    INITIAL STRUCTURAL INTEGRITY ASSESSMENTREPORT (SIAR)

    Factory Name: SONIA & SWEATERS LTD

    Address: Kondolbagh, Taibpur, Ashulia Road, Savar, Dhaka, 0,BD Savar, Dhaka Dhaka Bangladesh

    Assessor: Bureau Veritas

    Date: 11 May 2014

    reated with EO.Pdf for .NET trial version. http://www.essentialobjects.com.e Alliance for Bangladesh Worker Safety Page 1/

  • 8/10/2019 Sonia & Sweaters Ltd_structural

    2/9

    troduction to the Report

    he following report contains a site profile and summary of non-conformities identified during an onsite assessment commissioned by theliance for Bangladesh Worker Safety (Alliance) and conducted by a third-party Qualified Assessment Firm (QAF). The assessment wasnducted against the Alliance for Bangladesh Worker Safety Assessment Protocols (APs) and Fire Safety and Structural Integrity Standard,hich is harmonized with the factory assessment guidelines developed by Bangladesh University of Engineering and Technology (BUET) for e Bangladesh National Tripartite Plan of Action (NTPA). The goal of the Alliance process is to provide clear and practical technicalquirements by which Bangladeshi Ready Made Garment (RMG) Factories producing for Alliance members may be consistently and fairlyaluated for fire, structural, and electrical safety in a non-duplicative manner. Each assessment will prompt action plans that will be used by

    MG factories to systematically and sustainably improve safety conditions for garment workers. Beyond tracking and reporting on actioneps taken in a transparent manner, the Alliance organization and its members will seek to further support factory improvements throughchnical assistance, training, implementation support for functional Worker Committees, and in some cases financial assistance and wagepport for workers if factories are closed for remediation.

    he contents of the report do not constitute a guarantee of compliance with the applicable laws, the Alliance Standard or the absolute or ntinued safety against fire, electrical and/or structural integrity issues that may lead to injury or loss of life. The report is designed to providenon-exhaustive summary of risk issues, based on a limited sampling and duration of time onsite by the named QAF. Neither the QAF nor e Alliance can certify or guarantee the quality, outcome, or effectiveness of actions taken in response to the report.

    or more information and report feedback please go to: www.bangladeshworkersafety.org.

    FactoryName:

    SONIA & SWEATERS LTD

    Address: Kondolbagh, Taibpur, Ashulia Road, Savar, Dhaka, 0, BD Savar, DhakaDhaka Bangladesh

    Assessor: Bureau Veritas

    Date: 11 May 2014

    reated with EO.Pdf for .NET trial version. http://www.essentialobjects.com.e Alliance for Bangladesh Worker Safety Page 2/

  • 8/10/2019 Sonia & Sweaters Ltd_structural

    3/9

    GENERAL INFORMATION

    General Information

    Factory Name: SONIA & SWEATERS LTD

    Address: Kondolbagh, Taibpur, Ashulia Road, Savar, Dhaka, 0, BD Savar, Dhaka Dhaka Bangladesh

    Country: Bangladesh

    Province: Dhaka

    City: Savar, Dhaka

    Zip Code:

    Audit Duration: 1 Days

    Re-Audit: Re-Audit After 0 Months

    Draft Report Date : 05-14-2014

    Final Report Date : 09-29-2014

    Are all Action ItemsFrom PreviousAssessmentCompleted?:

    N/A

    Buildings in Complex : There are 2 buildings in the factory premises out of which one is main production building and the other one isan ancillary building. The buildings are named as: 1) Eleven story main production building, 2) Single storymaintenance building.

    Number of BuildingLevels (Stories) :

    1) Eleven story main production building: Building height (Highest occupied floor level): 30.60 m or 100.4 ft[Height up to roof: 33.66 m or 110.4 ft], Stories above grade: 11, Stories below grade: 0, Occupied levels: 11,2) Single story maintenance building: Building height (Highest occupied floor level): 0.61 m or 2 ft above grade[Height up to roof: 3.05 m or 10 ft], Stories above grade: 1, Stories below grade: 0, Occupied levels: 1.

    Approximate BuildingArea (SF) :

    254517 sf

    Date of Building

    Construction :

    Factory personnel informed the date of construction as follows: Started in 2002 and finished in 2009.

