SOUTH DAKOTA BOARD OF REGENTS - sdbor.edu · SOUTH DAKOTA BOARD OF REGENTS . ... The three-story...

13
****************************************************************************** RECOMMENDED ACTION OF THE EXECUTIVE DIRECTOR Approve SDSU’s Facility Program Plan to develop design plans for construction of an Architecture, Mathematics and Engineering Building at an estimated cost of $17,082,800. Funding for this project will be $10,000,000 from the FY2014 issuance of HEFF bonds and $7,082,800 in gifts guaranteed through the SDSU Foundation. Bond proceeds will not be available until fall 2013 or spring 2014. SOUTH DAKOTA BOARD OF REGENTS Committee on Budget and Finance AGENDA ITEM: III – L DATE: December 12-13, 2012 ****************************************************************************** SUBJECT: SDSU Architecture, Mathematics and Engineering Building Facility Program Plan South Dakota State University requests approval of the Facility Program Plan to continue planning for the construction of an Architecture, Mathematics and Engineering Building at an estimated cost $17,082,800. This project was originally presented to the Board as part of the 2012 Ten-Year Plan in December 2011. The Preliminary Facility Statement for this project was approved by the Board at their March 2012 Board meeting. This project was authorized as part of HB1051 of the 2012 Legislative Session. The three-story building will be adjacent to and east of Solberg Hall. The new facility will occupy the site that includes Solberg Annex, Industrial Arts and parking areas for these buildings. Solberg Annex and Industrial Arts will be demolished in the early phase of construction. The gross square footage of the proposed project is 62,000 to 64,000 and will provide program and space needs for four departments: Department of Architecture, Department of Mathematics and Statistics, Department of Engineering Technology Management, and Department of Mechanical Engineering. The first floor of the building will for the Engineering Technology Management and Mechanical Engineering Departments and include 8,500 square feet for a metal machining and hot metal area, a wood shop, a digital fabrication area, a tool storage area, a layout and assembly area, and a masonry mixing area. About 4,700 square feet on this floor will be for design team prototyping, engine testing and project display. The remaining first floor space will be dedicated as classroom/conference space. The second floor will be dedicated to the Mathematics and Statistics Department with space for offices, reception and administrative work areas, conference room and testing area. Additionally, there will be six classroom spaces and a Mathematics Help Center area.

Transcript of SOUTH DAKOTA BOARD OF REGENTS - sdbor.edu · SOUTH DAKOTA BOARD OF REGENTS . ... The three-story...

****************************************************************************** RECOMMENDED ACTION OF THE EXECUTIVE DIRECTOR

Approve SDSU’s Facility Program Plan to develop design plans for construction of an Architecture, Mathematics and Engineering Building at an estimated cost of $17,082,800. Funding for this project will be $10,000,000 from the FY2014 issuance of HEFF bonds and $7,082,800 in gifts guaranteed through the SDSU Foundation. Bond proceeds will not be available until fall 2013 or spring 2014.

SOUTH DAKOTA BOARD OF REGENTS

Committee on Budget and Finance

AGENDA ITEM: III – L

DATE: December 12-13, 2012

****************************************************************************** SUBJECT: SDSU Architecture, Mathematics and Engineering Building

Facility Program Plan South Dakota State University requests approval of the Facility Program Plan to continue planning for the construction of an Architecture, Mathematics and Engineering Building at an estimated cost $17,082,800. This project was originally presented to the Board as part of the 2012 Ten-Year Plan in December 2011. The Preliminary Facility Statement for this project was approved by the Board at their March 2012 Board meeting. This project was authorized as part of HB1051 of the 2012 Legislative Session.

The three-story building will be adjacent to and east of Solberg Hall. The new facility will occupy the site that includes Solberg Annex, Industrial Arts and parking areas for these buildings. Solberg Annex and Industrial Arts will be demolished in the early phase of construction. The gross square footage of the proposed project is 62,000 to 64,000 and will provide program and space needs for four departments: Department of Architecture, Department of Mathematics and Statistics, Department of Engineering Technology Management, and Department of Mechanical Engineering. The first floor of the building will for the Engineering Technology Management and Mechanical Engineering Departments and include 8,500 square feet for a metal machining and hot metal area, a wood shop, a digital fabrication area, a tool storage area, a layout and assembly area, and a masonry mixing area. About 4,700 square feet on this floor will be for design team prototyping, engine testing and project display. The remaining first floor space will be dedicated as classroom/conference space. The second floor will be dedicated to the Mathematics and Statistics Department with space for offices, reception and administrative work areas, conference room and testing area. Additionally, there will be six classroom spaces and a Mathematics Help Center area.

