KATY INDEPENDENT SCHOOL DISTRICT
May 11, 2015
SOUTH TRANSPORTATION EXPANSIONDESIGN DEVELOPMENT PRESENTATION
| South Transportation Expansion, Katy Independent School District 1
Acknowledgments 2
Narrative/Design Briefs 3
Existing Site 6
Site Plan 7
Floor Plans 8
Renderings/Elevations 11
Schedule/Cost 19
Space Program 20
SOUTH TRANSPORTATION EXPANSIONKATY INDEPENDENT SCHOOL DISTRICT
| South Transportation Expansion, Katy Independent School District 2
SOUTH TRANSPORTATION EXPANSIONKATY INDEPENDENT SCHOOL DISTRICT
ACKNOWLEDGMENTS
Project Design Team
Gary Blanton, AIAPrincipal, Huckabee
Doug Bensen, RADirector of Operations, Houston Office
David Valtierra, AIAAssociate Principal, Huckabee
Casey CasstevensProject Designer, Huckabee
Laura McCollumInterior Designer, Huckabee
Erin EvansProject Leader, Huckabee
ArchitectHuckabeeThe Woodlands, TX
Civil EngineeringS&G Engineering Consultants, LLCKaty, TX
MEP EngineeringKME Salas Obrien EngineersHouston, TX
Structural EngineeringHuckabeeFort Worth, TX
Technology/SecurityHuckabeeFort Worth, TX
Katy ISD Board of Trustees
Mr. Bryan Michalsky President
Mr. Henry Dibrell Vice President
Ms. Rebecca Fox Secretary
Mr. Charles Griffin Treasurer
Ms. Courtney Doyle Sergeant-at-Arms
Mr. Joe M. Adams Board Member
Ms. Ashley Vann Board Member
Administration
Mr. Alton Frailey Superintendent
Dr. Christine Caskey Chief Academic Officer
Mr. Thomas Gunnell Chief Operations Officer
Mr. Christopher J. Smith Chief Financial Officer
Dr. John Alawneh Chief Information Officer
Design Team
Mr. Peter McElwain District Architect/Planner
Mr. Scott Walker Project Manager, Construction Department
Mr. Mike Robinson Assistant Superintendent for Support Services
Mr. Alan Anders Director of Transportation
Mr. Jim Porter Assistant Director of Transportation and Routing Supervisor
Mr. Stephen Loveless Materials Management Supervisor
Ms. Kathy McDonald Executive Director of Maintenance & Operations
Mr. Ron Chandler Director of Maintenance
Mr. Mark L. Hopkins Chief of Police
Mr. Robert E. Jinks Deputy Chief of Police
| South Transportation Expansion, Katy Independent School District 3
Project NarrativeThe project consists of four buildings on an existing site including the existing transportation building, a new daycare building, a new transportation facility and a new maintenance building. The existing transportation facilities will be modified and the existing temporary buildings will be removed from the site. The site of the existing temporary buildings will be infilled with concrete paving for additional bus parking. The existing bus parking will be re-striped to accommodate the bus parking addition. The current bus parking has existing site lighting that will remain intact. The existing transportation facility has two bays that will be modified to accommodate a new bus wash and a tire repair bay. This portion of the work will require phasing and will be completed once the new transportation facility is fully operational. As the details are finalized and construction documents are completed some changes may be necessary but the overall design concept should not be affected.
The existing transportation building is a pre-engineered metal building that currently serves as the maintenance building for transportation needs of the southern portion of the district. It was built with the initial plan of converting it into a bus wash and tire repair shop.
The new transportation facility is a 31,780 square-foot concrete tilt wall building, which will have patterned texture and paint. It will feature (14) 50-foot by 24-foot maintenance bays that are double loaded. It will have a dedicated space for Katy ISD District Police, driver spaces, break rooms, conference rooms, restrooms and other support spaces.
The new day care is a 6,105 square-foot concrete tilt wall building. It is designed to accommodate 105 children in two age groups with restrooms, storage and a directors’ office. The basis for child care capacity is 30 square feet per child with 45 18-month to first graders and 60 second to fifth graders.
The maintenance building will be a 3,500 square-foot pre-engineered metal building that will also be utilized by the grounds keepers. It will feature a 2,200 square-foot bay with two overheard doors and support spaces to include a break room, office, storage room and a restroom.
