SOUTH TOWER ELEVATIONS OF B30 XXXXXX XX $CSHTOT$ · 2013-03-10 · of 09/11 gt 09/11 xx xx/xx xx...

8
09/11 GT 09/11 XX/XX XX XX/XX XX 09/11 09/11 JN SOUTH TOWER ELEVATIONS B30 NOTES: LEGEND: T(n) R(n) TL(n) RL(n) INDICATE TOWER FRONT LEG PANEL POINT INDICATE TOWER REAR LEG PANEL POINT INDICATE TOWER FRONT LEG BRACING PANEL POINT INDICATE TOWER REAR LEG BRACING PANEL POINT 1. ALL TOWER STRUCTURAL STEEL SHALL BE AASHTO M270 GRADE 50 UNLESS OTHERWISE NOTED. 2. FOR EXTERIOR LADDER AND OTHER INFORMATION, SEE BRIDGE SHEET BXX. 3. FOR DETAILS 1 THRU 4, SEE BRIDGE SHEET B32. 4. FOR DETAILS 5 THRU 10, SEE BRIDGE SHEET B33. 5. FOR TYPICAL SHEAVE SUPPORT DETAILS, SEE BRIDGE SHEET B34. 6. FOR COUNTERWEIGHT DETAILS, SEE BRIDGE SHEET B36. 3/32" =1’-0" 1"= 1’-0" SECTION C-C 2’-4" 1 1 2 " 1 1 2 " 1" 1"= 1’-0" 2’-4" 1 3 4 " 1 3 4 " 1" SECTION D-D SPL TPZ ARCHER WESTERN CONTRACTORS STATE OF NEW HAMPSHIRE DEPARTMENT OF TRANSPORTATION * BUREAU OF BRIDGE DESIGN BRIDGE NO. STATE PROJECT TOWN LOCATION REVISIONS AFTER PROPOSAL SHEET SCALE DESIGNED DRAWN QUANTITIES REV. DATE ISSUE DATE FEDERAL PROJECT NO. SHEET NO. TOTAL SHEETS FILE NUMBER OF BRIDGE SHEET DATE BY CHECKED CHECKED CHECKED DATE BY HNTB Corporation The HNTB Companies Engineers Architects Planners SUBDIRECTORY XX $FILENAME$ .DGN LOCATOR $BRDESCR$ $TOWN$ $BRNO$ $STNO$ $BT$ $BRFILNO$ $CSHTOT$ XX XXXXXX PRELIMINARY PLANS SEPTEMBER 12, 2011 "= 1’-0" 34’-2 1 4 " 163’-2 1 8 " 21’-0" A B "= 1’-0" VIEW B-B SOUTH TOWER EAST ELEVATION 1 45 B 54’-3" EAST FRONT TOWER LEG WEST FRONT TOWER LEG BRIDGE 42’-0" 39’-4" 39’-4" 39’-4" 39’-4" 39’-4" 30’-2" 49’-6" 39’-4" 39’-4" EAST SHEAVE WEST SHEAVE 29’-4" TL3 TL2 TL1 42’-0" T5’ T4’ T3’ T2’ T1’ T1 T2 T3 T4 T5 T1 T2 T3 T4 T5 R1 R2 R3 R4 R5 R6 "= 1’-0" VIEW A-A 54’-3" WEST REAR TOWER LEG EAST REAR TOWER LEG BRIDGE 37’-8" 39’-4" 37’-8" R5 R5’ R4 R4’ R3 R3’ R2 R2’ R1 R1’ R6 R6’ RL1 RL2 RL3 DETAIL 1 A COUNTERWEIGHT DETAIL 2 DETAIL 3 DETAIL 4 DETAIL 6 DETAIL 5 DETAIL 7 DETAIL 8 DETAIL 9 DETAIL 10 CONNECTION COUNTERWEIGHT W14 W14 W14 W14 W14 W14 W14 D D C C KEY PLAN N.T.S. N 305’-10" 27’-1 1 2 " 27’-1 1 2 " 54’-3" EAST TOWER LEG WEST TOWER LEG BRIDGE SOUTH TOWER FRONT LEG NORTH TOWER FRONT LEG

Transcript of SOUTH TOWER ELEVATIONS OF B30 XXXXXX XX $CSHTOT$ · 2013-03-10 · of 09/11 gt 09/11 xx xx/xx xx...