SDSU – Architecture, Mathematics and Engineering Building-Facility Program Plan December 12-13, 2012 Page 2 The third floor of the building will house the Department of Architecture. This space will be set up with administrative work and support space, offices, a meeting room, a large student studio work space, photography, model building and printing/scanning activity area and seminar classroom or conference room and a student display gallery. Additional details of this proposed project can be found in SDSU’s Facility Program Plan document, site plan and schematic drawings. Funding for this project will be $10,000,000 in future HEFF bonds and $7,082,800 in donations guaranteed through the SDSU Foundation.

ATTACHMENT I 3

FACILITY PROGRAM PLAN FOR

ARCHITECTURE, MATHEMATICS & ENGINEERING BUILDING SOUTH DAKOTA STATE UNIVERSITY

SDSU requests approval of this Facility Program Plan to continue planning and design of a new building that will provide academic space for the Architecture Department, the Mathematics & Statistics Department, and portions of the Engineering Technology Management (engineering shops) and Mechanical Engineering Departments. The Preliminary Facility Statement (PFS) was approved at the March 2012 Board of Regents meeting. A. PROGRAMATIC JUSTIFICATION FOR DISCRETE SPACES: This project will address program and space needs for four departments. The Department of Architecture (DoArch) at SDSU is a new professional degree

program. The new building will provide program specific space for students and faculty, including studio spaces, shop, a library, advising areas, offices, etc.

The Mathematics & Statistics Department is a basic science that provides

educational support for all curricula across the University and provides fundamental educational courses required of every student. Faculty also conduct research and provide research support in areas of bioinformatics, biostatistics, decision support statistics, and decision support mathematics. The new building will provide permanent space for the Department and all of its specialized education space in one consolidated location.

The Engineering Technology Management and Mechanical Engineering Departments include class labs and resources to demonstrate and model the practical application of engineering sciences and manufacturing processes. Classroom laboratory spaces are required for student projects and instruction of welding technologies, foundry operations, machine testing, control testing, machine assembly, metal fabrication, model building, and machine design that are housed in a machine shop environment. The new facility will provide superior replacement educational environments to those that currently exist in Solberg Annex and elsewhere on campus. The new spaces will also replace the ME assembly project space currently housed in a storage shed on the far west side of campus, disconnected from the rest of the ME program. It will also provide design team space that does not currently exist for the required curriculum for senior design projects.

ATTACHMENT I 4

The first floor will address the space needs of the Engineering Technology Management (ETM) and Mechanical Engineering (ME) Departments. It will include some space that will have shared use by the Department of Architecture. All of the ETM spaces are shared with ME and DoArch and include an overall allocation of about 8,500 square feet of what is referred to collectively as Fabrication Lab space. The specific components include: a wood shop (about 850 square feet), a metal machining and hot metal area (about 2,000 square feet), a digital fabrication area (about 500 square feet), a tool storage area with workstation for a shop supervisor (about 300 square feet), a large layout and assembly area (about 4,800 square feet), and a small masonry mixing area with access to the outside (about 50 square feet). This space will have overhead doors to access a loading dock and a screened outdoor yard for additional project work area and for material storage. Additional space, about 4,700 square feet, on the first floor is dedicated to the ME program. This includes about 3,400 square feet for design team prototyping workbenches, project layout and assembly, engine testing, and project display. The remaining space will be partitioned and setup as classroom/conference space for student design teams to meet and collaborate on their projects. The second floor will be comprised solely of the Mathematics & Statistics Department. The spaces include about 7,700 square feet for 45 offices for teaching and research faculty, post-doctoral or adjunct faculty, and the Department Head. Also contained in this space are two offices for staff, a reception and administrative work areas, a conference room, and an area to administer tests to students. About 1,500 additional square feet is allocated for approximately 36 graduate students. A Mathematics Help Center is planned to occupy about 400 square feet. This floor will include three classrooms, totaling about 2,600 square feet. Two classrooms will be approximately 1,000 square feet each, with a student occupancy of about 40 students in each space. The third room will be about 600 square feet for a class size of 30 students. The third floor will contain the Department of Architecture. Administrative work/support space, two administrative/staff offices, the Department Head office, and nine Faculty offices will comprise about 2,500 square feet. Within the department space is a room dedicated for meeting with potential students and for program accreditation purposes (display and storage of student work and accreditation materials). The large majority of the floor, about 8,200 square feet, will be for student “studio” work space. This will be open and flexible space and contain allocated work areas for students of each of the six years of the program. About 2,600 square feet is needed and planned for building small scale models, for photographing work, and for printing/scanning/cutting activities, a dedicated seminar classroom or conference room (about 800 square feet), and a gallery space to display student work.