Site WorkPaving will be added to provide parking for 250 buses, the police department, bus drivers and visitors for a total of 350 parking spaces. Fencing will be added to match existing ornamental fencing along Falcon Landing with gates at the new entry drives. Chain link fencing will enclose the site to match the existing and a screen wall will be built along the property east of the new transportation building to shield the residential neighborhood from the maintenance bays.
Codes to be Utilized for this Project2012 International Building Code2014 National Electrical Code2012 Uniform Mechanical Code2012 Uniform Plumbing Code2012 International Fire Code2012 International Energy Conservation Code
ADA, TAS Plan Review and Inspection and Building Code ReviewerBill Winning, Winning Way Services, Inc.
SOUTH TRANSPORTATION EXPANSIONKATY INDEPENDENT SCHOOL DISTRICT
NARRATIVE
| South Transportation Expansion, Katy Independent School District 4
Heating, Ventilating and Air Conditioning (HVAC)
A. Shop area1. This space will be gas heated and ventilated only. Critical to the comfort in this space will be to feel air movement
in the summer and radiant heat in the winter.2. Gas fired radiant heaters are being proposed due to the large volume of this space due partly to the mass of the
cold buses and ventilation air. Radiant heaters will heat objects, concrete floor, buses, tools, etc., faster than unit heaters can heat the air. The occupants feel warmth from the warmed surfaces.
3. Ventilation air in the summer will require air exchange to push the hot air out of the building and air movement to enhance the evaporation process from the occupant’s skin. Fixed ventilation fans are being proposed for the exchange of air and 6’ diameter adjustable pivot fans located in the center of the building at each work station for comfort. The pivot fans are adjustable to direct air movement where desired.
B. Office and support area1. The various air conditioning load characteristics of this space will require a system that uses multiple thermostats
to maintain comfort. Due to the number of thermostats needed and ever changing outside ventilation rates based on occupant loading, a single air handling unit suitable for variable air volume service is proposed. This area will be served by gas boiler and gas heat.
2. Individual temperature control zones will be served with a fan powered series variable air volume box with a hot water heating coil.
3. Heat transfer from the air handling unit to the atmosphere will be accomplished with circulated chilled water. The outdoor equipment will be two packaged air cooled chillers each sized for 75% of the building load. (Optional DX condensing units could be used depending on final equipment selection and pricing.)
4. The building management and control system will be a microprocessor based system consistent with the district standards.
C. Daycare and maintenance buildings1. The daycare facility will be air conditioned with two DX style blower units with condensing units located outdoors
and adjacent to the mechanical room. The space will be heated with electric resistance heaters.2. A similar single DX system will be used for the maintenance building.
Plumbing Design Brief
A. Regulations and Codes: Installed in accordance with Local Codes and City Ordinances.
B. Scope: Connect all fixtures and related equipment to the soil, waste and vent systems and domestic water systems.
C. Sanitary Waste, Vent and Storm Piping: Service weight cast iron with “Tyseal” rubber gaskets in hub and spigot connections or “no hub” fittings above floor and schedule 40 PVC below floor.
D. Domestic Water Piping: Hard drawn Type “L” copper with wrought sweat fittings or pro press.1. The domestic water system will be designed with zone valving to facilitate service.
SOUTH TRANSPORTATION EXPANSIONKATY INDEPENDENT SCHOOL DISTRICT
DESIGN BRIEF
| South Transportation Expansion, Katy Independent School District 5
SOUTH TRANSPORTATION EXPANSIONKATY INDEPENDENT SCHOOL DISTRICT
DESIGN BRIEF
E. Plumbing Fixtures: Plumbing and fixture will be of standard institutional type: 1. Water Closets - Wall hung with exposed flush valves. 2. Lavatories - Wall hung. 3. Service Sinks - Floor mounted molded stone. 4. Electric Drinking Fountains - Wall hung, self contained, handicapped type. 5. Sinks - Stainless steel counter mounted.
F. Domestic Hot Water: Electric water heaters located in the mechanical room for the domestic hot water requirements. Gas heat in the main building.
Electrical Design Brief
A. Regulations and Codes: Installed in accordance with the National Electrical Code and Local City Ordinances.
B. Service and Distribution: Expand the existing electrical service. Panel boards shall be constructed and braced to withstand the maximum short circuit capability of the system.
