Sonepur 'l · 2019-02-23 · liane 3.,/ (R&B I Divrsion lNo lemaTu.s] Reouired (1) t7) (l)...
Transcript of Sonepur 'l · 2019-02-23 · liane 3.,/ (R&B I Divrsion lNo lemaTu.s] Reouired (1) t7) (l)...
| <,
: -es-.:g':-', -N: i -r::'a:^:', : -' :'^i!
|.l--i /.4 tr- ,tl^-tiRs. rn Lakhsi
\r--- ^f -:-
IPSPr t-],.,i ii; n t\I.
(1) (7) (5)Puri 1
7
3
(3)
5/R to Otd Circuit House at Pun
S/R to New Circurt House at Puri
S/R to 5pec'ia[ Circuit House at Puri
Total=1 S/R to Orissa High Court, Cuttack2 S/R to Orissa High Court Museum, Kiltafort3 S.C.B. Medical Cottege & hospital at Cuttack4 City Hospital, Cuttack
TOTAL5/R to R.D.C, N.D. office BuitJinq at Sambitpu,
\4)20.00
25.00
8.00
53.0080.00
10.00
r s.oo
zo.oo
125.OO
Cuttack- |
Sambalpur-l 1
2 S/R to Circuit House at Sambalpur3 S/R to S.P office at Samba[pur.
S/R to Cottectriat office at Sambatpur.
Su-b-Cottector off ice at Sambatpur.
Sub Col.tector office at Rairakhot.
4
5
6
Total =
5.00
5.00-.oo
5.00
4.003.00
27 -O0
1 5.00
s.00
Sonepur 'l Cot[ector Office at Sonepur2 S.P. Office at Sonepur
3 District CgyI!9glldiIs4 lmprovement to Circuit House at Sonepur
10.00
10.00
Total = 40.00
Grand Totat -- 245.00
Pe_1/1i c,l8t\5?r..2c:E79\A,'vlp2A:lt9\!i..'.:Cj, 19 ):-C7 )Aa!,:a';r,i. l.l.- -- :
Critica[- Non- Resid netial Buildings \ t1K,
(Rs. in Lakhs)'1eme of the(R&B) Division
st.
No.
Name of the Works AmountRequired
Remarks
(1) (2) (3) (4) (s)
PuriS/R to.... .
1 Renovation of store room of Cotlectorate at Purifor New office such as At. door and paintingwork.
2 Emergency Relief Godown at Puri
3 Toitet & tite flooring for D.S.W Office at Puri
4 Cycle shed in campus of D.S.W Office at Puri
5 Remodetling & renovation of Treasury strongroom side verandah at Puri
6 Providing brick work & verandah contitaverstab, plastering for cotlectorate office buitdingat Puri
7 Providing vitrified tile, industria[ tite flooring,fatse ceiling & iron gritI fitting for Cotlectoroffice building at Puri
8 Coltector office building at Puri such as titeflooring paver btock & fixing of cast iron gate
2.00
3.00
1 .50
1 .50
3.00
5.00
5.00
5.00
9 New Cottectorate Puri (Such as G.P. office 5.00renovation)
10 Renovation of NIC room of New Coltectorate 3.00
11 Renovation of DWO Office12 District Sub-Register Office teft side parking
s.00
5J013 Otd Cottectorate such as Ceiting & ftooring 5.0014 Otd Cottectorate such as ptastering & cotouring 5.00
Khurda
15 'Renovation of record room of Coltectorate Puri 5.00
Total = 59.00S/R to.....
1 D.H.H. at Khordha (Providing C.C. Road back 3.00side of OPD)
CDMO office khurda (providing cc pavement 4.00
Sub-Registar buitding at Jatani 4.00
Sub-Trasuary buitding at Jatani
ARCS office Uuiialng ffruraa
Total = 19.00S/R to.....
2
3
4
s
4.00
4.OO
E:\C.8.(B)\SPR\2018 19\AMP 2O1*19\A.M.P--2018-19 01-1G2O18\AMp-Non-Res Crticot NR Pg_7/2I
liane 3. : ..
,/ (R&B I Divrsion lNo
lemaTu.s] Reouired
(1) t7) (l)Cotlector office Building at Nayagarh
Etection office Buitding at Nayagarh
Circuit House at Nayagarh
Revenue Restshed at Nayagarh.
S.D.P.O Office buitding of Sub-Cotlector atNayagarh
DIET Buitding at Rajsunakhala.
Tahasil office at Ranpur
TahasiI Office at Khandapada
Total =
S/R to.....State Museum buitdingText Book Press at unit-llState Museum buitding
I (4) (s)
Nayagarh
Bhubaneswar- |
1
7
3
4
J
2. 00
1.00
1.00
1 .50
1 .50
1.s0
1.00
1.00
1 0.50
6
7
8
1
2
3
4
4.47
3.12
4.94
2.74Dr. ACHMC & Hospital in Unit-lll5 office of the Chief Architect Odisha in Nirman
Soudha at unit-V2.45
6 E Procurement buitding at unit-V 5.00
7 S/R to OLD AssembLy Sardar Pate[ Ha[[ at unit-ll 4.75
ACHMC &. Hospita[ in Unit-lll8
9
5.05
4.%Sanskruti Bhawan such as misc. work
10 OFFICE OF THE Director of Geotogy in Bhubigyan
Bhawan at unit-V4.74
11 Dr AC homeopathic Medical Cottege and 3.07Hospital at unit-lll
'12 E-Procurement cet[ buil.ding at unit-V 4.39'I 3 lmpvt. to approach road at back side of E-
procurement
14 Olo th Directorate of Geotogy in Bhubigyan 4.53
bhawan
15 Sangeet Mohavidyataya Hostel Buitding
4.20
4.83
4.7016 Sangeet Mohavidyataya Hoste[ Buitding
17 OLA Buitding at Unit-V 3.00
18 Kuntata kumari sabat Girl's hostet,unit-ll, 2017- 3.16
18
19 O.L.A.Buitding at Unit-V,Bhubaneswar(Fixing of 3.59cup board to P.A.C.Branch)
20 S/R to O.L.A.Buitding at Unit-V,Bhubanesw'ar
1['.F.new book tibrary south slde part)
21 O.L.A. Guest House at Unit-V, Bhubaneswar lorthe year 2017-18(New)
4.88
E:\C.8.(B)\sPR\2o18 19\AMP 2018 19\a M.P 2018 1901 10-2o18\AMP Non Res.crticot-NR
3.83
Pe_2/27
\L\qu., L/ rv l) lull NO
)) il ^
r... ,; I -r: - -tru tLu Iq
guard watt, pa
(1) Required
aneswa r(painting to O.4g
3.31
3.37
?at Unit-V, Bhu b
th)23 O.L.A. buitding at Unit_v, Bhubaneswar(Gate
No.3 Potice check post & Conference f,aLt ironitight post)
24 O.L.A.buitding at Unit-V, Bhubaneswar for theyear 2017-18(repair of house tobby, newbuitding room No.2 Legistative Branch eic.
25 office of S.E.R.W.S.S in Unit-lll 5.00Total = 98.59
S/R to.....Bhubaneswar-lt t Slshu Bhawan, Bhubaneswar
2 Driving Training Schoot3 New Mortury at Capitat Hospitat Bhubaneswar
for the year 2017_1g.
enter at Capitat Uospi tal Unit-6,eswar(Such as paintin g inside )Hospi taI Bhubaneswar(Su ch as repair ofhment section Room no. -303)
2.50
2.50
3.54
0.49
0.76
4 Capitat Hospitat Bhubaneswar (such as providing 1.04Mouner's Corner)
5ARTCBhuban
6 cap,'tut
I Estabtis
7 Capitat HospiGt Unit-6, Bhubaneswar (Such as 3.34, renovation of drain with cover staO in front oiRose Merry).
8 New miin gate in front of Ticket counter of 3.79,CapitaI Hospital, Bhubaneswa r. ( Such asrenovation of drain at main entrance)
9 New main gate in front of Ticket counter ofi 3.08Capitat Hospitat, Bhubaneswar. (Such asproviding Cow catcher over drain at mainentrance)
10 tNew main gate in front of Ticket counter of 2.00lCapitat Hospitat, B,Ashribad)
hubaneswar. (Main road to
lr 1 MCH at Capita[ Hospitat Bhubaneswar for theyear 2017-18(Such as providing staintess stee[2.67
protection gritI in front of lift & shoe stand)
'12 Rosemery Soudamini MemoriaI Patients 1.67Attendant Home at Capital HospitatBhubaneswar(Day Care un.it for Thalassemia &Oncology patients)( Such aswaiting place roofing & painting)
Ground Ftoor
(2) (3) (4) (5)
I
Required!,1a .'- a '
E&B ) Diviston I ,r". I(3)
t1\ (2)l
13 RosemerY Sou
Attendant Ho
Bhubaneswar(Da
Memoria[ Patien -s
CaPitat Hospitrlit for Thalassemia &
dam in i
me aty Care un
14
15
Oncotogy Patients)( Ground Ftoor)
New main gate in front of Ticket counter 3f
Capitat Hospitat, Bhubaneswar' (Ticket counter
to Ashribad)
infectious &. Diarrhoea ward at Capital Hospita[
, Unit-6, Bhubaneswar (Such as painting )
G roUeaeO oisaster Mlnagement facitities
Capitat Hospitat Bhubaneswar (Room no36)
17 RDC at CaP itat HosPita[ Bhubaneswar
18 SIDR Buitding
Bhubaneswar
at CaPitaL HosPita
19 MCH atprovidin
1o
room &. securitY shed)
Ayurveda hosPiiat at
(First ftoor internal)
swar tangi, BISSR 2'50
Zi r'few PharmacY btock Ayurveda hospitaI
Nageswar tangi, BBSR
22 SiR State drug testing taboratorY'
hospitaI at Nageswar tangi, BBSR
g tlUoratorv tcrouna ttooi internzrt)
on of office buitding and Pc'tato
'war (Such asCipitat HosPita[ Bhubanes
g atuminum shutter &' partition in OT
Nage
23 seed testin
Bhubaneswar-lll
24 Sub-Register Office
25 VetnarY Buitding
S/R to.....1 Director
renovatimission)
ofHorticutture Buil'ding,
2 Director of Horticu Iture Buitding, BBSR
3 Director of Horticutture Buitding, BBSR
4 DPI Community Centre Stage in Unit-8, BBSII
5 DPI Community tentre Stage in Unit-8' BBSR
o Cort. tilBuitding, Unjt-8' BBSR
7 Govt. tft Auitaing' Unit-8' BBSR (such a
Stand, C.C. Ptat form ultra ti[e )
8 Gout. PoLYtechnic, BBSR
9 Govt' PotYtechnic, BBSR
E:\C.E.(8)\}PB\2O18'1g\aMP 2018'1s\A M',P '2018'1s-01 fi 2A18\AMP'Non Res',Ctticot'NR
s 3ycle
Pe_4/27
(41 (5)
/. )u
2.00
1.57
of 7.40
2.50
iamp.,s, 2.50
2.50
at 2.40
Ayurveda 7.4O
2.20
2.00
0.20
Total= 55.00
BBSR(Such as 5.00
5.00
4.70
5.00
4.90
2.30
5.00
3.75
5.00
(R&B) Division No. Required LI(1) llzr (3) (4) (s)
10 Gopabandhu Academy of Administration,BBSR(Such as construction of parking area )
Total=S/R to
1 C.E., RD & QP Office Buitding at Unit-lX2 5/R Revenew lnspector offi of Naharkanta
(Repair to Compound Watt)
3 RD & QP Office Buitding, BBSR
1l Renovation &. conversion of old Hostel buitdingto Science Laboratory of La[ Bahadur Nodat HighSchool at Phulnakhara Khordha up to plinthIeveI
3. s0
43.65
Bhubaneswar-lV 1.29
2.69
1.98
2.004 BBSR(R&B) Sub Divn-lll5 zonal dispensary at Unit -|X(RZ) BBSR such as
ptastering and fixing tile,and sutter of 1stfloor West Block .
6 Zonal Dispensary at Unit-lX (RZ)
Bhubaneswar(Such as fixing of Watl. tite &Painting to inside and Front side)
7 Deaf & Dumb School ceiting Ptastering &Painting to Ctass room
8 Deaf & Dumb Schoo[ Constn of Stage 5.009 Deaf & Dumb School Concrete
Girts Hostel and wa[[ tite to Stage
Front path of 5.00
10 D/S Block No.19 (Room No.102 & entrance RookNo.103 entrance Assembly Guest House in Unit-tv)
0.45
4.07
4.96
2.95
5.00
12 7onal Dispensary Unit-lX Painting back side 1.36Compound Watt
13 Office Btdg Photo Bureau CID &. CB rasutgarh 2.00
14 (R&B) section no-lll of Sainik School 4.03
+ __,_ Total = 42.771.00
1.00
2.00
Bhubaneswar-V 1 Boy's Hostel No-3 of Tapoban High Schoot suchas replacement of doors and windows minorcement repair painting
2 Boy's Hostel No-3 of Tapoban High School suchas replacement of doors and windows minorcement repair and inside painting
3 Boy's Hostel No-4 of Tapoban High Schoo[ suchas replacement of doors and windows minorcement repair and inside painting ftooringrepair
E:\C.8.(B)\sPR\2o18 19\AMP 2018-19\A.M.P.-2018-19-01-lG2018\AMP-Non Res.Ctticot-NR Pg_s/2r
l, lI &B ) Division No.l Required
(1) i(2)l t3i i (4) (5)
4 Repair of C watt North side B.K. cottege of Arl &Crafts
5 Repair of C watt East side B.K. cottege of Art, &Crafts
6 CC road connecting from sub-station to hostelbuitding BK cottege art & Crafts
7 l.rteinaL drain & cross diain of BK cottege ar: &Crafts
8 Renovairton of cowcatcher, drain, gate pilterrepair BK cottege art & Crafts
9 Repair of Shed Barrack Block No-2 such as
Reptacement of chaukath shutter cement repairpaintingof Biju Pattnaik State open Air Ashrarn.
4 ACRC Btdg of SVP Sishubhawan, Ctc (Painting toinside watl surface to GF & FF)
5 Surgery Btock & Medicine Btdg, SCBMCH,
Cuttack (Urocon tite on footpath)
Pharmacy wing of SCBMCH, Cuttack
Surgery btock in SCBMCH, Cuttack
Gynacology Btdg, SCBMCH, Cuttack
Orthopedics Btock, SCBMCH, Ctc
1.00
1.00
1.00
0. s0
0.50
0.50
s.00
Cuttack-l
Toter[ = 8.50S/R to.....
1 Administrative Btock in SCBMCH, Cuttack (Gritlgate &. other repair)
3.00
2 Administrative Btock in SCBMCH, Cuttack (Paved
Block)
3 Annex BLock of AHRCC, Cuttack (At. door, jatty) 3.29
4.86
2.85
4.566
7
8
9
7.76
4.08
2.49'10 New Gents Hostel, SCBMCH, Ctc 2.50'I I Anatomy Buitding, SCBMCH, Ctc 4.19
12 Coltector office Btdg, Cuttack (Drain beh nd 4.29record room)
13 City Hospital Buitding, Cuttack (T.8. Ward) 2.08
14 Ladies Hostet, SCBMCH, Cuttack (Ceramic rt'atltite )
15 Superintendent Office, SCBMCH, Ctc
16 Otd Gents Hostet, SCBMCH, Cuttack
l7 Sur gery Eitock, SCBMCH, Cuttack lWeatlrer coatpainting)
18 Kitchen Btock, SCBMCH, Cuttack (Fty ash bri,:k,RCC work, watl tite)
3.56
3.52
7.94
7.79
E:\C.E.(B)\SPR\2018 19\AMP 2018-19\a.M.P. 2018 19 01 1G2018\AMP-Non Res.crticot-Na
3.29
Pg_6/21
(R&B) Division No. Required rrr"(5)(2)(1) (3)
19 Dentat co[lege, Cuttack (Renovation of Principaloffice & Lab)
20 Orthopedics Block, SCBMCH, Cuttack (Watt tite& vitrified tite)
21 Unmarried Nursing Btock, SCBMCH, Ctc (Back
yard concrete)
22 Btood Bank inSCBMCH,Ctc(Brick mssonary,plastering& weather coat painting)
23 Dean & Principal Buitding in SCBMCH
,Cuttack(Fatse ceiting,a[tumn.door M.S.Gri[[ &.
painting
24 Otd Medicine Block in SCBMCH Ctc (renovation
of ward & duty room)
(4)
2.08
2.74
3.43
2.74
4.99
4.34
Total= 80.87S/R to.....
Cuttack-ll 1 BBR and B firm Khapuria 4.87
2 Ctinical lnvestigation Laboratry Khapuria 4.70
3 SR to CoE buitding of Govt. lTl at Khapuria, 2.00
Cuttack i. e. Outside Cotouring
4 SR to Govt. lTl (Civi[ work of CoE Buil.ding
raising of front boundary watt and EMS Buitding)
at Khapuria, Cuttack
5 5R to RCC Drain inside Old LIC Cotony,
Badambadi, Cuttack
4.00
2.10
6 SR to Leprosy Home and Hospital at Nayabazar,
Cuttack i.e. Construction of Boundary WatL &.
repair of Leprosy Workers Training Schoot.
7 SR to Leprosy Home and Hospital at Nayabazar,
Cuttack i.e. Repair of Training Hat[, Testing
3.70
3.70
room
8 3.00
9 Sn to Covt. tft at Khapuria, CuttaOtd Ladies Hostet).
ck (Repair ofr 3.10
10 SR to BBR and BM Firm (LBD Firm) Khapuria,Cuttack such as providing Compound watl and
internal road in LBD Firm premises.
11 SR to Communrty Centre ot Odisha Govt. Press,
Madhupatna, Cuttack
12 Sub-CoLtector Office buitding at Banki for 2018-
19
4.00
SR to Govt. lTl at Khapuria, Cuttack (Repair ofBoys Hostel Room No 25 to 29,36 to 38 and
Office).
4.50
3.00
E:\C.E.(B)\SPR\2O1&19\AMP 201&19\A.M.P.-2018 19 01 10 2018\AMP-Non Res.Crticol-NR c_
Required(4\ (s)
4.00
4.00
5.00
55.67
5.00
5.00
5.00
Total= 15.00
4.00
4.004.00
3.003.00
Totill= 18.00
4.00
3 00
4.00
3.00
4.00
Tot;L[ = 18.00
1.46
0.41
&B) Divjsron l'{ o.
(1) \7)
2
(3)
13 TahasiI Office buitd'ing at Banki
14 Sub-Treasury Office buitding at Banki
15 S.D.l.P.R.O. BuiLding at Banki
Kendrapara 1
S/R to.....Cotteltorate, Kendrapara
D.H. H. Kendrapara
3 CDVO office buitding Kendrapara
S/R to.....Jagatsinghpur 1 Co[tectorateBui[ding, Jagatshinghpur.
2 OPD Buitding, DHH Jagatshinghpur
District Vety. Office building, Jagatsinghpur
Dist. Treasury Office, Jagatsinghpur(R&B) Division office buitding, Jagatsinghpur
Tota I =
3
4
5
S/R to.....Panikoili 1 Existing Cottector's Office,Jaj[ur
2 Dist.Treasury Buitding, Jajpur (otd Btdg)
3 Tahasi[ Office at Jajpur Road
4 ADM Katinganagar
5 SP Office at panikoiti
S/R to.....Dhenkanal 1 DHH at Dhenkanal(Dismantting of Mihir Mandir) 3.54
2 Sub Divisiona[ Head Quarter hospital at Hindol 5.00
3 G.E.D Section office at K.Nagar
4 .lnformation andDhenkanat.
pubtic relation office at
S/R to.....Angul 'l Sub Cotlector office, Angul
2 Circuit House, AnguI
3 Cottectorate, Angul
4 RTO office, Angul
5 L.A.bhawan, Panchyat bhawan & Biju KanyaRatna at Cottectorate, AnguI
6 DHH, Angul such as constn. Of Toitet block &app. Road
s.50
Tote,l = 10.41
s.00
5.00
5.bo
3.00
4.00
(R&B) Division No. Required
(7t (3) (4\ (5)(1)
7 Dispensory Bitding & out house at Athmallik.
B Sub-coltector office at Athmal[ik9 Circuit House at Athmattik10 TahasiI Office at Pallahara
3
5.00
Total = 45.50
3
5
5
00
00
00
Charbatia 1
2
S/R to.....Charbatia (R&B) Division Office at Choudwar
Asst. Executive Engineer Office Buitding atAthagarh (R&B) Sub-division
Otfice AuiiOlng at Barachana
5.00
s. oo
2.00
4 Sub-divisional Hospitat at Athagqrh
5 Sub-coltector office buitding at AthgarhTotal= 22.00
S/R to.....Ganjam-l 1 Asst. Labour Commissioner Office at Berhampur 1.00
2 Cottege of Nursing inside MKCG MC&.H at 5.00Berhampur
3 Girl.s Hostel of Nursing Col[ege of 2.50MKCG,MC&H,Berhampur
s.00
5.00
4 Deputy Drugs Controtler (Southern Zone) &. Druglnspector Ganjam-l Buitding ,at Berhampur
5 R.H.C Buitding at Digapahandi
5.00
4.00
6 Niramaya Btdg -2 Units of MKCG MC&H at 5.00Berhampur
7 Mining Geotogy Office at Berhampur 5.00
8 SpeciaI Circuit House at Berhampur 5.00
9 Cot[ege of Nursing Library BuitdingBerhampur
00ta 5
10 District Staticts office at Berhampur 5.00-. -- 5.0011 Revenue.l.B near Engg.Schoot Berhampur
'12 Sub cottector Office Otd BuiLding at Berhampur 3.00
'13 Sub-cottector office at Berhampur 3.00
14 Office of the S.P Vigiitance at Berhampur 3.00
15 Engineering School Library Buitding at 5.00
Berhampur
16 Casuatity block of City Hospita[, Berhampur
17 ADMO Office of City Hospitat,Berhampur
5.00
s.00
18 R.l Office Buitding at Digapahandi 2.00
19 Womens'Potytechnic (Auditorium) at Berhampur 4.00
'1
7 {*uuir,",,,,. No Required
(4) (s)(1) l7) (3)
C ity
3 .00
3 .00
3.00
3.00
3.00
25 lntegrated Physiotherophy btock of City 7.50
Hospitat, Berhampu r
26 CDMO Office (New) Toitet Block at Berhampur 3.00
27 Radiology Department of MKCGMC&H at 5.00
Berhampur
28 City Hospital Out Door Butding ,Berhampur 3.00
29 SDVO Office at Berhampur 3.00
30 Out Door Buitding of KATS at Ankushpur 5.00
31 Sub-Registrar Office at Hinjiti
20 5ub-Treasury buitding at Hinjiti21 CHC Buitding Digapahandi
77 OPD Btock of City Hospitat,Berhampur
23 LT.l Ladies Hostel Berhampur
24 Drug distribution center ofHospitat, Berham pu r
32 Tahasil Office Buitding, Digapahandi
33 Tahasil Office at Hinjiti34 Out Door Buitding of Biju Pattnaik Homeopathic
Cottege at Berhampur
35 CDVO Office at Berhampur
36 lndoor Buitding of C.H.C at Chikiti
5.00
5.00
4.00
4.00
4.003.00
37 ANM Training Center at Berhampur
Totirl =S/R to.....
