCA Marine Guidance Note 275(N) Proposed Offshore Renewable EnergyInstallations – Guidance on Navigational Safety Issues. (Reference1)

� Department of Trade and Industry (DTi) Guidance on ConsentingArrangements in England & Wales for a Pre-commercial DemonstrationPhase for Wave and Tidal Stream Energy Devices (Marine Renewables)Nov 2005. (Reference2)

� DTi Guidance Notes for Industry – Decommissioning of OffshoreInstallations and Pipelines under the Petroleum Act 1998. (Reference3)

� Guidance notes for the decommissioning of offshore renewable energyinstallations (section 6.2 of the Guidance Notes for the Offshore WindFarms Consents Process), March 2004. (Reference4)

� DTi Electricity development consents branch informal discussion paper ondecommissioning standards for offshore renewable energy installation,March 2006. (Reference5)

Page 68: South West of England Regional Development Agency · 2020. 1. 27. · South West of England Regional Development Agency Wave Hub Development and Design Phase Final design report June

Abbott Risk Consulting Ltd

Report No ARC-059-006Revision 1May 2006

Page 16 of 46

The Department for Environment, Food and Rural Affairs (Defra) is in the processof drafting a new Marine Bill which includes marine renewables in its scope and isintended to improve marine consenting procedures. The proposal will also includethe possible creation of a new marine management organisation to support theMarine Bill functions. The Marine Bill, if enacted, will impact on the Wave Hubdecommissioning consenting process and its requirements will require to bereflected in the decommissioning plan.

In addition, the DTi is issuing further guidance on the preparation ofdecommissioning programmes. This is due in October 2006. It is thereforeproposed that the decommissioning plan as submitted should be resubmitted withina 5 year period for further review and amendment as required to satisfy anyprovisions detailed in the licence agreement and any requirements of the October2006 guidance and the Marine Bill.

2.8.1 International obligations

International requirements have their origins in the United Nations Convention onthe Law of the Sea (UNCLOS), 1982 as implemented through the InternationalMaritime Organization (IMO). Applicable standards issued by the IMO include:

� International Maritime Organisation Guidelines and Standards for theRemoval of Offshore Installations and Structures on the Continental Shelfand in the Exclusive Economic Zone, adopted by IMO Assembly on 19October 1989, (Resolution A.672 (16)). (Reference6)

The UK is also a signatory to the 1992 OSPAR Convention (Internationalcooperation on the protection of the marine environment of the North-EastAtlantic). OSPAR Decision 98/3 was adopted to implement OSPAR’s offshore oiland gas industry strategy. It sets out binding requirements for the disposal ofdisused offshore oil and gas installations. Whilst there is no equivalent decision foroffshore renewable energy installations, OSPAR has produced guidance documentson offshore wind-farms, incorporating ideas on their decommissioning namely:

� Problems and Benefits Associated with the Development of Offshore Wind-Farms, Biodiversity Series, OSPAR Commission 2004. (Reference7)

2.8.2 Licence Provisions

The Wave Hub licence, as issued by the Crown Estate, shall include provisionspertinent to the decommissioning plan. Due to the DTI’s intention to issue newguidance in October 2006 of guidance, it will be likely that one of these provisionswill be to review and re-submit the decommissioning plan within a 5 year periodfor further review and amendment as required to satisfy any further provisionsdetailed in the licence agreement and any requirements of the October 2006guidance.

Page 69: South West of England Regional Development Agency · 2020. 1. 27. · South West of England Regional Development Agency Wave Hub Development and Design Phase Final design report June

Abbott Risk Consulting Ltd

Report No ARC-059-006Revision 1May 2006

Page 17 of 46

2.8.3 Relevant UK legislation.

At the present time the decommissioning plan must satisfy the following UKlegislation. It is inevitable that legislation will be amended over the life of theproject and this shall be taken into consideration during future amendments to thisdecommissioning plan and to the final decommissioning programme. The presentconsents regime is illustrated in Figure 2-5.

Figure 2-4 Geographical Extent of Consents

The Energy Act 2004

The Energy Act 2004 (Sections 105 to 114) contains provisions ondecommissioning offshore renewable energy installations. Section 105(8) of theAct stipulates that a decommissioning programme must include:

� Measures to be taken for decommissioning the relevant object (renewableenergy installation or related electric line).

� An estimate of the expenditure likely to be incurred in carrying out thosemeasures.

� Provision for determining the times at which, or the periods within which,those measures will have to be taken.

� Provision about restoring the place to the condition that it was in prior tothe construction of the object (where it is proposed that the object will bewholly or partly removed from that place).

� Provision about whatever continuing monitoring and maintenance of theobject will be necessary (where it is proposed that the object will be left inposition or will not be wholly removed).

Page 70: South West of England Regional Development Agency · 2020. 1. 27. · South West of England Regional Development Agency Wave Hub Development and Design Phase Final design report June

Abbott Risk Consulting Ltd

Report No ARC-059-006Revision 1May 2006

Page 18 of 46

The Coast Protection Act 1949

The Coast Protection Act 1949 (“CPA”) contains provisions for the safety ofnavigation. Under section 34(1) of the CPA, consent is required for removal of anyobject or materials from the seabed if the operation, causes or is likely to result inobstruction or danger to navigation. This provision applies to the seabed located inthe territorial waters adjacent to Great Britain and to the UK Continental Shelfextending beyond such waters. Whilst the CPA is not applied where operations arebeing carried out in accordance with a consent given under section 36 of theElectricity Act 1989, a CPA consent would be required for the decommissioning ofobjects and materials installed via such operations, as well as for the removal ofany cables or installations not covered by a Section 36 consent.

The Food and Environment Protection Act (FEPA) 1985

FEPA contains provisions to protect the marine ecosystem and human health and tominimise nuisance and interference to other legitimate uses of the sea. A FEPAlicence is required for the deposit of substances or articles within UK controlledwaters. A FEPA licence would, therefore, be required if it was proposed to depositany substances or articles (e.g. rock gravel or grout bags) during decommissioning.

Water Resources Act 1991

The Water Resources Act makes it an offence to cause or knowingly permit anypoisonous, noxious or polluting matter to enter controlled waters.

The EU Habitats and Birds Directives (Directives 92/43/EEC on theconservation of natural habitats and 79/409/EEC on the conservationof wild birds)

The Habitats Directive has established a European network of sites to promote theconservation of habitats, wild animals and plants, both on land and at sea. Aproject which would be likely to have a significant effect on one of these sites mustbe subject to an appropriate assessment. Where a renewable energy installationwould be likely to have a significant effect on one of these sites, the impacts thatmay be caused by decommissioning are likely to have been addressed in anappropriate assessment done prior to the original grant of Section 36 consent. Ifthat is not the case, however, for whatever reason, and the decommissioning wouldbe likely to have a significant effect on the site, an appropriate assessment shouldbe undertaken prior to approval of any updated decommissioning programme.

Waste Management Legislation

Waste is predominantly regulated through the Environmental Protection Act 1990and the Waste Management Licensing Regulations 1994. Once a decommissionedinstallation is deemed to be “waste”, it will need to be handled in compliance withwaste management legislation administered and enforced through the Environment

Page 71: South West of England Regional Development Agency · 2020. 1. 27. · South West of England Regional Development Agency Wave Hub Development and Design Phase Final design report June

Abbott Risk Consulting Ltd

Report No ARC-059-006Revision 1May 2006

Page 19 of 46

Agency (in England and Wales) and the Scottish Environment Protection Agency(in Scotland).

The Hazardous Waste (England and Wales) Regulations and the List of Waste(England) Regulations 2005 implement the European Parliament and CouncilDirective on Waste Electrical and Electronic Equipment (2002/96/EC). Theseregulations are enforced by the Environment Agency.

Health and Safety

Decommissioning operations will be required to comply with all relevant healthand safety legislation appropriate to such work. By virtue of the location of theworks and their nature i.e. the decommissioning of offshore renewable energystructures and the associated infrastructure within the territorial waters, The Healthand Safety at Work etc Act 1974 (Application Outside Great Britain) Order 2001Article 8 (1) states that the prescribed provisions of the Health and Safety at Work(HASAW) etc Act 1974 apply. Hence, the offshore works as well as the onshorewill be required to comply with the HASAW Act and all its relevant statutoryprovisions e.g. Construction (Design and Management) Regulations 1994, etc.

3.0 Description of Items to be Decommissioned

The Wave Hub infrastructure has, for the purpose of this report, been subdividedinto four categories, namely:

� Onshore infrastructure.

� Offshore infrastructure.

� Cable.

� WECs.

The complete list of the items to be decommissioned with a description of the item,are presented in Tables 3-1 to 3-4 below for the four categories respectively.

Table 3-1 Onshore Infrastructure

Infrastructure Description

Cable Splitter Chamber Concrete chamber

Cable trenches Concrete ducts

Transformer area Cable sealing ends,24 kV circuit breaker,24kV/33kV transformer,fencing

Substation Building Single storey brick-clad building on concrete slabover made ground. May be a steel framed, cladbuilding

Page 72: South West of England Regional Development Agency · 2020. 1. 27. · South West of England Regional Development Agency Wave Hub Development and Design Phase Final design report June

Abbott Risk Consulting Ltd

Report No ARC-059-006Revision 1May 2006

Page 20 of 46

Infrastructure Description

Foundation slab Reinforced concrete raft foundations and/or someform of ground improvement or piles founded atdepth within the sands / gravels or bedrock may bepresent in transformer area.

Access road, compound track andturning area

250m metalled road

Car parking area Concrete over made ground.

Drill pit and storage Concrete lined excavated pit.

Security fencing 1.9m high secure fencing surrounding transformer.

Low voltage electricity supply Trenched service cable.

Water line from mains Trenched water supply.

Septic tank Buried Plastic Tank and associated sewerage pipes.

Table 3-2 Offshore Infrastructure

Infrastructure Description

4 x 11kV cables between WECumbilical and PCU

Approx. 800m of 3 core armoured subsea 11kVcable with integrated fibre optic communicationconductors.

4 x Power Connection Units(PCUs)

A water-tight protective casing containing11kV circuit breaker11/24 kV 5MW transformer,24kV circuit breaker, metal frame,and sited on concrete/steel base.

4 x 24kV cables between PCUand TDU

Approx. 800m of 3 core armoured subsea 24kVcable with integrated fibre optic communicationconductors.

Termination and Distribution Unit(TDU)

A passive unit which provides a connection from the4 x 24kV cables from the PCUs to the single 24kVcable to the shore substation. Contains busbarsenclosed in oil-filled water tight protective casing.Sited on concrete/steel base.

8 x Navigation Buoys 4 x Class 2, 3m steel/plastic Cardinal buoys and 4 xSpecial Mark steel/plastic buoys

Table 3-3 Cable

Infrastructure Description

24kV Cable Approx 25km of 3 core, armoured subsea 24kVcable with integrated fibre optic communicationconductors.

Page 73: South West of England Regional Development Agency · 2020. 1. 27. · South West of England Regional Development Agency Wave Hub Development and Design Phase Final design report June

Abbott Risk Consulting Ltd

Report No ARC-059-006Revision 1May 2006

Page 21 of 46

Table 3-4 WECs

Infrastructure Description

WECs To be specified by developer

11kV Cable Up to 3km of 3 core, armoured subsea cable withintegrated fibre optic communication conductors perWEC

Moorings Chain/Man Made Fibre rope (or as otherwisespecified by developers)

Anchors As specified by developers. WEC anchoringsystems will be device dependent but may rangefrom easily removable clump weights to rockanchors. Tubular anchor piles between 1-1.2mdiameter and between 10-15m long.

4.0 Inventory of Materials

This section provides an inventory of the materials making up the constituent partsof the Wave Hub infrastructure. The quantity of each material is also listed wherethis is known or an estimate can be made. At this point in the Wave Hub project,without the detailed engineering specifications, being available, some elements ofthe final design have not been fixed e.g. the requirement is for a substation buildingto meet stated requirements. However, the exact method/type of construction wouldbe left to the successful tenderer to propose and complete. The availableinformation is presented in Tables 4.1 – 4.4 below for the four categoriesrespectively.

Table 4-1 Onshore Infrastructure Materials

Infrastructure components Materials Quantity

Brick To be provided

Concrete/re-bar To be provided

Steel framework To be provided

Substation Building(inclusive of Power circuitroom, Circuit breaker room,Metering room, Controlroom, Mess room, ROVworkshop and garage. Cladding To be provided

Foundation slab Concrete/re-bar To be provided

Cable trenches Concrete/re-bar To be provided

Drill pit and storage Concrete/re-bar To be provided

Steel casing To be provided

Transformer oil To be provided

Transformer area

Copper windings To be provided

Electrical Switchgear (24kV circuit breaker)

(tbc) Sulphur Hexafluoride(SF6) gas

<50kg per unit

Page 74: South West of England Regional Development Agency · 2020. 1. 27. · South West of England Regional Development Agency Wave Hub Development and Design Phase Final design report June

Abbott Risk Consulting Ltd

Report No ARC-059-006Revision 1May 2006

Page 22 of 46

SCADA and other IT/communication equipment

Computers/servers/printers/multiplexers and associatednetwork wiring

To be provided

Fencing Steel Fencing To be provided

Car parking area Concrete To be provided

Sewage To be providedSeptic tank

Plastic tanks and seweragesystem

To be provided

Table 4-2 Offshore Infrastructure Materials

Infrastructure components Materials Quantity

copper bus-bar c 100kg

Steel To be provided

1 x Termination andDistribution unit

Bus-bars

Steel caseSteel frame

Oil in enclosed container <1000ltrs

Copper To be provided

Steel case and frame To be provided

Transformer oil To be provided

Concrete To be provided

4 x Power Connection Units

11kV circuit breaker11/24 kV transformer24 kV circuit breakerMetal frameProtective casing and baseplates Steel base To be provided

Steel casing To be provided

Plastic casing To be provided

8 x Navigation buoys(including electronics &moorings)

Steel mooring cable andanchors

c100te

Table 4-3 Cable Materials

Infrastructure components Materials Quantity

Copper (Depending onspecification chosen tomeet design requirement,the cross sectional area(CSA) of each of thecores may be between400 and 630mm2. Hence,quantity may varybetween a total of 269teand 565te.

Steel wire armour sheath To be provided

24kV Cable (approx. 25kmin length)

Fibre optic communication To be provided

Page 75: South West of England Regional Development Agency · 2020. 1. 27. · South West of England Regional Development Agency Wave Hub Development and Design Phase Final design report June

Abbott Risk Consulting Ltd

Report No ARC-059-006Revision 1May 2006

Page 23 of 46

conductors.

24kV Cable (4 x 200 mconnecting cables betweenTDU and PCUs)

CopperSteel wire armour sheathFibre optic communicationconductors

Copper - Between 1 and2te

11kV Cable (4 x 200mbetween PCU and WECumbilical)

Copper Copper core 3 x 120mm2.Approx 1te

Table 4-4 WEC Materials

Infrastructure components Materials Quantity

WECs To be specified by developer To be specified bydeveloper

Umbilical Cable To be specified by developer To be specified bydeveloper (up to 3km)

Mooring lines Chain and/or man made fibreropes

To be specified bydeveloper

Anchors Tubular anchor piles 1-1.2mdiameter and 10-15mlong.