C. Branch Circuiting: All systems in conduits. Minimum size conduit 3/4”. Minimum size conductors - No. 12 AWG THWN. All wiring shall be stranded copper.
D. Lighting: Each space will generally provide the following illumination level:
Illumination level Area (Foot Candles) Maintenance Shop 50 Administrative Spaces 50 Corridors and Ancillary Spaces 30
E. Exit lights: Surface mounted with LED lamps.
F. Emergency lighting: Select fixtures connected to Emergency Generator.
G. Fire Alarm System: Fire alarm system will consist of a zoned, closed circuit double supervised system integrating the required functions for the building.
| South Transportation Expansion, Katy Independent School District 7
SITE PLAN
Maint.Bldg.
OutsideStorage
New Concrete Infill
Parking for 250 Buses
44 NewParking Spaces
30 New Parking Spaces
Proposed Re-Located Cross Over
Proposed Turn Lane
ExistingElementary School
Site
Gate 3
Gate 4
Gate 2
BackupGenerator
Existing BermGate 1
145 NewParking Spaces
117 NewParkingSpaces
Playground6 Years – 5th Grade
Playground18 months –
5 Years
Pre-Cast Panel Wall System
New 6’ Chain Link
FenceNew 6’
Chain Link Fence
New 6’ Chain Link
Fence
New Wrought Iron Fence with Pilaster
Exist. Bldg.Bus Wash
Transportation Facility
DaycareNew Pump
RadioTower
New Pump
Exist.Diesel
Diesel
Unleaded
Falcon Landing Boulevard
Existing Detention Pond
ExistingLift Station
Existing Drainage Swale
N
New/Renovated Facility
New Concrete
Existing Concrete
New 6’ Chain Link Fence
New Wrought Iron Fence with Pilaster
Pre-Cast Wall Panel System
| South Transportation Expansion, Katy Independent School District 8
FLOOR PLAN
14 Bus Bays
313’-6”10
2’-4
”
PartsReceiving/
Storage
OilChange
PitWaste OilCollection
Tank
2-TonOverhead
Crane
BackupGenerator
ChillerChiller
Lkr./Shwr.RR RR
Women
Men
Kitchenette
Kitchenette
WorkroomBrk.Office
Seat Repair/Storage
Mech.Mezz.Above
LubeRoom
Lead Drivers
Conf.
Conf.
PDInterview
PDOffice/Storage
Router
Asst.Routers
Training/General Assembly
Storage
Women
MenKey
s
Keys
Mai
lbox
es
Jan.
RoutersWorkroom
Spec.NeedsClerk
Spec.Needs
DriverTrainer
Recept. Asst.Dir.
Dir. PDOffice
DriverMgr. Dispatch
*
* *
**
*
Elec. Mech.
0’ 5’ 10’ 20’ 40’
AirDryer
Compressor
*Card Reader Access with Scheduler
N
Transportation Bays
Conference
Police Department Offices
Transportation Offices
Resource
Training/Assembly
Support Spaces
Shared/Common Area
| South Transportation Expansion, Katy Independent School District 9
DAYCARE & MAINTENANCE FLOOR PLANS
Maintenance
Break Room
ConferenceOffice
Storage
HVAC Condenser
IDF inCabinet
Storage/Mech.
Tech.
StaffRR
Girls
Girls
Boys
Unisex
Boys
Daycare Room 16 years – 5th Grade
Daycare Room 218 months – 5 years
Capacity = 45
Capacity = 60
OutsideStorage
Elec.
Mech.