Ganjam-ll 1 Circuit house at Chatrapur 4.00
2 Cottectorate OfficeChatrapur.
3 Sub-Coltector & Otd Tahasi[ Office at Chatrapur. 4.00
4 Science coltege at Chatrapur. 5.00
5 DIET lnstitute at Khattikote 3.50
:. so6 Special Repair to R.l.T.E. Buitdings atRangeitunda such as repairing of Hoste[ no - 2
(Gate)
5.00
144.OO
& Record Room at 4.00
SpeciaI Repair to R.l.T.E. Buildings atRangeilunda such as reptacement of Asbe:,tos
sheet and Gypsom Board ceiling of Hostel
8 Special Reparr lo Circuit House at Gopalpursuch as painting and providing steel grit[ atopening of Balcony
5.00
7 3.00
E:\C-E.(B)\SPR\2O1*19\AMP 2A18-19\A M.P. 2O1E 19-01-tO-2O1q\AMP-Nj1 Res CrticolNR
Tota[= 32.00Pe_1o/2L
( R&B ) Division No. Required s(4\(7) (l) (5)(1)
Bhanjanagr
Sub-Treasury Btdg at Aska
Budhagiri high school at Buguda
V.A.S Office at Sorada.
9 PWD Storage godown at Sorada.
10 Tahasil office at Bhanjanagar
S/R to.....Phulbani 1 Horticulture office at Phutbani.
1
7
S/R to.....Senior basis Schoo[ at Bhanjanagar
K.S.U.B. C.T.E" CoLtege buiLding
Bhanjanagar.
Govt. G.T. High Schoot at Bettaguntha
TahasiI office at K.S.Nagar
Sub- Register Office at Buguda
at5.00
5.00
5.00
4.00
3
4
5 5.00
6
7
8
3.00
5.00
5.00
2.004.00
Total= 43.00
0.98
2 Non Res buitding such as repair to GNM buitdingat Phutbani.
3 Non Res buiLding such as repair to GNM Schoolat Phutbani.
3.00
1.50
4 Non Res buiLding such as repair to GNM Schoolat Phutbani.
1 00
5 Non Res buitding such as leak repair to ANM
training centre Phutbani.0.50
6 Non Res buitding such as [eak repair to WT
station at Phul.bani.0.31
7 Horticutture office buitding at G. Udayagiri. 2.63
8 Non Res buitding such as raising compound wa[[and razar wire fixing of Vigitance DSP atPhutbani
4.22
9 Non Res buitding such as ousidewashing, painting and teak repair to bl.ock 6 andfemate ward of Dist Jai[ Phutbani.
4.56
10 Non Res buitding such as repair to Isotationward DHH at Phutbani 1R
1'1 Non Res building such as repair toward DHH at Phutbani 2R F
12 Section Office at G. Udayagiri(R&B) Section
13 Non Res buitding such as leak reapir to Agrt.Office at G. Uciayagiri.
lsotation
0.45
0.53
2.35
0.12
14 section office such as raising existing compoundwatl at G. Udayagiri.
2.76
E:\C.E.(B)\SPR\2O18 19\AMP 2018-19\A.M.p.,2O1A 79 01 1O-2018\AMp-Non Res.Crticol NR Pe_11/2L
(R&B) Divisicn l.lo Required(.1 ) i(2)i (3) (4)
4.64
1.45
31.00
4.00
3.00
3.00
2.OO
2.00
(s)
15 Sub-Divisional HospitaI at G. Udayagiri such as
water proofing treatment by Tarfetting'16 District [abour office.
Totzrl =S/R to.....
1 Dis!. Head Quater Hospiiat Boudh
2 Dist. Agriculture Office Boudh
3 Mate &. Fimate Ward D.H.H. Boudh
4 Labour Btock D.H.H. Boudh
5lnfection (Direa) Ward D.H.H. Boudh (C.D
Work)
6 D.D.A.Office Boudh
7 Excise Inspector Office Boudh
8 R.T.O.Office Boudh
9 Dist.lndoor Stadium Boudh
10 New Coltectorate Buitding Boudh
Boudh
3.00
3.00
4.00
Balliguda
S/R to.....1 Tahasil Office at Batliguda such as repair to
Office Main Btock and Otd Block etc.
Battiguda such asProvid ing
Door, Windows, G rading &
3.00
4.00
Toterl = 31.00
3.00
2.002 SDVO OfficeGritts,RepairCotouring
atto
3 Sub-Cotlector Office Battiguda such as
Renovation of the Conference Ha[t, Stores,Garage & public counter.
2.00
4 Sub-Treasury Office, Batliguda such as repairand renovation of Buitding
5 S.D.V.O office at Baltiguda such as taying ofPaver Block on the Approach Road inside thepremises of the Building. ( Spitt over)
2.00
2.00
Koraput
Total = 11.00S/R to.....
1 Repair & renovation of Staff Common room &.
Toilet inside Cotlectorate
2 Repair & renovation of D.l.P.R.O Office buitd ng
at Koraput.
3 Repair [r renolation of Tahasil office buii.ci ng 5.00at Koraput
4 Repair & renovation of P.W.D (R&B) Central store
3.00
2.00
E:\C.E (B)\SPR\2018-19\AMP 2018 19\A M.P -2018-19-01 10 2018\AMP-Non-Res.Crucol NR
4.00
PB_L2/27
(R&B) Division No. Required -tl-l)(3) (41 (5)(1) lrzi
5 Repair & renovation of G.E.D Sub-Division officebuitding at Koraput
6 Repair & renovation of 3 nos. V.A.S Office7 Repair & renovation of Pottutry Farm, layershed
at Koraput
8 SoiI Chemist Office at sunabeda
I Fouttry Farm breeding at SemiLlguOi
10 Storage Go down near Jaganatha Mandir in AEF
Cotony Sunabeda.
3 .00
3.00
4.00
3.00
5.00
5.00
11 Conference Hatt in AEF Cotony Sunabeda. 5.00
Total= 42.OO
S/R to.....Jeypore 1 Repair & Renovation to Drug lnspector Office at
Jeypore (Part-A)4.00
2 Repair & Renovation to Drug lnspector Office atJeypore (Part-B)
5.00
3 DDA Office Buitding at Jeypore 4.00- 3.004 DAO Office Buitding at Jeypore
5 Tahasi[ Office at Kotpad 5.00
6 Excise Office Buitding at Kotpad 3.00
24.OO
S/R to.....Nawarangpur 1 Treasury Office Buitding at Nabarangpur 3.00
5.002 P.W.D (R&B) Division Office, Nabarangpur3 DIET Schoot, Nabarangpur 4.004 ACCT Office Buitding at Nabarangpur 3.00
5 District Education Office, Nabarangpur 3.006 CHC, Umerkote 5.00
Total = 23.00S/R to.....
l{alkanagiri 1 District Treasury Buitding at Matkangiri 2.00
2 Otd Cottectorate Buitding at Matkangiri 2.00
3 D.H.H Buitding at Malkanagiri I 4.00
4 District Education Office Malkangiri 3.00
Total = 11.00S/R to.....
Rayagada-l 'l Cottector Buitding Rayagada i.e Painting work 5.00
4.002 Circuit House Rayagada
3 Tahasildar Office, Rayagada 3
J
00
4 Disl. Tr easur y of f ice l-ruilding at Rayagada .00
Total= 15.00S/R to.....
Rayagda-ll 1 Renovation of Nurshing Hostel at SDH at Gunupur 3.00Et\C.E.(B)\SPR\2O18-19\AMP 2O18-19\A.M.P. 2018-19-01-10-2O18\AMP-Non Res.Crticol NR Pg_73/27
&B ) Division No Requlred(1) l(2)i (3) (4) (s)
2 5ub-coltector office bui[ding at Gunupur3 Tahasil office at Gudari
Total=S/R to.....
'l Renovation of Circuit House buitding atParlakhemundi.
2 Repair & Maintenance to 5ub-Cottectors off ;ce
buitding at Partakhemundi.
3 Repair & Maintenance to office of Dy. Direc:orof Agricutture. at Pkd.
4 Renovation of CDMO /ADMO Office buitding ofDHH at Paralakhemundi.
4.00
4.00
1 1.00
1.00
2.00
4.00
5.00
Total= 14.00
4.97
4.70
4.95
2.62
3.67
2.93
Paralakhemundi
Sambalpur-lS/R to.....
'l such as Providing Stair Case, 2 wheeter stand,General waiting room etc. at office of theDistrict Registrar &. Marriage Office, Sambatpur
2 Repair and Renovation such as Armstrc'ngCeiting and watl Case/ wa[[ Almirah made withPty-wood at lssue Section of (R&B) Division-lSambalpur.
3 Repair and Renovation such as Door Pannelt ngand fixing of wa[[ case/ wa[ Almirah made withPty-wood at lssue section of (R&B) Division-lSambalpur
4 Repair & Renovation of the A.D.M.O. Farritywetfare & Training center and A.D.P.H.COBuitding at DHH Sambalpur
5 Repair & renovation of P.H work to Potice H'ghSchoo[ at Sambatpur. (lnt P.H.)
6 S.P Vigitance Office Buitding at Sambalpur.
7 SIR for site Development of CSB Zitla School atSambalpur
4.20
Total = 28.00
Sambalpur-ll5/R to.....
'l N.R. Buitding such as construction of securityroom, store room and drain at Psychiatric wardof VSS IMSAR, Burta.
^1 N.R. Burldrng such as repair b renovatlon toRoom No. 7,8,10 11,17,18 & repairing to road ofPtd Pediatric Buitding of VIMSAR, Burta .
4.78
E:\C-8.(B)\SPR\2018 19\AMP 201.8.19\A.M.P 2018 19 01-10.201,8\AMp.Non Res Crticot NR
4.89
(R&B ) Division No. Required.rJ
(4)(2)l (3)(1)
3 N.R. Buitding such as leak proof treatment toRoof slab of staff nurse hostel of VIMSAR, Burta
4 N.R. Building such as providing tarfeltingtreatment to Roof stab back side Boys Hostel
No.4 of VIMSAR, Burta .
5 N.R. Buitding such as providing taifettlngtreatment chhaja & parapet of Roof slab Boys
Hoste( No.2 of VIMSAR, Burta .
6 N.R. Buitding such as repair and renovation tosickle ce[[ buitding of VIMSAR, Burta .
7 Non-Residentia[ Building such as reptacement ofdamaged cupboard, door and window shutter toBoys Hostel No.1 2 &. 3 of VSS IMSAR, Burta
8 N.R. Buitding such as repair to lndoor Hospital
of VSS IMSAR, Burta .
9 N.R. Buitding such as providing tarfettingtreatment to middte head room, TV, TT room,
reading and kitchen room roof stab of Boys
Hoste[ No.3 of VIMSAR, Burta .
10 N.R. Buitding such as providing tarfettingtreatment to middte head room, TV, TT room,
reading and kitchen room roof slab of Boys
Hostel No.2 of VIMSAR, Burta .
11 Sub cotlector office at Kuchinda such as
renovation of dy sub co[[ector chamber &
provision of ladder to roof .
(5)
4.79
4.85
2.34
4.86
2.3
4.86
4.63
4.62
7.71
12 SDH at Kuchinda such as renovation of Store
Block outdoor to sDMo office .
4.89
13 Sub cottector office at Kuchinda such as repairof one lawer room .
14 Sub coltector office at Kuchinda such as suppty,
5ub-Registrar &. Etection section.
15 SDH at Kuchinda such as Garage room & waitingshed at ward.
16 SDH at Kuchinda such as Provision of grading
concrete outdoor.
17 SDH at Kuchinda such as leak proof treatmentto 0[d cabiu.
18 SDH at Kuchinda such as leak proof treatmentwith ptastic felt to outdoor .
4.87
4.46
2.24
4.79
2.33
2.36
E:\C.E.(B)\SPR\2018-19\AMP 201&19\A.M.P.-2018-19 01 1G2019\AMP-Non-Res.Crticol'NR PE_15/2L
Required
(4) (s)
4.48
4.BB
3.96
TOT/.1= 84.89
3.00
6.00
5.00
5.00
Total = 19.00
4.00
3.00
3.00
4.00
3.00
3.00
3.00
Totat= 23.00
003
2.00
3.00
5.00
2.50
5.00
i.004.50
5-00
' (R&B) Divrsicn l.lo
t7)'19 Govt. Potytechnic Renga[i Sambatpur such as
providing ptinth protection of Academic Btock &Roofing from Academrc Btock to workshop
20 S/R such as lmprovement of Civil works of lTl,Hirakud (Providing False Ceiling, FixingAtuminium Doors & ACP Partition wa[[s)
2'l S/R such as Modernization of Fitter Workshop oflTl, Hirakud(Roofing & Ftooring)
S/R to.....Deogarh (R&B) Sub-divn Office Deogarh
(R&.8) Sub-divn Office Reamal
(R&B) Sub-divn Office Barkot
4 (R&B) Divn Office at Deogarh
S/R to.....Jharsuguda RTO Office Jharsuguda
Engineering Schoot at Jharsuguda
Engineering Schoo[ Hostet at Jharsuguda4 Division Office at Jharsuguda
5 (R&B) Sub-Division Office at Jharsuguda
6 Cottectorate buiLding at Jharsuguda7 Sub-Cotlectorate office at Jharsuguda
S/R to.....1 H.E.T.C. Buitding Barpati such as repair a.nd
renovation of cycte stand and garrage.
2 C.H.C. Building Barpati such as provision of 2.00colour washing and painting.
3 P.W.D. Section Office Barpali
4 lmmunisation shed & lnfectious Ward ln DHH at 3.00Bargarh.
5 Electrical Workshop in lTl at Bargarh
6 40 seated Hostel Buitding of RHC Attabira7 Gents Hoste[ of DIET ,Bargarh8 Sub-Treasury office at Padampur
9 Exrce builoing at Padarrpur10 V.S. office, Padampur.11 S.D.V.O. office Padampur
. 12 Sub-Regiistrar office at Padampur
(1) (3)
1
2
3
1
2)
Baragarh
E:\C.E.(B)\SPR\2018 19\AMP 2018 19\A.M.P.-2018.19 01 1y2O18\AMP Non Res.Crticol NR
5.00PE-16/27
(R&B) Division No. Required al(1) (7) (3) (4) (5)
13 Kanyashram buitding at Padampur 5.00
48.00Total =
BolangirS/R to.....
'l Tahasit office buitding,Bi[angir2 District Head Quarter HospitaI Batangir
2.00
3
4
Distlilt lndustry Centre,BalangrrEtection office of Revenue Deptt.at Batangir
2.00
2.OO
3.00
5 Sub cotlector office at Batangir 2.00
2.OO6 Sub Register office Batangir
7 Excise range office Batangir 2.00
8 C.D.M.O office,Balangir 2.00
9 PtanningOffice,Batangir10 Statitics office, Batangir
2.00
3.bo '
1 I Mining Office, Batangir 2.00
12 Geology Office,Batangir 7.00
13 R.T.O Office,Batangir 2.00
14 I & P.R office,Batangir 3.00
15 Coltector Office at Sonepur 2.00
16 Sub-Collector Office at Sonepur 2.00'17 Sub-Cottector Office at Birmahrajpur 2.00
18 Circuit House at Sonepur 2.00'19 ADT Office buitding at Sonepur 7.00
Total= 41 .OO
S/R to.....Kantabaniji 1 Sub Cottector Office at Tititagarh 2.00
2 TahasiI Office at Tititagarh 7.003 Tahasitdar Office Buitding at Patnagarh 2.00
4 'R.l Office cum Res at Patnagarh 1.00
5 Revenue l.B at Patnagarh 3.00
6 Sub Registrar Office at Patnagarh 1.50
7 SDPRO office buitding at Patnagarh 2.50
8 Sub Treasury office buitding at Patnagarh 3.00
9 rSub-Treasry Buitding at Kantabanji 2.00
Totat =l 19.00S/R to.....
Sonepur 1 Col[ector Office at Sonepur 5 00
2 Sub-Cottector Office at Birmaharajpur 5.00
3 Sub Divisiona[ HospitaI at Birmaharajpur
4 CHC, Buitding Binka repairing
5.00
3.00
5 Tahasil Buil.ding Binka repairing 2.00
S/R to.....Total= 20.00
E:\C.E.(B)\SPR\2018 1g\AMP 2018-19\A M.P. 2018 19-o1-1G2o18\aMP-Non-Res.Crticol-NR
.6auii,u,,,on ro.l Required(1) l(2)l (3) t4) (s)
Kalahandi 1 DHH Bhawanipatna
2 District Labour Office at Bhawanipatna
3 R.l Office at Junagarh
4 Tahasil Office at Junagarh
5 Drugware House of SDH at Dharamarh
6 Sub Divisional Hospital Buitding of SDH atDharamarh
7 Coltectorate Bui[ding at Bhawanipatna
CHC at Bhawanipatna
Academic Btock of ITI at Bhawanipatna'10 Tahasil Office at Dharamagarh
1'1 Circuit house at Bhawanipatna
12 OPD of SDH at Dharamarh'l 3 Mate and Femate ward of SDH at Dharamarh'14 Kitchen Block of SDH at Dharamarh
4 Repalr &. Renovation to the CiviI Supply Brarchof the Su b-Cottectorate Buitding Balasore
7.00
2.00
2.00
2.00
2.00
2.00
8
9
3.00
1.00
zto3.00
3 -00
3.00
2.00
15 Sub-Collector Office at Dharamagarh
16 Tahasil Office at Dharamagarh
17 DCCT Office at Bhawanipatna 3.00
3.0018 ACCT Office at Bhawanipatna
TOTAL 45.00S/R to.....
Khariar 'I Centrat Ware house at D.H.H. Nuapada. 7.002 Dist. Labour office at Khariar Road. 2.003 R.l.Office at Nuapada. 2.00
4 DEIC at DHH,Nuapada. 2.005 Cotlectorate Btdg.at Nuapada. 3.00
6 Sub-Coltector Buitding at Nuapada. 2.007 Sub-Treasury Btdg.at Nuapada. 2.00
Total = 15.00S/R to. ....
1 Repair and Renovation to Taasil Office Buitdingat Soro.
2 Repair & Renovation to (R&B) Division Office 1O.OO
No-l at Balasore
Repair and Renovation to existing Off iceBuitding of (R&B) Division Office Balasoresuch as Construction of Record Room andConference Halt
3.00
2.OO
3.00
Ba lasore-l 4.00
3 19.00
E:\C.E.(B)\SPR\2018 19\AMP 2a1a-).9\A.M.P. 2018 19 01 1&2o18\AMP-Non-Res Crtrcol NR
2.00
Pg_1.8/21
(R&B) Division No.
(1)
Required
(2) (3) (4) (5)
5 Repair and Renovation to the Bar Hat[ insidethe Su b- Cotlectorate Building Balasore for 2018-19
2.50
6 Repair and Renovation to RecordTahasil Office at NiLgiriPtaster, Roof ,Watt,cotour, Door &damaged etc.
room ofsuch as
Window
2. 50
Total = 40.00S/R to.....
Balasore-ll 1 Govt. Dispensary Building at Jateswar 2.002
3
4
D.l. office Buitding at Jateswar 4.00Veterinary office Building at Jateswar 3.00
R/R to C.D.V.O Office Buitding ,Batasore 5.00
5 Ri R to Dist. Suppty Office Buitding ,Balasore 3.00
6 R/R to Malaria Office Buitding at DHH, Balasore 5.00
7 R/R to T.B ward at DHH, Batasore 5.00
27.OOTotal=S/R to.....
Bhadrak 1 District Education Office at Bhadrak. 2.00
2 S.D.V.O. Office Buitding Bhadrak. 2.00
3 Verinary Office, Dhamanagar (Site development
'& Compound Wal[)2.00
4 Repair & renovation of District Head QuarterHospitat, at Bhadrak.
15.00
5 C.H.C Dhamanagar (Approach road) 3.00
6 District Agricutture Office Buitding at Bhadrak 5.00
7 Vigitance Unit Office at Bhadrak(Such as
construction of approach road)4.00
8 Fire Station Buitding at Basudev pur ( Repair &Renovation of Main buitding)
2.O0
Total= 35.00S/R to...;.