To be specified bydeveloper

5.0 Removal and Disposal Options

This section provides a general description of the alternative removal and disposaloptions for the components of the project as detailed in the description of items tobe decommissioned. It includes a short list of options and the reasons for selectionof the chosen option.

As far as is practicable the decommissioning solutions proposed are consistent withinternational obligations, as well as UK legislation, and have a proper regard forsafety, the environment, other legitimate uses of the sea and economicconsiderations and are in line with the principles of sustainable development.

IMO RESOLUTION A.672(16) (Reference6), requires “abandoned or disusedoffshore installations or structures on any continental shelf or in any exclusiveeconomic zone to be removed, except where non-removal or partial removal isconsistent with the following guidelines and standards.” Whilst strictly referring tooil and gas installations, it is considered that the principles reflected in therequirements will be incorporated in the forthcoming guidance to the renewableindustry.

In instances where the removal of a part of the installation is not the best solution,other options can be considered only in situations where one of the following issatisfied:

Page 76: South West of England Regional Development Agency · 2020. 1. 27. · South West of England Regional Development Agency Wave Hub Development and Design Phase Final design report June

Abbott Risk Consulting Ltd

Report No ARC-059-006Revision 1May 2006

Page 24 of 46

� The installation or structure has the potential to serve a new use, such asenhancement of a living resource.

� Where entire removal would involve extreme cost.

� Where entire removal would involve an unacceptable risk to personnel.

� Where entire removal would involve an unacceptable risk to the marineenvironment.

The removal and disposal options favour, as far as possible, the complete removaland subsequent reuse, recycling or disposal of on land, of all installations at the endof the project life.

The installations shall, however, be removed in their entirety in the instance theyfall into any locations which are “approaches to or in straits used for internationalnavigation or routes used for international navigation through archipelagic waters,in customary deep-draught sea lanes, or in, or immediately adjacent to, routeingsystems which have been adopted by the IMO”.

Where parts of an installation or structures are proposed to be left on the sea-bedthe following provisions have to be made:

� Advance notice to mariners of the specific position, dimensions, surveyeddepth and markings of the installation or structure.

� advance notice to appropriate hydrographic services to allow for timelyrevision of nautical charts.

� notification of non-removal or partial removal to the IMO.

� where necessary, properly marked with aids to navigation.

In deciding the removal methodology for decommissioning the followingconsiderations have been taken into account:

� Best Practicable Environmental Option (BPEO). That is the option whichprovides the most benefit or least damage to the environment as a whole, atan acceptable cost, in both the long and short term.

� Safety of surface and subsurface navigation.

� Other uses of the sea.

� Health and safety considerations.

The decommissioning plan considers four areas namely;

� Onshore infrastructure.

� Offshore infrastructure.

� Cable.

� WECs.

Each of these areas are considered separately below.

Page 77: South West of England Regional Development Agency · 2020. 1. 27. · South West of England Regional Development Agency Wave Hub Development and Design Phase Final design report June

Abbott Risk Consulting Ltd

Report No ARC-059-006Revision 1May 2006

Page 25 of 46

5.1 Onshore Infrastructure

Decommissioning of the onshore infrastructure will involve the complete removalof the infrastructure as described in Section 6. No alternative disposal options areproposed.

5.2 Offshore infrastructure

The offshore equipment is predominantly seabed laid and is intended to be easilyrecoverable. There is little intrusive work on any of the offshore infrastructurealthough some parts of the 24kV cable will be buried to a depth of 1-3m closerinshore where this is possible. Some of the WECs may require rock anchors but, atthis stage, the exact nature of these is not known. Therefore, it is intended that themajority of the offshore infrastructure shall be removed for offsite disposal in asdescribed in Section 6.

5.2.1 TDU/PCUs

The TDU and 4 PCUs are intended to be easily recoverable in case of failure.Whilst the individual units and their locations may have become marine habitatsfor certain species, the removal of the TDUs and PCUs will reduce the risk tofishing vessels e.g. trawlers, when the area is subsequently opened to fishing.Given the ease with which the TDUs/PCUs can be removed, the preferred option isto remove them for subsequent re-cycling.

Two different disposal options were considered for the concrete base-plates andsteel grid on which the TDU and PCUs will probably sit:

1. Leave the bases in situ.

2. Bring to shore for disposal

Leaving the bases in situ would present a lesser hazard than the whole TDU/PCUstructure but may still present a significant hazard to trawlers which use the areadependent on the exact design/construction of the base-plate. It may, however bepossible to reduce the protrusion of the plates to an extent whereby it would beacceptable to leave the remains in situ. At the present time, with the exact design ofthe structures unknown, it is not possible to determine if this is an acceptablesolution.

Removal of the base-plate would be possible and would involve lifting and removalof the steel grid base plate for PCU. The concrete base-plate would, probably,require to be broken up and the remains brought to the surface.

The preferred disposal option, given the current knowledge of the system, is for thecomplete removal of the base-plates in order to remove any risk to vessels engagedin trawling.

Page 78: South West of England Regional Development Agency · 2020. 1. 27. · South West of England Regional Development Agency Wave Hub Development and Design Phase Final design report June

Abbott Risk Consulting Ltd

Report No ARC-059-006Revision 1May 2006

Page 26 of 46

Aids to Navigation

All aids to navigation (AtN) (i.e. 4 cardinal and 4 special mark buoys) will havebeen subject to periodic maintenance and replacement involving lifting andrecovery onboard a suitable vessel several times during their life and should be insuitable condition to be refurbished and re-used. Any components that havereached their end of their operational life would be sent for recycling.

It is proposed that the lifting and removal of AtN is conducted by the buoymaintenance vessel used to conduct the periodic maintenance (e.g. MV PATRICIA,Trinity House operating out of Swansea or similar).

5.3 Cable

The cable length has been considered as three elements; namely:

� 11kV cables between PCUs and WEC connection points. (Approx..800mtotal).

� 24kV interconnecting cable between TDU and PCUs (Approx. 800m total).

� 24kV cable between substation and point offshore navigable by removalvessel. (Approx. 25km).

11kV Cables Between PCUs and WECs

These four lengths of cable shall be removed completely for onshore recycling asoutlined in section 7.

24kV Interconnecting Cables between TDU and PCUs.

These four lengths of cable shall be removed completely for onshore recycling asoutlined in section 7.

Offshore cable.

The offshore cable presented three disposal options for consideration. These were:

� Leave the cable in situ.

� Remove all cable for onshore recycling/disposal.

� Partial removal of cable for onshore recycling/disposal.

The 24kV cable contains between, approximately, 269 and 565te of copperdepending on whether 400mm2 or 630mm2 cross sectional area core cable is

Page 79: South West of England Regional Development Agency · 2020. 1. 27. · South West of England Regional Development Agency Wave Hub Development and Design Phase Final design report June

Abbott Risk Consulting Ltd

Report No ARC-059-006Revision 1May 2006

Page 27 of 46

selected as meeting the specification requirement. At present (May 2006) rates1,this represents a potential value of £1m - £4m when recovered.

Recovery of the subsea cable is possible by the reverse process of laying i.e. to usea cable layer to recover the cable onto a cable drum. The cost of a cable layer atMay 2006 prices2 is between £17k and £35k per day depending on capability. Thecapability is based partially on the ability to recover cable buried at specifieddepths. Recovery could be completed within 3-4 days, hence, there would appear tobe a strong economic case for recovery.

It may not, however, be able to recover the cable buried near inshore where thevessel would be unable to navigate. As this is probably to be buried to a depth of,between 1m and 3m whilst the cable on the beach, will be buried to a depth of 3m,the cable within the 10m contour (approximately 1km) would require anothermeans of recovery (possible involving a mixture of excavation and winching).

Preliminary guidance on leaving cables in situ when buried has been provided byDTI in an informal discussion paper (Reference5). On the basis of this guidance it isconsidered that there may be a case for leaving the near shore section of the cablein situ given the technical difficulties in removing the cable which could make theremoval uneconomic. Also, the near shore area is a sensitive area (especiallyaround the rocks of St Ive’s Bay) and the potential; environmental impact ofsediment disturbance is high in this region. Leaving the cable in situ raises the issueof potential cable exposure in the future and the risk that this may present to othermaritime users. The cable would be monitored over the life of the installation inorder to assess the risks of the cable becoming exposed during that period. Therequirements for ongoing monitoring would then be based on these observationsand any other guidance.

It is therefore proposed that the decommissioning option for the near shore sectionof the cable is reassessed in the light the final design with regard to burial depthsand technical feasibility.

5.4 WECs

The WECs and their mooring lines shall be removed completely as discussed inSection 6. Two disposal options were presented for the WECs anchors. These are:

� Leave in situ.

� Remove for offsite recycling/disposal

Where an anchor can be used by another device there is good reason for it to be leftin situ. When there is no future use required for the anchor it shall as far aspractical be retrieved and brought to shore for reuse or recycling.

1 $7.1/kg; London Metal Exchange2 Global Marine

Page 80: South West of England Regional Development Agency · 2020. 1. 27. · South West of England Regional Development Agency Wave Hub Development and Design Phase Final design report June

Abbott Risk Consulting Ltd

Report No ARC-059-006Revision 1May 2006

Page 28 of 46

Preliminary guidance on the decommissioning of foundations below the seabed hasbeen provided by the DTi (Reference4). Where an installation’s foundations extendsome distance below the level of the sea-bed, removing the whole of thefoundations may not be the best decommissioning option, given the potentialimpact of removal on the marine environment, as well as the financial costs andtechnical challenges involved. In these cases, there is a case for rock anchorfoundations to be cut below the natural sea-bed level at such a depth to ensure thatany remains are unlikely to become uncovered. In the event of this proposed courseof action, it shall be decided on a case by case basis as part of the developer’sindividual decommissioning plans.

6.0 Selected Removal and Disposal Option

The decommissioning plan considers 4 areas namely;

� Onshore infrastructure

� Offshore infrastructure

� Cable

� WECs

Each of the different areas are considered separately below:

6.1 Onshore Infrastructure.

Decommissioning of the onshore infrastructure will involve;

� Disconnection of all electrical lines and other utility services.

� Emptying and removal of the septic tank

� Draining of the transformer.

� Offsite removal of all components from within the substation.

� Destruction of the substation building and removal of all building rubble.

� Removal of ground contaminated by the activities of Wave Hub andresurfacing for Brown field redevelopment.

� Infilling of the cable pit and landscaping the surrounding area.

Electrical Supplies and other Utilities/Services.

Electrical and water mains shall be terminated in accordance with the applicablesafety requirements. It is intended that the electricity and water mains will remainin situ for future site use.

Page 81: South West of England Regional Development Agency · 2020. 1. 27. · South West of England Regional Development Agency Wave Hub Development and Design Phase Final design report June

Abbott Risk Consulting Ltd

Report No ARC-059-006Revision 1May 2006

Page 29 of 46

Septic Tank

The septic tank contents shall be removed for offsite disposal and the septic tankshall be removed. The septic tank hole shall subsequently be in-filled with sand andsoil from the surrounding area. The hole shall be suitably compacted to ensure thatit does not represent a subsidence hazard.

Transformer

The transformer will be some 30–60 tonnes in size. It will be drained oftransformer oil on site using a licensed waste oil collection company. The oil willbe removed for offsite treatment and oil recycling facilities. The transformer casingand windings will be lifted and removed by road transport for refurbishment and re-use or sent for recycling as scrap metal as determined by survey at the time.

Substation Components

All components shall be removed from the substation and shall be taken offsite andshall as far as practical be reused and recycled. The ultimate route of disposal willdepend on the component and the legislative requirements at the time. It isproposed that, as part of the submission of the final decommissioning programme,a complete inventory of all the site equipment and components shall be compiledwith the appropriate disposal options listed for each component.

Substation Building

The building shall be removed without disturbing the underlying ground to as far aspractical. The concrete foundations shall be left in situ. Only areas that have beenidentified in the site survey as being damaged or being contaminated shall beremoved. Building rubble shall be removed by truck for disposal to landfill.Building rebar shall be removed for recycling.

It is anticipated that the access road will be developed into a metalled road over theproject life for other site users. The road shall be kept open for the future use of thesite.

Contaminated Ground

Prior to decommissioning an environmental survey shall be undertaken of the wavehub site by an accredited auditor to assess whether any of the site has beencontaminated by the Wave Hub project. Where contaminated areas are identified,the report will detail recommended clean up and disposal options for thecontaminated material. In contaminated areas the site shall be cleaned up andresurfaced with concrete in order that the area is able to be used for future brownfield development.

Page 82: South West of England Regional Development Agency · 2020. 1. 27. · South West of England Regional Development Agency Wave Hub Development and Design Phase Final design report June

Abbott Risk Consulting Ltd

Report No ARC-059-006Revision 1May 2006

Page 30 of 46

Cable Pit

The cable pit shall be removed and the void shall be bulldozed and infilled withsand and soil from the surrounding area. The pit shall be appropriately compactedto ensure it presents no future hazard from ground subsidence. The site shall belandscaped in accordance with the local topography such that the area is returned tothe original contours as far as practicable.

6.2 Offshore infrastructure

The decommissioning of the offshore infrastructure involves:

� AtN & mooring lifting and removal.

� TDU/PCU & interconnecting cable lifting and removal.

� Cable removal

TDU/PCU

The TDU and PCUs along with their interconnecting cable shall be lifted fromtheir bases and removed by vessel for on shore dismantling and recycling. Allcomponents of the TDU and PCUs can be recycled. The oil can be drained and sentfor recycling whilst the steel shells and any internal switchgear, transformers etcshall also be recycled.

Aids to Navigation

All aids to navigation (AtN) (i.e. 4 cardinal and 4 special mark buoys) shall belifted and brought to shore along with their moorings and anchors. The buoys andtheir moorings will have been subject to periodic maintenance and replacement andshould be in suitable condition to be refurbished and re-used. Any components thathave reached their end of their operational life will be sent for recycling.

It is proposed that the lifting and removal of AtN is conducted by the buoymaintenance vessel used to conduct the periodic maintenance (e.g. MVPATRICIA, Trinity House operating out of Swansea).

6.3 Cable

11kV Cable between PCUs and WECs

The four 11kV cables (approximately 200m each) between the WEC umbilicalpositions and will be recovered by the cable recovery vessel for onshore recycling.

Page 83: South West of England Regional Development Agency · 2020. 1. 27. · South West of England Regional Development Agency Wave Hub Development and Design Phase Final design report June

Abbott Risk Consulting Ltd

Report No ARC-059-006Revision 1May 2006

Page 31 of 46

24kV Interconnecting Cables between PCUs and TDU

The 24kV interconnecting cables (approximately 200m each) between the PCUsand TDU will be recovered along with the units themselves by the cable recoveryvessel for onshore recycling.

24kV Offshore Cable

The 25km of 24kV cable shall, as far as practicable, be recovered by a cable layingand recovery vessel. The 24kV cable will be separated from the TDU at theconnector and recovered onto a suitable capacity cable drum onboard the vessel.The cable shall then be brought ashore for recycling. The vessel will limited to anextent dependent on its draught and other capabilities in recovering the near shoresection of cable. The cable will be cut at the end terminated and buried at a suitablepoint offshore.