    Date of Last BuildingRenovation/Addition :

    No renovation/addition has been done in the structure.

    Is the Building mixeduse?:

    No

    Ancillary Structures inComplex :

    1) Single story maintenance building.

    FactoryName:

    SONIA & SWEATERS LTD

    Address: Kondolbagh, Taibpur, Ashulia Road, Savar, Dhaka, 0, BD Savar, DhakaDhaka Bangladesh

    Assessor: Bureau Veritas

    Date: 11 May 2014

    reated with EO.Pdf for .NET trial version. http://www.essentialobjects.com.e Alliance for Bangladesh Worker Safety Page 3/

  • 8/10/2019 Sonia & Sweaters Ltd_structural

    4/9

    Number of AncillaryLevels (Stories) :

    1) Single story maintenance building: Building height (Highest occupied floor level): At grade [Height up toroof: 3.05 m or 10 ft], Stories above grade: 1, Stories below grade: 0, Occupied levels: 1.

    Approximate AncillaryStructures Area (SF) :

    1) Single story maintenance building: 278.00 sft.

    Number of Occupants : Total number of occupants: 2217; 1) Eleven story main production building: 2210 (Ground floor: 97, 1st floor:198, 2nd floor: 358, 3rd floor: 237, 4th floor: 308, 5th floor: 44, 6th floor: 3, 7th floor: 207, 8th floor: 243, 9thfloor: 420, 10th floor: 95), 2) Single story maintenance building: 7.

    Exterior FacadeDescription :

    The building is RCC structure with infilled masonry wall. Exterior face of the masonry wall is of plaster andpaint works. The main door of the building is a wooden door and the windows are of sliding glass type.

    Structural SystemDescription :

    Mixed structural system. RCC Frame structure system up to 4th floor, 5th to 9th floor is a flat slab system withedge beam, and top floor is structural steel roofing with infilled masonry.

    FactoryName:

    SONIA & SWEATERS LTD

    Address: Kondolbagh, Taibpur, Ashulia Road, Savar, Dhaka, 0, BD Savar, DhakaDhaka Bangladesh

    Assessor: Bureau Veritas

    Date: 11 May 2014

    reated with EO.Pdf for .NET trial version. http://www.essentialobjects.com.e Alliance for Bangladesh Worker Safety Page 4/

  • 8/10/2019 Sonia & Sweaters Ltd_structural

    5/9

    ASSESSMENT FINDINGS

    Structural System Design

    Question: Are credible structural design documents available for review and kept on site?

    Priority Level: Medium

    Non-Compliance Level: 2

    Description: Credible structural design documents are available for review and kept on site,with the exception of the design report, as per BNBC 1.9.1.1.

    Source of Findings: Document Review: Credible structural design documents are properlydocumented except design report.

    Suggested Plan of Action:

    Have a qualified structural engineer prepare credible as-built documentsbased on the requirements of Part 8 Section 8.19 of the Alliance Standard.

    Suggested DeadlineDate:

    24 Jul 2014

    Standard: Alliance Standard Part 8 Section 8.19 Required Structural Documentation for New and Existing Factories

    Question: Is a clear and redundant load path to resist lateral loads provided?

    Priority Level: Medium

    Non-Compliance Level: 2

    Description: The structural configuration is moment resisting regular structure up to 4thfloor and from 5th to 9th floor it is flat slab structure with edge beam. Hence,the lateral load path is apparent only for up to 4th floor, not for 5th to 10th floor.Further information (design report) is required to understand the redundancyagainst lateral loads.

    Source of Findings: Visual Assessment: Visual inspection shows the lateral load path is apparentonly for up to 4th floor.

    Suggested Plan of Action:

    Have a qualified structural engineer prepare design report.