Mayurbhanja 1 T.B. Hospital at D.H.H. Baripada. 4.00
2 SR of CC Path near Kitchen at DHH, Baripada 4.90
? \Arorren's Hcstel of TTI at Takatpur ? ,50
4 DSWO Office at Baripada . 2.50
5 Surgery Ward-2 Unit-lll at DHH, Baripada. 4.80
E:\C.E.(B)\SPR\2O18 19\AMp 2018 19\A M.p.-2O18-19-01 1L2O18\AMp Non Res.Ctticot NR Pg_19/2t
Required
\4) (s)
4. 80
4.75
7.50
2.50
2.00
3.50
3.00
3.50
3J0
4.00
3.25
Total= 56.00
3.00
2.00
1 .50
4.50
Total = 12.00
5.00
15.00
6.00
1 5.00
Total= 51.00
(R&B) Division No
(1) \7)6
7
8
(3)
Surgery Ward -2 Unit-llat D.H.H. Bariada.
D. C. C.T. Off ice at Baripada.
Vaccine shade of F.W,Wing of DHH at Baripaca.
9 District DiagnosticOffice at Baripada.
of C.D.V.O.Laboratory
S/R to.....Rairangpur 1 Sub-Cotlector Office buitding at Rairangpur
S. D.V.O.office buitding, Rairangpur
Sub Registrar Office Karanjia
10 Repair to Biotogical Laboratory at Takatpur
11 Repair to DIET Buitding at Baripada'12 Udata Sub-Register Office such as cotouring ;rnd
Pty partition at Udata
13 Dist. Agricultture Office at Patbani, Baripada
14 DRCS Buitding at Baripada
15 DDH Office Buitding at Takatpur
16 DIET Buitding functioning as Central School atLIC Colony
4 Charge & Range office of Excise Office at 1.00Karanjia
2
3
5 (ReB) Section office, Thakurmunda
S/R to... ..Keonjhar 1 Repair to Circuit House Buitding at Keonjhar.
2 Repair to Raja Niwas at O.S.M.E. Keonjhar
3 Repair to O.S.M.E. Schoot Buitding at Keonjhar
4 Repair to DDM Office Buitding at Joda
5 Repair to New D.C.C.T. Office Buitding at Barbil 10.00
S/R to.....Ghatagaon 1 R/R to S.D.V.O office at Salapada ( Constn. of
Approach C.C Road )
E:\C.E.(B)\SPR\201.8 19\AMP 201A.8\A M.P. 2018-19,01 1c2O1q\AMp-Non Res.Crticot-NR
8.00
Pg_2o/21
rr^-^ ^i +i^^
i (R&B ) DrvisionSi
7
J
lra.l::, are \1i1O rks
()/
l.n!!iiRequired
10.00
10.00
28.00
P: r a'Lt: e'No
(1) (4) (s)R/R to Tahasit office Bullding at Ghasipura.Ri R to TahasjI office Buildinq at Anandapur
Total =S/R to. ....
Sundargarh 1 Zitta Sanskruti Bhawan (Gatteries) at Sundargarh Z.OO
2 Facititation Center of Cotlectorate Sundargarh 2.00
3 CotlectorateRepair)
Buitding at Sundargarh (Leak 3 00
4 Col[ectorate Buitding at Sundargarh 3.005 Excise Range Office at Sundaragrh 2.006 SDVO Office Buitdinq at Sundargarh7 CDVO Office Buitding at Sundargarh8 Asst. Engineer (Agri). at Ranibagicha 2.009Dy. Director Horticutture Office at Sundragarh 3.00
2.00
2.00
10 DHH at Sundargarh 5.00
2.OO11 Drugs Inspector at Sundargarh12 Govt. Hospita[ at Rajgangpur (Gynec Ward 2.0013 Govt. Hospital Buitding at Rajgangpur 2.0014 S.P. Office, Sundargarh 2.O0
636.00
Total = 34.00
Rourkela 1
S/R to.....S.K. D.A.V. Govt Polytechnic RourkeLa.
Buitding
2 U.G.l.E, Rourkela Main Buitdin
Main 15.00
o 15.003 CHC Biramitrapur '10.00
4 Utakatamani homeopathic medicaI cot[e 16.005 l.T.l. lnstitute Main buitding. Ctass room of
Fitter, Electrician,Welder, Ptastic trade,MechanicaI trade
15.00
6 RGH at Rourketa.7 S.D. Hospital at Bonai .
15.00
15.00
Total= 101 .005/R to Non-Residential Buildings =
Total (Criticat) = 2391.OOTotal Prestigious Buildings = Z45.OO
Grand Total (Prestigious + Critical )=
Chi ef E ngi neer (Bui I d i ngs )Odisha, Bhubaneswar
629.65
)rD6'?,
i
1 Puri 5/R to E.l. to different Non,ResrdentiaI Build]nss 1 0.002 Khurda S/R to E.l. to different Non Residentiat Buitdinss 10.003 Nayagarh 5/R to E.l. to different Non-Residentral Bujtdings 10.004 Bhubaneswar No i 5/R to E.l. to different Non ResjdentjaI Bujtdings 10.005 Bhubaneswar No ll S/R lo E.l. to different Non Residentiat Buitdinss 10.005 Bhubaneswar No lll S/R to E.l. to different Non Residential Buildings 10.007 Bhubaneswar No lV 5/R to E.l. to different Non ResidentiaI BL]itdinss 10.008 Bhubaneswar No V S/R to E.l. to different Non,Residentjal Buitdrngs 10.009 Cuttack'l 5/R to E.l. to different Non,Residenttal Buildings 10.0010 Cuttack ll 5/R to E.l. to different Non ResidentiaI Buitdings 10.0011 Kendrapara S/R to E.l, to different Non,Residentjat Buitdrngs 10.0017 Jagatsinghpur S/R to E,l- to different Non,Residential Buitdings 10.0013 Panikoiti S,/R to E.l, to different Non-Residentjal Buitdings 10_0014 DhenkanaI S/R to E.l. to different Non-Residentiat Buitdings 10.00'15 Angut S/R to E.l. to dr-fferent Non-Residentiat Buitdings 10.0016 Charbatia S/R to E.l. to different Non-Resjdentiat Buitdings 10.0017 Ganjam No-l S/R to E.l. to different Non-ResidentiaL Buitdinqs 10.0018 Ganjam No-ll 5/R to E.l. to different Non-Residential Bujtdings 10.0019 Bhanjanagar S/R to E.l. to different Non-Residentiat Euitdings 10.0020 Phutbani S/R to E.l. to different Non-Residentiat. Buitdings 10.0021 Boudh S/R to E.l. to different Non-Residential BuiLdings 10.0021 Batiguda 5/R to E.l. to different Non-ResidentiaI Buitdings 10.0023 Koraput S/R to E-1, to different Non-Residential Buitdinss 10.0024 Jeypore S/R to E.l. to different Non-Resideotrat Buildings 10.0025 Nabarangapur 5/R to E.l. to different Non-Residentiat Buitdjngs 10.0026 lvla tka n agiri 5/R to E.l. to different Non-Residential Buitdings 10.0027 Rayagada-l 5/R to E.I. to different Non-ResidentiaI Buildings 10.@28 Rayagada-ll 5/R to E.l. to different Non-Residential Bujtdjngs 10.0029 Paralakhemundi 5/R to E.l. to different Non-Residentiat Buitdings 10.0030 Sambatpur-l S/R to E.l. to different Non-Residentiat Buitdings 10.0031 Sambatpur-ll S,/R to E-1. to different Non-Residentiat Bujtdings 10.003Z Deogarh S/R to E.l. to different Non-Residentiat Buitdings 10.0033 Jharsuguda S/R to E.l. to different Non-Residentiat Buitdings 10.0034 Baragarh 5/R to E.l. to different Non-Residentiat BuiLdings 10.0035 Botangir 5/R to E-1. to different Non-Residentia( Buitdings 10.0036 Kantabanji 5/R to E.l. to different Non-Residentiat Buitdjngs 10.0037 Sonepur 5/R to E.l. to different Non-ResidentiaI Buitdings 10.0038 Katahandi 5/R to E.l. to different Non-Residential Buitdings 10.0039 Khariar S/R to E.l. to different Non-Residentiat Buitdings 10.0040 Balasore-l S/R to E.l. to different Non-Residential Buitdings 10.0041 Batasore- ll 5/R to E.l. to different Non-Residential Buitdings 10.0042 Bhadrak S/R to E.l. to different Non-Residentiat Buitdings 10.0043 Mayurbhanj S/R to E-1, to djfferent Non-Residentiat Buitdjngs 10.0044 Rairangapur S/R to E.l. to different Non-Residentiat Buitdiogs '10.00
45 Keonjhar S/R to E.l. to different Non-Residentiat Buitdings 10.0046 Ghatagaon 5/R to E.l- to djfferent Non-Residentia[ Buitdings 10.0047 Sunda rga rh 5/R to E.l. to different Non-Residentjal Buitdrngs '10.00
!rlilaaL l\c;r i.e3i-Uiaai; i,J,:''ttS ia,l, \':a, .:; ,'.hL![-SI
llo
48 Rourkela
i, a ill irv,src!l l.l: -,e cI lhc V,/o.K
lr l
,7.: rir i.akharAn roLrnt ReqLtrreaj
t.1)
10.00S/R to E.l. to different Non-Residentjat Buitdings
E1C
4U. U'lr. t0 L.l. i.. iilida.trL t\Jii ii.!t.le tLi.ii LJi[!]ll)S5
Total = 520.00
--(B)\SPRUa1e-1q\AMP 201&19\A i,4 P.-201*1s 24-ot-201&CD\CtiticatE I /Nan-Res
\
Odisha, Bhubaneswar
Chief Engi (Buitdings)
PROPOSAL FOR WORK LtST OF CRtTtCAL (NON-REStDENTTAL)
FOR THE yEAR 2018-19 OF G-p.H. (R&B) DtVtStON ^k'
Name of the(R&B) Division
5t.
No
Name of the work Amou n trequired(ln takhs)
G.P.H. No-l 1
2
S / R to PH work of construction of common lad.iestoilet of R&B division-ll office, Batasore
Const. oi n&B Sub-division sadar office, Batasore(EPH works)
S/R to PH work of (R&.8) Division-1, Batasore(Batance PH work)
4 Renovation of Toitet block for Assistant ExecutiveEngineer G.E.D, Balasore
5 S/R to PH work of New Toilet of Road Section-|,Batasore
1.00
1.00
0.50
1.00
1.00
3
6 S/R to PH
Jateswarwork of R&B Sub-Division office, 1.OO
7 S/R to PH work of R&B Sub-Division office & 2 nossection office, Basta, Batasore
8 M/R to PH work of GPH Sub-division office No-1 &No-2, BBSR
9 S/R to PH work (Cteaning and Maintanance) oftoitet under GPH Sub-division No-1, BBSR
10 S/R to PH work (Cleaning and Maintanance) oftoitet under GPH Sub-division No-ll, BBSR
1.00
1.00
1.00
1.00
11 S/R to PH work (Cteaning and Maintanatoilet under GPH Sub-division No-l,Cuttack
nce) of
12 S/R to PH work (Cteaning and Maintanance) oftoitet under GPH Sub-division No-ll Cuttack
13 S/R to PH work (Cteaning and Maintanance) oftoitet under GPH Sub-division Baripada
14 S/R to PH work (Cteaning and Maintanance) oftoilet under GPH Sub-division Balasore
i 15 5/R to PH work (Cteaning and Maintanance) oftoitet under GPH Sub-division Berhampur
16 S/R to PH work (Cleaning and Maintanance) oftoitet under GPH Sub-division Kendrapada
17 S/R to PH work of DAO attach toitet at (R&B)Division No-ll, BBSR.
18 S/R to PH work of AEE attach toitet at (R&B) Sub-division No-V undcr (R8.8) Diyision I'lo.ll, BBSR.
19 S/R to PH work of (R&B) Section Office at Unit-7,BB5R.
1 00
1.00
1.00
't.00
1.00
1.00
1.00
1.00
1.00
^\.,+Name of the
1R&B) Divisron
SI Name of the work
No.
70 S/R to PH work of (R&B) Section Office No.t2,14 &
15 at Unit-'l , BBSR.
21 S/R to PH work of (R&B) Sub-Divisio.t No-3,
Satyanagar, BBSR.
27 S/R to PH work of GED Division Office at Unit-1,BBSR.
23 S/R to PH work of AEE & AE 2nos attach toitet atUnrt-1, BBSR.
74 M/ R to PH work at Nirman soudha rear btock staffcommon toitet left wing first ftoor ladies toitet
75 lmprovement of PH work to(R&B) Sub-Division
office at Ra'irangpur .
26 lmprovement of water suppty to (R&B) Section 0.50office at Kutiana
77 lmprovement of PH work to (R&.B) Sub-Division- lloffice at Baripada .
28 lmprovement of PH work to PWD Section office atTakhatpur. Baripada .
29 MiR to PH works of R&B Sub-Division Ctffice atKabisuryanagar
30 M/R to PH works of GPH Store at Berhampltr
11 M/R to PH works of PWD Sub Division Ofice atDigapahandi
32 M/R to PH works of PWD Section Ofice atCourtpetta Berhampur
33 M/R to PH works of PWD lvledicat Section 'f,fice atBerhampur
34 M/R to PH works of PWD Section Ofice at Chatrpur
35 M/ R to PH works of PWD Sub Division Ofice atChatrpur
36 M/R to PH works of PWD Section Ofice at Rambha
37 M/R to PH works of PWD Sub Division Ofice atRambha
38 M/R to PH works of PWD Section Ofice at Copatpur 1.00
l9 ,\\,/R to PH rvorlis of P\{D Sub DivisionKhattikote
40 S/R to PH works of R&B Sub-Division office atMohana
Amountrequired(ln takhs) -
1.00
1 .50
1.00
1.00
1.00
1.00
1.50
1 00
0.50
1.00
0.50
1.00
1.00
1.00
1.00
Oficc
1.00
1.00
JL 1 .50
0.50
Name of the workName of theq R&B ) Division
5t
No.
41
47
43
44
S/R to P.H. Work of (R&B) Sub-Division No,llt atKil[afort, Cuttack.
5/R to P.H. Work of (R&B) Section Bidanasi No.ll atKiItafort, Cuttack.
S/R to P.H. Work of (ReB) S.E. Circte Office ar OtdSecretariate, Cuttack.
S/R to P.H. wort< oi lnaA; Sub -Division under R&BDivision-ll atKendrapara.
1.00
1 00
0. s0
1.00
45 S/R to P.H. work of (R&B) Section office at Jajpur town 1.00
46 S/R to P.H. work of (R&B) Section office at Sukinda 0.50
47Construction of (R&B) quatity control laboratory at 1.00Chandikhote in the dist of Jajpur
48 Office of Tirtot (R&B) Sub-Division 1.0049 PWD (R&B) Office Buitding at Jagatsinghpur 1.5050s /R to PH Work of Charbatia (R&B) Sub-Division 1.00
office No.ll, Choudwar.
51 S/R to PH Work of (R&B) Sub- Division Office Badachana 1O052 S/R to PH Work of (R&B) Section Office Tigiria 1.00
53 S.K
/R to P.H. Work of (R&B) Sub-Division No.lll atittafort, Cuttack.
1.00
54 s /R to P.H. Work of (R&B) Section Bidanasi No.ll at 1.00Kitlafort, Cuttack.
55 SlR to PH Work of Quatity Controt (R&B) Division 1.00Office at OMP Sqr, Cuttack.
56 ,S/R to P.H. Work of (R&B) Division No.l, O[d, 't.00Secretariate, Cuttack.
57 S/R to P.H. Work of (R&B) S.E. Circte Office at OtdSecretariate, Cuttack.
0.s0
58 Repair and renovation to IPH work of Assembtyguest House at Puri (WlP Suit 2 nos )
1.00
59 lRepair and renovation to lpH workguest House at Puri (Wlp Suit 2 nos )
of Assembtyr 1.00
60 Repair and renovation to IPH work of Assembtyguest House at Puri staff toitet
1.00
61 Repair and renovation to lpH work of Assembtyguest House at Puri External pHwork
bZ Sr R to PH work of Area Hospital at Nrmpara
1.00
1.50
1.5063 S/R to Ph work of Court Buitding at Nimpara
Total = 62.00
Amou n trequired(ln lakhs)
rL,'{,-
t-\'
Name of the(R&B) Division
G.P.H. No-ll
5t
i{o.
Name of the work Amountrequ ii-e ci
(ln takhs ) -!
4
1 S/R to P.H work of Circujt House at Raygada.
2 S/R to P.H work of Excise Superltendent Of fice qtr
at Bhawanipatna.
3 S/R to P.H work of P.D.D.R.D.A qtr at Nabarangpur.
5/R to P.H work of Govt. Potytechnic at Randapati,
Jeypore . (Cafteria)
S/R to P.H work of GentsE Ladies Toitet of Dist.
Agricutture Office at SambatPur.
S/R to P.H work of Govt. Polytechnic at Randapati,
Jeypore . (Gents Hostel)
S/R to P.H work of Govt. Potytechnic at Randapati,
Jeypore . (Ladies HosteL)
1.70
0.76
0.52
2.82
4.50
3.27
3.80
5
6
7
8 S/R to P.H work of l.T.l at Umerkote. 7.21
9 S/R to P.H work of GED Sub-Division Office at
Sambatpur.
0.55
10 S/R to P.H work of Dist. Labour Office at
Rayagada.
11 S/R to P.H work of Dist. Agricutture Cffice at 2-21
Raygada.
12 lmput. to P.H work of Revenue l.B at Batiguda. 2.00
0.55
13 S/R to P.H work of P.W.D (SENC) Office at
Sambatpu r.
14 S/R to P.H work of (R&B) Road Sub-Divn at
Sambatpur.
15 S/R to P.H work of N.H.S.E Office at Sambalpur.
16 S/R to P.H work of D.S.O at Sambatpur.
17 5/R to P.H work of N.H.S.E Office at Samb,atpur.
18 lmp. of P.H work to Court Manager (Toitet Chamber
& Ext. S/D) of Dist. Judge Court at Sambatpur.
20 S/R to P.H work of Zonal Laboratory Bu lding atSambalpur.
21 S/R to P.H work of D.T.O Toitet at Sambaipur.
77 S/R to P.H work of Mining Office l-oilet at
Sambatpur.
2.21
r,| EE
2.20
0.55
0.55
7.00
19 S/R to P.H work of (R&B) Buitding Sub-Divn. at 0.55
Sambatpur.2.20
0.55
0.55
Amou n trequrred(ln takhs)
I sL Name of the work lltoiio
73 S/R to P.H work of G.M CoLLege Common Staff
i orlei at Samoalpur.
24 lnt. & Ext. P. H work of Off rce-Cum -Residence ofDrug lnspector at Keonj har.
25 S/R to P.H work of Dist. Election Office atRaygada.
76 S/R to P.H work of Sub-Cotlector Office atSambatpur.
27 R/R of P.H work to Vigitance officer's club 5.P
Vigitance Division Office at Sambatpur.
28 S/R to P.H work of G.P.H Section Office at Koraput. 1.00
2.00
1.28
1.10
1 .30
2.00
29 1.98
30 lmpt. to P.H work of TahasiI Office at AthamaLl.ik. 1.11
l1 lmpt. to P.H work of Sub-Cottector Office at 1.11
Athamatti k.
32 S/R to PH work to Sub Division Office of Gunupur
and Bansadhara .
33 Sinking of 5" bore wetl at NH Subdivision at 1.40
Rayagada
5/R to P.H work of Sub-Division Office (R&B) atJeypore.
2.00
34 lmprovement to P.H. Work of Dist Vigitance Office,Phulbani (lnt &. Ext PH work)
35 lmprovement to P.H. Work of office of DEO, Boudh
(lnt & Ext PH work)
1.70
1.74
36 Construction of ADPRo Office Buitding at Paltahara 2.50
37 S/R to PH Work of Offfice of Zonal Laboratory ( R&
B) Bol.angir
1 .50
38 S/R to PH Work of Offfice of Mechanical ( R&. B) Sub
Division No. lll, Botangir
1 .50
Tota[ = 62.00
Grand Total = 124.00
1\ i6Chief Engineer Buildings)
Ocjisha, Bhubaneswar
Name of the(R&B ) Drvisrcir
5t. No Name of theiR&B) Divisron
l.lame of the Work AmountRequire.j
\ t4, trvrlr. I
Ra desio-r:1d.i <,',:j.g (r rrrr' i^. ..-a.i^ra l-:ic..,. : ,,e-ci y
Totat =
(Rs. ln Lakhs i
-Gtt
Puri1 S,/R to Crfferent Non-Residentiat Bu,tdings of exrsting Courts 20 00
7 Khurda S/R to djfferent Non-ResjdentraI Buildings of existing Courts 20 00
l Nayagarh S/R to different Non Resrdential Buitdjngs of existing Courts 20.00
4 Bhubaneswar No ll S/R to different Non Residentlat Buitdings of existing Courts 20.00
5 Cuttack-l 5/R to different Non-ResjdentiaI Buitdings of existrng Courts 20.00
6 Kendrapara 5/R to different Non Residential Buitdings of existing Courts- 20.00
7 Jagatsinghpur 5/R to different Non-Residentiat Buitdings of existing Courts 20.00
8 Panikoiti 5/R to different Non-ResidentiaI Buitdings of existing Courts 20.00
9 Dhenkanal 5/R to different Non-Residentia[ Bujtdings of existing Courts 20.00
10 Angul 5/R to different Non Residentiat Buitdings of existing Courts 20.00
11 Ganjam No-l S/R to different Non-ResidentiaI Buildings of existjng Courts 20.00
12 Ganjam No-ll 5/R to diffe.ent Non-ResidentiaL Buitdings of existing Courts 20.00
'13 Bhanjanagar 5/R to different Non-Residentia[ Buitdings of existing Courts 20.00
14 Phutbani S/R to different Non-Residenttat Buitdings of existing Courts 20_00
15 Boudh 5/R to different Non-ResidentiaI Buildings of existjng Courts 20.00
16 Koraput 5/R to different Non-Residential Buitdings of existing Courts 20.00
17 Jeypore S/R to different Non-Residentiat Buitdings of extstjng Courts- 20.00
18 Nabarangapur 5/R to different Non-ResidentiaI Buitdings of existing Courts 20.00
19 lvlatkanagiri S/R to different Non-Residentiat Buitdings of existing Courts 20.00
20 Rayagada-l 5/R to different Non-Residentiat BuiLdings of existing Courts 20.00
21 Paratakhemundi 5/R to different Non ResjdentjaI Buitdings of existing Courts 20.00
22 Sambatpur-l S/R to different Noo-Residential Buitdings of existing Courts. 20.00
13 Deogarh 5/R to different Non-ResidentiaI Buildings of existing Courts 20.00
24 Jharsuguda S/R to different Non-ResidentjaI BuiLdings of existing Courts 20.m
Baragarh S/R to different Non'Residential Buitdings of existing Courts- 20_ 00
76 Botangir 5/R to different Non-ResidentiaI Buitdings of existing Courts 20.00
77 Kantabanji S/R to different Non-ResidentiaI Buitdings of existing Courts 20.00
28 Sonepur 5/R to different Noo Residential Bui(dings of existing Courts 20.00
z9 Katahandi S/R to different Non-ResidentiaI Buitdings of existing Courts 20.00
30 Khariar S/R to different Non-ResidentiaI Buitdings of existing Courts 20.00
31 Batasore-l 5/R to djfferent Non-Residential Buildings of existing Courts- 20.00
32 Bhadrak 5/R to different Non-Residentiat Buitdings of existing Courts. 20.00
33 Mayurbhanj 5/R to different Non-ResidentiaI Buitdings of existing Courts 20.00
34 Rairangapur 5/R to different Non-Residentiat Buitdjngs of existing Courts 20.00
35 Keonjhar S/R to different Non.Residentiat Buitdings of existjng Courts 20.00
36 Sundargarh 5/R to different Non-Residentral Buitdings of existing Courts 20.00
J7 Rourkela 5/R to different Non-ResidenriaI Buildings of existing Courts 20.00
5/R to drfferent Non-ResidentiaI Euitdings of existing Courts 414 64
-,-<-..'.1\\.