Further assessment will be required with regard to the potential removal of thenearshore and beach sections of cable.

6.4 WECs

The WECs shall be removed from the wave hub following their trial periods. It isnot envisaged that the same WEC shall remain on the wave hub for the duration ofthe project. Each WEC shall be removed and brought onshore for reuse as far aspractical. Where the WEC has exceeded its operational life it shall as far aspracticable be recycled.

WEC device moorings (including anchors) shall be removed and brought ashorewith the WEC device for subsequent disposal by re-use or re-cycling. Pile anchorsmay, as discussed in Section 5.4, be cut below the natural sea-bed level at such adepth to ensure that any remains are unlikely to become uncovered. In the event ananchor is to remain in situ this shall be decided on a case by case basis as part ofthe developers individual decommissioning plans.

The removal of WECs and mooring lines shall be done by vessels appropriate tothe task and engaged by the developers. Developers will be required to provide adecommissioning plan to meet the requirements of the appropriate consentingauthority. Appendix A shows the structure of such a plan and the headline issues tobe addressed.

7.0 Hazard Identification & Risk Assessment

A formal Hazard identification and Risk Assessment was carried out on theselected decommissioning option. The Hazard Identification and Risk Assessment(HIRA) is intended to determine all potential hazards to personnel (including thepublic) and the environment impact associated with both the decommissioning

Page 84: South West of England Regional Development Agency · 2020. 1. 27. · South West of England Regional Development Agency Wave Hub Development and Design Phase Final design report June

Abbott Risk Consulting Ltd

Report No ARC-059-006Revision 1May 2006

Page 32 of 46

activities and the equipments being removed and to estimate the risks that they maypresent.

The HIRA was conducted using a systematic approach (based on guidance in ISO17776:2000(E) -Guidelines on tools and techniques for Hazard Identification andRisk Assessment). This provides assurance that, so far as is possible, all suchimpacts have been identified and that low frequency/high impact risks are capturedas well as high frequency/low impact ones.

The identified hazards (issues) were assessed for the risk that they present to:

� Personnel involved in the decommissioning activities.

� Members of the public (particularly other users of the marine environment).

� Other adjacent equipment/structures (whether part of Wave Hub or not).

� The environment (including social, cultural and heritage aspects).

The Results of the Hazard Identification & Risk Assessment are included inAppendix B.

7.1 Environmental Issues

The environmental component of the HIRA incorporates the identification ofenvironmental issues normally carried out by the more narrowly focussedEnvironmental Issues Identification (ENVID) process. This section defines anddocuments the environmental requirements to ensure that prior to and duringdecommissioning, minimum harm to the environment is achieved. This can bejustified by ensuring that the management methods applied for the significantenvironmental issues are consistent with the following requirements:

� Best Available Technology (BAT) for each significant environmental issue.This needs to demonstrate that:

1. Environmental sensitivities relevant to the project, as identified in theEIA, are to be considered in defining BAT for the significantenvironmental issues;

2. Legislative requirements are met.

� The principles of Best Practicable Environmental Option (BPEO), for thesignificant environmental issues, have been considered, where appropriate.

This assessment covers the evaluation of all environmental aspects (includingpotential ones) associated with decommissioning activities. The following are themain potential environmental receptors that have been discussed during theENVID, which are applicable during decommission operations:

� Nature conservation.

� Fisheries.

� Tourism and recreation.

Page 85: South West of England Regional Development Agency · 2020. 1. 27. · South West of England Regional Development Agency Wave Hub Development and Design Phase Final design report June

Abbott Risk Consulting Ltd

Report No ARC-059-006Revision 1May 2006

Page 33 of 46

� Landscape and visual amenity.

� Heritage and archaeology.

� Land and sea use.

� Traffic and transport.

� Air and climate.

� Water.

� Soil, geology, hydrogeology and geomorphology.

� Coastal processes, waves and currents.

� Solid and other wastes.

� Nuisance (noise, vibration, odours, light).

� Socioeconomic.

The environmental impacts associated with the decommissioning of the Wave Hubproject are reported in Table 7.1. The timing of decommissioning is important toavoid or minimise the environmental impacts that have been identified. Table 7.1shows the months in which key environmental impacts should be as far as possibleavoided. This information should be balanced with the practical restraints put onthe project with regard to weather and sea state. Periods of heavy weather will notonly make operations more difficult they will increase the associated risks to healthsafety and the environment. The window of opportunity has therefore beenproposed as during the month of September. Increased care would be requiredduring this period to avoid disturbance to fishing pots in the near shore areas andimpacts to the last of the season’s recreational users.

Table 7-1 Restrictions on time table for decommissioning by month

Environmentalreceptor

Jan Feb March April May June July Aug Sept Oct Nov Dec

Bird nestingseasons (scrubonshore)

Seabirdvulnerability

Bird migrationthrough HayleEstuary

Dover SolePeak Fishingseason (>30moffshore)

Fish breedingseasons (St

Page 86: South West of England Regional Development Agency · 2020. 1. 27. · South West of England Regional Development Agency Wave Hub Development and Design Phase Final design report June

Abbott Risk Consulting Ltd

Report No ARC-059-006Revision 1May 2006

Page 34 of 46

Ives Bay)

Shell fish (StIves Bay out to30m)

Peak Spawningperiods

Recreation andtourisms (StIves Bay)

8.0 Waste management

When considering the management of waste arising from the decommissioning ofthe Wave Hub, all waste shall be brought to land for reuse, recycling, incinerationwith energy recovery or disposal. No waste shall under any circumstances bedisposed of to sea.

The choice of waste management options have been based on an assessment of theBest Practicable Environmental Option (BPEO). That is, the option which providesthe most benefit or least damage to the environment as a whole, at an acceptablecost, in both the long and short term. In determining the BPEO, three keyconsiderations have been taken into account:

� The waste hierarchy; re-use should be considered first, followed byrecycling, incineration with energy recovery and, lastly, disposal.

� The proximity principle; waste is required to be disposed of as close to theplace of production as possible, thus reducing the environmental impact oftransporting waste.

� Self-sufficiency; waste should not be exported from the UK for disposal(although export for re-use or recycling may be considered).

9.0 Stakeholders Issues

Stakeholders have been consulted with regard to the development and operation ofthe Wave Hub facility and their views and requirements taken into account. Thestakeholders and required consultation processes are described in the EIA. Thosestakeholders will be consulted again as part of the decommissioning consentprogramme described in Section 14 and in the light of the Marine Bill and futureguidance.

10.0 Licenses Associated with the Disposal Option

The licenses and permits that will be required for the selected disposal option ofwave hub are listed below:

Page 87: South West of England Regional Development Agency · 2020. 1. 27. · South West of England Regional Development Agency Wave Hub Development and Design Phase Final design report June

Abbott Risk Consulting Ltd

Report No ARC-059-006Revision 1May 2006

Page 35 of 46

11.0 Pre and Post Decommissioning Monitoring andMaintenance

11.1 Pre decommissioning

The following studies have been identified as being required prior todecommissioning the Wave Hub project.

� Offshore Cable Survey – this survey is required to identify the exactlocation and condition of the cable prior to lifting.

� Onshore Phase 1 and 2 Environmental audit of substation facility – thepurpose of this audit is to ascertain whether there has been anycontamination arising from the Wave Hub project (e.g. from disturbance) tothe ground in the vicinity of the sub station. The audit findings will be usedto ascertain the requirement for the removal and/or subsequent clean up ofareas of the site. The typical cost for the environmental audit will bebetween £5k and £10k depending on the amount of intrusive investigation(i.e. bore holes and soil samples) required.

11.2 Post decommissioning.

Upon completion of decommissioning, a survey shall be undertaken to verify seabed clearance. This survey shall ensure that all infrastructure and debris has beenremoved. It will identify the location of any debris that has accidentally been left onthe sea bed which may have arisen from the project or as part of thedecommissioning operation itself.

Where an installation is not removed entirely, some post decommissioningmonitoring will be required. The IMO standards require the adoption of a specificplan to monitor accumulation and deterioration of material left on the sea-bed toensure there is no subsequent adverse impact on navigation, other uses of the sea orthe marine environment. Monitoring could identify any new or increased risksposed by remaining materials (for example, where cables and foundations mayhave become exposed due to natural sediment dynamics). Appropriate action couldthen be taken to mitigate the risks.

After decommissioning has been completed a visual landscape assessment shall beundertaken to ensure that the wave hub project area has been returned to, as far asis possible, the condition to which it was in, prior to the start of the project. Thetypical cost for a landscape assessment would be in the region of £8k.

12.0 Supporting Studies

At the time of writing this report, no supporting studies have been identified asbeing required to be undertaken during the decommissioning phase of the project.

Page 88: South West of England Regional Development Agency · 2020. 1. 27. · South West of England Regional Development Agency Wave Hub Development and Design Phase Final design report June

Abbott Risk Consulting Ltd

Report No ARC-059-006Revision 1May 2006

Page 36 of 46

13.0 Costs

An estimate of the costs associated with all the identified activities relating to thepreferred decommissioning option, including post-decommissioning inspection andmaintenance are detailed in the table below. These costs have been expressed in £sterling at current rates (2006). Due to the fact that the design and/or the equipmentor structures have not yet been finalised, the figures are, in most cases, extremelytentative. They will require review once the infrastructure specifications aredecided.

Page 89: South West of England Regional Development Agency · 2020. 1. 27. · South West of England Regional Development Agency Wave Hub Development and Design Phase Final design report June

Abbott Risk Consulting Ltd

Report No ARC-059-006Revision 1May 2006

Page 37 of 46

Table 13-1 Estimated Costs

Activity Asset Rate Time Cost

Surveys

Pre-Decommissioning Survey –subsea cables/TDU/PCUs

Surveyvessel/ROVPersonnel

£5k/day 5 days(inc. mob/demob)

£25K ± 50%

Pre-Decommissioning Survey –Phase I & II EnvironmentalAudit of Onshore infrastructure

Personnel N/A N/A £7.5k ± 30%

Landscape Assessment Personnel N/A N/A £8k ± 30%

Post-Decommissioning Survey Surveyvessel/ROVpersonnel

£5k/day 3 days(inc. mob/demob)

£15k ± 50%

Monitoring (Periodicity to bedetermined)

Surveyvessel/ROVpersonnel

£5k/day 3 days(inc. mob/demob)

£15k ± 50%

Onshore Structures

Electrical De-commissioning Personnel/Plant

N/A N/A £20k ± 50%

Civil Structure DemolitionTeam/Plant

N/A N/A £30k ± 50%

Land fill (Transport & Disposal) Personnel/Plant

N/A £5k ± 50%

Offshore Infrastructure (including 24kV cable)

24kV Cable CableVessel

PCUs/TDU & interconnectingcabling (11kV and 24kV)

CableVessel

£30-65k/day(Av.£47.5k)

4 days(inc. mob/demob) £190k ± 50%

Aids to Navigation (8 buoys) BuoyrecoveryVessel

N/A 2 days £4k ± 50%

ESTIMATED AVERAGE COST) £319.5k

Upper Estimated Cost £476.6

Lower Estimated Cost £162.3

Page 90: South West of England Regional Development Agency · 2020. 1. 27. · South West of England Regional Development Agency Wave Hub Development and Design Phase Final design report June

Abbott Risk Consulting Ltd

Report No ARC-059-006Revision 1May 2006

Page 38 of 46

14.0 Programme

This section of the report looks at the programme of events required prior toinitiation of the decommissioning phase of the Wave Hub Project.

This programme should be viewed as preliminary guidance only as, at the time ofwriting this report, the DTi Guidance for the decommissioning of offshore waveenergy installations has not been issued (expected to be issued October 2006).

At the project application stage a decommissioning programme shall be submittedto the DTi ORCU. The DTi ORCU shall act as coordinating body for the receipt ofconsent applications. The Secretary of State may then make requests foramendments to the decommissioning programme including more detailed costingsor demonstration of the arrangements in place to ensuring funds are available.Upon approval of the decommissioning programme the Secretary of State mayrequest revisions to the programme possibly at 5 year intervals. In addition, it isproposed that certain disposal options considered within this report are reassessedin light of more detailed engineering design and future technology available. Theareas that have been proposed for reassessment include:

� Detailed inventory of substation equipment and components as detailed inSection 4.

� Removal of cable from near shore (<10m contour) as detailed in Section 6.

� Removal of nearshore and beach section of cable as discussed in Section 6.

At any time during the project life the Wave Hub Owner is obliged to notify theSecretary of State of any modifications to be made to the programme or of changeof ownership of the project.

Upon realising a date for project end the owner shall submit a finaldecommissioning programme to the DTi ORCU for discussion and review at least2 years prior to project end. It has been proposed that the decommissioning willtake place during the month of September to minimise identified environmentalimpacts (see Section 7.1 of this report). A 2 year period will allow ample reviewand amendment time to the programme. It is anticipated that the approval processwill take approximately 10 months. Upon approval of the programme the operatoris required to apply for all associated consents and licences for conduction theactual works. This shall include but not be limited to:

� Marine works consents: Secretary of State

� Marine works: Maritime and coastguard authority

� Traffic routing: Highways Agency

� Demolition works: Local Planning authority

� Waste management licences: Environment Agency

Page 91: South West of England Regional Development Agency · 2020. 1. 27. · South West of England Regional Development Agency Wave Hub Development and Design Phase Final design report June

Abbott Risk Consulting Ltd

Report No ARC-059-006Revision 1May 2006

Page 39 of 46

Other bodies shall also be communicated with including:

� MOD

� Fisheries

� General Public

A diagram showing the proposed programme is shown in Figure 14.1

Page 92: South West of England Regional Development Agency · 2020. 1. 27. · South West of England Regional Development Agency Wave Hub Development and Design Phase Final design report June

Abbott Risk Consulting Ltd

Report No ARC-059-006Revision 1May 2006

Page 40 of 46

Figure 14-1 De-commissioning Programme

Submit Applications forWave Hub ProjectConsents

Submit costedDecommissioningProgramme to Secretary ofState

ElectricityAct/CPA/FEPAConsents granted

Secretary of Statemay requestrevisions toprogramme

Approved DecommissioningProgramme

Secretary of Statemay requestrevisions toprogramme

Project Time Line Decommissioning Consentrequirements

Application andconsent processcoordinated by DTiORCU

Apply for associated licensesand permits to carry outworks

Revise DecommissioningProgramme

Apply for consent for actualDecommissioning

2 years prior toproject end DTi ORCU

discussions andreview period

Authorising Body

Consider Waste managementlicences; Marine worksconsents, local authority,highways agency, maritimeand coastguard agency,consents; otherconsiderations e.g. fisheries,MOD and publicrequirements.

Decommissioningprogramme approved

5 year intervals

Obligation to notify ofmodifications to programmeor changes in ownership

1 year prior toproject end

Project end

Page 93: South West of England Regional Development Agency · 2020. 1. 27. · South West of England Regional Development Agency Wave Hub Development and Design Phase Final design report June

Abbott Risk Consulting Ltd

Report No ARC-059-006Revision 1May 2006

Page 41 of 46

15.0 References

1 MCA Marine Guidance Note 275(N) Proposed Offshore Renewable EnergyInstallations – Guidance on Navigational Safety Issues.