Page 1: SOUTH TOWER ELEVATIONS OF B30 XXXXXX XX $CSHTOT$ · 2013-03-10 · of 09/11 gt 09/11 xx xx/xx xx xx/xx 09/11 jn 09/11 b34 notes: tower - typical sheave support details 1. all tower

09/11

GT 09/11

XX/XXXXXX/XXXX

09/11

09/11JN

SOUTH TOWER ELEVATIONSB30

NOTES:

LEGEND:

T(n)

R(n)

TL(n)

RL(n)

INDICATE TOWER FRONT LEG PANEL POINT

INDICATE TOWER REAR LEG PANEL POINT

INDICATE TOWER FRONT LEG BRACING PANEL POINT

INDICATE TOWER REAR LEG BRACING PANEL POINT

1. ALL TOWER STRUCTURAL STEEL SHALL BE AASHTO M270 GRADE 50

UNLESS OTHERWISE NOTED.

2. FOR EXTERIOR LADDER AND OTHER INFORMATION, SEE BRIDGE SHEET BXX.

3. FOR DETAILS 1 THRU 4, SEE BRIDGE SHEET B32.

4. FOR DETAILS 5 THRU 10, SEE BRIDGE SHEET B33.

5. FOR TYPICAL SHEAVE SUPPORT DETAILS, SEE BRIDGE SHEET B34.

6. FOR COUNTERWEIGHT DETAILS, SEE BRIDGE SHEET B36.

3/32" =1’-0"

1"= 1’-0"

SECTION C-C

2’-4"

1 1 2 " 1 1 2 "

1"

1"= 1’-0"

2’-4"

1 3 4 " 1 3 4 "

1"

SECTION D-D

SPL

TPZ

ARCHER WESTERN CONTRACTORS

STATE OF NEW HAMPSHIRE

DEPARTMENT OF TRANSPORTATION * BUREAU OF BRIDGE DESIGN

BRIDGE NO. STATE PROJECTTOWN

LOCATION

REVISIONS AFTER PROPOSAL

SHEET SCALE

DESIGNED

DRAWN

QUANTITIES

REV. DATE

ISSUE DATEFEDERAL PROJECT NO. SHEET NO. TOTAL SHEETS

FILE NUMBER

OF

BRIDGE SHEET

DATEBY

CHECKED

CHECKED

CHECKED

DATEBY

HNTB Corporation

The HNTB Companies

Engineers Architects Planners

SUBDIRECTORY

XX $FILENAME$

.DGN LOCATOR

$BRDESCR$

$TOWN$

$BRNO$ $STNO$

$BT$

$BRFILNO$

$CSHTOT$XXXXXXXX

PRELIMINARY PLANS

SEPTEMBER 12, 2011

�"= 1’-0"

34’-2 1 4 "

16

3’-2

18

"

21

’-0

"

A

B�"= 1’-0"

VIEW B-B

SOUTH TOWER EAST ELEVATION

1

45

B

54’-3"À EAST FRONT

TOWER LEG

À WEST FRONT

TOWER LEG

À BRIDGE

42’-0"

39

’-4

"39’-4"

39’-4"

39’-4"

39’-4"

30’-2"

49’-6"

39

’-4

"3

9’-4

"

À EAST SHEAVE À WEST SHEAVE

29

’-4

"

TL3

TL2

TL1

42

’-0

"

T5’

T4’

T3’

T2’

T1’T1

T2

T3

T4

T5

T1

T2

T3

T4

T5

R1

R2

R3

R4

R5

R6

�"= 1’-0"

VIEW A-A

54’-3"À WEST REAR

TOWER LEG

À EAST REAR

TOWER LEG

À BRIDGE

37

’-8

"3

9’-4

"3

7’-8

"

R5R5’

R4R4’

R3R3’

R2R2’

R1R1’

R6R6’

RL1

RL2

RL3

DETAIL 1

A

COUNTERWEIGHT

DETAIL 2

DETAIL 3

DETAIL 4

DETAIL 6

DETAIL 5

DETAIL 7

DETAIL 8

DETAIL 9

DETAIL 10

CONNECTION

COUNTERWEIGHT

W14

W14

W14

W14

W14

W14

W14

D D

C C

KEY PLANN.T.S.