Chjef Engineer (ELrtdingsl
Odisha, Ehubaneswai
154 64 4lt*={
E:\c.8.(8)\SPR\2018 19\AMP 2018 19\A.M.P. 2o18-19.01.10-2019\AMp-Non-Res.1Oth plon-NR Pc-7/26
JIAIE.TY\CI\ITransferred From Ptan Scheme- Non-ResidentiaI Builoings
^(1(Rs. in Lakhs)
Nanre of the (R&'B)
Divisionst.No.
Name of the Works Amou ntRequired
Remarks
(1) (2) (3) (4) (s)
1 .50
Puri 1
S/R to.....DIET Buitding at Puricotouring
such as plastering & 2.50
2 SR to Ramp and renovation of compound watt 1.50for DEO Office, Puri
3 Site devetopment of otd Co[lectorate office atPuri
5.00
4 Site development of New Cottectorate officeat Puri
5.00
5
6
D.S.W Office at Puri 5.00New Cottectorate at Puri s.00
7 Treasury strong room at Puri 5.008 SR to rest shed near Grivence ce[[ in otd 5.00
cottectorate, Puri
9 Sub-Coltecter office at Puri 4.00'10 Tahasil office at Puri 4.0011
1Z
13
Sub-Register office at Puri 5.00DIET at Puri 5.00DEO Office at Puri 5 00
14 Renovation to statue stand for DIET, Puri 5.0015 Renovation of GPH Section office 2.00
Total= 64.00S/R to.....
Khurda 'l R&B Division office Khordha 5.002 CDMO office khurda
room)(providing new kantine' 6.00
3 Coltector's Circit house at Khordha right sideiboundary watt
s.00
4 Cotlector's Circit house at Khordha Back side 5.00boundary watI
Total= 21 .OO
S/R to.....Nayagarh '1 Debottar office Buitding at Nayagarh 1 .50
2 D.l office buitding at Nayagarh 'I .00
1 .503 Pautse specialist office buitding at Nayagarh.
4 Agreeculture overceer office building at 1.50Nayagarh.
5 D.A.O office buitding at Nayagarh.
lran-,e of -rhe (Rats )
Divi5i66
5t ,rail ri Ol ii-le \'\ O (S
R eq rri rsdr\all ral fi5
( No
(7) (3)
6 DIET Bui[ding at Rajsunakhata.
7 Govt Press at Khandapada
8 Revenue Godown office Buitding ,rt
Khandapada.
9 Sadar Dispensary office Buitding ,ttKhandapada.
10 B.T.R.l SO Office Buitding at Khandapada.
11 B.T.R.lOffice Buitding at Khandapada.
12 lHC Buitding at Ranpur.
13 Sub registration Office at Khandapada
TotalS/R to.....Nirman Soudha at unit-V
Dr AC Homeopathic Medical
Hospital at unit-lll
ioshati Bhawan at Satyanagar
Cottege and 2.952
(5)
1.00
1.00
1 .50
Bhubaneswar- |
4 Dr AC HomeopathicHospitat at unit- lll
5 DR AC HomeopathicHospital at unit-lll
1.00
1.00
1.00
2.50
1.00
17.OO
2.971
7.397
arrd 3.674
and 2.486
1
2
3
MedicaI
MedicaI
Cottege
Cot[ege
6 Dr AC Homeopathic Medicat Cottege
Hospital at unit-lll -
Toshati Bhawan at Satyanagar
and 2.327
4.3117
8 Dr AC Homeopathic Medical Cotlege and 2.834Hospital at unit-lll
9 Nirman Soudha at unit-V 4.870
Nirman Soudha at unit-V 4.949a.iti
10
11 Nirman Soudha at unit-V
12
13
Toshati bhawan at Satya Nagar BBSR 4.971
State Museum, BBSR such as construction ,lfdisptaying Odisha sculpture at ground ftortrcorridor
'14 Board of Secondary Education Buitding in unitll ( such as Balance work)
15 S/R to Secretariat Buitding such as renovationwork in lndustry Deptt.
'16 State Museum Buiiding at Museum are, ,
Bhubaneswar such as out side ptastering &painting work
17 Provision of interior design for new AnnexBuitding Jayadev Bhawan such as T -Poy in
Ground ftoor Restaurant) in Unit -ll
4.825
4.655
5.000
2.746
E:\C-€-lBl\SPR\2018 19\aMP 2o18 19\a M.P.'2018'19'o1'10'2018\AMP Non'Res-701h Plon NR
2.096
PE_2/26
(2) (3) (1) (5)
Name oT rne (KdrJ)
Division(1)
)t.No.
l\ame or tne vvorKs
1B State Setection Board office Buitding in unit-ll, BBSR ( such as providing of watl panetingand ftush door)
19 Jayadev Bhawan in unit-ll, ahubaneswii suchas provision of Spiked gritl to East sidecompound wat[, weather coat painting, repairto Guard room, Potycarbonate sheet toPortico room etc.
20 Sanskruti Bhawan, Bhubaneswar for the year2017-19 such as finishing work to New Toitetbtock
21 Toshati Bhawan at Satyanagar, BBSR Such as
provision for wooden ftooring in the room ofDirector of Human Rights Commission Directorroom.
Amou nr RemarksRequi red
1, >>O
4.879
4.941
0.927
r.+TD
22 Dr. A.C.H.M.C &. Hospital in unit-lll such as
Const. of Pindi.
23
24
Toshati Bhawan at Satyanagar, BBSR.
Toshati Bhawan at Satyanagar, BBSR Such as
repaire and renovation of store roomDepartment of Human Rights Commission.
2.805
0.366
4.150
25 Toshali Bhawan at Satyanagar, BBSR Such as
wi[[ Ptaneting and file cabinet department ofpubtic Prosecution.
2.972
26 Dr. A.C.H.M.C & Hospitat Buitding, unit-lll,BBSR such as repair and renovation ofMinifarmacy.
27 ,Dr. A.C.H.M.C &. Hospital Buitding, unit-lll,l 2.661BBSR such as cup board of cotlege Buitding.
28 Dr. A.C.H.M.C & Hospitat Buitding, at unit-lll, 2.589;BBSR (Such as cup board fixing).
3.672
29
30 Dr. A.C.H.M.C & Hospital Building, at unit-lll,BBSR (Such as tabte & cup board to nctass
room first ftoor).
31 Laxmisaqar LP.D.P at BBSR Such as Earthcutting C.C. road repair of stair case cetting &cotouring.
Dr. A.C.H.M.C & HospitaI Bui[ding, unit-lll,r 2.661BBSR such as cup board of cottege Buitding.
2.215
E:\C-E-(B)\SPR\2O18-19\AMP 2018-19\A.M.P. 2018 19-01-10-2018\AMp-Non Res.loth plon NR
3.724
Pg_3/26
n-e Or Li-re (ncD)l_r 1\/t s.a n
5itrtc
i\oLllC Ul Ll rt .\ L'i 1.5 Amou ntP.equired
/ 1c)4
4.993
4.507
4.252
RemarKS i
I
(7) (3 )
32 Dr. A.C.H.M.C & Hospitat Builciing, at unrt-lll,BBSR Such as repair of tabte, chair and n€wdoor.
33 Labour Commissioner at Unit-lll, BBSR Such as
Cement Concrete work and fixing of tite toparking area buitding side.
34 Office of the Director of Treasury & AccountsBhawan in Unit-lll, BBSR Such as provision ofgypsum & Armstrong ceiting in 4th ftoor ofContro[[er of Accounts.
35 Text Book Press Processing Unit-lll, BBSR Sur:h
as repair of compound watl (Back and Westside).
36 Text Book Press Buitding AdministratsaieBtock at Unit-lll, BBSR Such as renovation ofAccounts Officer room and A/C Branch.
37 Text Book Press BBSR Such as repair ofcompound watl (front and east side).
(5)
4.482
4.958
Total = 134.000S/R to.....
Bhubaneswar-ll 1 Sub-OrdinateStaffsetection Commission
2 Section office No-lll BBSR
3 Samajbadi party office, Unit -6 Bhubaneswa- 7.50
7.50
3J0
(4)(1)
4 Revenue Rest Shed 4.72
5 Govt. Secondary training School 4.41
6 Govt. Secondary tra'ining Schoot 4.72
7 Govt. Secondary training Schoo[
8 Govt. Secondary training School
9 BBSR (R&B) Division Office10 Sub Cotlector office
3.00
3.97
11 Tahasi[ Office 3.68
Total=r 42.35
Bhubaneswar-lll
S/R to.....1 Govt. Polytechnic, BBSR (Such as repair to G
type Qtr. No 9 to 12 )
2 Govt. Potytechnic, BBSR(Such as fixing ofceramic wa[[ E floor ti[e & painting to insi,lewatl of Chemisty tab. & physics tab. )
2.10
E:\C- E-(B)\Sp R\2018 19\AM P 2018- 19\A. M . P. - 2018- L9-O1- 1O-2O18\AMP- Non- Res. TOth Plon NR
5.00
Pg_4/26
4.73
4.62
E:\c.8.(B)\SPR\2018-19\AMP 2018 19\A.M.P.-2o18-19.01-1c2018\AMp-Non-Res.1oth pron NR Ps_s/26
t.tame oT rne (KuB.)
Division(1)
5t.No.
l\ame or tne worKs AmountRequ'ired
iiemarks
l.Nv\5_-(7) (3) (4) (5)
3 Govt. Potytechnic, BBSR (Such as fixing ofceramic wall & ftoor tite & painting to insidewatl of Admn. Btdg. & Computer Room )
4 Govt.Potytechnic, BBSR
5 Govt. Potytechnic, BBSR
6 Govt. Polytechnic, BBSR (Such as repair to G
type Qtr. No 2 )7 Govt. Potytechnic, BBSR
8 Govt. Polytechnic, BBSR
3.00
5.00
5.00
2.75
1.s0
5.00
9
10
11
Govt. Potytechnic, BBSR
RIPAE&S Hostet Buiding at Nayapal.ti, BBSR
Gopabandhu Academy of Administration,BBSR(Such as repair of tibrary and conferencehattNo5&7)
5.00
3.80
3.65
Bhubaneswar- lV
S/R to.....CTO Office Buitding
4.40
Total = 45.70
0.82
12 Gopabandhu Academy of Administration,BBSR(Such as repair and renovation to Addl.Commisioner room , facutty room )
1
2j
Deaf and Dumb School
SAINIK SCHOOL COMPOUND WALL ANNAPURNA
MESS
4 Krishna Hostel Sainik School
5 Zona[ dispensary at Saheed Nagar BBSR suchas repir and weather coat painting to outerwatl of the buitding
2.00
2-A9
2.92
1.49
6 Brahmaputra Hostel of Sainik Schoo[ Bath 1.58Place Shed
7 Drug Testing and Research Laboratory NearSainik SchooI
1.63
8 Ganga Hostel of Sainik School
9 Gomti Hoste[ of Sainik School
1 .58
1.48
10 Anupama Hoste[ buitding such as provision ofgrit[,watl and ftoor tite,weather coat andenamel coat painting ting etc.
5.00
Total = 21 .OO
4.00
2.50
Bhubaneswar
No-V
1 Repair of Main Buitdinq of B. K Cottege of Art& Crafts (Ground Floor)
2 Repair of Library Building of B.K Cottege, Art&. Crafts
al'_./ ,,
a n-re
,("Ol
n,\Li ie ( i\aD l )1.
\nllame oI I te \,!ot-KS Antou t
Recuired
9.00
2.91
2.67
2.86
3.51
1.62
3.35
3.1 5
1.89
2.60
1.29
0.57
0.33
3.80
Remarks
\7) (3)
3 Repa;r of Cffice Room cf B.K Collese of A,t &
Crafts
Total =
S/R to.....1 Back side C.Watt of Chief Fire Oficers Office,
Kanika Chhak
2 Deptt of Piihotogy, SCBMCH, Ctc lFtastering,painting to outside waIt)
3 Famity Wetfaie Buitding, SCBMCH, Cutta:k(Painting to corridor & fixing of At. stidirrgwindow)
c otd centi HosGL in SCBMCH, CtC (Concrete &cotouring to Basket Ba[[ court)
5 Lecture Theatre Btdg, SCBMCH, Cuttack(Vitrified tile ftooring to ver arrd
distempering)
6 Surgery Block in SCBMCH, Cuttack(Renovation to Library room &. other repair)
7 Famity Wetfare Btdg, SCBMCH, Cuttack(grading of roof stab&. painting)
8 FMT Deptt in SCBMCH, Cuttack (Renovation ofbatcony at 2nd ftoor)
9 Otd Gents HosteL, SCBMCH, Cuttack (Fixing ofAt.jattyelBtbiL)
10 Dean & Principal office, SCBMCH, Cuttack
(5)
Cuttack-l
11
17
Mental Heatth Btdg, SCBMCH, Ctc
Hostel Buitding of Ravenshaw ColtegiateSchool (Leak Proof treatment)
'13 Vanijyakar Bhawan, Cuttack14 GPHD Section office, Otd Secretariat 1.49
r 15 Pathotogy Deptt, SCBMCH, Ctc (Door windowpainting)
16 Mental Health lnstitute, SCBMCH, Ctc 1.70(Weather coat painting)
Super speciaI Medicine Btock, SCBMCH, Cuttack
1.43
17
18
19
Super speciat Medicine Btock, SCBMCH, Cuttack
DentaI Co(teqe. Cuttack (Fatse ceiting &,\t.partition watting)
20 P.P. centre, SCBMCH, Cuttack (Ptastering,cotouring)
4.70
3. 51
4.08
E:\C.E.(B)\SPR\2O18 19\AMP 2018-19\4.M-P- 2018-19-01-1G2018\AMP-Non-Res 10th Plon NR
0.66
Pg_6/26
(2t (3) (4) (5)
I lcille ()l LIle (K(ID)
Division)t.No
r\ame or Lne vv orKs
21 Ladies Hostel & Supdt. Office (New & Otd),SCBMCH, CtC
22 Auditorium Btdg, SCBMCH, Cuttack (Urocontite & sLiding window)
23 Gents ft House staff Hostet, SCBMCH, Ctc(Weather coat painting to courtyard)
24 T.B. & Chest Buitding, SCBMCH, Cuttack (Ftyash brick & Profite sheet for gas ptant)
25 Ladies Hostet, SCBMCH, Cuttack (Concreting&. lron truss to Baket Bat[ court)
AmountRequired
1.45
2.24
2.55
3.50
3.99
f(emarKs 9)(1)
26 Ladies Hostel, SCBMCH, Ctc (washing room formess)
27 Ladies Hostel, SCBMCH, Ctc (Parent & Guestroom renovation)
28 Cuttack(R&B)Divn.No.l(Suppty of Godrej makeAtmirah)
29 Veterinary medical, Buxibazar,(Grading ptaster, C.wa[[)
30
31
District Emptoyment Exchange, CDA, Ctc
& s.00Excise Deptt Buitding,outside painting)
Bidanasi (insid-
32 Canteen of District Treasury 3.0033 District Audit Office & Locat Fund Audit 5.00
(outside painting)
34 Deputy Director, C.Tax office, Cuttack 4.86
3.1 3
3.84
7.61
Cuttack 5.00
35 Banijyakar Bhawan, Otd Sectt, Cuttack(Outside painting-2nd & 3rd ftoor)
5.00
36 Banijyakar Bhawan, Old Sectt, Cuttack (lnsidepainting & Tite flooring - GF & FF)
4.80
i 37 Chief Fire Officer office, Kanika Chhak,
I Cuttack (Roof grading & outside painting)38 Fire Station Buitding at Buxibazar, Ctc 5.0039
40
Conference hatt of OPSC, Cuttack 5.004nos Candidates Waiting room, OPSC, Cuttack 4.50
5.00
41
42
Hindi Training Schoot, Otd Sectt, Ctc\{akf Board Chairman office. Otd Sectt.Cuttack
43 Dy. Labour Commissioner office, Otd Sectt,Cuttack (Office)
4.904.00
E:\c.E.(B)\sPR\2o18-19\AMp 2O1eD\a.M p.-2018 1s 07-10-2018\AMp-Non-Res Toth plon-NR
s.00
Pg_7 /26
r.,iqn e OT Lne ln[b/Drvis jo "
)L
f'lcL\arTLe of tne Vy'orks Airrou t-l L
Pequired
5.00
5.00
i\e it ta I (s
(3)
Old Canteen Btdg 1n NCC Office. Otd Sec,t.Cuttack (lnternal repair)
NCC Office main building, Otd Sectt, Ctc (t-C
parking)
Directorate of Vigitance, Cuttack
Technical Wing, Vigitance, Ctc
D.H.H. Buitding, City Hospitat, Ct. (C,,*catcher)
20 beded Eye Ward, City Hospitat, Ctc
Paediatrics Deptt, SCBMCH, Cuttack
Neurotogy Deptt. SCBMCH, Cuttack
Eye Deptt (O.T. Comptex), SCBMCH, Cuttactr
(5)
45
46
47
48
4.50
4.55
s.00
49 5.00
(Renovation of wards)
50 Otd Medica[ Ward of SVP Sishu bhawan(Vitrified tite, at. stiding window & prof i[e
sheet roofing)
51 New Medical Ward of SVP Sishu bhawan(Vitrified tite, a[. sliding window & profltesheet roofing)
52 l.D. Ward of SVP Sishu Unawan (naising ofgate with CC approach)
56 Superintendent office of SVP Sishu bhawan(Armstrong ceiting & painting)
57 Hospital Btdg, Tutasipur, Cuttack
58 Baby Surgery Ward, SCBMCH, Ctc
Endorine Surgery Ward of iiaMcH, Cuttack59
5.00
s.00
53 Nurses Barrack of SVP Sishu bhawan 3.00
(Dismantting of Barrack)
54 ACRC Btdg of SVP Sishu bhawan (Armstrong 2.00
ceiting & p9jltjry)55 Surgical ward of SVP Sishu bhawan (Armstrong
ceiting &. painting)1.00
5.00
1.00
5.00
4.50
5.00
60 Surgery Burn Ward, SCBMCH, Ctc 4.50
61 Trauma ICU of Surgery Btock, SCBMCH, 4.50
Cuttack
62
63
Orhtopedics Ma[e Ward, SCBMCH, Cuttack 5.00
Medicine Deptt Fema[e Ward, SCBMCH,
Cuttack (3rd ftoor)5.00
64
65
66
4.00
4.00
4.00
(7)(1)
E:\C-E-(B)\5?R\2O18 19\AMP 2018-1.9\A.M.P.-2018-19 01 1G2018\AMP Non Bes 10th Plon-NR
Total 237.O0
Pg.8/26
a )\r
r\alre oT tne ( Kuu lDivision
5t.
No.Name of the Vy'orks
S/R to.....S R to Form Press Buitding Madhupatna5 R to Govt Press Building at MadhupatnaS R to Testing LaboratorySR to R and B Divisionrepair to Garrage
ll at OMP Square
5 S.D.V.O. Office building at Banki6 B.E.O. Office buitding at Banki7 Fire Station buitding at Oanki8 Earth fitting & C.C. Pavement in Fire station,
Banki
9 Cotour washing & fixing of tites & sLidingdoor/window & watL panneLting of SDH Banki
Sub-Registrar Office at Jagatpur, 5.00
AmountRequired
RemarksA.