Storage
Director
Entry & ReceptionVestibule
to Playground
RR
0’ 5’ 10’ 20’ 40’
N
Daycare
Conference
Offices
Resource
Maintenance
Support Spaces
| South Transportation Expansion, Katy Independent School District 10
FUELING STATION/BUS WASH
New Tire Repair Shop
Tire Racks
Existing Storage to BecomeWash Equipment Room
Elec. ControlRR
New Pump ExistingDiesel Pump
ExistingDiesel Pump
New 20,000-GallonUnleaded Tank
New 20,000-GallonDiesel Tank
Existing Diesel Tank
ExistingFuel Tank
Loading Access
Fuel Bay
Fuel Bay
Fuel Bay
Renovate Maintenance Bay forBus Wash with New Bus Wash Equipment
New CMU Wall
Unleaded Diesel
New PumpUnleaded Diesel
RadioTower
0’ 5’ 10’ 20’ 40’
NBus Wash
Maintenance
Support Spaces
| South Transportation Expansion, Katy Independent School District 12
TRANSPORTATION & DAYCARE PERSPECTIVE
| South Transportation Expansion, Katy Independent School District 14
TRANSPORTATION AND EXISTING BUILDING PERSPECTIVE
| South Transportation Expansion, Katy Independent School District 15
TRANSPORTATION BUILDING INTERIOR PERSPECTIVE
| South Transportation Expansion, Katy Independent School District 16
DAYCARE RECEPTION INTERIOR PERSPECTIVE
| South Transportation Expansion, Katy Independent School District 17
DAYCARE PLAYROOM INTERIOR PERSPECTIVE
| South Transportation Expansion, Katy Independent School District 18
DAYCARE PLAYROOM INTERIOR PERSPECTIVE
| South Transportation Expansion, Katy Independent School District 19
SCHEDULE/COST
MASTER SCHEDULE2014 2015
Nov. Dec. Jan.
Pre-Design Phase
Conceptual Design Phase
Schematic Design Phase
Design Development
Construction Document
Jurisdictional Review
Bid & Award
Construction Observation Services
COMPLETE1.20.15
COMPLETE2.03.15
COMPLETE3.03.15
COMPLETE4.16.15
COMPLETE7.13.15
COMPLETE10.26.15
COMPLETE11.25.15
COMPLETE12.15.16
2016 2017
Mar.Feb. Apr. May June July Aug. Sept. Oct. Nov. Dec. Jan. Mar.Feb. Apr. May June July Aug. Sept. Oct. Nov. Dec. Jan. Feb.
2014 BOND ALLOCATION
Total Project Cost . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$16,035,750 (includes Construction Cost, FF&E Cost, Technology Cost, Professional Fees, Surveys, Material Testing, and Other Project Soft Cost)
| South Transportation Expansion, Katy Independent School District 20
TRANSPORTATION CENTER SPACE PROGRAM
Huckabee 2 3/2/15
QtyNo. ofUnits
Unit SF Other AreaTotal SF (Shops)
TotalBldg SF
QtyNo. ofUnits
Unit SFOther Area
Total SF (Shops)
TotalBldg SF
Diff. (SF)
Administration4 Director Special Needs Clerk 1 1 175 175 1 1 150 150 (25)
Assistant Director 1 1 175 175 1 1 190 190 15Driver Manager 1 1 175 175 1 1 170 170 (5)
5 Vestibules (Drivers) 1 2 75 150 1 2 75 150 06 Dispatch 1 1 210 210 1 1 240 240 30
Clerk 1 1 120 120 1 1 150 150 30Router 1 1 120 120 1 1 170 170 50Lead Driver Conference 1 1 210 210 1 1 125 125 (85)Assist Routers 3 1 300 300 1 1 375 375 75
7 Plotter Printers Route Workroom 3 1 120 120 1 1 200 200 80Conference Room 1 1 250 250 1 1 250 250 0Lead Driver Office 1 1 1000 1000 1 1 950 950 (50)Work Room 1 1 250 250 1 1 250 250 0Special Needs 1 1 200 200 1 1 170 170 (30)Storage Room 1 1 120 120 1 1 150 150 30PD Office 2 2 150 300 1 1 190 190 (110)PD Conference 1 120 120 1 1 150 150 30PD open Office 1 1 0 0 1 1 1050 1050 1050
9Multi-Purpose / Training Area Holding room Small Kitchenette
200 1 1800 1800 1 1 1800 1800 0
Telephone alcove 4 4 0 0 0 0