N

305’-10"

27

’-1

12

"2

7’-1

12

"

54’-3"

À EAST TOWER LEG

À WEST TOWER LEG

À BRIDGE

À SOUTH TOWER

FRONT LEG

À NORTH TOWER

FRONT LEG

Page 2: SOUTH TOWER ELEVATIONS OF B30 XXXXXX XX $CSHTOT$ · 2013-03-10 · of 09/11 gt 09/11 xx xx/xx xx xx/xx 09/11 jn 09/11 b34 notes: tower - typical sheave support details 1. all tower

09/11

GT 09/11

XX/XXXXXX/XXXX

09/11

09/11JN

NORTH TOWER ELEVATIONSB31

NOTES:

LEGEND:

T(n)

R(n)

TL(n)

RL(n)

INDICATE TOWER FRONT LEG PANEL POINT

INDICATE TOWER REAR LEG PANEL POINT

INDICATE TOWER FRONT LEG BRACING PANEL POINT

INDICATE TOWER REAR LEG BRACING PANEL POINT

1. ALL TOWER STRUCTURAL STEEL SHALL BE AASHTO M270 GRADE 50

UNLESS OTHERWISE NOTED.

2. FOR EXTERIOR LADDER AND OTHER INFORMATION, SEE BRIDGE SHEET BXX.

3. FOR DETAILS 1 THRU 4, SEE BRIDGE SHEET B32.

4. FOR DETAILS 5 THRU 10, SEE BRIDGE SHEET B33.

5. FOR TYPICAL SHEAVE SUPPORT DETAILS, SEE BRIDGE SHEET B34.

6. FOR COUNTERWEIGHT DETAILS, SEE BRIDGE SHEET B36.

3/32" = 1’-0"

SPL

TPZ

ARCHER WESTERN CONTRACTORS

STATE OF NEW HAMPSHIRE

DEPARTMENT OF TRANSPORTATION * BUREAU OF BRIDGE DESIGN

BRIDGE NO. STATE PROJECTTOWN

LOCATION

REVISIONS AFTER PROPOSAL

SHEET SCALE

DESIGNED

DRAWN

QUANTITIES

REV. DATE

ISSUE DATEFEDERAL PROJECT NO. SHEET NO. TOTAL SHEETS

FILE NUMBER

OF

BRIDGE SHEET

DATEBY

CHECKED

CHECKED

CHECKED

DATEBY

HNTB Corporation

The HNTB Companies

Engineers Architects Planners

SUBDIRECTORY

XX $FILENAME$

.DGN LOCATOR

$BRDESCR$

$TOWN$

$BRNO$ $STNO$

$BT$

$BRFILNO$

$CSHTOT$XXXXXXXX

PRELIMINARY PLANS

SEPTEMBER 12, 2011

34’-2 1 4 "

16

3’-2

18

"

21

’-0

"

A

54’-3"

À BRIDGE

1

45

A

54’-3"

À BRIDGE

42

’-0

"39’-4"

39

’-4

"3

0’-2

"

37

’-8

"3

9’-4

"37’-8"

39’-4"

39

’-4

"

À EAST SHEAVEÀ WEST SHEAVE

29

’-4

"

À EAST FRONT

TOWER LEG

�"= 1’-0"

�"= 1’-0"

VIEW A-A

�"= 1’-0"

VIEW B-B

NORTH TOWER EAST ELEVATION

39

’-4

"39’-4"39’-4"TL3

TL2

TL1

R1 R1’

R2’R2

R3 R3’

RL1

RL3

RL2

R4’R4

R5 R5’

R6’R6

42

’-0

"

T5’

T4’

T3’

T2’

T1’

T5

T4

T3

T2

T1T1

T2

T3

T4

T5

R1

R2

R3

R4

R5

R6

DETAIL 1

B

B

COUNTERWEIGHT

DETAIL 3

DETAIL 2

DETAIL 4

DETAIL 6

DETAIL 5

DETAIL 7

DETAIL 8

DETAIL 9

DETAIL 10

À EAST REAR

TOWER LEG

À WEST FRONT

TOWER LEG

À WEST FRONT

TOWER LEG

49’-6"

KEY PLANN.T.S.