€'t
(1)
Cuttack-ll 1
2
3
4
4.39
4.28
2.73
4.50
5.00
4.005.0-4.00
4.O0
10 SR to Tahasil Office at Jagatpur, Cuttack.(Backside compound watL)
11 SR toCuttack.
12 SR to RDC Office at Jagatpur, Cuttack. 4.0013 sR to R.l. office at Jagatpur, cuttack 2.0014 SR to (R&B) Section
CuttackOffice at Jagatpur, 5.00
4.00
15 SR to Soil.
Cuttack.Chemistry Office at Jagatpur, 3.OO
16 SR to Agricutture Office at Jagatpur Cuttac 3.00k
17 SR to Tahasil Office at Jagatpur, Cuttack 3.0018 SR to PWD 5ub-Division
Cuttack.Office at Satipur, 4.00
19 SR to PWDiCuttack.
Section Office at Mahanga, 3.00
20 Renovation of Section Office stiding Storeinside Otd LIC Cotony, Badambadi, Cuttack.
5.00
(7) (3) (4) (5)
21 Renovation of boundary watt inisde Otd LIC 5.00Cotony, Badambadi, Cuttack (East side) pt-1.
22 Renovation of boundary watt inisde Otd LICCotonv, Badambadi, Cuttack for the year 201g19 (East side) Pt-[.
: \c.E.(8)\SpR\2018 19\AMp 2018-1s\A.M.p._201, 19-01 1G2O18\AM7 Non-Res.1)th pton NR
5.00
Pg_9/26
ln.irdn-re of the iR&B I
Divis jonSi l\ame OT Lne !\,OTkS Anrount
Pequ r redF.e marris
Nc
(l)SR to Govt. III at l(hapuria, Cuttack OutsidePainting of Workshop / Academic Btock and
Ctass room.
Administrative Btock of S.D.H. Banki
Total =
S/R to.....TahasiI Bui[ding, Pattamundai
Sub- Registrar office, Pattamundai
Excise Range office, Kendrapara
(5) ,
23
24
1
2
3
5.00
97.00
Kendrapara 5.00
6.00
5.00
Total= 16.00S/R to.....
Jagatsinghpur 1 R.T.O Office building at Jagatsinghpur
3 A.C.T.O. Office buitding Jagatsinghpur
4 A.R.C.S Office buitding, Jagatsinghpur
5 N.K.C. Stadium at Jagatsinghpur
6 Btood Bank building of DHH, Jagatsinghpur
5.00
3.00
4-c[4.O0
Tota 1=
3 Renovation of left gate of Dist. Sanskrut'i
Bhaban , Jajpur
4.00
' io.ooS/R to.....
Panikoili 1 Rev Inspector's Office Btdg (Jajpur Tahasit) 4.00
2 Rep. & Renovation to Fire Station BuildirgJajpur
4.00
4.00
(2) (4)(1)
4 Renovation of right gate of Dist. SanskrutiBhawan , Jajpur
4.00
5 Renovation of Boundary watl of ptay ground ofN.C (Auto) cottege Jajpur
Total= 2O.OO
S/R to.....Dhenkanal 1 District Treasury office at Dhenkanat. 5.00
2 Deputy Director of Agricuttuer office at 5.00
Dhenkanat.
3 Subregister office at Dhenkanat. 5.00
4 P.W.D Section office at Hindot. 3.00
5 Soi[ conversation office buiLding at K.Nagar. 3.00
6 Fire station office buitding at K.nagar. 4.00
Total= 25.00S/R to.....
1 DHH, Angul such as constn. Of 3 nos Ge,n. 5.00shed
2 Dist. Statistica[ office, Angul
Angul
E:\C.E.(B)\SpR\2018-19\AMP 2018- 19\A.M.P.-2018-L9-01-10-2Oi.a\aMP Non-Res.1Oth Plon-NR
3.00
Pg_1O/26
4.00
E:\c.E.(B)\SPR\2018-19\AMP 2018-19\A.M.P.-2078-19-01-1G2o18\aMp-Non Res.loth ptdn-NR Pg_tt/26
r'{dll rc ul ule (KtID,Division
(1)
)t.No.
l\ame or tne woTKs A.mou ntRequired
Rema rks
^1,\(2) (3) (4) (5)
3 Acidt. Office bitdinq of 5DVH at Athmallik4 Eye ward of SDH at Athmattik5 Excise office at Athmattik6 Repair to fire staiion buiting at Tatcher
Total=
1.00
4.00
1.00
10.00
24.O;A
7.00
S/R to.....Charbatia 1 S/R to Asst. Director of Textite, Athagarh
2 S/R to Constn. of Athagarh (R&B) Sub-Divisionoffice building (Cow Catcher, approach roadto portico and main gate)
3 Sub-Register building, Athagarh
4 Sub-Treasury office buitding at Athagarh
5.00
5.00
5.00
Total =. 17.OO
S/R to.....Ganjam-l 1 O.B.C.C office,Bijipur,Berhampur 3.00
2 Deputy Director Agricutture, Berhampur 5.00
5
3 Vigilance DSP Chamber, Berhampu r4 Vigitance Conference Hat[, Berhampur
Settetement office ofCommisssioner, Berhampur
R.D.C.Office Buitding at Berhampur7 S.E.S.C (R&B)office,Berhampur
3.00
5.00
Joint 3.00
6 5.00
5.008 Vigitance S.P.Chamber,Berhampur 3.009 DPIASE at Kanisi, Berhampur 4.0010 Womens' Potytechnic Ladies Hostet No.1 at 3-00
Berhampur
11 Gents Hostel No.1
M.C. &H, Berhampurof M.K.C.G. & 4.00
Womens' Potytechnic Ladies Hoste[ No.l at 3.00Berhampur
i l3 tOut Door Building of C.H.C at Chikiti 5.00
17
14 Revenue l.B at Chikiti 5.0015 Superintendent Office of M.K.C.G. &
rM.C. &H, Berhampur3.00
16 Sub Registrar Office at Chikiti 3.0017 Hostel of ANM Training Center at Berhampur 3.00
'18 G.S.T.S at Chikiti 5.0019 Veterinarv Dispensery at Berhampur
20 UCP Engg School (Atakananda Hostel NO.2) atBerhampur
5.00
3.00
21 TahasiI Office at Berhampur 3.00
(1) (2)
, L1-llr= OI tne \ncD)ll}i- r-,iq,jcian
si.Nc
l\ame oi r-Tre v\ oi Ks Amou n tRequireC
RemarKs
(5) -_27
L)
74
5.00
5.00
5.00
5.00
5.00
lr)l.T.l. Compound watt at HinjilrSetttement Officers Chamber at Berhampur
Ladies Hostel No-2 of M.K.C.G. &M.C. &H, Berhampur
Tahasit Office Btock at ChikitiUCP Engineering School Civit Engg.Deptt. atBerhampur
27 Entrance Gate of C.H.C at Chikiti
25
76
5.00
3.0028 P.W.D. (R&B) Section office at Chikiti29 M.K.C.G. & M.C.&H Auditorium at Berhampur 5.00
30 Administrative Btock of KATS at Ankushpur 5.00
31 Government .l.T.l Ladies Hostel at Hinjili 5.00
32 UCP Engineering School Etectrical branch atBerhampur
5.00
33 Garage for Fire Station at Berhampur 5.00
34 lndoor Buitding of KATS at Ankushpur 5.00
35 Administrative Btock of BP HomeopatlricCottege at Berhampur
36 ANM Training Center Kitchen and Dining Btockat Berhampur
3.00
37 Ganjam (R&B) Division No.l office at 3.00Berhampur
38 Nursing ColtegeMKCG,MC&H,Berhampur
Buitding insirle 3.00
Total = 156.00S/R to.....
Ganjam No.ll Sub-Divisionat Hospital at Chatrapur. 5.00
Treasury office at Chatrapur. 5.00
3 Sub-TreasuryOffice, Purushottampur 3.50
4 RTO office at Chatrapur. 5.00
3.00
1
2
5 Tahasil office at Kodata 4.006 PHC at Rambha
7 Arts & Crafts cottege at Khattikote.8 Special Repair to Mandiapatti
mandiapatti
S/R to.....1 r(.5.U.0. C.T.E.
Bhanjanagar
2.50
Tota[= 35.00
Bhanjanagar Coltcgc building ]t 5.00
2 A.C.C.T. Office buitding at Bhanjanagar3 L.l. Training centre at Bhanjanagar
3.00
E:\C.E (B)\sPR\2a18 B\aMP 2018 19\A.M.P. 2ua 19-01-10-2o18\aMP Non Res.loth Plon NR
4.00
Pg_12/26
(4)
-store at
]
5.00
E:\C.E.(B)\SPR\2018-19\aMq 2O18-19\a.M.p.-2018 19 01 102018\AMp Non Bes.TOth pton-NR PE_B/26
l.,lame of the (R&B)
Division
(1)
st.
No.
l.iame of the Works AmountRequired
Remarxsrb
(2) (3) (4) (5)
4 District Poutarty fram at Bhanjanagar5 5.D.V.O. Office buitding at Bhanjanagar
6 Diarty fram building at Bhanjanagar.7 Veterinary hospital dispensary at Bhanjanagar
4.00
3.00
4.004.00
8
9
10
Btock Veterinary Office btdg.at Buguda
Fire Station bLdg at Aska
PWD Section office btdg at Buguda
2.00
3.00
11
12
Tahasi[ office at Aska
Sub-Cottector Office at Bhanjanagar'13 Fire station buitiding at Bhanjanagar
3.00
3.00
4.00
3.00
Total = 45.00
PhulbaniS/R to.....
1 Non Res buitding such as repair to Malaria andSkin VD Office of DHH at Phulbani.
Non-Res buitding such as repair to AgricuttureOfficer and staff Q.r. at G. Udayagiri.
3 Non Res building such as leak repair to mainbuitding DHH at Phutbani.
4 Non Res buitding such as repair to DHH atPhutbani.
1.20
2 2.53
1.00
0.50
5 Non Res buitding such as repair to Dist 0.50Labour Office at Phutbani.
6 Non Res buitding such as [eak repair to 0.75Coltectorate at Phutbani.
7 Non Res buitding such as repair to Dist.Ptaning and Manitory unit office at Phutbani.
1.00
8 Non Res buitding such as repair to CDMO
Office with approach road of DHH, Phutbani.2.O0
9 Addl. Sub-Cottector OfficeUdayagiri
buitding at G. 3.42
10 Non Res building such as repair to two storiedhostel buitding of ANM training centre atPhutbani.
11 Non Res buitding such as repair to Dist labourOffice at Phutbani
12 Non Res buitding such as leak repair to ANMtraining centre building at Phulbani
1.48
0.48
0.69
tfi)D afire Oi rtLe tiaol
D1,'':r: -(1)
)1.f'J
l',lame of rne \.! oi r..s
Rec - ired
1 0C)
1 1'7
3.94
0.23
Remarks
(3)
13 l!or, Res buitding such as repair to Comm,:nroorn & Mutti Propose hatt of GNM bultding atPhutbani.
14 Non Res buitding such as repair to NHM off i,:e
buitding DHH Phutbani
15 Non Rei britdlng such as providing right sirje
and raising compound watl with wire fencingof Circuit house Phutbani.
16 Non Res buitding such as wa[[ tile to OT of E'ye
hospital and approach tite of orthopaeciccorrection centre DHH at Phulbani.
(5 ) ;-:
17 Non Res buitding suchoffice with approachPhutbani.
as rePalrroad of
to CDMO
DHH at2.78
2.418 Non Res buitding such as leak repair to mainbtock cottectorate at Phutbani.
19 Non Res buitding such as providingcatcher at DHH Phutbani.
co\v- 3.85
Total = 34.00
Boudh
S/R to.....1 C.D.V.O.Office New Boudh
2 Dist.Employment Office Boudh
3 A.R.C.S Office Building Boudh
4 Leprosy Hospital & Rehabitation Center Boudh
5 A.D.T. Office Boudh
6 Sadar R.l.Office Boudh
7 Repair renovation to C. Wa[[ infront of circuitHouse
8 Drugs lnsputer office9 l.T.l.Work Shop Building Boudh
5.00
2-00
3.04
3bo
4.004.00
5.00
5.00
3.00
Balliguda
S/R to.....1 Medical buitding such as renovation of Wating
room for attendant at Ba[[iguda.
Total= 34.00
2.00
2.00
2.OO
2.00
7
3
4
5
6
East. Section office at Battiguda
Division Store at Battigudatrarinqharli (RftB) Section officJ it I'raringl,acli
Daringbadi t naS)SuU- Oluiii;n at Daringbadi
Bamunigam (R&B)Section Office2.00
z.oo
E:\C.E.(B)\SPR\2018 19\AMP 201a-19\A M.P -201a.19-O1-10-2018\AMP-Non.Res lOth Plon-NR
Totat.= 12.00
Pg_L4/26
E:\C.E.(B)\SPR\2O18-19\aMP 2o18-19\A.M.P.-2o18-19-07-1G2o18\AMP-Non-Res.l.Oth Pton-NR Pg_75/26
l.lame of the (R.&B)
Division(1)
st.No
l'{anre of the Vvorks Amou ntRequired
R.emarksnl\h
(4)(2) (3) (5)
KoraputS/R to.....
1 Special Circuit House
2 Repair & renovation of Su b-cottectorateoffice buitding at Koraput, (Record Room)
3 Repair & renovation of Cottector's Officebuitding
4 Repair & renovation of Election Office5 Repair & renovation of DSWO Office buitding
at Koraput
6 Repair & renovation of Asst. Labour Office atKoraput
5.00
3.00
3.00
District Cuttural 3.00
5.00
10.00
3.00
7 Repair & renovation ofBuitding at Koraput
8 Repair ft renovation of Shakti Bhaban inside 3.00CotIectorate
9 Repair & renovation of R.l Office buitding atKoraput.
3.00
10 Renovation of 6 nos. of Suits at Special CircuitHouse
5.00
11 Repair & renovation of CDVO Office building 3.00
12 VPHL BuiLding at sunabeda 5.00
Total= 51 .00
rSlR to.....Jeypore 1 Office -Cum Res of Drug lnspector at Jeypore 3.00
2 Rl Office Buitding and Modern Record Room atJeypore
3.00
3 Vigitance S. P. Conference Ha[[ at Jeypore. 2.00
4 S.E. Office at Jeypore such as construction of 1.50lcow catcher.
5 ;DRCS Office at Jeypore such as repair towatchmen shed & C.C. Drain.
2.00
6 SR to flooring of DRCS office at Jeypore. 00
00
3
7 JCCTO/ACCTO Office Building at Jeypore. 2
8 Conference Hatt of ACCTO Buitding at 3.00Jeypore.
9 4nos of Garrage & Compound watt of ACCTO
BuiLding at Jeypore.
10 Repair & Renovation of Ward & Cabin at SDH, 2.50
Jeypore.
7.00
(1) (2)
1.1 e Ot Lne r. KGtr I
Division
Nawarangpur
)i..No-
1
7
3
4
i\ame of the Vr'orks
(3)
11 Repair & Renovation of ANlvl Training Centi-e(Girts Hostet, Ctass Room, Laboratory, Offi,:eRoom) at Jeypore.
S/R to.....DSP Vigittance Office at NabirangpurDistrict Agricutture Office, Nabarangpur
Veterinary Off ice, Nabarangpur
PolytechnicNabarangpur
(Administrative Btock ), 5.00
5 EmptoymentExchange, Nabarangpur6 Fire Station Buitding at Nabarangpur7 (ReB) Sub-Division, Umerkote8 Veterinary Office, Umerkote
S/R to.....Malkanagiri 1 Matkangiri (R&B) Division Office & Sui:- 4.00
Division Office at Malkangiri
2 R.T.O Office at Matkangiri
3 Cotlectorate Building at Malkangiri
S/R to.....Rayagada-l I Vigilance Office Rayagada
2 ARCS Office Rayagada i.e Const of compoundwa[ and inside painting
3 200 seated Hostel Buitding UGMIT at Rayagacla 7.00
4 Girts Hostel buitding UGMIT Rayagada
5 RTO Office at Rayagada
6 Drug ware House at Barijhota
7 S/R Dist. Head Quarter Hospital Rayagada
Total=S/R to.....
An-rount
(4)
26.00
Ren-rar <s
(5) .r
5.00
5.00
4.OO
5.00
2-00
3.00
3.00
Total = 32.00
4.00
4.00Total = 12.00
3.00
2.00
2.00
3.00
2.00
3.00
17.OO
Rayagada-ll 1 Repair and reptacement of doors & Windovrsof SDH Gunupur
2 Revenue lB at Gunupur
3 SR to compound watl of Sub-Cottector officebuiLding at Guuupur
S/R to.....
E:\C.E.(B)\SPR\2018 19\aMp 2018 19\A.M.p.-2018 19 01 10-2018\AMp-Non-Res.10th plon-NR
Total= 11.00
Pg_76/26
4.00
3.00
4.00
r\ arlle or Lne (K.Irr)
Division(1)
Par--a [akherr, u ndi
Sambalpur-l
No.
Name oT tne vvorKs
1 District Treasury office Buitding atParatakhemundi.
2 Repair &. Maintenance of C.H.C. at Kasinagar.
3 Repair & Maintenance of Dist. Head Qr.HospitaI at Paratakhemundi.
4 Repair & Maintenance of casuality & Btood
bank of DHH at Paralakhemundi.
Repair &. Maintenance Vigilance unit office atPkd.
Amou nt KCMATKS
Required
3 .00
4.00
3.00
3.00
2Q
5
S/R to.....1 Repair and Renovation
Office at Sambalpur .
2 S/R for fitting back side of V.S.5. Auditorium,Sambatpur Right side of parking area
3 Repair and Renovation of G.E.D Section officebuitdings at Brooks Hitt, Samba[pur
3.00
Totat= 16.00
of District Etection 3.06
3.91
1.23
(2) (3) (4) (s)
4 Repair and Renovation such as watl Pannettingwith Ply-wood at lssue Section of (R&B)
Division-l Sambatpur
5 the Homeopathic Hospitat at Sambatpur.
4.30
4.826 Renovation of R.O. Room at District Head 3.84
Quarter Hospita[, Sambatpur
7 Renovation of Store Room at District Head
Quarter Hospital, 5ambatpur2.26
8 S/R such as Repair andRegional Vaccine store inQuarter, Sambalpur.
9 Repair and Renovation to O/o the Deputy.Director of Agricultur, farm road Sambatpur.
10 CDVO Office, Sakhipada, Sambatpur such as
repair to Approach Road at back side of CDVO
office Staff Colony Campus.
11 Board of Secondary Education Zonal Officesuch as repair to Ptinth Protection watt.(Right Side)
12 Distempering and painting works of Govt.Women's Cottege at Sambalpur.
Renovation ofDistrict Head
1.39
1.03
4.17
4.36
E:\C.E.(8)\SPR\2018 19\AMP 2018.19\A.M.p_-2018 19 01-10 2O1a\AMp-Non-Res7hh plon-NR
4.46
Pg_17 /26
i\arrre of the (R&B l
Division
Si l\an re oI -t|-ra Yv o, KS Amou n i
5.00
43.82
4.75
4.67
3.90
3. 50
2.51
neilarks\A\.1 No
(3)
13 HeaIth & famity wetfare training centre atAinthapati Sambatpur.
Total =
S/R to.....1 N.R. Buitding such as construction of ftooring
and approach road to cow shed No.4, 5 & 6 atSLBF Chiptima
2 Non-Resideniiit eritalng trih as constru&ionof D.G. Set near Library Buitding of VSS
IMSAR, Burta
i Nln buitding sich ur upp[vlne putty ,E=ticemulsion paint &. painting to doors & windolt's& fixing of Mosquito net to 2nd & 3rd Surgery(1st ftoor) ward of lndoor Hospital ofVlMSAR,Burta.
4 N/R buitding such as apptying putty ,ptasticemulsion paint & painting to doors & windora,s
& fixing of Mosquito net to 4th & 5th Surgery(1st ftoor) ward of lndoor Hospital ofVIMSAR, BurLa f or 2017 - 1 8.
5 Non-Residential Building such as constructionof garrage near Library Buitding of VSS lMSAtl,
Burta
5 N/R buitding such as Repair & renovation tomodern laundry of Vh\rlSAR,Burta
N/R buitding such as raising of compoundwatt,providing revotving gate &. concreting t.o
front portion of store room of cottege fietd ofVIMSAR
8 SDH at Kuchinda such as constn of one waitirrgroom & guard room & renovation to Ramb,liprasuti Bhawan
9 N / R buitding such as raising of compourrdwalt,repair to DG Shed & cooking shed ofPutmonary dept.of VIMSAR
10 N/R buitding such as providing & fixingdesigner tite from entrance gate to the mainbuitding of Putmonary dept.of VIMSAR .
(5)
Sambalpur-ll
2.50
7 5.00
4.84
3.50
l7)(1)
E:\C.8.(B)\SPR\2018-19\AMP 2018-19\A.M.P. :'O18 19-01-10-2O78\AMP Non-Res.10th Plon-NR
5.00
Pg_78/26
E:\C.E.(B)\SPR\2018-19\AMP 2o18 19\A.M.P.-2018 19-01-1G2O1?\AMP-Non-Res.11th Pton-NR PE_L9126
Name oT tne (KdE, )
Division(1)
51.
No.
l\ame or tne worKs Amount KemarKsRequired
(4)(2) (3) (5)
11 5/R such as rer-rovation to (R&B) DivisionNo.ll, Sambalpur (Brickwork in second floor &
roofing)
12 Govt. Potytechnic, Rengati, Sambatpur such as
preparation of base for fixing chequred titesin Courtyard of Academic Btock
13 N/R buitding such as repair to director room
,Gita bhawan & stair case near main entranceof co[tege buitding of VIMSAR,Burla for 2017-
18.