2 Department of Trade and Industry (DTi) Guidance on Consenting Arrangementsin England & Wales for a Pre-commercial Demonstration Phase for Wave andTidal Stream Energy Devices (Marine Renewables) Nov 2005.

3 DTi Guidance Notes for Industry – Decommissioning of Offshore Installationsand Pipelines under the Petroleum Act 1998.

4 Guidance notes for the decommissioning of offshore renewable energyinstallations (section 6.2 of the Guidance Notes for the Offshore Wind FarmsConsents Process), March 2004.

5 DTi Electricity development consents branch informal discussion paper ondecommissioning standards for offshore renewable energy installation, March2006.

6 International Maritime Organisation Guidelines and Standards for the Removal ofOffshore Installations and Structures on the Continental Shelf and in the ExclusiveEconomic Zone, adopted by IMO Assembly on 19 October 1989, (ResolutionA.672 (16)).

7 Problems and Benefits Associated with the Development of Offshore Wind-Farms, Biodiversity Series, OSPAR Commission 2004.

Page 94: South West of England Regional Development Agency · 2020. 1. 27. · South West of England Regional Development Agency Wave Hub Development and Design Phase Final design report June

Abbott Risk Consulting Ltd

Report No ARC-059-006-R1Revision 1May 2006

Page 42 of 46

Appendix A

Developer’s De-Commissioning PlansScope of Work

Page 95: South West of England Regional Development Agency · 2020. 1. 27. · South West of England Regional Development Agency Wave Hub Development and Design Phase Final design report June

Abbott Risk Consulting Ltd

Report No ARC-059-006Revision 1May 2006

Page 43 of 46

1.0 Developer’s Decommissioning Plans

Each device developer will be required to complete a decommissioning plan fortheir device taking into account the standards and guidance appropriate at the time.The outline provided below is based on guidance currently available with regard tothe decommissioning of offshore structures. It will be subject to review and updatein the light of consenting authorities requirement and guidance as subsequentlyissued.

Introduction

Executive Summary

Background Information

Relevant background information, supported by diagrams, including:

� The relative layout of the facilities to be decommissioned (installations,subsea equipment and navigational aids).

� The relative location, type and status of any other adjacent facilities whichwould have to be taken into consideration.

� Information on prevailing weather, sea states, currents, seabed conditions,water depths etc.

� Any fishing, shipping and other commercial activity in the area.

� Any other background information relevant to consideration of the draftdecommissioning programme.

Description of Items to be Decommissioned

A full description, including diagrams, of installations, cables, navigational aidsand shore structures.

Inventory of Materials

For all items described above, an inventory listing the amount, type and relativelocation of all materials including, transformer oils, lubricants, heavy metals,sacrificial anodes and other controlled materials should be included.

Removal and Disposal Options

This section will provide a general description of the alternative removal anddisposal options for the items described above. It will include a short list of optionsand the reasons for rejecting those not short-listed.

Page 96: South West of England Regional Development Agency · 2020. 1. 27. · South West of England Regional Development Agency Wave Hub Development and Design Phase Final design report June

Abbott Risk Consulting Ltd

Report No ARC-059-006Revision 1May 2006

Page 44 of 46

Selected Removal and Disposal Option

This section shall describe the proposed decommissioning option. It should include:

� The removal and disposal option, describing the removal method and thedisposal route.

� An indication of how the principles of the waste hierarchy will be met,including the extent to which the installation or any part of it, will be re-used or recycled.

� Details of any cleaning or removal of waste materials, including cleaningmethods; cleaning agents and disposal of residues.

� Details of any materials and remains on the seabed after decommissioning.

� Water clearances above any remains.

� Predicted degradation, movement and stability of any remains.

Risk Assessment

This section should include the results of the Risk Assessment (RA) of the selecteddecommissioning option. It will be an assessment of the likely effects of the projecton project personnel, the public, and the environment and the measures envisagedto avoid, reduce to tolerable level (As Low As Reasonably Practicable - ALARP)and, where necessary, remedy any significant adverse affects should they occur.The RA will include the following:

� Impacts on the marine environment, including exposure of biota tocontaminants associated with the installation, other biological impactsarising from physical effects, conflicts with the conservation of species,with the protection of their habitats, or with mariculture, and interferencewith other legitimate uses of the sea.

� Impacts on other environmental medium, including emissions to theatmosphere, leaching to groundwater, discharges to surface fresh water andeffects on the soil.

� Other consequential effects on the physical environment which may beexpected to result from the option.

� Impacts on amenities, the activities of communities and on future uses ofthe environment.

Stakeholder Issues

A description is required of the consultation processes undertaken, including asummary of the statutory consultations with interested parties and the extent towhich they have been taken into account in the programme.

Page 97: South West of England Regional Development Agency · 2020. 1. 27. · South West of England Regional Development Agency Wave Hub Development and Design Phase Final design report June

Abbott Risk Consulting Ltd

Report No ARC-059-006Revision 1May 2006

Page 45 of 46

Costs

Estimates of cost should be included for all identified activities relating to thepreferred decommissioning option, including post-decommissioning inspection andmaintenance.

Licences Associated with the Disposal Option

This should indicate any other licences or permits that are required in order to carryout the proposed decommissioning option.

Pre- and Post-Decommissioning Monitoring and Maintenance

The requirements for pre and post –decommissioning surveys shall be addressed.

Supporting Studies

The requirement for supporting studies such as a Fish Ecology Study, shall beidentified and addressed here.

Programme

A programme of required actions shall be included which will indicate thesequence of activities, including consent applications, required for the de-commissioning to be completed successfully.

Page 98: South West of England Regional Development Agency · 2020. 1. 27. · South West of England Regional Development Agency Wave Hub Development and Design Phase Final design report June

Ab

bo

ttR

isk

Co

nsu

ltin

gL

td

Rep

ortN

oA

RC

-059

-006

Issu

e1

May

2006

Pag

e46

of46

Ap

pen

dix

B

De-

Co

mm

issi

on

ing

Haz

ard

Iden

tifi

cati

on

&R

isk

Ass

essm

ent

Page 99: South West of England Regional Development Agency · 2020. 1. 27. · South West of England Regional Development Agency Wave Hub Development and Design Phase Final design report June

LC

IL

CI

1M

arin

eM

arin

etr

ansp

ortu

sed

toco

nduc

toff

shor

esu

rvey

s

Col

lisio

nbe

twee

nsu

rvey

and

othe

rve

ssel

s/de

vice

s/bu

oys

lead

ing

tove

ssel

bein

gsu

nk,o

rcr

ewin

jure

d.V

esse

l,de

vice

oreq

uipm

ent

may

bese

rious

lyda

mag

ed.

Pot

entia

lrel

ease

tom

arin

een

viro

nmen

t

25

10S

urve

yve

ssel

lit/m

arke

din

acco

rdan

cew

ithIn

tern

atio

nalr

ules

for

the

prev

entio

nof

colli

sion

atse

aap

prop

riate

toits

size

and

task

.1

55

2P

ress

ure

haza

rds

Div

ing

oper

atio

nsm

aybe

requ

ired

inin

shor

ear

eato

surv

eyca

ble

cond

ition

.R

isk

ofdi

ving

acci

dent

15

5

Use

ofR

OV

spr

efer

red

whe

repo

ssib

le.

Div

ing

only

used

clos

ein

shor

ew

here

RO

Vus

eim

prac

tical

i.e.w

ithin

surf

line,

henc

em

inim

isin

gris

kof

divi

ngin

cide

ntU

seof

SQ

EP

Div

ing

cont

ract

or.

0

3A

sphy

xiat

esW

ork

over

wat

erdu

ring

mar

ine

surv

eys

Ris

kof

drow

ning

/hyp

othe

rmia

25

10P

rovi

sion

ofha

rnes

ses

and

lifej

acke

tsan

d,w

here

appr

opria

te,p

rote

ctiv

ecl

othi

ngw

hils

tcar

ryin

gou

tuna

void

able

wor

ks.

12

2

4H

eigh

tW

ork

athe

ight

sdu

ring

surv

eyF

alll

eadi

ngto

deat

h/in

jury

25

10P

rovi

sion

ofap

prop

riate

edge

prot

ectio

n/sa

fesy

stem

ofw

ork/

pers

onal

fall

prev

entio

neq

uipm

ent

15

5

5E

nviro

nmen

tH

igh

sea

stat

e/w

ind

Exc

eeds

seak

eepi

ngca

pabi

lity

ofsu

rvey

vess

el2

48

Wor

kbo

atm

eets

MC

AC

ode

for

wor

kboa

tsan

dop

erat

ing

area

22

4

6H

eigh

tLi

ftin

gop

erat

ions

durin

gde

mol

ition

.Li

ftin

geq

uipm

entc

olla

pses

orto

pple

s.Lo

adis

drop

ped

orco

llide

sw

ithw

orke

r(s)

orst

ruct

ure.

Inju

ryto

wor

kers

.D

eath

ofw

orke

rs.

Loss

ofS

truc

ture

.D

amag

eto

equi

pmen

t2

510

Spe

cify

com

plex

orhe

avy/

high

lifts

plan

se.

g.tr

ansf

orm

er.

Spe

cify

adeq

uate

and

SQ

EP

pers

onne

lto

cont

ract

orfo

rlif

ting

oper

atio

ns.

Pro

vide

hard

-sta

ndin

gsfo

rlif

ting

oper

atio

ns.

Pro

vide

liftin

gat

tach

men

tsan

dC

ofG

mar

king

sfo

rco

mpl

exor

heav

yeq

uipm

ent.

15

5

7H

eigh

tF

alls

from

heig

htIn

jury

/dea

thof

oper

ator

s2

510

Mos

tdem

oliti

onof

shor

esid

est

ruct

ure

isby

mea

nsof

plan

t.B

uild

ing

issi

ngle

stor

yP

rovi

sion

ofap

prop

riate

edge

prot

ectio

n/sa

fesy

stem

ofw

ork/

pers

onal

fall

prev

entio

neq

uipm

ent

15

5

8H

eigh

tS

truc

tura

lcol

laps

edu

ring

dem

oliti

onD

eath

/inju

ryto

oper

ator

s3

515

SQ

EP

cont

ract

orS

afe

met

hods

ofw

orki

ng,a

ppro

pria

tepl

ant

15

5

9E

lect

ricity

Con

flict

with

exis

ting

serv

ices

durin

gde

mol

ition

e.g.

exis

ting

live

unde

rgro

und

/ove

rhea

dH

VC

able

s.

Fire

.E

xplo

sion

.E

lect

rocu

tion.

Flo

odin

g.In

jury

tow

orke

rs.

Dea

thof

wor

kers

.Lo

ssof

Str

uctu

re.

Loss

ofS

ervi

ce.

Dam

age

toeq

uipm

ent

25

10

Det

aile

dsi

tesu

rvey

tolo

cate

and

map

alls

ervi

ces

befo

rest

arto

fco

nstr

uctio

n.A

llW

ave

Hub

serv

ices

tobe

isol

ated

Loca

lcon

firm

ing

surv

eys

prio

rto

exca

vatio

n.P

rote

ctio

nof

over

head

serv

ices

and

excl

usio

nof

high

vehi

cles

/str

uctu

res

from

vici

nity

ofliv

eW

PD

equi

pmen

ts.

WP

Dov

erhe

ad/a

djac

ente

quip

men

tsar

esu

ffic

ient

lydi

stan

tfro

mar

eaof

oper

atio

nsno

tto

pres

enta

haza

rd

15

5

10E

rgon

omic

Man

ning

leve

ls/L

one

wor

king

etc

Inju

ryto

wor

kers

exac

erba

ted

byla

ckof

othe

rsto

notif

yem

erge

ncy

serv

ices

Lack

ofsu

itabl

equ

alifi

edpe

rson

nelt

oas

sist

(E.G

1Sta

ider

)2

48

No

lone

wor

king

durin

gde

mol

ition

phas

eA

dequ

ate

prov

isio

nof

com

mun

icat

ion

for

site

secu

rity

pers

onne

l1s

tAid

faci

litie

s1

22

11A

cces

sLa

ndsi

detr

affic

conf

licts

durin

gde

mol

ition

-si

teac

cess

,na

rrow

brid

geD

river

(s)

orpe

dest

rian(

s)m

aybe

inju

red

orki

lled.

Veh

icle

(s),

stru

ctur

eor

equi

pmen

tmay

bese

rious

lyda

mag

ed.

25

10T

raff

icM

anag

emen

t.O

ne-w

aysy

stem

s.C

ontr

acto

rto

prov

ide

bank

smen

durin

gun

avoi

dabl

em

anoe

uvre

s.1

55

12E

ntra

pmen

tLa

ndsi

deex

cava

tions

durin

gde

mol

ition

/rem

oval

ofca

ble

cone

ectio

npi

taff

ectin

gdu

nest

abili

tyC

olla

pse

ofdu

nes

into

wor

kar

ea.

Dea

thof

wor

kers

.Lo

ssof

Str

uctu

re.

Dam

age

toeq

uipm

ent

25

10E

nsur

esu

ppor

tof

exca

vatio

nsis

clea

rlysp

ecifi

edin

met

hod

stat

emen

t.S

egre

gate

vehi

cles

and

wor

kers

from

exca

vatio

ns.

15

5

13P

ress

ure

haza

rds

Sys

tem

sun

der

pres

sure

Rel

ease

lead

ing

toin

jury

/dea

thof

oper

ator

s2

48

All

Sys

tem

sis

olat

edan

dde

-pre

ssur

ised

prio

rto

dem

oliti

on1

44

14P

ress

ure

haza

rds

Bot

tled

gase

sus

edfo

rcu

tting

and

burn

ing

equi

pmen

tR

isk

offir

e/ex

plos

ion

14

4P

rope

rst

owag

epr

ovid

edby

cont

ract

or1

44

15B

iolo

gica

lS

ewag

efr

omse

ptic

tank

durin

gta

nkre

mov

alO

pera

tor

illhe

alth

23

6T

ank

tobe

drai

ned

and

clea

ned

befo

rere

mov

al.