N

305’-10"

27

’-1

12

"2

7’-1

12

"

54

’-3

"

À EAST TOWER LEG

À WEST TOWER LEG

À BRIDGE

À SOUTH TOWER

FRONT LEG

À NORTH TOWER

FRONT LEG

Page 3: SOUTH TOWER ELEVATIONS OF B30 XXXXXX XX $CSHTOT$ · 2013-03-10 · of 09/11 gt 09/11 xx xx/xx xx xx/xx 09/11 jn 09/11 b34 notes: tower - typical sheave support details 1. all tower

09/11

GT 09/11

XX/XXXXXX/XXXX

09/11

09/11

B32

NOTES:

LEGEND:

T(n)

R(n)

TL(n)

RL(n)

INDICATE TOWER FRONT LEG PANEL POINT

INDICATE TOWER REAR LEG PANEL POINT

INDICATE TOWER FRONT LEG BRACING PANEL POINT

INDICATE TOWER REAR LEG BRACING PANEL POINT

7 8 "

1’-

12

"

1’-10"

1’-10"

11

2"

(T

YP

.)

1"= 1’-0"

SECTION A

À TOWER DIAGONAL

TOWER DETAILS - 1

À FIXED SPAN DIAGONAL

NOTE: ONLY IN BAY 9, FIXED SPAN DIAGONALS L8-U9 (L8’-U9’), U9-L9 (U9’-9’) OR

TOWER DIAGONALS R1-R2 (R1’-R2’), R2-T1 (R2’-T1’)

1"= 1’-0"

DETAIL 2

1"= 1’-0"

DETAIL 3

1"= 1’-0"

DETAIL 4

R5

(R5’)

R4

(R4’)

RL3

1. ALL TOWER STRUCTURAL STEEL SHALL BE AASHTO M270 GRADE 50

UNLESS OTHERWISE NOTED.

2. ALL BOLTS SHALL BE �" DIA. HIGH STRENGTH ASTM A325 AND SHALL

BE GALVANIZED PER THE REQUIREMENTS OF ASTM A153. NUTS AND WASHERS

SHALL BE A563 AND F436 RESPECTIVELY, AND SHALL BE GALVANIZED PER

REQUIREMENTS OF ASTM A153

3. FOR LOCATION OF DETAILS 1 THRU 4, SEE BRIDGE SHEET B30 AND B31.

AS NOTED

CSE

SPL

TPZ

ARCHER WESTERN CONTRACTORS

STATE OF NEW HAMPSHIRE

DEPARTMENT OF TRANSPORTATION * BUREAU OF BRIDGE DESIGN

BRIDGE NO. STATE PROJECTTOWN

LOCATION

REVISIONS AFTER PROPOSAL

SHEET SCALE

DESIGNED

DRAWN

QUANTITIES

REV. DATE

ISSUE DATEFEDERAL PROJECT NO. SHEET NO. TOTAL SHEETS

FILE NUMBER

OF

BRIDGE SHEET

DATEBY

CHECKED

CHECKED

CHECKED

DATEBY

HNTB Corporation

The HNTB Companies

Engineers Architects Planners

SUBDIRECTORY

XX $FILENAME$

.DGN LOCATOR

$BRDESCR$

$TOWN$

$BRNO$ $STNO$

$BT$

$BRFILNO$

$CSHTOT$XXXXXXXX

PRELIMINARY PLANS

SEPTEMBER 12, 2011

�"= 1’-0"

DETAIL 1

A

2 SPA. @ 4�"2 SPA. @ 4�"

4"

31

2"

(T

YP

.)

31

2"

(T

YP

.)

23 S

PA

. @

7" =

13’-5" (T

YP

.)

24 S

PA

. @

7" =

14’-0" (T

YP

.)

A

R2

(R2’)

R1

(R1’)

Page 4: SOUTH TOWER ELEVATIONS OF B30 XXXXXX XX $CSHTOT$ · 2013-03-10 · of 09/11 gt 09/11 xx xx/xx xx xx/xx 09/11 jn 09/11 b34 notes: tower - typical sheave support details 1. all tower

09/11

GT 09/11

XX/XXXXXX/XXXX

09/11

09/11

B33TOWER DETAILS - 2

1"= 1’-0"

DETAIL 5

1"= 1’-0"

DETAIL 6

1"= 1’-0"

DETAIL 7

1"= 1’-0"

DETAIL 8

1"= 1’-0"

DETAIL 10

LEGEND:

T(n)

R(n)

TL(n)

RL(n)

INDICATE TOWER FRONT LEG PANEL POINT

INDICATE TOWER REAR LEG PANEL POINT

INDICATE TOWER FRONT LEG BRACING PANEL POINT

INDICATE TOWER REAR LEG BRACING PANEL POINT

NOTES:

1. ALL TOWER STRUCTURAL STEEL SHALL BE AASHTO M270 GRADE 50

UNLESS OTHERWISE NOTED.