'14 Govt. Potytechnic, Rengati, Sambatpur such as
fixing chequred tiles in Courtyard ofAcademic Btock
15 ,R sub ireasury otiice at xucninaa
-).)Y
4.88
5.00
4.83
16
17
18
19
3.00
5.00
Guard Shed and old Sub-Treasury Office at 4.50Kuchinda
Sub-cotlector Office compound wa[[ atKuchinda
S/R such as repair to kitchen oi tV Raman
Boys Hoste[ of lTl, Hirakud
20 SC/ST Boys Hoste[ of l.T.l Hirakud for theyear (Fixing Kota Stone in Staircase)
5.00
3.37
1.78
21 S/R such as Painting works outside of Boys
Hostel at Hirakud ( Ground Floor)
5.00
22 Academic Buitding of Potytecnic at Rengali, 5.00
_'1111q!'23 lTl, Hirakud such as Repairing of Brick work, 4.88
Plastering & Painting
TOTAL= 96.00
S/R to.....Jharsuguda 1 Treasury Office, Jharsuguda
2 5ub-Registar office at Jharsuguda
4.00
5.00
3 PHC Panchpada 5.00
4 Revenue Rest shed Jharsuguda
5 Rl Office Jharsuguda
6 Fire Station Bui[ding Jharsuguda
7 District Head Quarter Hospitat, Jharsuguda
2.00
3 -00
2.00
4.00
Total = 25.00
/"ne_
S/R D.A.O office Kuchinda
\7)(1)
i\aiie Oi tne inaD)Dir''icinn
Baragarh
Bolangir
Sr.
No
1
5
6
9
i\a,ne ci li e \'\ ai r,.5 AmountRequired
5 .00
2.00
4.00
5.00
6.00
4.00
5.00
[e ral-(S
r{(l)
S/R to... ..Nishmani High Schoot Bargarh such as repa rand refnovation to Ctass room.
Samaleswari High Schoot Ambapali such .Ls
washing and painting and approach road.
George High Schoot,Bargarh such .rs
renovatiion of Toitets
Attariba eoyi Higrr Schooi,such ar coio,.,twashing & painting
Attariba girts High School,such as cotoLrr
washing &. painting
Ranapratap Hlif,,scnoot sucli as piovlslon t>f
main gate
(5)
2
3
4
8
7 Govt Girls High school such as renovation ofctass rooms
S/R Govt girts high schoot,egqlmplLHostel Building of Attabira High Schoot.
10 Govt.Girts High Schoot Buitding Barpati su<;h
as repair to Urinal for girts students &provision of Fatse Ceiting to newly renovaterd
office.
5.00
5.00
5.00
Total= 46.00S/R to.....
1 C.S.O Buitding,Batangir
7
3 Agritcutture SoiI Testing Laboratory, Batangir
2.00
?.oo
4.OO
4 District Veternary Office ,Batangir5 Dist. Treasury office Batangir
6 Dy. Director of Horticulture Building, Ba(angir
4.00
4.00
4.00
8
7 District Education offiece Batangir
Dls!19t xry1h.1 eiglgn xendra, Balangir
Veterinary Sub division office Batangir
District Audit o-ffice, Balangir
Statistic Office at SonepurOtd Buitding of district Treasurv Office at Sonepur
Agricutture Office at Birmaharajpur
2.00
2.00
J.oo9
10 Agritcutture Office buitding, Batangir (2Nos) 2..00
11
12
1l14
3.00
2.00
5 .00
5.00
2.0015 ACCT Office Buitding at Sonepur
t:\C.E.(B)\SPR\2018-19\AMP 2018.19\A.M.P. 2018 19 01 10 2O18\AMP Non Res.TOth Plon.NR
Tota[= 45.00
Ps-2o126
E:\C.E.(B)\SPR\2018-19\AMP 2018 19\a.M.P. 2018-19 01 1}-2018\AMP Non-Res.7oth Pton-NR Pg_27/26
Name or tne (Rttb )
Division
(1)
5t.
No.
l\ame oi the YvorKs AmounL RemarksRequ'ired n7i
(4)(7) (3) (s)
Kantabaniji
Sonepur
S/R to.....1 DAO office at Titilagarh Repair work , CC
Drain & Ceting work
2 SDVO office at Titilagarh Renovation of CattleShed / Ftoor work.
3 Revenue office at Kantabanji4 CfO office buitding at kantabanji
Total=S/R to.....Dy. Dire-tor lgriculiure Otfiie at Sonepur
2 Excise Superintending Office at Sonepur
Stat'sti9 Offilgjrt Sonepur
PWD Sub-Division Office at Sonepur
RTO Office at Sonepur
5.00
7.00
4.00
5.00
21.00
1 2.00
,-oo2.003
4
5
6
2.00
3.00
Otd Buitding ofSonepur
district Treasury Office at 3.00
7 Agricutture Olfice atACCT Office Buitding
alaahgrajollat Sonepur
2.00
8 3.00
9 District P[anning Office 3.00
10
11
ARCS Office at Sonepur 3 00
oo
0o
CDMO Office at Sonepur 2
12 District Veterinary Office at Sonepur 3
Total= 30.00S/R to.....
Kalahandi 1 lnfection ward of District Head Quarter 3.00
HospitaI at Bhawanipatna
Z CHC at Junagarh 10.00
3 S/R of P.P. Centre at DHH at Bhawanipatna 4.00
4 Labour room and Cabin of SDH at Dharamgarh 2.00
5 S/R of Homeopathic Office at Bhawanipatna 2.50
6 5ub-divisional hospital at Dharamgarh 3.00
7 TB ward of DHH at Bhawanipatna8 S/R such as Votty Bal.t Fietd forAcademic Btock
of Govt. Engineering cottege at Bhawanipatna
9 Govt. Enqineerinq cotteqe at Bhawanipatna
10 A/R to Revenue lB at Bhawanipatna
2
1
00
00
2.00
2.00
TOTAL 31.50
me OT tne (NcD/
Di'.,isior
Khariar
Balasore-l
:t.l\l^
I',tame oi irre v{ o TKS All-LOU n t R,emarxs I
(3)
SiR to.....1 CHC at Khariar Road such as Constn.of
Compound waIt.
2 Circuit house at Nuapada.
3 (R&B)Su b- Division office,Khariar4 Revenue rest shed such as Compound wer[[
raising at Nuapada.
S Office Btdg. of Agricutture Depit- at Nuapad;i
Requ;red
2.77
(5)
4.58
4.93
2.21
3.00
S/R to.....1 Repair and
Buitdingat lTl
Total = 17.OO
Renovation to lTl Hostel 0.50Ba[asore
0.50
14.67
2 Repair & Renovation to the witness sht:d
(Function as Bar Hatt No-3) inside theRevenue Buitding Comptex Batasore such as
Extension of Portico
3 Repair lnst'itution Buitding for CTE Batasore(Such as C. Wat[ Drain & Road work)
(2)(1)
4 Repair & Renovation to Tahasil Offi:eBuitding Batasore (Such as Raising of Floors
and cotouring )
8.70
5 Repair & Renovation to PWD (Re.B) Sub-
Division Office approch road at Batasore
7 Repair and Renovation to SDH buitding w thatt Wards at Nitgiri such as Ptaster, Ror:f,
Watt, cotour, Door &. Window damaged etc.
2.66
6 Repair and Renovation to constabte barrack 2.47at Sub-Treasury Soro
3. 50
Totirl= 33.00S/R to.....
Balasore-ll I Sub-freazury Buitding at Jateswar 5.00
2 R/R to ANM Training center at DHH ,Batasore 5.00
3
4
5
R/R
F.i R
R/R
to T. B Hospital & ward at Balasore
to Sutrlrat I l,-:spitat at Da[rsor .to R.T.O Off ice at Ba[asore
5.00
s.00
s.oo
25.00
E:\C.E.(B)\SPR\2018 19\AMP 2018 19\A M.P 2018 19 01 1G2018\aMP Non-Res thh Plon NR
Total=
Ps_22/26
(4)
E:\C-E-(B)\SPR\201&19\AMP 201&19\A-M-P.-2018-19 O1-1G2O18\AMP Non-Res.1oth Plon-NR Pc_23126
I\ame oT rne (KutJ)
Division
5l l.tame or tne vv orKs AmountRequired
iiemarksNo @
(1) (2) (3) (4\ (5)
Bhadrak
Mayurbhanj
S/R to.. ...1 Veterinary Dispensary office buitding at
Basudevpur
2 C.H.C. Buitding at Chandabati
3 Post Mortum Centre at Dhamnagar.
4 Fire Station Buitding at Basudev pur ( Repair& Renovation of Main buitding)
3.00
4.004.00
3.00
S/R to.....Collectoiate buitding at Blripada(work suchas E-Ce[[ inside Touzi & part of EstablishmentSection with BWR pty with mica)
Total= 14.00
4.90
4
2 DWO Office Buitding at Baripada 4.00
3 Statistics Office at LIC Cotony Baripada 4.90
Soi[ Chamist Office at Takatpur 4.50
5 Repairs to Revnue Rest Shed office Building 2.50at Udatap.wo. suuoivision tlo-ii, sirip;aa .6 3.80
7 G.E.D. Section Office at Gotapbag, Baripada . 2.00
8 S/R such as repair to D.G. Sheed for DHH at 3.00
Baripada.
9 Treatment Shed & NPZ Room for C.D.V.O.Office at Baripada
10 S/R zuch as providr'ng fiting & fix'ng of C.C.
tite on back side path & dead bodypreservation front path for DHH at Baripada
4.90
3. s0
11 Repairs to UGCTE Office Buitding at Takatpur,Baripada (Such as grading any roof stab)
4.70
12 rSrgt" r99,.1ne ?gqlt,Femate Surgery Ward at
t E!, hripgdaDHH, Baripada
3.00
13 3.50
14 GED Sub-Division Office at LIC Colony, 3.89
Baripada
15 Leprosy Ashram Buitding at LIC Colony, 7.90Baripada (Mait Ward)
16
17
Repair to Horticulture Office at Udata .
SDVO Office at Udala .
3.00
2.50
18 SDH such as repair of Pediatric Ward at Udata 2.50
^1se of ine (^ab)
Di\/isrcn
liame of the Vr'o rKs
24
Rairangpur 1
(3)
19 SDH Udata such as constn. Of CC i-oad front ioOPD Btock to Medicine Ward at Udata .
20 SDVO Office suich as repair of Hechery atUdata for
71 Tahasit Office such as cotouring of OffireBuitding at Udata .
22 UdaLi Horticul.ture Office sucn ai repair ()f
Office buitding at Udata .
SOn Uaata sucfr as iupptying ana fl*ing offtooring infront of Office at Udata .
SDH Udata such as constn. Oi CC road OF'D
Btock to Medicine ward at Udata .
')?
S/R to.....Femate ward oj i9Ht RaigqqqurEye ward in SDH, Rairangpur
Pediatric wgrd in SDH, Rairangpur
Oq!99, UgLO,rg of SDH, Rairangpur
Main OJin SDH, Rairangpur
Medicine ward of SDH Rairangpur
Mate surgery ward of SDH, Rairangpur
7
3
4
5
6
7
8 Renovation of main gate SDH, Karanjia9 maternity OPD, Xray, tabortary, conferen,:e
ha[[ etc.of SDH at Karanjia
(7)(1)
Amoul-iL
PecuireC
3.00
7.70
2.00
2.81
2.50
hemar(s
5
Tota l= 79.OO
2.00
2.00
3.00
2.00
1 .50
1 .50
2.00
2.00
3.00
S/R to.....Total= 19.00
Keonjhar 'l Repair to Chitd Protection Unit Buitding at 5.00
Keonjhar.
2 Repair to Etection Office, Store, Watchm,an
Shed at Keonjhar.
3 Setttement Office Buitding at 3.00
4 Excise Superintendent Office at 2.00
5 Repair to R.T.O. Office Buitding at Keonjhar. 3.00
6 Repair to 40 Seated Boys Hostel of O.S.M.E. atKeonjhar
7 Repair to Mental Ward at DHH, Keonjhar.8 Repair to S.D.H. with Subsidiary Btdg. at
Cha mpua
Repair toKeonj har.
nepair toKeonjhar.
E.\C.E-(B)\SpR\2018.L9\AMP 2018.19\A.M.P. 2018-19-01.1G2018\AMP-Non-Aes.1)th pton-NR Pg_za/26
4.00
5.00
3
4
00
oo
(4)
iran rc oi ihe 1ir,:-;Division
)i.
No
liaaila al ir a i. -i-^S .riii-LO;i,a
Req u; re d
-.-- ,.- Itr):(1) \7) (3) (4) (s)
9
10
11
12
13
Repair to Bloccj Bank a Admin jsti-ai ivc Blockof S. D. H. Champua
Repair to ACTO Btdg. at Champua
Repair to TahsiI office at Barbil
Repair to Otd vety Dispensary at Barbit
Repair to DDM Office Buitding at Joda
Repair to Dispensary bldg at Barbi-Total= 56.00
3.0c
3. 00
4.OO
5.00
00
00
14
5
7
S/R to.....Ghatagaon 1 R/R to 5.D.V.O office buitding at Ghasipura . 5.00
2 R/R to l.T.l Buitding at Satapada (Work shopbuitding )
10.00
5.003 Constn. of C.Wat[ of sub- cottector office Backs'ide at Anandapur.
4 R/R to Sub-Register Office Buitding at 5.00Anandapur.
5 R/R to Sub-Treasury office Buitding (Such as
Constn. of Toitet & Raising of compound watlat Anandapur .
5.00
Totat = 30.00S/R to.....
Sundargarh '1 Cotlectorate Buitding at Sundargarh
2 Sub-Cottector Office Building at Sundargarh
4.O0
3.003 Revenue lnspector Res - cum - Office Buitding
at Rajgangpur3.00
4 DRCS & ARCS Office Buitding at Sundargarh 4.00
5 R&B Executive Engineer Office (Conference Hat[,
Rajgangpur Setting Office, Hemgir - Sub Divisionoffice)
4.00
6 DAO, Office Buitding at Sundar garh 2.OO
7 Seed Godown at Sundargarh
8 Dist. Agricutture Office Buitd'ingRajgangpur
3.00
a z.o0t
9 Govt. Hospital Buitding at Rajgangpur 2.0010 Legat Meterotogy at Rajgangpur 7.00
Total = 29.00S/R to.....
Rourkela 1
7
R.T.O office. Udit naear
Fire Station Office Buitding at Bonai
4.O0
4.00
3 Civit Defence Office at Rourkela 3.00
E \C.E (B)\SPR\2018-19\AMP 2018-19\a.M.P.-2A18-19-24-07 2018-CD\AMP-Non-Res.1Oth Pton-NR
4.00
Ps 2s/26
4 Excise Office buiLding at Rourketa
r':',- il Ou;-i rai- e;-\S
(5)
- :l it':_aa
{1) t7)
5
6
7
8
9
(3)
5ub-Coitecior office at [ioiaiSub Treasury olljce at Bonai
SDVO office at Bonai
Sub-Cottector office at panposh
Deputy Labour CommissionerRourketa.
Office a t
5.00
3.00
3.00
5.00
4.00
10
11
17
Veterinary Hospita[ btdg. at 5.T.1. Rkt. 5.00Dist. Agricutture office at Bonai 3 .00
Speciat Circuit House at panposh; Rourketa. s.00
'13 PWD Sub-Division Office Panposh, Rourkela. 5.00
14 Veterinary Office,Biramitrapur.15 l.T.l. R.l hostel at Rkt.
4.00
5.0016 Tahasil Office at RKL 5.00
80.04816.40
)0)6.\b \
Chief EngineeOdisho, Bhubaneswor
(Buildings)
17 R.l. office at Uditnagar, Rourketa. 3.0018
19
20
Horticulture Office Panposh.
Mining Office at Rourketa.
PWD (R&B) R.C. Sub division, Rourketa.
3.00
3.00
5.0071 workshop U.G.l.E,Rourkela 5.0022 D.l.C. Office buitding at Rourketa. 4.0023 Deputy Commissroner of Commercial Tax at
Rourketa.5.00
24 Testing Laboratory at Panposh.
25 A.D.M. Office at Rourkela.5.00
5.00
Total,= 105.00Non-Residential Bui ldings'=
Grand Total"
t:\C E.(B)\SPR\2AB B\AMP 2018.L9\A.M.P.-2018-19 24 07 2O19-CD\AM?.Non-Res lOth plon-NR Pg_26/26
4
t.4J
STATEMENT
Periociica l- Non- R.esdientia I Buildings v(Rs. in Lakhs)
AmountRequired
RemarksName of the (R&B)
Divisionsl..
No.
Name of the Works
(4) (5)(7) (3)(1)
Puri
S/R to.....1 S/R to Circuit House at Puri 4.00
4.002 l.D.H Buitdingrenovation
Superintendent office
3 D.H.H at Puri
A iurl 1naal Olvision a Sub-division office5.00
5.00
3.00
5.005 C.D.M.O Office at Puri
6 Sub-Cottector Office at Puri
7 Repair & renovation of OLA Guest House (Out
House) at Puri
5.00
Total= 31.00
S/R to.....Khurda 1 D.H.H. Khordha (Such as internal roads
renewal coat infront of M.C.H &. Main buitdingof D.H.H)
CHC Medicat building at Jatanr-
3.00
2 2.00
3 Sub-Trasuary buitding at Jatani 2.00
4 Asst. Director of Textile office at Khurda 1.50
5 CDVO office at Khurda 1 .50
Total= 10.00
S/R to.....Nayagarh 1 Coltector office Buitding at Nayagarh 1.00
2 FeMate Surgery ward of D.H.H at Nayagarh 0.50
3 Eye ward of D.H.H at Nayagarh 0.50
4 5.D.V.O Office buitding at Nayagarh 1.00
5 Tahasit Office at Khandapada 1.00
6 Sub treasury Buitding at khandapada 1.00
7 Vetrenary Office at Khandapada 0.50
8 .Vigilance Unit office buitding at Nayagarh. 1.00
9 ADT office buitding at Nayagarh. 0.s0'10 Veterinary Dispensary Buitding at Daspalta. 1.00
11 Homeopathic Dispensary Buitding at Daspatla. 0.50
12 Agricutture office Buitding at Daspatla.
13 Medical office Buitding at Daspatta.
0.50
0.50
oJ01o.0o
14 Sub registration Office at Khandapada
Total
E:\C.E.(B)\SqR\2018-19\AMP 2O18 19\A.M.P.-2018 19 01-1G2018\AMP Non-Res.Petiodicol NR Pg_7/L7
AmountRequrreo
2.12
4.46
2.51
4.56
(5)-
Remarks
4.61
4.81
2.74
4.88
4.99
2.93
2.12
3.56
3.03
z.sa
2.31
3.78
3.94
4.95
3.01
2.75
1.08
Total = 82.003.00
3. 50
(1) (2t
).)\ Name of the (RtrB )
Division
Bhubaneswar- |
5t
lrO
Name of the Works
(3)
1 State Museum buitding2 Olo SE RWSS at Unit-lll3 New PWD Colony such as garage 6 nos
4 Office of the Chief Architect Odisha in Nirma.rSoudha at unit-V
5 5R to HOD Buitding at Unit-V6 lnstattation of 4lvlM AC and lmpvt to Director
of Local Fund Audit
E Procurement buitding at unit-VN/R buitding to the O/o lmptementaryFactory at Satyanagar
N/R buitding to lmptementary Factory a-Satyanagar
10 E-procurment Cett Buitding at Uniilv11 Nirman Soudha at unit-V12 Dr AC Homeopathic Medica[ Cottege and
Hospital at unit-lll13 E-Procurement cetl buitding at unit-V 4.90t a StaiiSetection Commission office at Hatt No- I 5.00
in unit-V
15 Toshati Bhawan at Satyanagar16 Toshati Bhawan at Satyanagar17 SR to approach road at back side of E-
procurement
18 Dr AC Homeopathic Medical Coltege andHospital at unit-lll
19 Disttict Labor office at unit-lll20 Nirman Soudha at un'it-V21 Dr.A.C Homeopathic Medical Coltege &
Hospital unit-lll BBSR
: 22 Dr.A.C Homeopathic Medical Cottege &Hospita[ unit-lll BBSR
23 Dr.A.C Homeopathic Medical Co[tege &Hospita[ unit-lll BBSR
Repair & renovation of Registration count€,rat CapitaI Hospitat Bhubaneswar
Observation room & waiting space of Casuattyet Capitat Hcspitat Bh'.rbanesrtar
3 Repair of MS gate Capitat hospitatBhubaneswar
7
8
9
Bhubaneswar-ll 1
7
E:\C.8.(B)\SPR\2O18-19\AMP 2018.19\A.M-P--2018 19 O1.1G201B\AMp Non-Res periodicot-NR
2.00
PE_2/77
(4)
SI,
No
Name of the Works
(1) t7) (3) (4) (5)
6rName of the (R&B)
DivisionAmountRequired
2.00
Remarks
4 S/R to Male Medicine ward at Capitat Hospitat j.00Dlrria,te:vrai
S/R to Surgery wardHospitaI Bhubaneswar
S/R to Surgery warJHospitaI Bhubaneswar
7 S/R to ICU of Capitat Hospitat BhubaneswarReplace ment of entrance door & repair ofwaiting room
5
6
(mate )
(femate )
at Capital 2.50
at Capital 1.50
8 S/R to Nationa[ Vector Borne Disease ControlProject office Unit-6 Bhubaneswar
2.50
9 S/R to Orthopaedic MateHospitaI Bhubaneswar
ward at Capital 2-20
10 S/R to Cancer UnitBhubaneswar
of Capital Hospital 2.50
11 Peadiatric wardBhubaneswar
at Capitat Hospital 2.O0
12 S/R to IDH of Capitat Hospitat Bhubaneswar(Repairing of door & windows
1.30
Total = 28.00S/R to.....