Met

hod

stat

emen

tand

Ris

kA

sses

smen

tto

refle

ctha

zard

s1

33

16N

oise

Noi

sefr

omde

mol

ition

activ

ities

exce

eds

stat

otor

yle

vels

Dam

age

toop

erat

ors

hear

ing

23

6C

ontr

acto

rta

kes

appr

opria

teac

tion

tore

duce

/pro

tect

agai

nstn

oise

13

3

17T

oxic

/nui

sanc

esu

bsta

nces

Mas

onry

/cem

entd

ustr

elea

sed

durin

gde

mol

ition

Adv

erse

effe

cton

dem

oliti

onw

orke

rs.N

uisa

nce

effe

cton

adja

cent

hous

ing

23

6U

seof

dust

supp

ress

ion

mea

sure

son

site

whe

reap

prop

riate

App

ropr

iate

PP

Efo

rop

erat

ors

12

2

18T

oxic

/nui

sanc

esu

bsta

nces

Dus

t/fu

mes

ffro

mgr

indi

ng/c

utte

rsA

dver

seef

fect

onde

mol

ition

wor

kers

.Nui

sanc

eef

fect

onad

jace

ntho

usin

g2

36

Use

ofdu

stsu

ppre

ssio

nm

easu

res

onsi

tew

here

appr

opria

teA

ppro

pria

teP

PE

for

oper

ator

s1

33

19G

roun

dC

ondi

tions

Adv

erse

geol

ogic

alco

nditi

ons

Dam

age

tost

ruct

ures

/cab

les/

inst

alla

tion

equi

pmen

t3

412

Ens

ure

full

and

adeq

uate

surv

eyof

Wav

eHub

cons

truc

tion

area

14

4

Ons

hore

Sub

Sta

tion

and

Dat

aC

entr

eD

emol

ition

Gu

idew

ord

Co

ntr

ols

/Miti

gat

ion

Mea

sure

sT

oB

eT

aken

Ris

kIn

dex

afte

rM

itig

atio

nA

ntic

ipat

edM

easu

reT

hat

Co

uld

Be

Ap

plie

dB

yT

he

Co

ntr

acto

r(o

rO

ther

s)

Des

ign

Mit

igat

ion

Act

ion

Ow

ner

(Initi

als)

Tar

get

Dat

e

Dat

eA

ctio

nT

aken

Ris

kIn

dex

Are

a

Dec

om

mis

sio

nin

gH

azar

d/R

isk

Ass

essm

ent:

Haz

ard

IDH

azar

dC

on

seq

uen

ce

No

te:

Lik

elih

oo

d(L

):1

-U

nlik

ely

too

ccu

rin

rele

van

tp

erio

d.

2-

Lik

ely

too

ccu

rin

rele

van

tp

erio

d.

3-

Lik

ely

too

ccu

rse

vera

ltim

esin

the

rele

van

tp

erio

d

Co

nse

qu

ence

(C):

5-

Dea

tho

rto

tals

yste

ms

loss

4-

Maj

or

inju

ryo

rill

nes

s.M

ajo

rd

amag

eo

ren

viro

nm

enta

lim

pac

t.3

-L

ost

tim

ein

jury

or

illn

ess.

Dam

age

or

envi

ron

men

tali

mp

act.

2-

Fir

stai

din

cid

ent.

Ro

uti

ne

mai

nte

nan

cere

pai

r1

-V

ery

min

or.

Lit

tle

con

seq

uen

ce.

Ind

ex(I

):L

ikel

iho

od

xC

on

seq

uen

ce(S

eeal

soC

IRIA

SP

125)

.

10-1

5V

ery

Hig

hR

isk

-n

ot

acce

pta

ble

.Ap

ply

mit

igat

ion

.See

kd

irec

tor

app

rova

lif

sig

nif

ican

tri

skre

mai

ns.

6-9

Hig

hR

isk

-A

pp

lym

itig

atio

n.S

eek

dir

ecto

rap

pro

vali

fri

skca

nn

ot

be

reas

on

ably

and

pra

ctic

ally

be

red

uce

db

elo

w"t

his

"le

vel.

1-

5L

ow

Ris

k-

May

be

acce

pte

dif

allr

easo

nab

lyp

ract

icab

leco

ntr

olm

easu

res

inp

lace

.

Wav

eH

ub

Dec

om

mis

sio

nin

gP

has

e

Pre

-de-

com

mis

sion

-in

gsu

rvey

Page 100: South West of England Regional Development Agency · 2020. 1. 27. · South West of England Regional Development Agency Wave Hub Development and Design Phase Final design report June

LC

IL

CI

Gu

idew

ord

Co

ntr

ols

/Miti

gat

ion

Mea

sure

sT

oB

eT

aken

Ris

kIn

dex

afte

rM

itig

atio

nA

ntic

ipat

edM

easu

reT

hat

Co

uld

Be

Ap

plie

dB

yT

he

Co

ntr

acto

r(o

rO

ther

s)

Des

ign

Mit

igat

ion

Act

ion

Ow

ner

(Initi

als)

Tar

get

Dat

e

Dat

eA

ctio

nT

aken

Ris

kIn

dex

Are

a

Dec

om

mis

sio

nin

gH

azar

d/R

isk

Ass

essm

ent:

Haz

ard

IDH

azar

dC

on

seq

uen

ce

No

te:

Lik

elih

oo

d(L

):1

-U

nlik

ely

too

ccu

rin

rele

van

tp

erio

d.

2-

Lik

ely

too

ccu

rin

rele

van

tp

erio

d.

3-

Lik

ely

too

ccu

rse

vera

ltim

esin

the

rele

van

tp

erio

d

Co

nse

qu

ence

(C):

5-

Dea

tho

rto

tals

yste

ms

loss

4-

Maj

or

inju

ryo

rill

nes

s.M

ajo

rd

amag

eo

ren

viro

nm

enta

lim

pac

t.3

-L

ost

tim

ein

jury

or

illn

ess.

Dam

age

or

envi

ron

men

tali

mp

act.

2-

Fir

stai

din

cid

ent.

Ro

uti

ne

mai

nte

nan

cere

pai

r1

-V

ery

min

or.

Lit

tle

con

seq

uen

ce.

Ind

ex(I

):L

ikel

iho

od

xC

on

seq

uen

ce(S

eeal

soC

IRIA

SP

125)

.

10-1

5V

ery

Hig

hR

isk

-n

ot

acce

pta

ble

.Ap

ply

mit

igat

ion

.See

kd

irec

tor

app

rova

lif

sig

nif

ican

tri

skre

mai

ns.

6-9

Hig

hR

isk

-A

pp

lym

itig

atio

n.S

eek

dir

ecto

rap

pro

vali

fri

skca

nn

ot

be

reas

on

ably

and

pra

ctic

ally

be

red

uce

db

elo

w"t

his

"le

vel.

1-

5L

ow

Ris

k-

May

be

acce

pte

dif

allr

easo

nab

lyp

ract

icab

leco

ntr

olm

easu

res

inp

lace

.

20E

xtre

me

Wea

ther

Con

ditio

nsflo

odin

gof

site

from

extr

eme

tidal

leve

lor

rain

accu

mul

atio

nD

amag

eto

stru

ctur

es/c

able

s/in

stal

latio

neq

uipm

ent

14

4S

itele

veli

ssa

me

asW

DP

Sub

stat

ion

-as

sum

ew

ithst

and

13

3

21W

aste

Per

sonn

elar

eex

pose

dto

tran

sfor

mer

oils

durin

gdr

aini

ngop

erat

ion

cont

amin

ated

poils

can

beca

rcin

ogen

ican

d/o

rca

use

dete

rmiti

tis2

48

Ris

kA

sses

smen

t/Met

hod

stat

emen

tfor

activ

ityto

bepr

oduc

edby

cont

ract

or1

44

22W

aste

Bat

tery

elec

trol

yte

Bur

nset

cto

oper

ator

s/re

mov

ing

batte

ries

23

6R

isk

Ass

essm

ent/M

etho

dst

atem

entf

orac

tivity

tobe

prod

uced

byco

ntra

ctor

13

3

23E

nviro

nmen

thi

ghw

ind/

blow

nsa

ndS

and

inju

ryto

pers

onne

l/da

mag

eto

mac

hine

ry3

13

Non

e-

risk

tole

rabl

e3

13

24H

ealth

Haz

ards

Man

ualH

andl

ing

durin

gde

mol

ition

Mus

culo

-ske

leta

lInj

ury

ofw

orke

rsdu

ring

dem

oliti

on.

23

6C

ompe

tent

cont

ract

or.

Use

ofm

etho

dst

atem

ents

and

risk

asse

ssm

ents

.1

33

25F

ire/E

xplo

sion

Fire

durin

gde

mol

ition

Inju

ryto

wor

kers

.D

eath

ofw

orke

rs.

Loss

ofS

truc

ture

.D

amag

eto

equi

pmen

t2

510

Min

imis

efla

me

cutti

ng,w

eldi

ng,h

otw

orki

ngpr

oces

ses.

Use

ofH

otW

ork

proc

edur

e.C

ontr

acto

rto

prov

ide

adeq

uate

fire-

fight

ing

equi

pmen

t.1

55

26E

nviro

nmen

talH

azar

dC

onta

min

ated

land

inar

eaof

sub

stat

ion

Rel

ease

tow

ider

envi

ronm

ent(

incl

udin

gm

arin

een

viro

nmen

t)by

dist

urba

nce

/rem

oval

33

9E

nviro

nmen

talM

anag

emen

tPla

n1

33

27E

nviro

nmen

talH

azar

dN

oise

Dis

turb

ance

ofbi

rds

durin

gne

stin

gpe

riods

-pr

ogra

mm

ead

just

men

tsca

use

proj

ectd

elay

24

8E

nviro

nmen

talM

anag

emen

tPla

n1

44

28S

ecur

ityT

resp

asse

rs/v

isito

rsIn

jury

tope

rson

s/ch

ildre

n2

48

Fen

cing

ofde

mol

ition

area

sat

Sub

Sta

tion

site

and

beac

h"p

ullt

hrou

gh"

area

s.S

ecur

itym

anni

ng1

44

29E

lect

ricity

Live

syst

ems

HV

elec

tric

ityris

kof

shoc

k2

510

Per

mit

tow

ork.

Pro

cedu

res

for

test

.S

QE

Ppe

rson

nel(

Aut

horis

edpe

rson

s)1

55

30H

eigh

tLi

ftin

gop

erat

ions

durin

gre

mov

alLi

ftin

geq

uipm

entc

olla

pses

orto

pple

sor

load

isdr

oppe

dor

colli

des

with

wor

ker(

s)or

stru

ctur

ele

adin

gto

deat

h/in

jury

/dam

age.

25

10S

peci

fyco

mpl

exor

heav

y/hi

ghlif

tspl

ans.

Spe

cify

adeq

uate

and

SQ

EP

pers

onne

lto

cont

ract

orfo

rlif

ting

oper

atio

ns.

Pro

vide

hard

-sta

ndin

gsfo

rlif

ting

oper

atio

ns.

Pro

vide

liftin

gat

tach

men

tsan

dC

ofG

mar

king

sfo

rco

mpl

exor

heav

yeq

uipm

ent.

15

5

31C

ontr

olph

iloso

phy

Ves

selM

oorin

gac

tiviti

esdu

ring

inst

alla

tion

ofna

viga

tion

buoy

sD

amag

eto

pow

er&

Dat

aca

bles

.2

36

Seq

uenc

ing

oper

atio

nsw

here

poss

ible

tore

mov

eN

avig

atio

nbu

oyaf

ter

cabl

e/su

bsea

equi

pmen

tre

mov

al.

Not

ing

cabl

ero

utes

onm

arin

ein

stal

latio

nch

arts

Clo

sesu

perv

isio

nof

inst

alla

tion

App

rove

dm

oorin

gpl

an

13

3

32C

ontr

olph

iloso

phy

Lift

ing

Ope

ratio

nsD

amag

eto

Pow

er&

Dat

aca

bles

.2

48

Ves

selw

illbe

DP

capa

ble

-no

treq

uire

dto

anch

or/m

oor

Per

mit-

to-W

ork

RA

&M

etho

dS

tate

men

tsT

ailo

red

Wea

ther

fore

cast

ing

for

offs

hore

de-c

omm

issi

onin

gpe

riod

14

4

33A

cces

sLo

ssof

stru

ctur

alst

abili

tydu

ring

tran

spor

tatio

nLo

ssof

equi

pmen

t.In

jury

tost

aff.

Sta

ffat

risk

from

:dro

wni

ng,

hypo

ther

mia

,exp

osur

e1

55

Det

aile

dde

sign

and

spec

ifica

tion

oftr

ansp

ortp

roce

dure

.S

peci

fyad

equa

tean

dS

QE

Ppe

rson

nel

toco

ntra

ctor

for

tran

spor

tope

ratio

ns.

Pro

vide

adeq

uate

liftin

gat

tach

men

tsan

dC

ofG

mar

king

sfo

rco

mpl

exor

heav

yeq

uipm

ent.

15

5

34A

djac

entL

and

Use

Mar

ine

traf

ficco

nflic

tsdu

ring

de-c

omm

issi

onin

g

Col

lisio

nbe

twee

nve

ssel

san

dco

nstr

uctio

nve

ssel

s/pl

atfo

rms/

barg

esm

aybe

sunk

,or

crew

inju

red.

Ves

sel,

stru

ctur

eor

equi

pmen

tmay

bese

rious

lyda

mag

ed.

Pot

entia

lre

leas

eto

mar

ine

envi

ronm

ent

24

8

Nav

igat

iona

lRis

kA

sses

smen

tfor

de-c

omm

issi

onin

gph

ase

iaw

MC

AG

uida

nce

Not

ifica

tion

toan

dlia

ison

with

mar

ine

auth

oriti

es(in

clud

ing

MC

A,H

arbo

urA

utho

ritie

s).

Nav

igat

ion

buoy

sst

illm

ark

Wav

eH

ubar

ea.

Not

ices

toM

arin

ers

14

4

35E

xtre

me

Wea

ther

Con

ditio

nsE

xtre

me

Wea

ther

durin

gde

com

mis

sion

g.Lo

ssof

Str

uctu

re.

Inju

ryto

staf

f.S

taff

atris

kfr

om:d

row

ning

,hy

poth

erm

ia,e

xpos

ure

35

15

Obt

ain

deta

iled

met

eoro

logi

cald

ata

for

entir

eof

fsho

rede

com

mis

sion

ing

perio

d.V

esse

lope

rate

sw

ithin

know

nop

erat

iona

lenv

elop

e.S

uspe

ndop

erat

ions

and

reca

llst

aff

ifris

kis

notif

ied.

Ens

ure

that

time

atris

kis

min

imis

ed.

Ens

ure

oper

atio

nsar

epl

anne

dfo

rlo

w-r

isk

perio

ds(e

.g.

sprin

g/su

mm

er).

Ens

ure

adeq

uate

time

inpr

ogra

mm

eso

that

cont

ract

oris

notp

ress

ured

into

taki

ngris

ks.

15

5

36H

ealth

Haz

ards

Man

ualH

andl

ing

durin

gde

-com

mis

sion

ing

Mus

culo

-ske

leta

lInj

ury

ofw

orke

rsdu

ring

cons

truc

tion.

23

6S

peci

fylig

htw

eigh

tmat

eria

ls.

Des

ign

inlif

ting

atta

chm

ents

tohe

avy

equi

pmen

t/mat

eria

ls.

Pre

fabr

icat

ion

whe

repo

ssib

le.

22

4

37S

ecur

ityP

ublic

acce

sstp

beac

hdu

ring

cabl

ere

mov

alop

erat

ions

inju

ryto

publ

ic3

412

ITIS

NO

TY

ET

CLE

AR

WH

ET

HE

RR

EM

OV

AL

OF

TH

EN

EA

RS

HO

RE

&B

EA

CH

SE

CT

ION

OF

TH

EC

AB

LEIS

VIA

BLE

Fen

ce/w

arni

ngsi

gns/

secu

rity/

light

ing

Sub

Con

trac

tor

H&

SP

lan

-M

etho

dst

atem

ent/p

roce

dure

Liai

son

with

loca

laut

horit

y

14

4

38H

uman

Err

orIn

corr

ectc

arry

ing

outo

fpr

oced

ure

durin

gre

cove

ryop

erat

ions

Col

laps

eof

stru

ctur

edu

ring

cons

truc

tion

orop

erat

ion.