    Suggested DeadlineDate:

    24 Jul 2014

    Standard: Alliance Standards Part 8 Section 8.17 Design for Lateral Loads and 8.3.3.2006 BNBC Part 6 Section 1.5

    FactoryName:

    SONIA & SWEATERS LTD

    Address: Kondolbagh, Taibpur, Ashulia Road, Savar, Dhaka, 0, BD Savar, DhakaDhaka Bangladesh

    Assessor: Bureau Veritas

    Date: 11 May 2014

    reated with EO.Pdf for .NET trial version. http://www.essentialobjects.com.e Alliance for Bangladesh Worker Safety Page 5/

  • 8/10/2019 Sonia & Sweaters Ltd_structural

    6/9

    Question: Have provisions been made in floors or decks for a concentrated load (such asheavy equipment, water tanks, stored materials, etc) applied at a locationwherever this load acting upon an otherwise unloaded floor would producestresses greater than those caused by a uniform load?

    Priority Level: Medium

    Non-Compliance Level: 2

    Description: There are eight water tanks with a capacity of 5000 ltr each on the toilet zoneof the roof which are not shown in the structural design. These tanks act asconcentrated load on the roof slab.

    Source of Findings: Visual Assessment: There are eight plastic water tanks found on top of theroof.

    Suggested Plan of Action:

    Engage a qualified structural engineer to confirm and document that provisionshave been made to accommodate concentrated loads. If provisions have notbeen made, have a qualified structural engineer develop a remediation plan.

    Suggested DeadlineDate:

    24 Jul 2014

    Standard: Alliance Standard Part 8 Section 8.13 and 8.14

    Question: Are Certificates of Occupancy available for review?

    Priority Level: Low

    Non-Compliance Level: 1

    Description: Certificate of Occupancy is not available for review.

    Source of Findings: Document Review: Occupancy certificates are not found in the submitteddocuments.

    Suggested Plan of Action:

    Provide Certificates of Occupancy for review.

    Suggested DeadlineDate:

    24 Jul 2014

    Standard: Alliance Standard Part 8 Section 8.3 Preliminary Structural Assessment

    Structural System Construction

    Question: Have all areas of needed maintenance, including areas with efflorescence,dampness, standing water on rooftops, and corrosion been addressed.

    Priority Level: Medium

    Non-Compliance Level: 1

    Description: Water ponding was observed at the roof top.

    Source of Findings: Visual Assessment: Water ponding was observed at the roof top.

    FactoryName:

    SONIA & SWEATERS LTD

    Address: Kondolbagh, Taibpur, Ashulia Road, Savar, Dhaka, 0, BD Savar, DhakaDhaka Bangladesh

    Assessor: Bureau Veritas

    Date: 11 May 2014

    reated with EO.Pdf for .NET trial version. http://www.essentialobjects.com.e Alliance for Bangladesh Worker Safety Page 6/

  • 8/10/2019 Sonia & Sweaters Ltd_structural

    7/9

    Suggested Plan of Action:

    Under guidance from a qualified structural engineer, address all areas of needed maintenance by correcting the identified issues.

    Suggested DeadlineDate:

    24 Jul 2014

    Standard: Alliance Standard Part 8 Section 8.26 Durability and Maintenance

    Question: Are all non-structural elements suspended from, attached to, or resting atopthe structure adequately anchored and braced to resist earthquake forces?

    Priority Level: Medium

    Non-Compliance Level: 1

    Description: The storage racks at the Ground floor and 2nd floor are not braced for earthquake forces. There are 8 plastic water tanks with considerable height,which are also not braced or anchored properly.

    Source of Findings: Visual Assessment: Visual inspection shows that the storage racks at theGround floor and 2nd floor are not braced for earthquake forces. There are 8plastic water tanks with considerable height, which are also not braced or anchored properly.

    Suggested Plan of Action:

    Adequately anchor and brace all non-structural elements to resist earthquakeforces to comply with the BNBC and Alliance Standard.

    Suggested DeadlineDate:

    24 Jul 2014

    Standard: Alliance Standards Part 8 Section 8.18 Seismic Bracing of Key Non-StructuralElements and 2006 BNBC Part 6

    Structural Safety Programs

    Question: Are floor loads in compliance with posted plans?

    Priority Level: Medium

    Non-Compliance Level: 3

    Description: There is no floor load plan available to compare with actual floor loading.

    Source of Findings: Document Review: Floor load plans are not available in the submitteddocuments., Visual Assessment: No floor load plan is posted in the floor tocompare the actual floor loading.