ATTACHMENT I 5

B. GROSS SQUARE FOOTAGE: The facility will be three stories tall plus a mechanical penthouse, totaling approximately 62,000 to 64,000 gross square feet. C. SITE ANALYSIS: The site is adjacent to and east of Solberg Hall. The building will occupy the site that includes Solberg Annex, Industrial Arts, and the parking areas adjacent to these buildings. Solberg Annex and Industrial Arts will be demolished early in the construction phase of this project. Solberg Hall will be retained. The new Architecture, Mathematics, and Engineering building will be an addition to Solberg Hall. The first floor of both buildings will be directly connected. Other floor to floor connections will not be made due to significant differences in the floor to floor heights, the amount of construction and space necessary to create these connections, and the lack of programmatic connections between the functions in the conjoined buildings. The Communications Building will also be demolished during the course of the project. Administration Lane will be removed and 12th Avenue between 8th and 9th Streets will also be removed at the conclusion of the project. This will be replaced with landscaping and pedestrian sidewalks. During the construction of the project, these streets will be closed and utilized for construction staging. Access to the campus will be maintained utilizing 13th Avenue and Rotunda Lane. Campus utility lines in and around the site are of adequate size and capacity to serve the new building. The utilities will be modified as necessary to construct the AME building. The electrical utilities (transformer & switchgear) serving Solberg Hall and Solberg Annex will be expanded to include the new building. Existing water and sanitary sewer utilities will be extended to serve the AME building. Storm drainage will utilize existing surface and subsurface drainage systems and provide new subsurface piping connecting to roof drains. The existing steam tunnel extending under Solberg Annex that serves the south half of campus will remain in place. The AME building will be constructed over the top of this utility tunnel. Steam service lines to Solberg Hall will be rerouted and modified to serve both AME and Solberg Hall. The AME building will be connected to the central chilled water system. Existing piping has the capacity for this building with spare capacity for future construction or the addition of existing buildings to the central system. Central chiller capacity will not be adequate for the new building. An additional 500 ton chiller will be added within the chiller plant for the AME building and for future connected loads. D. DESCRIPTION OF KEY BUILDING FEATURES:

ATTACHMENT I 6

The facility will be three stories with a mechanical penthouse. The main floor is at grade level and will include a commons/lobby space for student/faculty collaboration, building mechanical and electrical equipment, and a combination of individual and shared shop space for teaching and student projects for Mechanical Engineering, Architecture, and Engineering Technology and Management Programs. The shop space will be accessible by a loading dock and will be adjacent to a screened outdoor location for material storage and additional workspace. The second floor will house the Mathematics & Statistics Department including three classrooms. Floor three will be occupied by the Department of Architecture and include offices, student studio spaces, reception, and associated program spaces. Restrooms will be located on every floor. The building structure is planned as a conventional steel frame, with cast in place concrete at grade level, and precast concrete core planks for the upper levels. The roof framing will be steel joists and a metal deck with insulation and a fully adhered roof membrane. The exterior walls will be insulated steel studs with masonry and cast/natural veneers. The exterior wall finish will complement Solberg Hall and consist of precast concrete insulated panels and/or brick masonry. Windows will be punched openings with an aluminum thermally broken storefront system. Portions of the facades will be an aluminum thermally broken curtain wall system. Double pane, low-E insulated glazing is planned. Overhead doors in the shop area will be glass panel insulated garage doors. The facility will be fire sprinklered. Vertical circulation will be by an elevator up to the penthouse and concrete filled metal pan stairs. Interior construction will consist of metal stud framing with CMU or shaft-wall gypsum assemblies at vertical shafts. E. ILLUSTRATIVE FLOOR PLANS: The following attachments are included:

Site Plan Floor Plan - Level 1 Floor Plan - Level 2 Floor Plan - Level 3 Floor Plan - Roof/Penthouse Level Exhibit II.A Exterior Perspective Images

F. INITIAL COST ESTIMATES: Estimated total project costs to develop the site, build the facility, and complete site utilities are estimated at $17,082,000. A breakdown of estimated of costs is as follows:

Construction Utility (Chiller) Infrastructure Equipment/Furnishings

$13,252,000 $1,125,000 $550,000

ATTACHMENT I 7

*The construction costs include project contingency allowance.

Architect/Engineer SDSU/OSE Project Management Survey

$1,845,000

Asbestos Abatement Commissioning Materials Testing/Inspection

$310,000

G. IMPACT TO M&R: All of the proposed changes to campus square footage will be categorized in the academic/administrative type of building as recorded on SDSU’s facilities inventory. Therefore the square footage changes will be reflected in SDSU’s HEFF M&R allocation. Based on recognized industry standards, the annual funding for maintenance and repair/capital renewal funding should be equal to 1.5-3% of the project costs or the building replacement value. The annual M&R allocation should be between $132,386 and $264,773 based on the value calculated after adjusting the project cost estimate of $17,082,800 with the replacement values of the buildings to be demolished as part of this project. At actual HEFF M&R funding levels, the annual M&R allocation for the net additional square footage of building is $33,149. H. BUDGET FOR ONGOING OPERATIONAL COSTS: The additional utility expenses are estimated at $31,587. This represents only utility consumption and does not include the costs of utility connections, which will be included in the cost of construction. For routine maintenance expenses, a minimum of $85,619 should be allocated each year. I. PROPOSED FUNDING SOURCES FOR COSTS OF:

1. CONSTRUCTION The project will be funded from a combination of Higher Education Facility Funds (HEFF) and private gifts made to the University through the SDSU Foundation. Full project costs have been estimated as $17,082,800. Of this $10,000,000 will be HEFF and $7,082,800 will be private gifts. 2. ONGOING OPERATIONS The utility and operating costs of the facility will be funded from University operating budgets.

3. MAINTENANCE AND REPAIR The maintenance and repair costs for this facility will be funded through HEFF.

ATTACHMENT II 8

Solberg Hall

Coughlin Campanile

Lincoln Music Hall

Daktronics Engineering Hall

Engineering Green

Solberg Addition(AME Building) Future Building

Harding Hall

Crothers Engineering Hall

11th

Aven

ue

12th

Aven

ue

13th

Aven

ue

Pugsley Continuing Education Center

Engineering Green | Vision Plan

July 2012

ATTA

CH

MEN

T II 9

SD

SD

1 1

2 2

3 3

4 4

5 5

6 6

7 7

31'-4"

31'-4"

31'-4"

31'-4"

31'-4"

31'-4"

AA

BB

CC

DD

1'-6"

EE

1217 S

F

WO

RK

BE

NC

HS

PA

CE

136

1562 S

F

ME

AS

SE

MB

LY

136

X X

388 S

F

EN

GIN

ES

LA

B

132C

1305 S

F

TE

AM

DE

SIG

NLA

B

136A

651 S

F

HO

T S

HO

PA

RE

A

132

1192 S

F

WO

OD

S A

ND

MO

DE

L S

HO

P

132A

522 S

F

DIG

ITA

LF

AB

RIC

AT

ION

132B

6154 S

F

AS

SE

MB

LY

AR

EA

132

2615 S

F

PO

RC

H

199C

30'-6" 30'-6" 30'-6"

191'-0"

2'-6"

97 S

F

CU

ST

OD

IAL

126

225 S

F

WO

ME

N

128

233 S

F

ME

N

129

891 S

F

AH

U | S

HO

P

120

6'-0"

51 S

F

MA

SO

NR

YS

HO

P

131

201 S

F

MA

INE

LE

CT

RIC

AL

SE

RV

ICE

121A

459 S

F

ME

CH

AN

ICA

LS

ER

VIC

E

121

ST

OR

AG

EM

EZ

ZA

NIN

E

15'-0 1

/16"