2. ALL BOLTS SHALL BE �" DIA. HIGH STRENGTH ASTM A325 AND SHALL

BE GALVANIZED PER THE REQUIREMENTS OF ASTM A153. NUTS AND WASHERS

SHALL BE A563 AND F436 RESPECTIVELY, AND SHALL BE GALVANIZED PER

REQUIREMENTS OF ASTM A153

3. FOR LOCATION OF DETAILS 5 THRU 10, SEE BRIDGE SHEET B30 AND B31.

T5’

(T5) T4’

T3’

1"= 1’-0"

DETAIL 9

(T4)

(T3)

TL3

TL2

T2’

(T2)

1" = 1’-0"

CSE

SPL

TPZ

ARCHER WESTERN CONTRACTORS

STATE OF NEW HAMPSHIRE

DEPARTMENT OF TRANSPORTATION * BUREAU OF BRIDGE DESIGN

BRIDGE NO. STATE PROJECTTOWN

LOCATION

REVISIONS AFTER PROPOSAL

SHEET SCALE

DESIGNED

DRAWN

QUANTITIES

REV. DATE

ISSUE DATEFEDERAL PROJECT NO. SHEET NO. TOTAL SHEETS

FILE NUMBER

OF

BRIDGE SHEET

DATEBY

CHECKED

CHECKED

CHECKED

DATEBY

HNTB Corporation

The HNTB Companies

Engineers Architects Planners

SUBDIRECTORY

XX $FILENAME$

.DGN LOCATOR

$BRDESCR$

$TOWN$

$BRNO$ $STNO$

$BT$

$BRFILNO$

$CSHTOT$XXXXXXXX

PRELIMINARY PLANS

SEPTEMBER 12, 2011

Page 5: SOUTH TOWER ELEVATIONS OF B30 XXXXXX XX $CSHTOT$ · 2013-03-10 · of 09/11 gt 09/11 xx xx/xx xx xx/xx 09/11 jn 09/11 b34 notes: tower - typical sheave support details 1. all tower

09/11

GT 09/11

XX/XXXXXX/XXXX

09/11

09/11JN

B34

NOTES:

TOWER - TYPICAL SHEAVE SUPPORT DETAILS

1. ALL TOWER STRUCTURAL STEEL SHALL BE AASHTO M270 GRADE 50

UNLESS OTHERWISE NOTED.

2. FOR EXTERIOR LADDER AND OTHER INFORMATION, SEE BRIDGE SHEET

BXX.

3. FOR SOUTH AND NORTH TOWER ELEVATIONS, SEE BRIDGE SHEETS B30

AND B31 RESPECTIVELY.

1/2" = 1’-0"

PRE

TPZ

ARCHER WESTERN CONTRACTORS

STATE OF NEW HAMPSHIRE

DEPARTMENT OF TRANSPORTATION * BUREAU OF BRIDGE DESIGN

BRIDGE NO. STATE PROJECTTOWN

LOCATION

REVISIONS AFTER PROPOSAL

SHEET SCALE

DESIGNED

DRAWN

QUANTITIES

REV. DATE

ISSUE DATEFEDERAL PROJECT NO. SHEET NO. TOTAL SHEETS

FILE NUMBER

OF

BRIDGE SHEET

DATEBY

CHECKED

CHECKED

CHECKED

DATEBY

HNTB Corporation

The HNTB Companies

Engineers Architects Planners

SUBDIRECTORY

XX $FILENAME$

.DGN LOCATOR

$BRDESCR$

$TOWN$

$BRNO$ $STNO$

$BT$

$BRFILNO$

$CSHTOT$XXXXXXXX

PRELIMINARY PLANS

SEPTEMBER 12, 2011

N.T.S.