Computer area 1 1 0 0 0 010 Restrooms (Men) (5 fixtures) 1 1 200 200 1 1 200 200 0
Restrooms (Women) (10 fixtures) 1 1 400 400 1 1 400 400 0Technology (IDF) 1 1 110 110 1 1 110 110 0Custodial 1 1 60 60 1 1 60 60 0Kitchenette 1 1 160 160 1 1 200 200 40
11 Electrical 1 1 80 80 1 1 80 80 0Mech 1 1 120 120 1 1 120 120 0
sub total 6,925 7,930Support Facilities
12 Bus Maintenance Office 1 120 120 1 1 170 170 50 Locker rm. w/ shower 1 120 120 1 1 150 150 30 Break Rm. 1 175 175 1 1 135 135 (40) Restrooms 2 75 150 1 2 75 150 0
13 Bays 16 1,000 16000 1 14 1,200 16800 800
Bus Lift & Hoist (Equipment) 1 incl
Parts Receiving 1 120 120 1 1 200 200 80 Parts Storage 1 500 500 1 1 400 400 (100)
14 Seat Repair / Storage 1 250 250 1 1 285 285 35 Lube room 1 0 1 1 200 200 200 Storage 0 0 0Tool Equipment Storage 1 0 0 0Mezzanine Tool Storage 1 400 400 1 1 0 0 0
sub total 17,435 18,490TOTAL NET AREA 17,435 6,925 18,490 7,930Common Area (Bldg @ 40%; Shops @ 20%)) 3,487 2,770 3,698 3,172
Subtotal Transportation 20,922 9,695 30,617 22,188 11,102 33,290
TOTAL Proposed Building Area 20,922 9,695 22,188 11,102
Katy ISD Bond Program - 2014 South Transportation Expansion
Transportation
Program of Spaces - Auxiliary Services Center
Space
Program Space Actual Space
***
*Includes PD offices (added 1,300 sf) to original program.
| South Transportation Expansion, Katy Independent School District 21
DAYCARE & MAINTENANCE SPACE PROGRAM
Huckabee 5 3/2/15
QtyNo. ofUnits
Unit SF Other AreaTotal SF (Shops)
TotalBldg SF
QtyNo. ofUnits
Unit SFOther Area
Total SF (Shops)
TotalBldg SF
Diff. (SF)
18 Reception with alcove 1 1 400 400 1 1 500 500 100Director 1 1 200 200 1 1 175 175 (25)
19 Daycare room age group 1 1 2 500 1000 1 1 1,800 1800 80020 Daycare room age group 2 1 2 500 1000 1 1 1,380 1380 380
Restrooms 1 2 75 150 1 2 170 340 190Restroom Unisex 1 1 0 1 1 160 160 160Toilet rooms (boys Girls) 1 3 145 435 1 2 175 350 (85)Staff RR 1 1 0 1 1 73 73 73Storage 1 2 100 200 1 1 185 185 (15)IDF Storage 1 1 55 55 1 1 50 50 (5)Outside Storage 1 1 0 0 1 1 145 145 145Storage Mech 1 1 0 0 1 1 110 110 110Mech Elect. 1 2 72 144 1 2 75 150 6Vestibule to playground 1 1 0 0 1 1 137 137 137Outdoor Playground 1 1,000 0 0 0Employee Parking 1 7 325 2275 0 0Vehicle Parking 1 3 325 975 0 0
sub total 3,250 3,584 5555 1971TOTAL NET AREA 3,584 5,555
Common Area 0 1,075 0 1,667
Subtotal Child Day Care Facility 4,659 7,222
TOTAL Proposed Building Area 0 4,659 0 7,222
Child Day Care Facility
Katy ISD Bond Program - 2014 South Transportation Expansion
Program of Spaces - Auxiliary Services Center
Space
Program Space Actual Space
Huckabee 12 3/2/15
QtyNo. ofUnits
Unit SF Other AreaTotal SF (Shops)
TotalBldg SF
QtyNo. ofUnits
Unit SFOther Area
Total SF (Shops)
TotalBldg SF
Diff. (SF)
Break Room 1 1 325 325 1 1 325 325 0Office 1 1 120 120 1 1 120 120 0Conference 1 1 145 145 1 1 145 145 0Storage 1 1 300 300 1 1 260 260 (40)Maintenance 1 1 2,250 2250 1 1 2,250 2250 0Restroom 1 1 60 60 1 1 60 60 0
sub total 0 3,200 0 3,160TOTAL NET AREA 3,200 3,160
Common Area 0 960 0 948
Subtotal New Maitenance Facility 4,160 4,108
TOTAL Proposed Building Area 0 4,160 0 4,108
Renovation
New Maitenance Building
Katy ISD Bond Program - 2014 South Transportation Expansion
Program of Spaces - Auxiliary Services Center
Space
Program Space Actual Space
*Daycare capacity and square footage has been increased.
**