298 S

F

TO

OL C

RIB

132

DIS

PLA

Y W

ALL,

CO

MB

INA

TIO

N O

FV

ISIO

N G

LA

SS

AN

DD

ISP

LA

Y E

LE

ME

NT

S

INT

UIT

IVE

ST

AIR

138 S

F

VE

ND

ING

/FO

OD

125

Du

st

Co

llec

tor

16'-6"

8'-0"

VIS

IBIL

ITY

+D

ON

OR

RE

CO

GN

ITIO

N

OV

ER

ALL

DO

NO

RR

EC

OG

NIT

ION

WA

LL/D

ISP

LA

Y

17'-0"

RE

FE

R T

OE

QU

IPM

EN

TP

LA

NS

FO

RLA

YO

UT

S

62 S

F

MO

TH

ER

SR

OO

M

123

16'-0"

191'-0"

1'-6"

42 S

F

SE

RV

ICE

130

736 S

F

CO

RR

IDO

R199B

234 S

F

ST

R_W

_01

S1

322 S

F

S2

S2-1

102 S

F

VE

ST

IBU

LE

199D

115 S

F

VE

ST

IBU

LE

199E

107 S

F

PA

SS

AG

E

199A

55 S

F

ELE

VA

TO

RE

1

102

103

106

116

116B

116A

114

115E

115D 115C

115B

115A

115

113

111

105

102

100

9/28/2012 11:41:21 AM

SD

SU

_ A

ME

Build

ing │

LE

VE

L O

NE

© 2

01

2 R

AT

IO A

rchitects

, In

c. │

2012-0

9-0

1

12039.000

ATTACHMENT II 10

UP

DN

DN

UP

1 1

2 2

3 3

4 4

5 5

6 6

7 7

A B C D E

140 S

F

RE

SE

AR

CH

FA

CU

LT

Y

268

1027 S

F

CLA

SS

RO

OM

210

984 S

F

CLA

SS

RO

OM

214

610 S

F

SE

MIN

AR

CLA

SS

RO

OM

220

421 S

F

GR

AD

UA

TE

OF

FIC

E

253

439 S

F

GR

AD

UA

TE

OF

FIC

E

261

734 S

F

GR

AD

UA

TE

OF

FIC

E

249

140 S

F

TE

AC

HIN

GF

AC

ULT

Y

239

X X

274 S

F

PO

TE

NT

IAL

ST

UD

EN

TLO

UN

GE

(2

futu

re o

ffic

es)

282

140 S

F

ST

AF

F O

FF

ICE

284

140 S

F

TE

AC

HIN

GF

AC

ULT

Y

286

179 S

F

WO

RK

RO

OM

277

97 S

F

CU

ST

OD

IAL

202

144 S

F

TE

AC

HIN

GF

AC

ULT

Y

288

91 S

F

PO

ST

DO

C

267

164 S

F

ST

OR

AG

E

271

225 S

F

WO

ME

N204

233 S

F

ME

N

207

91 S

F

DA

TA

/EL

EC

.

265

142 S

F

TE

AC

HIN

GF

AC

ULT

Y

289

239 S

F

MA

TH

DE

PT

.H

EA

D

209A

153 S

F

MA

TH

RE

CE

PT

.

209

52 S

F

TE

ST

ING

ALC

OV

E

299I

91 S

F

PO

ST

DO

C

269

83 S

F

ST

UD

EN

TW

AIT

ING

299I

30'-6" 30'-6"

1'-6"

MA

TH

ID

EN

TIT

Y

'WO

W' W

IND

OW

94'-6"

31'-4"

31'-4"

31'-4"

31'-4"

31'-4"

31'-4"

1'-6"

16'-0"

191'-0"

144 S

F

TE

AC

HIN

GF

AC

ULT

Y

276

142 S

F

TE

AC

HIN

GF

AC

ULT

Y

291

10'-4"

8'-0"

432 S

F

MA

TH

HE

LP

CE

NT

ER

292

10'-4"

140 S

F

RE

SE

AR

CH

FA

CU

LT

Y

264

8'-0"

1'-6"

ST

OR

AG

E C

AB

INE

TS

188 S

F

PO

ST

-DO

C232

1'-6"