AA

SOUTH FIXED SPAN NORTH FIXED SPANLIFT SPAN

KEY ELEVATION

�"= 1’-0"

VIEW A-A(NORTH OPP. HAND)

44’-2

34

"5

’-1

11

4"

10’-0"

5’-1

11

4"

N

56

’-1

14

"

54’-3"

À WEST FRONT TOWER LEG

À WEST SHEAVE

À BRIDGE

À EAST SHEAVE

À EAST FRONT TOWER LEG

À FRONT TOWER LEG

Page 6: SOUTH TOWER ELEVATIONS OF B30 XXXXXX XX $CSHTOT$ · 2013-03-10 · of 09/11 gt 09/11 xx xx/xx xx xx/xx 09/11 jn 09/11 b34 notes: tower - typical sheave support details 1. all tower

XX

XX

XX

XX

XX

XX

XX

09/11

JN 09/11

XX/XXXXXX/XXXX

09/11

09/11

COUNTERWEIGHT

KIPS

KIPS

KIPS

KIPS

METAL WEIGHT

CONCRETE WEIGHT

(UNIT WEIGHT XXX PCF)

CAST IRON BLOCKS *

(XX LB PER BLOCK)

TOTAL WEIGHT EACH CTWT

NOTES:

* - THE TOTAL QUANTITY OF CAST IRON BALANCE BLOCKS

PROVIDED BY THE CONTRACTOR SHALL BE XXX,XXX LBS.

XXKIPS

BALANCE OF LIFTSPAN

SPAN DOWN

SPAN SIDE CTWT SIDE

LOAD TO LIFT

FIXED WEIGHT CTWT

FIXED WEIGHT ROPES

UNBALANCED WEIGHT OF ROPES

TOTAL

INTENTIONAL IMBALANCE

XX

SPAN SIDE CTWT SIDE

SPAN UP

KIPS

KIPS

KIPS

KIPS

KIPS

XX XX

3

B36

1.

2.

3.

4.

SOUTH TOWER COUNTERWEIGHT SHOWN.

NORTH TOWER COUNTERWEIGHT OPPOSITE HAND.

COUNTERWEIGHT CONCRETE DESIGN UNIT WEIGHT IS

BASED ON THEORETICAL WEIGHT OF THE SPAN AND IS

APPROXIMATELY 220 LB/FT.

BALANCE BLOCKS SHALL CAST IRON AND DETAILED AS SHOWN.

FOR COUNTERWEIGHT CONNECTION DETAIL 1, SEE BRIDGE SHEET B37.

AS NOTED

COUNTERWEIGHT ELEVATIONS

SPL

GT CSE

ARCHER WESTERN CONTRACTORS

STATE OF NEW HAMPSHIRE

DEPARTMENT OF TRANSPORTATION * BUREAU OF BRIDGE DESIGN

BRIDGE NO. STATE PROJECTTOWN

LOCATION

REVISIONS AFTER PROPOSAL

SHEET SCALE

DESIGNED

DRAWN

QUANTITIES

REV. DATE

ISSUE DATEFEDERAL PROJECT NO. SHEET NO. TOTAL SHEETS

FILE NUMBER

OF

BRIDGE SHEET

DATEBY

CHECKED

CHECKED

CHECKED

DATEBY

HNTB Corporation

The HNTB Companies

Engineers Architects Planners

SUBDIRECTORY

XX $FILENAME$

.DGN LOCATOR

$BRDESCR$

$TOWN$

$BRNO$ $STNO$

$BT$

$BRFILNO$

$CSHTOT$XXXXXXXX

PRELIMINARY PLANS

SEPTEMBER 12, 2011

�"= 1’-0"

B

B

A

A

20’-1"20’-1"6’-4 3 4 "

52’-11 1 2 "

12’-0"

5’-0

"

À BRIDGE

À SYMM.

DETAIL 1

COUNTERWEIGHT ELEVATION

6’-4 3 4 "

�"= 1’-0"

9’-0" 1"

7"L3x3x�

(TYP.)

`�"x8"

(TYP.)

`�"x5�"

(TYP.)

`�"

(TYP.)

L3x3x�

CLIP 1"x1"

(TYP.)

`�"

(TYP.)WT9x20

WT4x14

�"= 1’-0"

`�"

(TYP.)

1"

7"

7"

7"

1" 9’-0" 1"

L3x3x�

(TYP.)

`�"x5�"

(TYP.)

`�"8"

(TYP.)

WT4x14

`�"

(TYP.)

L3x3x�

CLIP 1"x1"

(TYP.)

`�"

(TYP.)