Inju

ryto

wor

kers

.D

eath

ofw

orke

rs.

Loss

ofS

truc

ture

.D

amag

eto

equi

pmen

t2

510

Ens

ure

allc

ritic

alas

sem

bly

proc

edur

esar

ecl

early

mar

ked

orcr

oss-

refe

renc

edon

cons

truc

tion

draw

ings

.M

inim

ise

site

asse

mbl

yof

stru

ctur

alas

sem

blie

s(p

refa

bric

atio

n).

15

5

Off

shor

ei.e

.S

ubse

aC

able

/T

DU

/PC

Uan

dfib

reop

ticlin

kA

tNbu

oys

Page 101: South West of England Regional Development Agency · 2020. 1. 27. · South West of England Regional Development Agency Wave Hub Development and Design Phase Final design report June

LC

IL

CI

Gu

idew

ord

Co

ntr

ols

/Miti

gat

ion

Mea

sure

sT

oB

eT

aken

Ris

kIn

dex

afte

rM

itig

atio

nA

ntic

ipat

edM

easu

reT

hat

Co

uld

Be

Ap

plie

dB

yT

he

Co

ntr

acto

r(o

rO

ther

s)

Des

ign

Mit

igat

ion

Act

ion

Ow

ner

(Initi

als)

Tar

get

Dat

e

Dat

eA

ctio

nT

aken

Ris

kIn

dex

Are

a

Dec

om

mis

sio

nin

gH

azar

d/R

isk

Ass

essm

ent:

Haz

ard

IDH

azar

dC

on

seq

uen

ce

No

te:

Lik

elih

oo

d(L

):1

-U

nlik

ely

too

ccu

rin

rele

van

tp

erio

d.

2-

Lik

ely

too

ccu

rin

rele

van

tp

erio

d.

3-

Lik

ely

too

ccu

rse

vera

ltim

esin

the

rele

van

tp

erio

d

Co

nse

qu

ence

(C):

5-

Dea

tho

rto

tals

yste

ms

loss

4-

Maj

or

inju

ryo

rill

nes

s.M

ajo

rd

amag

eo

ren

viro

nm

enta

lim

pac

t.3

-L

ost

tim

ein

jury

or

illn

ess.

Dam

age

or

envi

ron

men

tali

mp

act.

2-

Fir

stai

din

cid

ent.

Ro

uti

ne

mai

nte

nan

cere

pai

r1

-V

ery

min

or.

Lit

tle

con

seq

uen

ce.

Ind

ex(I

):L

ikel

iho

od

xC

on

seq

uen

ce(S

eeal

soC

IRIA

SP

125)

.

10-1

5V

ery

Hig

hR

isk

-n

ot

acce

pta

ble

.Ap

ply

mit

igat

ion

.See

kd

irec

tor

app

rova

lif

sig

nif

ican

tri

skre

mai

ns.

6-9

Hig

hR

isk

-A

pp

lym

itig

atio

n.S

eek

dir

ecto

rap

pro

vali

fri

skca

nn

ot

be

reas

on

ably

and

pra

ctic

ally

be

red

uce

db

elo

w"t

his

"le

vel.

1-

5L

ow

Ris

k-

May

be

acce

pte

dif

allr

easo

nab

lyp

ract

icab

leco

ntr

olm

easu

res

inp

lace

.

Pos

tD

ecom

mis

sion

ing

Sur

vey

39A

sfo

rP

re-

deco

mm

issi

onin

gsu

rvey

Page 102: South West of England Regional Development Agency · 2020. 1. 27. · South West of England Regional Development Agency Wave Hub Development and Design Phase Final design report June

Appendix C – Designers Risk Assessment

Page 103: South West of England Regional Development Agency · 2020. 1. 27. · South West of England Regional Development Agency Wave Hub Development and Design Phase Final design report June

+ ����$��� ������ ��#�� ������, �&�������������� �������$� ������������� ������$ ���

��� ������ � ��� ��

4� 6� ����8/�(**)�:������������� ��� ���!� ���7;����

(� 6� ����8/�(**)�:�������� ������ �������������7;����

0� 6� ����8/�(**)�������� ��������� ���������������� 3��7;����

A� 6� ����8/�(**)�7� ����&��!���7;����

+�� 6� ����8/�(**)�"-�� ����!������ ���������7;���

Page 104: South West of England Regional Development Agency · 2020. 1. 27. · South West of England Regional Development Agency Wave Hub Development and Design Phase Final design report June

Appendix D – Electrical Design Philosophy�

Page 105: South West of England Regional Development Agency · 2020. 1. 27. · South West of England Regional Development Agency Wave Hub Development and Design Phase Final design report June

Electrical Design Philosophy

#��� ������� ��

�������� ������������������������� ������������ ������3 ����������� ������ �����������������

������������� ��������������������������� ����������� ���������������?��������������3 �

�������!� �������������������������� ������3 �� ���������!� ��������������� ������������

� ������ �� ��� �������!� ����

����������� �������������������� 3#�

• ��������3����� �������������� �������������!� �������������3 �

• -� ��������� �����!� ��� ������������� ����� ���!� �������!� ��

• ����3 ���������� �������������� ����� ���!� ���������!������(*-�����������

�����!�

����!������������������������� �����!�������� ��� ,���!���� 3������������ 3#�

• & �������������������� �3���� �������������

• ���� 3�

• :��������� ��

• ��!� ���� �� ����������� �� ���

• ������� ����� �� ���

• �� ������

• ���������������� �

• �� ����� ��!� ���� 3�

����������� 3����� 3������������������������������� 3�!� �#�

• ��3� ���7;���<4**#��������� �� ��;���� 3�:���!����=�"�������

• ��3� ���7;���<(*A#��������� �� ��;���� 3�:���!����=�" �����

• ��3� ���7;���<(**#���������" �����:����2������

• ��3� ���7;���<A**#���������6���"���������/�������� �:���!�����

• ��3� ���7;���<A*4#����������� ����� ��-� ���� 3�:����!�

:���!�����

#��� ������������� ��!�$��-��������$�������

/��� ���������3���������3 ��������!� �,�0������������������������������������� 3���

����������������� ����� ������������� �(**C������������� 3��������������������������

Page 106: South West of England Regional Development Agency · 2020. 1. 27. · South West of England Regional Development Agency Wave Hub Development and Design Phase Final design report June

� �������������?����� ���3�� ��� ��������������������������������� ������ ���!� ���� ��

� �������#�

������#��.�+ ������������!-���$���������������

#�$������ #�$ ���/���� ���� ��

"��� �������������� ����!��� ;�� �3��"��� ���������� ���3����& �� ����1���� ������,�$H�I�����5����,�

$:/�"8;�� � -8�4***� ���!�����

:��� �� ����� �:����!��(**+,������������ 3������������������ ���������:�8�/����

���� 3������������������� ���������������������� ��������������

������#��.��������������!-���$���������������

#�$������ #�$ ���/���� ������� ������0�

"��� ���������2�������������"��� ���������������

����!��� :�!������;�&� :��������

"��� ���������� ���3���� ����1���� :�!������;�&� :���������������3� � �������3� � ����������������(**>� ������������������1��2��� �����1�� ����������������(**>� �������������6���"��� �2��� 6"0� :�!������;�&� :��������:�������� �� ���� ��� 6����� 3������

����������������� ��� �� ��� � �������������

;������ �����8���� ������� ����� ���� ��� �������������

J�:����������������������������������������%���������������'�����������3� ������

:�8�/�� �������������������4+�����!��(**+��

& ����������=��� ��������� �������������������������� �������������������,�� �����

����������������!������������3����� ����� ,������������ 3�� ��!���� ��������3�����!�

����������������������#�

• 7� ������������������#������3�,��������� 3,������� �� �� �����

• ;��������������!��������������#�������������� ���,���!� ������ ��,�

�������� �

• ���� 3�� �������#�-.�����,�2.������� ������������������

�������� ������!���������������������� �� ���������� ��������� ��������������3 �

���������������6� ��� �3������� ��������������������������� �����3��!� ��� �����

���� ����������������� ������� ����� �� ��!�3��,�� ���!�������,������ �������@�� �����������

���� ���!� ��������������������

Page 107: South West of England Regional Development Agency · 2020. 1. 27. · South West of England Regional Development Agency Wave Hub Development and Design Phase Final design report June

%

#�%� ���� ���

������ �������������

�� �6:�� ���!� ���

& ������6:,��������� ����3������������������� 3����!����������� ����#�

• �� ����� ������� ������;���� ����$�#�44�.��� �!��������������������

��������������,�A��� 3�������������(�!�����,�������� �� ����� ����������

� ���� 3�!� ������;���� ��������

• �� ����� ������� �������$��� ����$#�00�.�������������������������

��������������,�A��� 3�����������@��4**!�������

• ����!�� ��� �!����� ��������!�������$������?�� �� 3����!��� �������

����#�00�.���������������������������������������,�(9�!��

• ;@�� ��� ��������!�� ��� �!����� ��������!�����?�� �� 3����!��� �������

������������� ������������� #�00�.�%��'�������������������������,�

����@��0**!��

• �����?�� ������� �����00�.���������������������������������� ������!��

� ��������������

��� ����3 ��������!� ��

:��������

������������������������ 3�� �� ���� ��������������������������#�

������#�%�� ��������1��������������� ����

2������������ ���� �� ,����&�� �������

/11� ������ /������!� ���������������������

-���� 3������*><44<(**+�

��@� ����������� ��& ��������7!��

�����=��� �!���������7�!� �=��������������

1��3���/������������� -���� 3������*0<*><(**+�

������� &����=�������������1�K��=��� �!��������

1��3���:��!� �������� -���� 3������(9<*C<(**+�

/;&�������2��� $H� 6������������� ������ �������/!�=����� $:/� $ �������!� ��������

�� 3����� ����������� �������

����������H���� ������ $ �������!� �����������00�.�

������ �������

:��!� ��7!�� 7�!� �� :�����.������!� ������� 3��������������������

������ �������

���������� :���� � $ �������!� �����������00�.�

������ �������

-���������������� �������0���������#�5=�����

5��� � /�������� ����������� ������ �������

Page 108: South West of England Regional Development Agency · 2020. 1. 27. · South West of England Regional Development Agency Wave Hub Development and Design Phase Final design report June

'

��@=:�!���!���;@��!�� ��� �����"��� ��� 3�-�������@�

;�� �3�� /������!� ���������������������

-���� 3����������!��(**+�

����A�!� ������������������������������������������ 3����������?��������

�����������,����������� ����3����!� ����������������������� ����!�,��������!���

������ ����������4(�!� �����

�����5�� �� 3�

�����!� ���������������������������������� ��� �!������!� ���������� 3�������

00�.������� � �� ������������������ �+***!��������������33���������������!�� �

�� �!����� ���������� �� �������!�������$��������� ������������� ,���������

���������� 3��� ��!��� 3�����3 �� ���������������������������� ���������?�� ��

� �����!���&����������������������!� ������������������������������� ������

�� �����

#-��3/��4���-.���������5 ���

"����� 3�.����3��

6���������� ���@���� ���� �������������4�A�(��� �!����� �.����3�,�����!�� ������

���������������(A�.��������� ����������3� ���00�.���������� ������6:��

�����2� 3����

������$���������������������������� ��������$������������������� ����������

�;���� ����� ��;����������,��������� ������ ��3��������������������������������

��!������������������� ������� ������������������:� ���������$��������

��!� � ������ �������������� ����� ������������� 3,���������������!���!������

�������� ����������������� 3����������������� 3�����������&���������!������!�������

����������������� 3��������(**!��������� �������0�!��

#-��3/��4���-.��#61"�6��������������77��

$ �� �����������

/����������� ���������������,����������������������������� ������������������������

����� ����� �������;���������������������������������������������������������

����� ����4�=�(!������������������� ������ ���������������������������� �����

�����������!��� 3������� ����������������� 3�� �� ������������� 3���!����

:����������������!!� �����3�� ���������� 3������������������������� �� ������

������ ����������� 3�����+!������������������������ ��� ��!���!� ����������

����!� ���������������������������,����������� ����!��� 3���������� ��������

������ �����������3�� ���!���!� ��������������� �������������� ������������������

�� ��� 3��

Page 109: South West of England Regional Development Agency · 2020. 1. 27. · South West of England Regional Development Agency Wave Hub Development and Design Phase Final design report June

(

/ ����� ��������������!� ���������;���� ����������� ���� ��������,���� ����3��

���������� ����� ��������������������� �������� ��!���!� ��������������������

�������� ��������� �� ������������������ 3������������������������������������!� �����

�����;����������

#-��3/��4���-.����� �����!-�������� ���������������� �� � ��

������� �������������

��� �6:�� ���!� ���

:�3 ������� 3����� ������������������� 3��� ���� �#�

• -� ���� 3�����;��������������������������

• �� ��������;��������������������������

• 2�!������� ����� ��!� ���� 3�����;��������������������

• -� ���� 3������������� ������������$��������

• �� ��������������������� ���������� ������������$��������

6������������������������������������������� �!����� ����� ��!���� �������#�

• ��������������� ������������������

• ������� ���� ���������� ����������������������

• 6"�������� ��� �!�����3���!�� ������� ��!���� �

• �� �!����� ���������3��������

• 6"��������� �����������!�� ����� �����!�������� �� ���������� ��

��������������������3������� ����

����������� ��3����������#�

• 6"������������������� ��������������������3��� ������������� ��������

���� �����

• 8��� �� ���� ������������ ����� ������

• :�������� ����������@�� �����

• ���������������� ����������������� ��!���� ���������� ������

�� ����3 ��������!� ��

����������������������������� ���!� �������������#��

Page 110: South West of England Regional Development Agency · 2020. 1. 27. · South West of England Regional Development Agency Wave Hub Development and Design Phase Final design report June

)

������#�'�!-���$���������8� ��������

#�$������ #�$ ��� + ������� �������

� � !-����"�6� "�6����#6� �#6���� ��

"��� ��������<"���

����!��� (������������ 3����0���������

(������������ 3�

(������������ 3�

"��� ����1���� A������!� �!�!�

(������ (������

6���"��� �� 6"0� 0������ (������ (������

&��������� ������ ����������3��������� �� ���� ����� �!���������������������

������ ����������@�� ������ ��!�������@� 3���3 ����� ������������������������ 3�

�������������!!� ������������

"�������������� �����������������������������������=�����������������������

���=�����������������,�� ����������� ������������� ����� �,����������� �����

���������

#-��3/��4���-.�'�� ��������������� ��� ���9����!-����� ��:�

��� ��������& ����������

-� ���� 3����������������� ������������$��������� �������� ��������������

������������ �������� ����� ��!� ���� 3������!�� �������$�������

��!!� ������ �������������������� ����� ��!� ���� 3������!������� ���������

������ ��� �����������3��������� �� ��������!����������� ���!� ������ 3� ������

�������������(��������������������� �������!��������$����������$�� ��(������

���������!�������$��������������������������������������������������$������!�

����� 3��

���� 3� ����7;���<A**��������������������� 3�!� ���

#-��3/��4���-.�'�� ������������ �"�6����#6�����7�� ����������#6�

��� ����

#��'� ��������"�����

������� �����������������

������������������������ 3����� ������ �� ���� ��������������������������������

� ���!� �#��

Page 111: South West of England Regional Development Agency · 2020. 1. 27. · South West of England Regional Development Agency Wave Hub Development and Design Phase Final design report June