Bhubaneswar-lll 1 5/R to RIPAE&.S Office Buiding at Nayapatti, 3.00BBSR
2 S/R to Standard Testing Laboratory Buitding,C.S.Pur, BBSR
3 rSlR to Gopabandhu Academy ofAdministration , C.S.Pur, BBSR (Such as repairto Brahmani Hostel outside providing At. door& window , 1"15 gritL gate and repair of drainwork )
2.00
3.20
4 S/R to Gopabandhu Academy ofAdministration, C.S.Pur, BBSR (Such as repairto Teaching Btock and arround main buitding)
o1
and
2.00
5.005 5/R to GopabandhuAdministration, BBSR (Such
treatment to Admn. Btdq)
Sr R to GopaoancihuAdministration, BBSR(such
renovation of Dy. D'ir. Room)
Academy ofas anti termite
o Acaderny
as repair
i:\C E.lB)\5PR\2O18 19\AMp 2018 19\A.tt1 p 2A1B 8.21.07 2O1B CD'/h4p Nonie pe.rcdtcot Nc Pe_3/17
4.du
st
No-
Name of lhe Works Amou n tRequ r red
4.50
3. 50
28.00
1.91
lRemarksName of the (R&B )
Divisto n
(2) (3)
7 SIR to GoPabandhu AcademY of
Aomtnrstrattoir, dijSiilSuci, d> rcpni, i-o !tr.,')conf ernece hatl No 1 ,7,3 &" 4\
8 S/R to GoPabandhu AcademY 'lfAdministration, BBSR(Such as construction lfParking area
' ,o,u,=
S/R to.....
(s)
ghubaneswar-tV t S/R to Vivekananda hatl of sainik school
2 S/R to Academic Btock of sainik school 7.70
3 S/R to masonary Dustbin of sainik school 0.99
4 S/R to compound Watt of Sainik School 1'57
Garbege road side
5 S/R to Gritt fixing to Hockey Stadium side
of Sainik Schoot, BBSR.
2.00
6 Repair of compound watt Sainik School Main 1'57
Road Side
7 Sainik School C Wat[ transformer 1.39
8 Schoot Verandah Painting Sainik School 1.00
9 Ba'itarani Hostel
Coat
such as Outside Weather 3.00
'10 5/R to Zonal dispensary at Saheed Nagar
BBSR such as Leak proof treatment to Buitding
2.80
Tot:r[ = 18.37
Bhubaneswar-V 'l Painting and minor repair school buitding of
Tapoban High Schoot Btock No-1
7.50
2 Painting and mionr repair school buitding, of
Tapoban High Schoot Btock No-2
7.50
3 Painting and mionr repair school buitdinll of
Tapoban High School Btock No-3
2.50
4 Repair to C watt & painting of Tapoban l{igh 2.50
SchooI
5 Repair to C watl & painting of BK cottege Art 3'00
& Crafts
6 Renovatron Biju Pattanaik Open Air ashrant
Total =
3.00
'l 6.00
Cuttack-l 1
S/R to.....Eiri .,a" t.watt of tnlEr rir" oficers ofrice. 3.75
Kanika Chhak
i ijislij!9rlll:'-19 Arii :aai :?\! ttl ' '2C13 1-a 2! 07 2A1q'CD\AMP Nc' F'?''21ac''Di'NF Pg_a/17
(4)(1)
SI
No
Narne of the Works AmountRequired
Remarks
(1) (2) (3) (4) (5)
g*rName of the (R&8)
Div'ision
2 P.P. Centre & Otd Supdr. Office,LuLiack (Ptastenng, V rrrjrreo tiieceramic wat[ tite )
3 Otd Gents Hostet, SCBMCH, Ctc (Renovationto Kitchen & dining hatl of Canteen)
4 Gynecotogy Deptt, SCBMCH, Cutrack (Gradingof Znd floor roof s[ab)
5 Sadar Tahasil Office, Cuttack (Vitrified titeftooring, ceramic watt tite, Novapan boarddoor, At. partition watl to office)
SCBMCH,
t Ioorin g,
). LL
3 .98
4.38
7.54
6 Madhusudan lTl, Cuttack (Vitrified titeftooring, Gypsum board ceiling to Smart classroom)
2.65
7 Madhusudan ITl, Cuttack (Store room,distempering, brick work, painting to doorwindow, out side weather coat, renovation togirts hostet)
4.51
8 '2nos of Office room inside O/O JointCommissioner of C.Tax (Enforcement Range),Cuttack
4.44
9 FamiLy Wetfare Centre, SCBMCH, Ctc Z.O9(Ptastering, ceramtc watl tite)
10 P.G. Hostet, SCBMCH, Ctc (Staintess steel 1.21Ietter)
11 Otd Gents Hostet, SCBMCH, Cuttack(Ptastering, distempering in 1st floor corridor)
2.17
12 P.G. Hostet Btdg of SBW Cotlege, Cuttack(Ftooring, ftush door shutter & griLt fixing)
13 Directorate of Vigilance Office]buitding,Ctc. (Grooves in ptastered surface,painting ,roof grading,rotter blind etc,
2.94
0.74
14 Directorate of VigitancebuiI'ding,Ctc. (Lift wetI machinepanetting,etc,
Officeroom, watl
3.50
15 Directorate of Veterinary, Mangalabag, Ctc 4.90
5.00io Main Buiioing of Disrr ict Tr easury17 District Audit Office & Local Fund Audit
(Repair of GF garage), CDA
a \\c E (Et\sPR\,2C15 :9\At4p 2Ai8-19\A_Ll ? 2015 i,c 24 O7 )C1g CD\Aivlp Nct pe5 pe.tadrcot.Np P e_s /17
5.00
>s,
(1)
Name of the tR&B l
Dtvision
5l
No
Name of the Works Amou n tRequr reci
5.00
5.00
4.00
4.00
5.00
i Remarks I
())(71
18 Banijyakar Bhawan, Otd Sectt, Cutta( k
(ou tslde parnUng-Gr c rt)19 Banrjyakar Bhawan. Otd Sectt, Cuttar-k
(Outside paintinq-4th & 5th ftoor)
20 4nos Olfice room. OPSC. Ctc
21 Memlgrs room, OPSC, Cuttack
22 Wakf Board Commissioner office, Otd Sectt,
(3)
Cuttack
23 G.E.D. Sub-divrsion Office, Old Sectt, Cuttack 4.00
74 GED Section & Store, Otd Sectt, Cuttack
25 Dy. Labour Commiss'ioner office, Otd Sect:t,
Cuttack (Office Chamber)
5.00
5.00
TOTAL 94.00
S/R to.....Cuttack-ll 1 BBR and BM Firm LBD farm 3.26
2 BBR and B frim LBD Farm
3 Directorate of Stationary pubtication
4 S.D.V.O. Office buitding at Banki
4.78
3.96
5.00
5 B.E.O. Office buitding at Banki 4.00
6 OGP Community Centre at Madhupatna,
Cutttack (such as comPound watt)
7 District Labour Office Buitding, Cutta-k, 3-00
Nuapada
3.00
8 HorticuttureNuapada
Office Buitding, Cuttack, 3.00
9 Renovation of waste paper shed [eft side ofGovt. Press Buitding
'10 Renovation of waste paper shed Right side'ofGovt. Press Buitding
5.00
5.00
11 Construction of approach road of waste paper
shed of Govt. Press Buitding
5.00
Total = 45.00
S/R to.....Kendrapara 1 CDVO office buitding Kendrapara
Veterinary Disptgnsarl Kelqapar?Agricutture Deptt.at Kendrapara
DAO office Buitding Kendrapara
DDAO ott rce a[ hencjrapara
6 District Treasury, Kendrapara
1.50
7
l4i
1 .00
1.00
l.oo'l .5r.)
Pe_6/77i\CE.(E)\,SPR\,2C18:?:r":::!l,i-iir.:.': lC:3 192-C-:l:': af,41r!:,.. Res Pettadlcai NP
Tota[=1.00
7.00
5t
No.
Name of the Works Amou n tRequired
Remarks
(71 (3) (4) (s)
e/eName of the (R&B)
-__ Division
(1)
JagatsinghpurS/R to.. .. .
1 D- l. E.T bui[ding,Punanga,Jagatsinghpur.
2 District Judge Office buiIding, Jagatsinghpur
5.00
s .00
3 Way side Amenitycentre(Jaipur), Jagatsinghpur.
at Khandatri 3.00
Total= 13.00S/R to.....
Pani koi li 1 Circuit House Jaj pu r 2.002 DDCA Office at Jajpur Road 1 .50
3 Agriculture office at Jajpur Road 1 .50
4 JCCT Office at Jajpur Road 2.005 ACCT Office at Jajpur Road 2.00
Total= 9.O0
S/R to.....Dhenkana I 1 S/R to R.l office buitding at K.nagar. 3.00
2 S/R to Govt Potytechnic at Dhenkanal 4.003 S/R to Soi[ conversation office at Dhenkanal. 5.00
Total= 12.OO
Angu I
;S/R to.....1 Dist. Treasury, Angul 3.00
2 DIPRO office, Angul 3.00
3 CDVO office, Angul 3.00
4 5ub Registrar office, Angul 4.O0
5 Dist. Education office, Angul 3.00
6 lWork shop building of Govt. Polytechnic atAngul
3.00
7 rVigitance Unit office at Angul 3.00
8 Charge office at Athmal.tik of Excise 3.00Department
9 Veterinary Buitding at Pattahara 4.0010 Repair to R.l office at Tatcher 2.00
Tota[=' 31.00S/R to.....
Charbatia 1 Charbatia (R&B) Division Office at Choudwar 5.00
2 Asst. Executive Eneineer OfficeAthagarh (R&B) 5ub-division
Buitding at 5.00
4.003 Sub-treasury office buitding at Athagarh
Pg 7/7t-E.la!i5r\jrP\trls t9\Atv1P 2o)3 19\A.M.p. 2016 19 24 07.2018-CD\AM' Na.,,F,e\.,'?,ra(itcat NR
Tota[= 14.OO
\7)(1)
Name cf the (R&B )
Division
5l Nane cf '.ne Works AmoLntRequireo
I .00
3.00
3.00
Remarks i
No
(l)S/R to. .. ..
1 P.G Hostel No-2 ot MKCG MCtrH ]tBerhampur
2 District Statisticat Offrce, Berhampu r (Entrac€')
(s)
Ganjam-l
3.00
3 Canteen Btdg inside MKCG MC&H atBerhampur
a approJch road to O.P.D. buitding of KATS atAnkushpur
5 Pediatric Buitding of MKCG MC&H at 1.00
Berhampur
6 Ladies hoste[ of l.T.l. at Berhampur 3.00
7 New Medicine lndoor Btdg of MKCG MC&H atBerhampur
8 U.C.P. Engineering School Computer Science
Btock at Berhampur
3.00
5.00
9 Chest & TB Ward of MKCG MC&H at 5.00
Berhampur
10 Administrative Buitding of LT.l at Hinjiti 5.00
11 I.T.l.,Computer Lab.& Common room at 5.00
Berhampur
12 P.G.Ladies Otd Hostel (Warden Qtr) of MKCG
MC&H at Berhampur
13 U.C,P. Engg. School Extension Btock at 5.00
Berhampur
1 4 District Agricutature Officer, Berhampur 3.00
5.00
15 R.D.C.Office (New Extension) at Berhampur 4.00
16 Deputy D'irector Horticutture Office at 3.00
Berhampur
17 Gents Hostel No.l of MKCG MC&H at 3.00
Berhampur
18 Commerciat Tax Office, Enforcement range,atBerhampur
3.00
19 Textile office buitding at Berhampur 2.00
20 R.D.C.Office Buitdinq at Berhampur
21 Sub-Cottetctor Office,Berhampur2.00
-o
Ganjar-l-r -ii
Totrt:- 73.00
0iJ
2 5ub-DjvisionaI HospitaI at Chatrapur
3 C. H.C. At Purushottampur.
P g_8 /L7:\a:i3)\,5?p\.2018 1_a\AMP 2C1!:9 !rli]'trlt!lr,:,ct(.r:,i;,\_--rej,:.o.r.ir,!q
5.00
3.00
5t.No,
Name of the Works AmountRequired
Remarks
(7) (3) (4) (5)
Uif'lame of the (R&B)Division
(1)
4 Specia[ Repair to R l.T.E. Buitdings at Rangeitundasuch as repair io LUnrerelt(e irait
4.00
Total= 17.OO
Bhanjanagr 1
I
5/R to.....(R&B)Sub-d'ivision office at K.S.Nagar.
PWD iR&.8) Division office at Bhanjanagar3 Sub-Treasury office at Bhanjanagar4 TahasiI office at Bettaguntha
3 .00
5.00
2.50
4.ioTotal= 15.00
S/R to.....Phulbani 'l Girts High School at G. Udayagiri. 1.33
2 Non Res buitding such as repair to R.l officer andAsst. Tahasitdar office at G. Udayagiri.
1.06
3 Govt. Auto Coltege, Phulbani. 0.504 Non Res buitding such as providing steel 1.50
railing at MCH, Phutbani.
5 Non Res buitding such as repair to ANM officebuitding DHH at Phutbani.
1 .50
6 Two Nos Toi{ets of Phutbani (R&B) Section I & 1.817 Non Res building such as repair to Docter's
chamber from ICTC and NRC DHH at Phutbani1 .53
8 Non Res buitding such as repair to maleriaand Skin & VD office buitding with proviion ofone toitet of DHH at Phutbani .
1.39
9 Non Res building such as repair to lT Lab.And conference hatt of GNM schoot buitdingat Phulbani.
3. 38
Total= 16.00S/R to.....
Boudh 1 Sub- Treasury Office Boudh 2.00
2.00
4.00
2 PP Center for DHH Boudh3 Circuit House Boudh ( Gate Portion4 Leprosy Rehabitation Center Boudh 7.005 Excise range Office Boudh 3.00
Total= 13.00S/R to.....
Balliguda '1 5/R to Agriculture Buitding such as washing &painting, repair to Door & window and Leak proofat BatUguda
2 S/R to Non-Res Buitding such as repair ARCS OfficeBuitding at Battiguda.
3.00
3.00
Pg-9/ 17ErlCf.f5.)\SP81-l0r3 i-o:At\4P 20:!.:9\, tvt ? 2C1S 19-21 07.2018-CD\AL,|p Non Res.pena.ltc.t N?
Totat= 6.00
)
) Name of the (R&B )
Drviston
st.
No
Name of the Works
(3)
AmountRequirec
3.00
3.00
3 .00
3.00
lRemarks
(1) t4)
S/R to.. ...1 const. of Retaining u/air at DAvcTE Col[eg,:,
Korapul-
2 Repair & renovation of Science Btock (+l; .11
Govt. Coltege
3 Repair & renovation of Fire statjon office at
Koraput
4 Renovaton of 2 nos. of V.l.P Suits af Specicat
Circuit House
5 Repair & renovation of SCT| Conference hatl
at Koraput
6 Repair & renovation of DNK Guest House, 5.00
Koraput
7 Veternary Hospital at Semitiguda s.00
(5) '
Koraput
3.00
Total= 25.00
S/R to.....Jeypore 1 R&B Sub-Divn. Office at Boriguma (Sl)O 2.00
cham ber)
2 Fire Station buitding at Jeypore. 3.00
3 Asst. Controtter Legal Metrotogy at Jeypore.
4 (R&B) Division Office at Jeypore.
1.00
2.00
5 Repair & Renovation to Addt. Tahasildar 7.00
Chamber at Kotpad
12.00
S/R to.....Nawarangpur 1 R.T.O. Office, Nabarangpur
2 C.D.M.O., Office Buitding, D.H.H. at Nabarangpur
3 Agricutture Office, Umerkote
4 Horticutture Office, Nabarangpur
S/R to.....Malkanagiri 'l Dist Labour Office Buitding at Matkanagiri
5.00
5.00
3.00
2.00
Tot:rl = 15.00
2.00
2 TahasiI Office Buitding at Matkanagiri
3 Sub-Cottector Office Buitding at Malkangiri
3.00
1.00
Rayagada-l 1
7
S/R to.... .
uCr,rtf elitAing i.e inside Painting & repair work
Hostel No-l UGMIT (70ieated)
L-.]le > li.-!Lc'r iOi L-,.-:ir 'r . Ir-r1 J.lu-3
Total = 6.00
3.00
2.00
-.0,i1.004 Dist Employment Exchange, Rayagada such as
Aluminium Parl itioin etc
To:al=
a \C i l]t\,\Pt1.2013 19l4A,rP l0l.l 19\AA4F 2A18-19 24'A7 2.'1a C9\,1r,ii ni.1 ii-\ r,tadt.ai t,tR
8.00
Pe LO/77
-l
Name of the (R&B)
Drvisior-r
Amou ntRequired
Remark{5t.
No.
Name of the Works
(4) (5)(7) (3)(1)
Rayagada-ll
Paralakhemundi
S/R to.....'l R/R to Sub Division HospitaI Gunupur
Total=
S/R to.....1 Dist. Sub-Registrir offrce at Paralakhemundi
2 Repair &. Maintenance of Dist. Emptoyment
office,Ranipeta, Pkd.
3 Repair & Maintenance of out door of DHH atParalakhemundi.
5.00
5.00
2.00
1.ot
2no
4 Repair & Maintenance of District Labouroffice buitding at Paratakhemundi.
Total= 7.OO
S/R to.....District Auditorium Sambatpur such as fixingof Paver Btocks at the parking area ofAuditoriu m.
Supptying &. fixing of Vetrified tites eAtuminum Openable windows of Ladies
Hostel, O.M.C.H&R. Centre at MajhipatiSambatpur . (Ground Floor)
3.78
2.O0
Sambalpur-l 1
,z 2.97
3 Retaining wa[[ and Concrete road of P.M Trainingcottege at LIC cotony, Motijharan, Sambatpur.
3.93
4 Repair & Renovation the Office Buitding of 3.95
Deputy Commissioner Commercial Tax,
Sambatpur Circle No. 1, Sambalpur.
5 Repair to Drain & Fixing of Paver Btock of 3.37
Addt. Commissioner Commercial Tax Office,Sambatpur.
6 Euctr "ar
Proviaing Pindi, fixing Stiding type 3.00
windows & Painting works at office of theDistrict Registrar &. Marriage officer,Sambatpur.
Total- 21.00
S/R to.....Sambalpur- ll 'I N/R buitding such as providing &. fixing steel
letters to both side entrance gate ofVlMSAR,Burta.
2 N.R. Buitding such as providing tarfettingtreatment to top roof stab of Boys Hostel No.2
of VIMSAR, Burta.
2.75
4.78
,.4
E:\C. E.(B)\SPR\2018-19\AMP 2o18-19\A.M. P.-2o18 79-01-1G2O1g\AMP-Non Res Peiodicot-NR Pc-u177
(1) (7)
me of the (R&B )
D ivisrorrName of the \r/orks
i\io
(3)
3 N.R. Buitding such as renovation to Recorrlroom, SPM, OPD, Repair to OPD portion [rSNCU, Btood Bank and ptatform for watrertank at roof of OPD & lndoor Buitding of VSiIMSAR, Burta.
4 N/R buitding such as repair & renovationMRI room of VIMSAR,Burta .
5 N.R. Buitding srch at repair of Pig FarmSLBF Chiptima
6 N/R buitding such as repair to canteen [iproviding cover slab to the existing drain nearlG auditorium of VIMSAR .
7 N.R. Buitding such as providing vitrified an,lwat[ tite and minor repair to Hostel No.ll & lllof LITC of SLBF Chiptima
8 N/R buitding such as leak proof treatment tcLibrary buitding of VIMSAR,Burta .
9 N.R. Buitding such as approach road anCpainting to Diary farm office at SLBF Chip[ima
10 N/R buitding such as repair & renovation ofLibrary Building of VIMSAR,Burta .
11 SD. Hospitat buitding at Kuchinda
TOTAL=S/R to.....
Deogarh 1 CDVO Office Deogarh
2 Dy. Director of Agricutture office at Deogarh
3 Horticutture Office Btdg
Si AmounIRequlrecl
4.57
5.17
4.85
3.50
3.50
4.71
Remarks j
(5)-
tr:
of
774
3. s0
4.95
47.OO
4.00
4.OO
3.00
Total = 11.00S/R to.....
Jharsuguda 1 Outside colouring of lTl 3.00
1.002 (ReB) Storage Godown at JharsugudaI Workshop Buitding at Jharsuguda Engineeing Schoot
4 District Agriculture Office at Jharsuguda5 DLO Office at Jharsuguda6 Excise Office Jharsugudi7 Minins Office Jharsusuda
S/R to.....
f:\C. E (B )\SPR\2O18- L9\AM P 2O18. 19\A.lt1. P-.2018-19-01-10- 2018\AM p Non- Res. perbdjcot- NR
Total=
PC-72/U
2.00
1.00
2.00
1.00
2.00
12.00
\,r
(4)
Name of the (R&B)
Division
(1)
Baragarh 1 Dist. Agrrculturef Office Bargarh such as
wasn rng and palnttng.2 A.G.C.S.Office Buitding Bargarh (Co-Op.
Deptt.) such as Construction of Compoundwat[.
3 S/R to H.E.T.C. Buitdihg Barpali such aswashing painting and repairing to kitchen &Mess of D/S Hostel Buitding.
4 Veterinary Hospital Buil.ding Barpali such aswashing painting to Compound watt OffjceBuitding Anima[ Treatment shed.
2.00
1.00
2.00
2.00
5t
No
Name cf the Works Amou n tRequired
Remarks
t7) (3) (4) (5)
5 Tahasil Off ice Buitding Barpatiwashing,painting to FacititationOffice Buitding.
such as
Centre &2.00
6 District Treasury Office at Bargarh 2.007 D.l.P.R.O. Office at Bargarh 2.008 Tahasil Office at Attabira. 2.009 Ladies hostel at D|ET,Bargarh 2.O010 Tahasil office at Padampur 1.001l Sub-Cottector office Padampur 2.0012 D.A.O. buitding Padampur 2.0013 Fire station building at Padampur 7.00
Total= 24.OOS/R to.....
Bolangir 1 District Emptoyment Exchange, Batan gtr 5.002 Live Stock lnspector of
BatangirVeterinary Deptt., 5.00
3 District Labour office ,Batangir 5.004 District Social Welfare office Buitding Batangir 4.005 RITE Boys Hostet, Batangir 2.00
Total=' 21 .O05/R to.....