WT9x20

7"

17’-0"

12’-0"

SECTION A SECTION B

À COUNTERWEIGHT

À ROPE GROUP

Page 7: SOUTH TOWER ELEVATIONS OF B30 XXXXXX XX $CSHTOT$ · 2013-03-10 · of 09/11 gt 09/11 xx xx/xx xx xx/xx 09/11 jn 09/11 b34 notes: tower - typical sheave support details 1. all tower

09/11

09/11

XX/XXXXXX/XXXX

JN 09/11

09/11

B37

NOTES:

1. FOR LOCATION OF DETAIL 1, SEE BRIDGE SHEET B36.

1 1/2" = 1’-0"

COUNTERWEIGHT ROPE CONNECTION DETAILS

CSE

GT TPZ

ARCHER WESTERN CONTRACTORS

STATE OF NEW HAMPSHIRE

DEPARTMENT OF TRANSPORTATION * BUREAU OF BRIDGE DESIGN

BRIDGE NO. STATE PROJECTTOWN

LOCATION

REVISIONS AFTER PROPOSAL

SHEET SCALE

DESIGNED

DRAWN

QUANTITIES

REV. DATE

ISSUE DATEFEDERAL PROJECT NO. SHEET NO. TOTAL SHEETS

FILE NUMBER

OF

BRIDGE SHEET

DATEBY

CHECKED

CHECKED

CHECKED

DATEBY

HNTB Corporation

The HNTB Companies

Engineers Architects Planners

SUBDIRECTORY

XX $FILENAME$

.DGN LOCATOR

$BRDESCR$

$TOWN$

$BRNO$ $STNO$

$BT$

$BRFILNO$

$CSHTOT$XXXXXXXX

PRELIMINARY PLANS

SEPTEMBER 12, 2011

ISOMETRIC VIEW

A A

VIEW A-A

B

B

VIEW B-B

2’-0

"

3’-5�"

2’-5

"

10"

2’-0"

2’-5

"

10

"

3’-5�"

1�" = 1’-0"

1�" = 1’-0"

1�" = 1’-0" 1�" = 1’-0"

2"

2"

DETAIL 1

Page 8: SOUTH TOWER ELEVATIONS OF B30 XXXXXX XX $CSHTOT$ · 2013-03-10 · of 09/11 gt 09/11 xx xx/xx xx xx/xx 09/11 jn 09/11 b34 notes: tower - typical sheave support details 1. all tower

09/11

09/11

XX/XXXXXX/XXXX

JN 09/11

09/11GT

B38

1"= 1’-0"

1"= 1’-0"

1"= 1’-0"

NOTES:

B B

AS NOTED

VIEW B-B

ISOMETRIC VIEW

VIEW A-A

À TRUSS

2’-0"

À END FLOORBEAM,

FB0

À TRUSS

2’-9"

1. FOR TYPICAL FIXED SPAN TRUSS GIRDER GEOMETRY AND LIFT SPAN TRUSS GIRDER GEOMETRY,

SEE BRIDGE SHEET B16 AND B42 RESPECTIVELY.

3’-0

"

3’-1

�"

4’-6�"

1’-6

"

COUNTERWEIGHT ROPE CONNECTION AT LIFT SPAN

TPZ

CSE

À END FLOORBEAM,

FB0

À TRUSS

ARCHER WESTERN CONTRACTORS

STATE OF NEW HAMPSHIRE

DEPARTMENT OF TRANSPORTATION * BUREAU OF BRIDGE DESIGN

BRIDGE NO. STATE PROJECTTOWN

LOCATION

REVISIONS AFTER PROPOSAL

SHEET SCALE

DESIGNED

DRAWN

QUANTITIES

REV. DATE

ISSUE DATEFEDERAL PROJECT NO. SHEET NO. TOTAL SHEETS

FILE NUMBER

OF

BRIDGE SHEET

DATEBY

CHECKED

CHECKED

CHECKED

DATEBY

HNTB Corporation

The HNTB Companies

Engineers Architects Planners

SUBDIRECTORY

XX $FILENAME$

.DGN LOCATOR

$BRDESCR$

$TOWN$

$BRNO$ $STNO$

$BT$

$BRFILNO$

$CSHTOT$XXXXXXXX

PRELIMINARY PLANS

SEPTEMBER 12, 2011

�"= 1’-0"

(NORTH OPP. HAND)

END FLOORBEAM, FB0END FLOORBEAM,

FB27

DETAIL 1

A

AÀ SOUTH FIXED SPAN À LIFT SPN

N.T.S.

SOUTH FIXED SPAN NORTH FIXED SPANLIFT SPAN

KEY ELEVATION

DETAIL 1