TW

O-S

TO

RY

OP

EN

TO

BE

LO

W

140 S

F

RE

SE

AR

CH

FA

CU

LT

Y

258

140 S

F

RE

SE

AR

CH

FA

CU

LT

Y

262

140 S

F

RE

SE

AR

CH

FA

CU

LT

Y

260

1'-6"

140 S

F

TE

AC

HIN

GF

AC

ULT

Y

237

140 S

F

TE

AC

HIN

GF

AC

ULT

Y

235

140 S

F

TE

AC

HIN

GF

AC

ULT

Y

233

140 S

F

TE

AC

HIN

GF

AC

ULT

Y

231

143 S

F

TE

AC

HIN

GF

AC

ULT

Y

223

140 S

F

TE

AC

HIN

GF

AC

ULT

Y

221

134 S

F

TE

AC

HIN

GF

AC

ULT

Y

225

147 S

F

TE

AC

HIN

GF

AC

ULT

Y

227

140 S

F

TE

AC

HIN

GF

AC

ULT

Y

229

1'-10 1

1/1

6"

7'-0"

140 S

F

TE

AC

HIN

GF

AC

ULT

Y

278

9'-10 3

/32"

9'-10 3

/32"

9'-10 3

/32"

7'-0"

140 S

F

RE

SE

AR

CH

FA

CU

LT

Y

266

140 S

F

TE

AC

HIN

GF

AC

ULT

Y

270

148 S

F

TE

AC

HIN

GF

AC

ULT

Y

274

140 S

F

TE

AC

HIN

GF

AC

ULT

Y

272

140 S

F

RE

SE

AR

CH

FA

CU

LT

Y

246

140 S

F

RE

SE

AR

CH

FA

CU

LT

Y

250

140 S

F

RE

SE

AR

CH

FA

CU

LT

Y

256

140 S

F

RE

SE

AR

CH

FA

CU

LT

Y

252

140 S

F

RE

SE

AR

CH

FA

CU

LT

Y

254

140 S

F

RE

SE

AR

CH

FA

CU

LT

Y

248

140 S

F

RE

SE

AR

CH

FA

CU

LT

Y

244

148 S

F

RE

SE

AR

CH

FA

CU

LT

Y

240

140 S

F

RE

SE

AR

CH

FA

CU

LT

Y

242

140 S

F

TE

AC

HIN

GF

AC

ULT

Y

217

140 S

F

TE

AC

HIN

GF

AC

ULT

Y

219

140 S

F

TE

AC

HIN

GF

AC

ULT

Y

215

140 S

F

TE

AC

HIN

GF

AC

ULT

Y

213

140 S

F

TE

AC

HIN

GF

AC

ULT

Y

211

8'-0"

30'-6"

223 S

F

ST

UD

EN

TW

AIT

ING

299

42 S

F

SE

RV

ICE

206

643 S

F

CO

RR

IDO

R299G

662 S

F

CO

RR

IDO

R299H

315 S

F

CO

RR

IDO

R

299I

413 S

F

CO

RR

IDO

R

299B

1617 S

F

CO

RR

IDO

R

299D

107 S

F

CO

RR

IDO

R

299A

475 S

F

CO

RR

IDO

R

299E

205 S

F

ST

R-E

-02

S2-2

306 S

F

ST

R-W

-02

S1-2

55 S

F

ELE

VA

TO

RE

1

9/28/2012 11:41:23 AM

SD

SU

_ A

ME

Build

ing │

LE

VE

L T

WO

© 2

01

2 R

AT

IO A

rchitects

, In

c. │

2012-0

9-0

1

12039.000

ATTACHMENT II 11

1 1

2 2

3 3

4 4

5 5

6 6

7 7

AA

BB

CC

DD

EE

X X

179 S

F

SE

SS

ION

AL

FA

CU

LT

YO

FF

ICE

367

126 S

F

FA

CU

LT

YO

FF

ICE

370

267 S

F

DE

PT

. H

EA

DO

FF

ICE

372

44 D

ES

KS

(3'X

3' M

od

ule

)

127 S

F

ST

AF

F O

FF

ICE

378

127 S

F

ST

AF

F O

FF

ICE

376

127 S

F

ST

AF

F O

FF

ICE

374

714 S

F

ST

UD

IO (

YR

3)

320

126 S

F

FA

CU

LT

YO

FF

ICE

368

126 S

F

FA

CU

LT

YO

FF

ICE

364

393 S

F

PR

INT

/SH

OO

T/S

CA

NLA

B

320B

624 S

F

GA

LLE

RY

/R

EC

EP

TIO

N

301

298 S

F

PLA

CE

ME

NT

AN

D A

DV

ISIN

G/

AC

CR

ED

ITA

TIO

NR

OO

M

380

133 S

F

RE

CE

PT

.