    Suggested Plan of Action:

    Have a qualified structural engineer prepare load plans including theinformation required in Section 8.20 of the Alliance Standard and post the loadplans as required.

    Suggested DeadlineDate:

    24 Jun 2014

    Standard: Alliance Standard Part 8 Section 8.10 Floor Loading Plans (Load Plans).

    FactoryName:

    SONIA & SWEATERS LTD

    Address: Kondolbagh, Taibpur, Ashulia Road, Savar, Dhaka, 0, BD Savar, DhakaDhaka Bangladesh

    Assessor: Bureau Veritas

    Date: 11 May 2014

    reated with EO.Pdf for .NET trial version. http://www.essentialobjects.com.e Alliance for Bangladesh Worker Safety Page 7/

  • 8/10/2019 Sonia & Sweaters Ltd_structural

    8/9

    Question: Is a program in place to ensure that the live loads for which a floor or roof is or has been designed will not be exceeded?

    Priority Level: Medium

    Non-Compliance Level: 3

    Description: There is no program that will ensure that the designated load in each floor willnot be exceeded.

    Source of Findings: Document Review: No such program has been documented.

    Suggested Plan of Action:

    Develop a program to ensure that all live loads for which a floor or roof hasbeen designed for will not be exceeded. The designated Load Manager shalloversee this program and ensure it is enforced.

    Suggested DeadlineDate:

    24 Jul 2014

    Standard: Alliance Standard Part 13 Section 13.7 and Part 8 Section 8.9.

    Question: Have Load Plans been prepared for each floor documenting the actualmaximum operational loading that is intended and/or allowable on each floor.

    Priority Level: Low

    Non-Compliance Level: 3

    Description: There is no load plan available showing the actual maximum operationalloading that is allowable.

    Source of Findings: Document Review: Document review shows that there is no load planavailable showing the actual maximum operational loading that is allowable.

    Suggested Plan of Action:

    Have a qualified structural engineer develop Floor Loading Plans per therequirements of Part 8 Section 8.20.5.3

    Suggested DeadlineDate:

    24 Jul 2014

    Standard: Alliance Standard Part 8 Section 8.10 Floor Loading Plans (Load Plans)

    Question: Are Floor Load Plans posted as required?

    Priority Level: Low

    Non-Compliance Level: 3

    Description: Floor Load Plans are not posted as required.

    Source of Findings: Visual Assessment: No load plan was found posted as required.

    Suggested Plan of Action:

    Have a qualified structural engineer prepare load plans including theinformation required in Section 8.20 of the Alliance Standard.

    Suggested Deadline 24 Jul 2014

    FactoryName:

    SONIA & SWEATERS LTD

    Address: Kondolbagh, Taibpur, Ashulia Road, Savar, Dhaka, 0, BD Savar, DhakaDhaka Bangladesh

    Assessor: Bureau Veritas

    Date: 11 May 2014

    reated with EO.Pdf for .NET trial version. http://www.essentialobjects.com.e Alliance for Bangladesh Worker Safety Page 8/

  • 8/10/2019 Sonia & Sweaters Ltd_structural

    9/9

    Date:

    Standard: Alliance Standard Part 8 Section 8.20.5.3

    Question: Are areas used for storage of work materials and work products, clearly

    marked to indicate the acceptable loading limits as described in the Load Planfor that floor?

    Priority Level: Low

    Non-Compliance Level: 3

    Description: In the 5th floor, storage areas are marked to indicate the acceptable loadinglimit. No such indicators were found at the other floors. Additionally, load planswere not posted as required.

    Source of Findings: Visual Assessment: No marking is provided at storage areas.

    Suggested Plan of Action:

    Provide signage or the appropriate markings at all areas used for storage toindicate the acceptable loading limits detailed in the Load Plan.

    Suggested DeadlineDate:

    24 Jul 2014

    Standard: Alliance Standard Part 8 Section 8.11 Floor Load Markings

    FactoryName:

    SONIA & SWEATERS LTD

    Address: Kondolbagh, Taibpur, Ashulia Road, Savar, Dhaka, 0, BD Savar, DhakaDhaka Bangladesh

    Assessor: Bureau Veritas

    Date: 11 May 2014

    reated with EO.Pdf for .NET trial version. http://www.essentialobjects.com.