*

������#�(����1���������� �����8� ����������� �����

��� �6:�����3 �L�00�.��� �!����� ������3�#�"���� �4�

����������������� ������3 ���������� ������6:�������!������� �!� ����

����!�� ����!� �������������������� 3���,���!������;��� �#�

• ���!������ ���������� ��������;��

��������

�������� ��� � ��� ��

���� �� "���� ���������

# ����� �� �������

7;�; �3�� �6:� $:/� ��$,���$� 7;�; �3������������������������� �������������� ����� �����������������

��������� �������� �

/�����I��2��� �6:� 6� ��� ��$,���$� /�����I�����������!��������� ����/�����!����� ���������� �!����� �� ����������� ������!���/�����I������������������������� �������������� ����� �����������������

��������� �������� �������������� �������������������������00�.�������3����

7�����:�� �����

:��������; ������� 6� ��� ��$,���$� 7�����:�� ���������������������������� �������������� ����� �����������������

��������� �������� �

�������� ���!���

:��������; ������� $H� �� ���!��� ����������������������������� �������������� ����� �����������������

��������� �������� �

6�!��; 3� ��� 3�

����:������3� ������ ��$,���$� 6�!��; 3� ��� 3������������������ ����������������� ��� ?� ���� ������/11�������������� ������!�������6�!����������������� ,�����!���I������������������6���,��������������������������

-������� �������� ��� ?� ���� �����������!� ����������

-��������� & ������ 5��� � $ � �� � �������� 3��������� ��������� �������� �

:��!� �� �6:� ������ ��$,���$� /�!���� 3���������������-�������H �3��,�1��� �����������!� ��-� �3��� �(9�5����(**+��:��� �� ���,�:��!� ������������������������� �������������� ����� �����������������

��������� �������� �������������� �������������������������00�.�������3���

/�����!� /���� $H� ��$,���$� /�����!�� ������������������������������� �������������� ��

��� �����������������������������!���� 3�*C<*0<(**),����������������������������������!��������� ���!� ���

-���������������������������!� ��������

/11<.����� �6:� �� ���!��=6� �� ��:�����3��=������

/��� .�������������%������������ ���3�'�������������/11������� ���� �� ���� �� ����!�� ���������,��������� ��������������/11,�� ��.���������������������� ���������������������!� ������� 3����/11��

:�������

Page 112: South West of England Regional Development Agency · 2020. 1. 27. · South West of England Regional Development Agency Wave Hub Development and Design Phase Final design report June

;

• $�����(�!�44�.���������00�.�������

• ���!������ �����

• ��$���!���� 3#�

o 44�.�������������

o +-./��� ���!�,�44<00�.�

o 00�.�������������

• ���!������ �����

• /���@��4**!�00�.���������������� ������������#�

o 00�.�0����������������� ����������������!�������������!�� �

�!�������������������!��������������!�� ��!��������

o 00�.�0����������������� ����������+*� !!��� ���4�!���������

�������������� �����������������������!� �!�!���� �!�����

!� ������� 3��� 3����

o 00�.�0����������������� ����������������!�������������44�.�

������� �������������!��������������44�.����������(�!��

o 00�.��� 3������������������������

• ��$�������� �������� �� ������

• /���@��(>�!�00�.������

• ����������������!��

• ���������� 3�� ���

• 00�.�������������

• 0*-./��� ���!��00<00<*�A�.�

• 00�.����� 3���!��� ���!�����������������

• *�A�.������� �� 3���!��� ���!�����:.��

• :.��

• 00�.�������������

• 00�.��� ����� ��������00�.��������������� ���������

�� :���������������� �

������������������ ����������������/11<.������3��� 3��������� ������������� ��

������������������������� ����&���� ������������������ ��� ������������ �!����� �

�����3�����00�.,������������� ������6:,���� �������������������������3� �����

���������/��� �!����� ������3�����(A�.�������33�������������� ���!� ����������

!������� �������3������������!� ���

�������� ���������!������������ �4���#�

Page 113: South West of England Regional Development Agency · 2020. 1. 27. · South West of England Regional Development Agency Wave Hub Development and Design Phase Final design report June

<

��� �������� ����� ������3 ����00�.���������������������������������� ��

����3 ������(A�.����������������������������� ���� ��3�� 3�

����������� ��������� ���������� ��3���� �������&�������� �����������!� �����

������00�.�� ���� ������(A�.������

���� ������� ������3 ������00�.�������������������!����������� 3����3��

!���� ��!�������� �����!�� �� � ������������(=0�����������(A�.�� ���

������!�3 �������������������� ����� ��!�� �� � ����������������������

������������ #�

��� ������� 3����������������� ������3����!�� �� � ���� ��

!�� ��� � 3����

���� ������� 3����������������� ������3����!�� �� � ���� �� ���

!�� ��� � 3������������ 3������� ����������

����� ������� 3���!��� ���������������������������������� ����� ��

!�� �� � ����

/11<.������������������������������� ����� ������3 ����+-./��������

�� ���!������� ���������� �����3 ���������4�)-./�� �������� ������� ���� �

����3 ���������0�+-./��� ���!�������4�-./�������� �������� �������!�������

������������ �� �����������6�!��; 3� ��� 3����������������������������������������

������!��� 3����!���������������� 3����������������� ������3 ����3�������������

>-./������������������������� ������!��������@�� �� 3������@���� 3�����3 ����

����!!��������+-./��� ���!���

��� ����3 ��������!� �=�(A�.��� �!����� #�"���� �(�

���������3 ���������������������!����������!����������������������00��.��6:�

����3 �� ���������������� ��3���� ��������� �������������������

����!�� ����!� ������������������ 3���,���!������;��� �#�

• ���!������ ���������� ��������;��

• $�����(�!�44�.������

• ���!������ �����

• ��$���!���� 3#�

• 44�.�������������

• +-./��� ���!�,�44<(A�.�

• (A�.�������������

• ���!������ �����

• /���@��4**!�(A�.������

o (A�.�0����������������� ����������������!�������������!�� �

�!�������������������!��������������!�� ��!��������

Page 114: South West of England Regional Development Agency · 2020. 1. 27. · South West of England Regional Development Agency Wave Hub Development and Design Phase Final design report June

�7

o (A�.�0����������������� ����������+*� !!��� ���4�!���������

�������������� �����������������������!� �!�!���� �!������

!� ������� 3��� 3���

o (A�.�0����������������� ����������������!�������������44�.�

������� �������������!��������������44�.����������(�!��

o (A�.��� 3������������������������

• ��$�������� �������� �� ������

• /���@��(>�!�(A�.������

• ����������������!��

• ���������� 3�� ���

• (A�.�������������

• 0*-./��� ���!��(A<00<*�A�.�

• 00�.����� 3���!��� ���!�����������������

• *�A�.������� �� 3���!��� ���!�����:.��

• :.��

• 00�.�������������

• 00�.��� ����� ��������00�.��������������� ���������

�������� ���������!������������ �(���#�

��� ������� ������3 ������ ��������������C**/����(A�.�� ������������(*���3�

����/�0*-./��� ����� �� ��������� ��������������C(*/��&�����3� ������

�����������,�����,��� ���������!����������������������� �!�������

����� ��������������� �(*���3���� �������� 3������������,�������� 3��������

�� ���������������� ������

�� ����!�� ��� �!����� ������������������� ����)0*� !!������������

����������������������������������� �������������!!�����������������K���

������,�������� ��������!��������� 3������� �����������������������

������������� ��� ������

����������� ��������� ��������������� �!����� ������3�����(A�.�� �������������

� ���!� �� ��������������� ����������������� ��3���� ��������� ����,�� ��

�������������#�

• "�������������!� �������������������00�.�������������

• "����������� ���������������������������������������������� 3�!���� ��!�

#-��3/��4���-.��'&�������� �� ��$������

Page 115: South West of England Regional Development Agency · 2020. 1. 27. · South West of England Regional Development Agency Wave Hub Development and Design Phase Final design report June

��

���� 3������������ ����� �!����� ������3�����(A�.,������������� ���������

����������������� 3�������� ���������������������������������������3��������3��

�� 3� 3����������$��� ���!���

����������� ��������� ����������������������������#�

• �� ���!��62�����4(*/��2�3������������(A�.����4)*/��-� �!�!���K��

� ��������4>*/����� ����

• /11<.������������������������������ �������� �������� ��������������

• (A�.������������������������ ��=3�� 3� ����������� ���������������

• ��������������������������������=��� ���� �� ���� ������������������

#-��3/��4���-.��'&��� ��� ������&��� ��"�6�

����������� 3����� 3������������������������������� 3�!� ������������ ����

�� ����� ��� 3�!� �#�

• ��3� ���7;���<4*(#���������;���������1��������3�!�

��� /� 3�!� ������� �

�����6:�� ����3���� ��� 3�!� �������������$������������������!��� ������

������ 3�����������������������$���

& ���������� �������� ��,�� ������� 3�!� �����������������������$�� ������A�

��$����������!�� ����� �� ����3���������������������������������� �������

� ��=�� ���� 3����� 3�� ������������� �������

������$����������������� ����������������,�����������3������� ���/���

�� ����� ���������������������!������������#�

• 44���)�)�.������

• (A�.������

• 6��<�������

���� ����� �������������� 3�!� ��������� �� ��������<3���� �������

������!!� �������������������� ��������������� ����� ������� �����

:����������� ���

������� ��� ��������!�!�������������

��� �6:�� ���!� ���

& ������6:,��������� ����3��������������$������������A������������������$��������

���������� �� ���������@����������������(*-./��

Page 116: South West of England Regional Development Agency · 2020. 1. 27. · South West of England Regional Development Agency Wave Hub Development and Design Phase Final design report June

��

�� ����3 ��������!� ��

F�� ���������� ����� ���� ���

��� 3�����3 ��������!� �,�������!������� ���������� ��������+���)��� ����� �

��� �����������!������ �!���� ������� 3���!�������!� �����������������#�

• ��������� ��������������������������������!�@�!�!��@����������������

0*-./������������������� ����� ����00�.�������������� ����)�

�� ����� ���� �������������� ����� ���� �������!��������+-./�!�@�!�!��

• ;�� ��������������@���������!��������(*-./��� ��� 3�A��� ����� �

��� ���,�� ��@����� ����� ���� ����(����������������� �� ���������

����� ���!� ���

• &���������������� ��������;�����������������!���� �����������������������

+-./�������������������� ����� ��/ ��@����� ����� ���� ��������

�������������� ����� ����������+���)�3������������������� ���������3����

�� ����� ���������������!��������(*-./��

• &��!������������������ 3����������@��;���������3���������� �����

��� ��A@(��!��������� ��

• &�����������������������������������������;�������������������@�� ����

� ������������

• &�������������� ����������� ���������3 ������!�@�!�!�3� ����� �� ��

�� ����� ��� ����� � ����;@�� ��� ����������������� ����������� �

���������������������������� �������@�� ������

& �������������������?��������� ���3��,�:�8�/�������������������� ����� �

�����������!�������������������(*-./���������,���!���� 3�A���������+-./�������

#-��3/��4���-.�'������� ��� ����� � ������������� ������72���

����3 �2����

������$��������������� �����!���� 3��� 3������������ �������� �� ����=�������

����=��3���� ��������/������ ���!� ������������������������ ��!��� 3��������

������ �����!�� � ����&��������� ����� ��� �� ������������� �����!�� �� � ����

������� 3���������,�����������!������������������ ������� ������ ����������������

� �����!����������������� �������������������������!�����������������������

� ���������,� �!� �����(+�������������������� ��������� ������ ���!� ����

#-��3/��4���-.��#6������������ $���� �=���1���� �$�����

:��������

"�������������� ������������������������� ���!� �����������,���������������,�� ���

.������ ����������/�����!��������!����� ���!� ��� ���������

Page 117: South West of England Regional Development Agency · 2020. 1. 27. · South West of England Regional Development Agency Wave Hub Development and Design Phase Final design report June

�%

& �����!���� 3������*><44<(**+,�.����������������������������!� �����������A�

�� ����� ���� ��� �����������(A��.�� ������������ �� ���������.������������������

������� �!� ����������� ��������A,�+���)��� ����� ���� �����������(A��.����� �

�@�� ��� ������� ������ ���3���/�����3�������������� �����������!� �����

�@���� 3�����3 �,�.������������������� ������� � �!������� ����� ���� �������

������ ����� ��� 3�� ��@�� �������� 3���������3 �� �������� ���� �������� 3������

��!����

& �����!���� 3������*C<*0<(**),�/�����!����������������������������3 ���

� ���!� ��������� ������������� ��������������� ���

������� ����������������"���

��� �6:�� ���!� ���

& ������6:,�������$������ ����3��������!����#�

• �� ���!�,�+-./,�00<44�.�

• 44�.�������������

• 00�.�������

��� 3���������������3�,������������!� ����������������� ���!������+-./����

��!!������������������������ 3���� ������(*-./�������� �����������!� ���&��

�������������������������������� ����� ����� ���������;������������!�� ��

����������������������������������$����+-./���� 3��

�����6:���������������������� �� �����00�.��������������� ���!�������������

�������������62�������+-./��� ���!�����>C�+/����!!��������������������������

0)�.�� 3��������)0/���

�� ����3 ��������!� ��

�� ���!���������� #�00�.������

��� 3���!���� 3������/11������� �*)�5����(**+,�� ������ �� ���� ������� �� �

*+�/�3���,������������!� ��������������������������� �����00�.�������������

�� ���!����� �������������������������3����� ����� 3�� ������

��������0�������� �#�

��� & ������(�������� �������������������6�����!�������� �������� ����������0�

���������!���� �������������������� ���� ���������������� �������!������

��� 3���� �������������� ��������� 3�������$����������������

�� & ��������00�.������������������ �������$#�A���������� ��������������

� �� ����� ������������ ���!� ������ ��������� ����� �������������������� �

������$��6����,�� �������� ��������������!�� �� � ������� ��� ���������

Page 118: South West of England Regional Development Agency · 2020. 1. 27. · South West of England Regional Development Agency Wave Hub Development and Design Phase Final design report June

�'

00�.�������������,���� �����!��������� ���� ��������������� �����

��������������������,�������� 3����������;����������� ����������$������� ���

��������������

��� & ��������00�.�������������� �������$��������������� �������� ����������

�� ����� ����������������������3 ������������� ��������������������������

����� ��

#-��3/��4���-.���$ ��� ��� ������&������������ � ���$������� � ���

������� ����� ��

����������������� ����� ����#�

• ������$����������!�� � ��������������� ������������!�� �� � ���� ��

!�����������������������

• ������$�!��������������� �������� ����� ����������������������

�������������� ���,��������� �� ��!���� 3��

• �����������!� ���!������(**!��������������� 3����������$���������������

� ���������!!�������������!���!� ��

��$�2������ �

������$������������������� ������������$�������#�

• / �44�.������������������� ������ ������ ���� 3������(A�.������

• �� ������������������� 3���� �����!�,�������!� � ���������������3����#�

o !�� ��� �!����� ������

o ������$�

o A��� 3����������� 3����������$�#���������������������������

��������

• $ ����� ������������� ���������;����������

#-��3/��4���-.�������"�6���������� ���#6�

2.������:�����������$�

��������� ����������������������������� ���!� �������������2.�������������

�(A*<44*<(A.����������������� �������� �������$������������������������!�����

������� 3�������#�

" =�����:������� �

������������ ���������������� �����!�� ���������� �!����� ������� ��

�� ������ ��� ���� ����������3�����������$�����������������!������������

����������� ��)*D���������!�������������� ��������� ��!����� ����� ���� ��

� �����������������&���������������������!������������ �� ������������������ �����

!�� ��� �!����� �����,�������������������������������� ���������� ���!����& �

�������� �,������������������� ����������� ������������!���������������

Page 119: South West of England Regional Development Agency · 2020. 1. 27. · South West of England Regional Development Agency Wave Hub Development and Design Phase Final design report June

�(

2����������������$�

���������(A�.<44*.����������!����� ���!��������!�����3���������������(A�.�

������������������������ �!�������� �3�����������3���� �������� ������� ��

��� ������;���������3� ����� ����������

#-��3/��4���-.���$ ����> � ����������������������� ��"�6�

��� ��!�� � ���� ���� �

������$����������!�� � �������������!��� ���� ��������������

44�.��������1�����

• �������������� ���!��44�.��� �� 3�� �������� �������������� �����44�.�

�����

• ������������44�.��������������;���������� �������� �������������� �����

�� ���!��44�.��� �� 3�

44<(A�.��� ���!��

• :�����������������3�����������!������;������������������������ �!����� �

(A�.��������1�����

• �������������� ���!��(A�.��� �� 3�� �������� �������������� �����(A�.�

�� �!����� ������

• ������������(A�.��� �!����� ������� �������� �������������� �����

�� ���!��(A�.��� �� 3�

�����#� �����������������������"����

�����6:��� ������������������������$�������������������!������3 ���������,������;��

���������������!����� ��������������� ���� ����� ��� 3�!� ��������� 3���������

����� ����� ������������������!� �������"�������!����������������3 �������������� ���

��� 3������������������� �������� ���� ����� ���� �����)�)��.���������� 3���A�+-���������

������!!�������� �� ����$������ 3� 3������� ���!�����)�)��.�� ������ ��!� 3������

� �������� 3������� ����� ���� ���� ���������� �������!���@���������"��������������

������������������� ��� �������44�.���)�)��.�������� 3�������������$��� 3�!� �����

� ���������������� �������� ������������������� ����� ���� �������������� �����

�����$� �����������

��� �6:�� ���!� ���

�����6:��� ���������������!������ ������������������������������ ������

������������@��!���������������!������ �������

/�����3���������������������������������� ��������������� ��������������3 ���

�����,��������� ����������� ������6:��

Page 120: South West of England Regional Development Agency · 2020. 1. 27. · South West of England Regional Development Agency Wave Hub Development and Design Phase Final design report June

�)

/�������6:����3�,������������������������ ���������������,������ ���!� �����

�� ���������2.���������������� ���������������

�� ����3 ��������!� ��=�������� ������

����������� 3����!������ ����#�

������#�)�"������������������� ������8� ��������

���� 3���������!�� ��� #�

&��!�4=���$���������3��������#��� ����� ���������

�������������������������@����� ����� �3�� ������!� ���� ����� ������

������#�

• &���������!������������������ �������� ��������������������$���!�����

�������������,�� ���� �������,������������� �� ������������ ����

• &����������������!���������� ����� �������������!� �������'����!�����

• &������������������ �����������$�� �������������� 3�����������������!�� �

�� �!����� ���������������

• ������������!������� �!������� ����� �

#-��3/��4���-.�� >�������� ��

&��!�(=���$�� �������$������#��� ����� ������$�

��������������������������������@����� ����� �3�� ������!� ���� ������ �������

������#�

• &���������!������������������ �������� ������������������� �����!�����

�������������,�� ���� �������,� �� ������������ ����

• &����������������!���������� ����� ��������������!� �������'����!�����

���� ?�� ������� "���� �������� ������ + ���� ����� ���� ��

4� 4� (A�.<0��<+*�K (*-./ A>*/� 0**<A**� !! +)� �� ������ ��$�� ���!�����

(� A� (A�.<0��<+*�K +-./� 4**/� +*� !!� 4)� �� ������ ��$����������$�

0� A� (A�.<0��<+*�K +-./� 4**/� +*� !!� 4)� ���!���� ��$�� ���!���$

A� A� 44�.<0��<+*�K +-./� 0**/� C*<9+� !!� >� ���!���� ��$���������;��

+� A� 44�.<0��<+*�K +-./� 0**/� C*<9+� !!� >� ���!���� �;���� �����

Page 121: South West of England Regional Development Agency · 2020. 1. 27. · South West of England Regional Development Agency Wave Hub Development and Design Phase Final design report June

�*

• &������������������ �����������$�� �������������� 3�����������������������

������������������������������(**!��� 3��

• ������������!������� �!������� ����� �

#-��3/��4���-.�� >�������� ��

&��!�0=���$���������3��������#��� ����� ������$�

���������������������������������!������ ������������#�

• �����!��������������������������� ����������$��������������������3������

��������!�� �� � ���

• &������������������!� ��������������������������!� �������'����!�����

• ������������!������� �!������� ����� ���������� ���� ������� �����

#-��3/��4���-.��������������� ��

&��!�A=���$�� ������;�������#��� ����� �����;��

���������������������������������!������ ������������#�

• �����!��������������������������� ����������$��������������������3������

��������!�� �� � ���

• &������������������!� ��������������������������!� �������'����!�����

• ������������!������� �!������� ����� ���������� ���� ������� �����

#-��3/��4���-.��������������� ��

&��!�+=��;��������#��� ����� �����;��

���������������������������������!������ ������������#�

• �����!������������������������ ����� ������� ���������;��

• &������������������!� ��������������������������!� �������'����!�����

• ������������!������� �!������� ����� ���������� ���� ������� �����

#-��3/��4���-.��������������� ��

����!������ ������������������!������ �� �� ������������ �������������

����������,���������� ��������������������������������!���!����@�� ��������

-.���� ������ ������ �����!������ �������

/��!���� 3����������������,�������������������������������������������������� 3�

��������#�

Page 122: South West of England Regional Development Agency · 2020. 1. 27. · South West of England Regional Development Agency Wave Hub Development and Design Phase Final design report June

�;

������#�*��$ �������� ����

#�$����� ����� ��� ,����&��

"��� 7��!�,�7�!� �� :������������)�)�.�� ������������������44�.�� �(**C�

"��� "��� �����3 �& ��,�$:/�

-.�����!���������/11<.�����

"8;�� � $ � �� � �����������������!������ ������

������������������ ���������������������������� ������� �����$H,��� ���2���

� �������!���� 3��� �*0�"������ ��*0�����!��(**+��

�� ���!� �������#�

��� 44�.����!������ ������

�� 44�.�����!������ ������

��� 00�.�����!������ ������

��� 6����������6"������!������ ������

���!������ ���������������������������� ����������$���������������� ����� �

������������������� �������������

����!������������������������������ ����� ���#�

• ��� ������ 3�������$,����������������3����������� ������� ������� �

������������������ ����:������������������������������ 3��������������

�������������������������������� � ����������� �!������������3 ����

!���!� ���

��� ����3 ��������!� �=���3 ����� ������

��������3 ������������ ������������� 3����!����#�

• "���� ��������� �������4)��������!�������;����������&���������!�������

����)��;����������� ����4)����������,�9)��������������� ������ �

�������

• 5�� �� 3������������������� ����� ��@�������� �� ���������� ������

�"�&�!� ��������� �>=����6"��� ����,�� ��� 3�4(�� ��������

• ���� �!���������������������������!�������@� 3��������,������

������� ��������!�������@���������������� �������$������!�������@��

������� ������������������� ����������� ���� ���!� ����������� ���

Page 123: South West of England Regional Development Agency · 2020. 1. 27. · South West of England Regional Development Agency Wave Hub Development and Design Phase Final design report June

�<

��!������������� ��3��� ��������-�������@� 3�� �������$���������

�� ��������

• 6����!���������������� �� �������!���������;�������������$�����

�����

• ������������� �� ���������� �����,�������;�������������������������

A������������������������������ �������������� ���!� ���� ��������

��!����� �� ���������� �!�������(*���������������

• �� ��������������� ������������������������!��� 3���6"������� ������������

�� ����� ��!����������������� �����������@��������!��� ���� ��!� ���� �

� �����3 !� ��!������� �������� �������������� ������!!� �����

!����6"��� �������/��������������������������������������������!����

�� ������

#-��3/��4���-.���������������� �=�'�� ��������������� ���

��� ���������� ����� ��-� ���� 3�:����!�

��������3 ������������ ������������� 3����!����#�

• /������������ 3���������� ����� ��!� ���� 3������!�� ��� 3�A������

������������������ �������$�� ����$�� ��A����������� �������$�

� ��:�����

• ��������� 3��������!��������������� 3����������$���

#-��3/��4���-.���������������� �=�'�� ����� �������������� �"�6=�

'�� �������� ���9��������7�� �������� ��:�

��� ����3 ��������!� �=�2.��������� ������

"��������� �������(�2.���������������������������������������������������

��������"���� ����� ���(��������� ���!� ������������ ����������(�����

� ��(����������!� ����

�������"�����6���"��� �� ����2.�������������

& ����������� �������� ������� ����� ��� 3�!� ������������$,������������

����� ��������������

#-��3/��4���-.�������������� �����������$ ��

�����$� ������� ����� ���������%&�� ����

" ������ ������ ���!� ������������������������!� ����3�!!��������������������� ��

!������������� �����3 ����� ���3��� ������������������������������3 ����� ��

�������!� ����7������,�����������������!� �����������������������������������

���� ������ ���!� ���������������� ��� �3� ������������������� ���������������� ����� � 3�

��� 3�������!��������� ������� ����!�!� ����������

Page 124: South West of England Regional Development Agency · 2020. 1. 27. · South West of England Regional Development Agency Wave Hub Development and Design Phase Final design report June

�7

����������� �������� ���� ������ ����!� �������,�/11=.�����������������������3 ����

���� ����� ���3�����!� ��������!�������������� ��� ������/11���������������������������

����������������������!� ����������������������������� ������ ���!� ��������������

��������������� 3�!� ������� 3��������!����/������������3�,�/�����!������������������������

������������������������ ��� ����������������� ��������� ���!� ��������/��������

!� ����������������3 ����� �� �� �����������������!� �������������������

#��(� !�$��4���������� ��

���#��� �'��(�&��� �����

& ������6:,����������� ����3��������!����#�

��� 00�.�%�� ��� ��� 3'��������������� ���� ��������������-��

�� 00�.�%!���� 3'��������������� ���� ����������������

��� �� ����� ��!� ���� 3�� ���!� ��

���#��� ������������ ����

������������������� � ������������,������ ��������������� ���������������������

��������������������-.�������3�������������#�

������#�;�!"#�����$��2���� �� ���������� ����

2������������ 2��� �������

:��!� �� �MG� ���� ������ ��!���� ���������/11� NM4�(� ���� ������ ��!���� �I� ������� ���������/���� �:� ���� ������ ��!���� ���������

���������3 ��������!� �,������������ 3�� ���!� ����� ���� ����3��#�

��� (A�.��������������������

�� (A<00<*�A�.��� ���!��

��� 00�.�� ������������������ ���� ��������������-��

��� :������./���!�� ������� �������������� �� 3�

��� �� ����� ��!� ���� 3�� ���!� ��

�������� ��������������!��������� ������������� ����3���� ������6:��������������#�

��� (A�.��������������������

• ����������������������������!������������� �� �������� ����#�

o �� ���!��������������� �����(A�.������������������� �����

��� �������00�.�������

o �� ���!������������������������

Page 125: South West of England Regional Development Agency · 2020. 1. 27. · South West of England Regional Development Agency Wave Hub Development and Design Phase Final design report June

��

o ������ ���!��� ����������������������������� ����!�� �� � ����

&���� ������������� �����00�.�3����������������������00�.�

�������������

• ���������!���������������� ����������������,������������������ ������

� ������ �����00�.����������!�

#-��3/��4���-.��'&������� ��� ������&�����8� ���

�� &������� ��� ���!��

• ������ �!����� ������3����!�������������������(A�.��/��� ���!�����

��������������������������3�������!����������������������3����00�.���

• .������ ��� �3� �����������3���� ���� �������������@�����������3������

� ������� �������!!����������������� �� =������������ 3���

#-��3/��4���-.��������������8� ���

��� 1������ �� 3�

• ����:.�������� ���������������!� ������������A-./�������� �������

)***/��� ����� ��������� �� ������� ����������������� 3�����

�� �� 3���������� ����� 3���

#-��3/��4���-.������������& �����8� ������� �����5��������������@��

���� � ��������9��������:�

��� :������./���!�� ������:.���

������ ���� ���������������������#�

• �� �����������������������@�����������3���

• �� ����./��������

• 2�!�����!� ������ ���@����

• 8�3�����������3��� �������������������������

• 2�!����� ��� ����������� �����=�����3���

#-��3/��4���-.�������8� ���������� ��� �����5��������������@��

���� � ��������

��� �� ��������� 3�������������

��������(������ ���������� 3��������������� ��������� 3#�

"���� �4#���!���������������2.� ������

Page 126: South West of England Regional Development Agency · 2020. 1. 27. · South West of England Regional Development Agency Wave Hub Development and Design Phase Final design report June

��

"���� �(#���!��������������������� ��� ���!��������A**�.���������� �� 3���

����������00��.<A**�.��� ���!��

������!!� ������� �4��������������� 3����� �#�

• ������������������������������������� 3�� ��������� �� ����!!����� � 3�

• &�������������������,� ������� �� ����� ����������� 3��������������������

���

• /������ ����� ����� ���� ������������ ���!��

• ������������� ����������������������� ����� �/3��!� ��

������������ ���������� ��3���������������������������� ������������!���� 3�� ��

� ������3��!� ���������!������������

#-��3/��4���-.���������������������!"#������&�

/������������������ ��������������������!��������3��� 3,������ 3�� ����������

����:�/�/������!�� �������������� ������ ���������������!�� ����� �����

!���� 3���!��

��� �� ����� ��!� ���� 3�� ���!� ��

������ ������!�����������#�

• 6�����������!� ���� �� ���!� ��

• �;�����������!!� ������ �� ���!� ��

• :�/�/���������� �

������������������������������ ����� ��!� ������������������� ����!�����

:�/�/���������� ��

���������������������������������������������������������!���� 3�� ���!� ��

�����������!�������������� ��� �� ����� ����� ���

�� ���� ���������������� �����������������������������!���� ����������������� �

�;����������

Page 127: South West of England Regional Development Agency · 2020. 1. 27. · South West of England Regional Development Agency Wave Hub Development and Design Phase Final design report June

Halcrow Group LimitedAsh House Falcon Road Sowton Exeter EX2 7LBTel +44 (0)1392 444252 Fax +44 (0)1392 444301www.halcrow.com