379

97 S

F

CU

ST

OD

IAL

302

225 S

F

WO

ME

N

304

233 S

F

ME

N

307

100 S

F

DA

TA

/EL

EC

.

365

263 S

F

ST

UD

EN

TLO

UN

GE

/CR

IT.

320

16'-0"

RE

SO

UR

CE

LA

B

299 S

F

BU

ILD

ING

CO

NF

. R

OO

M

382

1250 S

F

ST

UD

IO (

YR

6)

320

1280 S

F

ST

UD

IO (

YR

1/2

)

320

MA

ILB

OX

ES

7'-0"

SH

OO

T Z

ON

E

SO

LA

R-T

UB

ES

FO

R O

FF

ICE

SB

ELO

W

7'-0"

126 S

F

FA

CU

LT

YO

FF

ICE

358

126 S

F

FA

CU

LT

YO

FF

ICE

362

811 S

F

ST

UD

IO (

YR

4)

320

7'-0"

302 S

F

CR

IT S

PA

CE

320

313 S

F

ST

AF

F W

OR

KR

OO

M

377

42 S

F

SE

RV

ICE

306

20'-4"

11'-0"

205 S

F

ST

R_E

_03

S2-3

166 S

F

ST

UD

EN

TO

RG

. O

FF

ICE

320A

310 S

F

ST

R_W

_03

S1-3

107 S

F

PA

SS

AG

E

399A

504 S

F

CO

RR

IDO

R

399B

261 S

F

CR

IT S

PA

CE

320

277 S

F

CO

RR

IDO

R

399I

541 S

F

CO

RR

IDO

R399H

497 S

F

CO

RR

IDO

R

399G

418 S

F

CO

RR

IDO

R

399E

1248 S

F

ST

UD

IO (

YR

3)

320

710 S

F

ST

UD

IO (

YR

1/2

)

320

774 S

F

CO

RR

IDO

R

399D

20 D

ES

KS

(3'X

5' M

od

ule

)

973 S

F

ST

UD

IO (

YR

5)

320

26 D

ES

KS

(3'X

5' M

od

ule

)26 D

ES

KS

(3'X

5' M

od

ule

)

465 S

F

ST

UD

IO (

YR

4)

320

20 D

ES

KS

(3'X

5' M

od

ule

)28 D

ES

KS

(3'X

3' M

od

ule

)

28 D

ES

KS

(3'X

5' M

od

ule

)23 D

ES

KS

(3'X

5' M

od

ule

)

RE

SO

UR

CE

TA

BLE

55 S

F

ELE

VA

TO

RE

1

126 S

F

FA

CU

LT

YO

FF

ICE

366

126 S

F

FA

CU

LT

YO

FF

ICE

360

9/28/2012 11:41:26 AM

SD

SU

_ A

ME

Build

ing │

LE

VE

L T

HR

EE

© 2

01

2 R

AT

IO A

rchitects

, In

c. │

2012-0

9-0

1

12039.000

ATTACHMENT II 12

DN

1 1

2 2

3 3

4 4

5 5

6 6

7 7

AA

BB

CC

DD

EE

X X

12'-0"

30'-6"

58'-0"

303 S

F

CU

ST

OD

IAL

RO

OM

401B

144 S

F

ELE

VA

TO

RE

QU

IP.

401A

55 S

F

ELE

VA

TO

R

E1

261 S

F

WE

ST

ST

AIR

S1-4

Redundan

t R

oom

ME

CH

AN

ICA

L

401

9/28/2012 11:41:27 AM

SD

SU

_ A

ME

Build

ing │

RO

OF

LE

VE

201

2 R

AT

IO A

rchitects

, In

c. │

2012-0

9-0

1

12039.000

ATTACHMENT II 13