Kantabaniji 1 Eye Hospita[ at Tititagarh 3.007 Btood Bank at CHC Kantabanji 3.003 AC Cabin SDH at Tititagarh 2.00
Total= 8.O05/R to.....Repair and Renovation of COrrlO, ,qOmO Oiflce it 3.OO50nepur
Sonepur 1
2 Section Officehome)
at Uttunda (Occupied to Govt. 3.00
3 Rl Office at Sonepur
E'\C a.(Bl\SP?\2A15-131\Arr1,D 2C1g 19\A M.p 2013 19 21 07-2A1E CD\Atv,tp.t\tan Res per@(itcot-t,tR PC 73/11
4.00
e)-
i.lame of the I R&B )
Division
Kalahandi
sl Name of the Works A.rountRequirecl
I Re n., a r-k s i
No
17) (3) (4) (s)
4 Patjent Ward / OT at CHC, SonePur
Tota i=
4.00
14.00
3 .00
2.00
2.00
2.00
2.00
2.00
tbo
S/R to.....1 CHC at Kesinga
2 Veterinary Office at Dharmagarh
3 CotLectorate Buitding at Bhawanipatna
4 DPMU Office at BhawaniPatna
5 TahasiI Office Buitding at Junagarh
6 Tahasit Office at Dharamgarh
7 RTO Office at Bhawanipatna
8 Statisticat Office at Bhawanipatna 2.00
9 Cottectorate Building Main Gate at 2.00
Bhawanipatna
10 Conference Hat[ at Bhawanipatna 2.00
11 Tahasil Office at BhawaniPatna 2.00
TOTAL 23.00
KhariarS/R to.....
r coLGct& UuiLaing at t'lr"piAu2 D.H.H.at Nuapada
3 District Etection office at Nuapada.
2.00
3.00
2JO
4 Sub-Cottector Office B[dg.at Nuapada 1.00
5 Sub-Treasury Btdg. at NuaPada 1.00
Tota [= 9.00
5/R to. .. . .
Balasore-l 1 Repair and Renovation to Vetrinary
Dispensary Buitding at Soro such as repair ofgodown
3.00
2 Repair and Renovation to the District PulticRelation Office Batasore for 7018'19 (
Extention for a Parking shed)
2,00
3 Repair & Renovation to 5.D HosPita[ such as
Construction of Gate
1.00
4 Repair and Renovation to Agricu[ture God':wn
at Nilgiri such as
Plaster, Roof ,WatL,cotour, Door & WinCow
damaged etc.
Repair and Renovation to 5ub-Collector 0lficeBuitding at Nitgiri such as
F',asLei ,Ro,-ri,ivalL,uolout ,Do,.-rr E W ti',lovr
damaged etc.
4.O0
5 5.00
E)\C.t (8)',5?A\2A13 19,AMF :iE 1)\A I:: tr 'r'l!r i9 -?'.i Ai 2Oi3 Cr\At4e t1.. Fe\-pea.dt.dl NR Pg-14/17
Name of the (R&B)
Division
(1)
S/R to.... .
Balasore-ll 1 R.l. office at Jaleswar2 Agriculture Office Buitding , Balasore
6 Repair and Renovation to Tahasitdar Officebi.,rliiir-rg aL iir[grri such as ptas[er,Roof , Wat[, colour, Door & Window damagedetc.
5 .00
Total= 20.00
2.00
3.003 Dist. Labour Office Buil.ding,Balasore 3 .004 O.T room at DHH ,Batasore 3.005 Ayurvedic Dispensary Buitding at Bts. 3.00
Total= 14.OOS/R to.....
Bhadrak 1 Sub-Register office buiLding at Dhamnagar. 3.002 Veterinary Dispensary buitding at Bhadrak. , 3.003 Vererinary Office, Dhamanagar 5.004 Track-Court Buil'ding at Bhadrak. 3. s0
Total=, 14.5O
5t.
No
Name of the Works RemarksAmountRequired
(7) (3) (4) (5)
S,rR to.....Mayurbhanj 1 S.T. School at
Gate )
Baripada. (Construction of 2.90
2 Cotlectorate buitding at Baripada . 3 .003 Witness shed and Re-Construction of Damaged
compound wa[[ of Tahasil Office at Baripada .
2.00
4 District Planning Office at Baripada .
5 Additionat Btock of DCCT Office at Baripada .
2.002.50
6 Such as repair renovation to Out House forCircuit House, Baripada .
4.90
7 Special P. P.Office(Vigitance) at Baripada. 2.008 G.P. and DIPRO office at Baripada . 2.009 Leak Repair of roof & Con. Of C.C drain for
kitchen room at D.H.H, Baripada.10 Main buitding & compound watt of p.C.l.T.l at
Baripada . (Such as painting to inside)
11 Work shop Building of P.C.l.T.l at Baripada . 4.00
12 Laboratory Buildrng ot D.H.H at Takatpur 2.90Baripada.
4.00
4.90
€.\c.E (B)\SPR\2O18 tg],AMp 2013 lg\A.M p. 2O1E 19 24 O7.2O|8-CD\A^4P No. R€s oetadtct NR Pg_1s/L7
Total= 37.00
(7)(1)
.Zfia me of the (R&B I
Division No
Rairangpur
Nanre of the Works
(3)
Amou n tRequrreo
Remarks
I
(5)
S/R to. ....1 Sub-Regrstrar Otijce burictng ar Ratrangpur :).fu
2 (R&B) Division Offrce at Rairangpur (
Construc[ion of Main gate )
3 Storage godwn of R&B Sub-Division atKaranjia (Near Sub-Division campous )
4 Kitchen Btock of SDH, Karanjia 2.00
Total = 10.00
S/R to.....1 Repair to 5ub-Cotlector Office Building at 2.00
Keonj har.
2 Repair to Horticulture Office at Champua 4.00
2.50
2.00
Keonj har
3 Repair to Sub-Treasury Office at Champua 3.00
4 Repair to Record room at Barbil 3.00
5 Repair to 12 beded Hospitat at Barbil 3-00
inctuding O.T. Passage
6 Repair to 2 Nos. extra room at Go'/t. 2.00
Dispensary btdg at Barbit
7 Repair to 30 beded Hospita[ at Joda 3.00
8 Repair to 2 Nos. Cabin at Barbil Hospitat 3.00
9 Repair to Kitchen at BarbiI Hospital 3.00
Total= 26.00
S/R to.....Ghatagaon 1 P.H.C Buitding at Anandapur. s.00
2 P.H.C.Buitding atD'ispensary Btcok )
Fakirpur (Office & 5.00
3 R/R to (Such as construction of Approach
raod to PHC BuiLding at FakirPUr.
4.00
Total = 14.00
S/R to.....Sundargarh 'l Otd Boys Hostel Building of Govt. Cot[ege at
Sundargarh
3.00
2 Tahasil Office Buitding at Sundargarh
3 Cotlectorate Buitdinq at Sundargarh
4 Sub-Cottector Office Buitding at Sundargarh
5 Dist. Etection Office Buitding at Sundargarh
u lxlrc iup.-riniti'licni O;it:i ;i Sur,iii gith
7 Veteniary Office Buitding at Rajgangpur
8 So'I Chemist Office at Sundargarh .
'1 .00
2.00
2.00
2.00
c
2.00
7.00
:.taEl31\(PF\.201S:9\A^4P2A1t19\\!\rP 2013 19 )1 C1 2313.t:D"At]p N.n Re\ Pettod(ol ^!R
PE_16/77
SI
t4)
@VNarre of rhe (R&B)
DivisionName cf the Wor-ks Am ou nt
Requirecl
1.00
17.OO
4.004.00s,00
Reniarks
(1)
Rourkela
9 Renovat'ion & Repair of Electrical works ofHealth Departmen L
Total =
S/R to.....5.D.VO office buitding Royrkgtg
BTC buitding l.T.l, Rourkela.
PWD (R&B) .C-T Sub divisron, Rourketa.
1
2
3
4 PWD (R&B)division, RourkeLa. 5.00
5 -005 Tahasil Office at Biramitrapur6 Admn. Buitding at RGH,Rourketa. 5.007 U.G.l.E D/5 hostel Rourkela
8 Girts hoste[ No-2 At SKDAV polytechnic4.004.OO
9 Civit Defence Office at Rourketa 5.00
48- 5
408.40
tbs1.81
Chief Eng (Bu
\ildings)
Odisho, Bhuboneswar
10 Kamata Neheru Adivasi women's Hostel at 5.00Uditanagr
11 Employment Exchange Office buitding at 5.00Rourkela
Tota[= 51.O0S/R to Non-Residential Buildings = L-;t.til
Grand Tota[=
t:\C.E (B)\5PR\2A18 rc\A^4 P 2A18.19\A.M.P zAc.E 4A7 20:3 CD\Ait|p Non pet ?encdrcot ^tF
Pg 17 /77
st.
t\o.
(2) (3) (4) (5)
Old- Non Residential Buitdings b1Rs. in Lakhs)
RemarksSI
No.
AmountRequired
Nf.ne of the(R&B) Division
Name of the Works
(1) (7) (3) (4\ (5)
Pu ri 1
7
3
S/R to.....Mate & Femate ward of D.H.H at Puri
Eye ward D.H.H at Puri
l.D.H Buitding at Puri
V.H.F Work Shop in R.P. Line at Puri
5 Repair to lst ftoor of Chitd Court6 Repair & renovation of OLA Guest House at
Puri (Such as fatse ceiting, stiding window &.
atuminium jatty)
7 Repair & renovation of OLA Guest House at' Puri (Such as Ptinth protection, fixing of door &.
tite)
8 Repair & renovation of Sports Comptex at Puri(Such as approach road)
9 Sub-registrar Office at Nimapara
10 SR to Auditorum Buitding at Nimapada
SR to PWD Storage Godown at Nimapada
5.00
5.00
4.00
3.00
5.00
4
5.00
5.00
5.00
5.00
s.00
5.0011
17 4.00SR to Tahasil office Building at Nimapada (Such
as repair to comptetion of ongoing buitdingwork)
13 SR to Approach road of GED Section office atNimapada
5.00
14 SR to Area Hospital Buitding at Nimapada (such
as repair of new block)2.50
l
15 Area Hospital Buitding at Nimapada (New 5.00
16 New Fire Station Buitding at Nimapara 5.00
18 Repair & renovation of Sports Complex at Purifor 2018-19 (Such as fixing of aluminiumroofing sheet) (North Side)
5.00-5-OO
19 Repair & renovation of Sports Comptex at Purifor 2018-19 (Such as fixing of aluminiumroofing sheet) (South Side)
S/R to.....Khurda 1 Otd cotectorate khurda buitding renovation
I CDh\O office l(hordhicotouring
(insicie and ou[ sicic
3 (R&B) Division Office Khordha
4 R.l. Office at Khordha
5.00
Total= 88.50
5.00
5.00
4.505.00
E:\C.E.{B)\SPR\2018-19\AMP 2018-19\A,M.P.-2018-19-01 10 2018\AMP-Non Res-/Old NR Pg_1/a3
, 17 PWD Division Office at Puri
,\ (R&B ) Drvrsron l.lo Required(1) \7)
Nayagarh
(3) (4)
5.00
5.00
29.50
(5)
5 D. H. H. at Khordha (Such as highteen ofCompound watl at doctois qurts )
6 Asst. Dircctor of Teytite office at Khurda
Total,=
S/R to.....1 Cottector office Buitding at Nayagarh
2 Etection ofiice Buitding at Nayagarh
3 Dist Treasury office Buitding at Nayagarh
4 Sub-Cottector office Buitding at Nayagarh
5 Circuit House at tlayagJrh
6 Otd R.T.O office buitding used as RailwayLand acquisition office.
7 D.C.D.R.F buitdihg at Nayagarh.
8 Drug were house buitding at Nayagarh
9 C.D.MO.Office buitding (Admin. Btock) atNayagarh
10 Medicine ward ground floor at Nayagarh.
11 Authopedic ward at Nayagarh'12 Special Cabin buitding at Nayagarh
13 D.l office building at Nayagarh
14 Head Master office building of B.H School atNayagarh.
15 DIET Buitding at Rajsunakhata.
16 Tahasil office at Ranpur
1.00
1.OO
2.00
1.OO
2.00
2.fro
1.00
2.00
1 .50
1 .50
1 .50
1.00
1.00
1^00
2.00
2.0017 OT &. 10 Beded ward at Khandapada. 1 .50
't.00
1.00
'18 Sub treasury Buitding at khandapada
19 Govt Press at Khandapada
_2! V91re-nqry Off ice atl(handapada21 Record Room at TahasiI office at Khandapada.
1.00
1J0
27 Sadar Dispensary office Buitding at 1.00Khandapada.
Total= 30.00
Bhubaneswar- |
S/R to.....1 S/R to Chief Etectrica[ lnspector Buitding at
Unit-V
2 S/R to Chief Etectrical lnspector Building atUnit-V
3 S/R to Text Book press at Satyangar
4 SrR to NrR bur[drng to tlre Type-rrr Eitock No-7at UNIT-1
4.68
2.57
4.95
4.60
5 S/R to Otd Assembty Sardar Patel Hatt in Unit-ll 4.95
E:\C.E.(B)\5PR\2018 19\AMP 2018-19\A.M P.-2018 19 01 10 2018\AMp-Non-Res./Otd NR PE_2/a3
(R&B) Division No.
(1)Required lIl
(2) (3) (4) (5)
S/R to Toshati Bhawan at Satyanagar
S/R to Bhubigyan Bhawan at unrt-V
S/R to Ladies Hostel at BJB Cotlege
S/R to Sectt Tranning lnstitutre office buitdingin unit-ll
S/R to Utkal University of Cutture in unit-llS/R to O/O the Asst Engineer iecGon No-1 inu nit- ll
17 S/R to DR AC Homeopathic Medical Cotlege andHospita[ at unit- lll
13 S/R to BCDD OFFICE BUILDING lN UNIT-ii 5.0014 S/R to Dr AC homeopathic Medical Cottege and
Hospital at unit-lll15 S/R to Nivedita Hostel at Unit-V 4.1816 S/R to e-Procurement CetL buitding at unit-V 2.65
17 SlR to o/o the EE GPH Division inSoudha at unit-V
Nirman 4.98
18 S/R to Dr. ACHMC & Hospital in Unit-lll 2.12
19 S/R to DirectorBhawan at unit-V
of Geotogy of Bhubigyan 3.53
20 SiR to N/R buitding to the o/o the EE
(Agriculture in premises of lmplement factoryat Satyanagar
21 S/R to N/R buitding to the o/o the Co-'Opeartive Tribunal at Kharaveta Nagar
3.54
22 R/R of the C.E.O. Odisha (Home etection) 3.4623 S/R to O.L.A. Buitdi ng in Unit-V
6
7
8
9
4.50
4.71
3.03
4.99
10
11
4.13
3.84
2.95
2.66
4.89
2.99
24 S/R to Natinidevi Women Cottege in Unit-lll 2.8725 lnstaltation of 4lvi[4 AC
of Local Fund Auditand lmpvt to Director 4.88
26 S / R to o/o the Director of Employment in unit-ilt
4.79
27 SIR to Kuntata Kumari Sabat Adivasi hoste[ inUnit-ll
28 S/R to Secretariat BuiLding such as Renovationwork in R.D. Deptt.
29 S/R to Secretariat Recreation Ctub in Unit-ll
30 5/R to Toshati Bhawan at Satyanagar
5.00
5.00
5.00
31
32
33 S/R to TTI at Laxmisagar 9Guest House)
Si R to BJB Cottege
S/R to Kuntata Kumari Sabat Adibasi Hostel
34 S/R to Toshati Bhawan at Satyanagar
4.83
5.00
5.00
2.66
4.83
E:\C.E.(B)\SPR\2018-19\AMP 2018-19\A.M.P.-2018-19-01-10-2018\AMP-Non-Res./Old NR Pg_3/43
(R&ts) Division No.
(1) (7t (3)
35 S/R to o/o the DIRECTOR OF Geotogy irBhubigyan Bhawan at unit-V
S/R to OFFICE OF THE Director of Geotogy irBhubigyan Bhawan at unit-V
S/R to Toshati Bhawan at Satyanagar
Repair to plinth protection at back side of E-
procurement
36
39 5/R to O/o th Directorate of Geotogy irBhubigyan bhawan
(4)
4.32
3.1 3
(s)
1-7
?a3 .93
4.40
4.89
3. 3640
41
5/R to TTI at Laxmisagar
S/R to ACHMC & Hospital in Unit-lll 2.84
42 SIR to Nirma Soudha at unit-V 4.944.4143 S/R to Junior Boys Hostel of BJB Cottege
44 S/R to BJB Cottege 2.56
45 S/R to Dr AC Homeopathic Medica[ Cottege an,C
Hospital at unit-lll3.09
46
47
5/R to Dr.A.C Homeopathic Medical CottegeHospital unit-lll BBSR
Sln to Or.a.t Homeopathic t*teaicat totteeEHospital unit-lll BBSR
ti
ri
2.30
4.60
48 S/R to Odia Chalachitra gatlery and install thetrinty images of Lord Jagannath, Batabhadraand Devi subhadra in front of the conferenceHat[ of odisha State Museum (Front Side)
5.00
49 S/R to Board of Secondary Education Buitding,in unit-ll ( such as renovation work of frontshed and Ext. room)
50 S/R to State Museum, BBSR such as
construction of watl paneting at ground ftoc,r
corridor windows
5.00
4.87
51 S/R to State Museum, BBSR such as renovationof Natural History Galery and inside paintingwork
4.86
52 S/R to Sectt. Recreation Ctub in unit-ll ( such
as enamel painting and fixing of cup Board)
53 S/R to OLd Ladies Hostet, BJB Cottege,,
Bhubaneswar such as construction of nervpi rrj.r| i';th i.rla slonc iior ing itrci f i.,,rng i,fgritt
3.73
E:\C.E.(8)\SPR\2018 19\AMP 2018 19\A.M.P. 2018 19 01 10 2018\AMP Non Res./Old NR
2.30
Pg_4/a3
I Requirecl
(4) (5)(2) (3)
54 S/R to State Museum, BBSR such as repair towooden frame for displaying Odisha heritageand monumement at ground ftoor corridor
55 S/R to Board of Secondary Education Buitdingin unit-ll ( such as renovation work of Ext.room)
56 S/R to Odia Chatachitra gattery and instat[ thetrinty images of Lord Jagannath, Balabhadraand Devi subhadra in front of the conferenceHat[ of odisha State Museum (lner Side)
57 S/R to Sanskruti Bhawan at Museum Area,Bhubaneswar such as fixing of watl partition inoffice room
58 S/R to State Setection Board office Building inrunit-ll, BBSR ( such as renovation work)
59 S/R to Jayadev Bhawan in unit-ll, Bhubaneswar,such as provision of paver Btock in Cycte Stand,,Berm concreting, Polycarbonate Sheet inParagota (Annex Buitding)
60 S/R to Jayadev Bhawan in unit-ll, Bhubaneswarlsuch as provision of Uttra tile near Pump House,& other Monor repair works
I
4.88
5.00
4.94
4.98
5.00
4.96
2.68
61 S/R to Toshali Bhawan at Satyanagar, BBSR
Such as file cabinet &. cup board to O/o MahilaCommission.
' 62 :SlR to O/O the Labour Commissioner in unit-lll,, rsuch as cement concrete work and fixing of the
t to a k no afea bU Ld no s e
4.59
e p f d
5.00
4.6863 1 Bha an at atyanaoa f B SRBS
Such as provision of fite cabinet & watl'paneting to O/O pubtic Prosecution.
64 SlR to Toshali Bhawan at Satyanagar such asfitting and fixing of cup board in Deptt ofEtection Commissioner.
65 S/R to Dr. A.C.H.M.C & Hospitat Buitding, atunrt-lll, BBSR Such as gradrng plaster andwaterproofing treatment of Boys Hostet.
4.90
2.00
/R&B) Division No
(1)Required ,3
E:\c.E.(B)\SPR\2018-19\AMP 2018-19\A.M.p.-2018-19-01-10-2018\AMp Non-Res./otd NR Pg_5/43
t
to ToshaR
\\
\: LIC Ji -. a
(R&B) Division lNo(1) (7t
Required
(3) \4) (s)
2.56
4.91
3.09
2.32
66 SiR to Dr. A.C.H.M.C & HospitaI Building, atunit-lll, BBSR Such as fitting , fixing of curboard at Medical Buitding.
67 S/R to O/O Toshati Bhawan at Satyanagar,BBSR Such as temporary booking counter sid3
over burden earth custing
68 Si R to Dr. A.C.H.M.C &. Hospitat auitaing, atunit-lll, BBSR Such as fitting , fixing of cucboard at Cottege Buitding.
69 S/R to Dr. A.C.H.M.C & Hospital Buitding, atunit-lll, BBSR Such as fitting , fixing of cup
board at Hospital Buitding Doctor Chamber
70 5/R to Special Treasury at Unit-V, BBSR for theyear 7017-18 such as fixing of A.C.P. At frontand south side.
2.06
71 S/R to Nirman Soudh at Unit-V, Bhubaneswa rfor the year 7017-18 such as repairs to lst ftoc,r
roof arm strong fatse ceiting and partitionwork, patch grading and other work
77 SIR to office of Deputy Director,CiviI Defenceat Unit-V,Bhubaneswar such as grading
concrete with plastic felt and inside and
outside painting and other works.
73 S/R to District Emptoyment Emptoymer,tExchange Office, Khurda at Unit-V, Bhubaneswerr
such as painting ,cement ptaster and ptastic
fett over A.C. /G.C.l. sheet.
2.78
I2.46
1.11
74 SlR to Medical Registration Office BarrackNo.ll at Unit-V,Bhubaneswar such as painting
,ptastic fett & M.S,gritt etc.
1.13
75 S/R to Nirman Soudh at Unit-V, Bhubaneswtrr
such as repair works to false ceiting and
balance partition work for 5th ftoor and
E. E. Division-4 and other works.
Sr R to Nrrmarr Soudlr at U nr t-V, Bh ubaneswtrT
such as painting to watt, compound grit[ andgarrage room, canteen and other works.
4.74
7o
E:\C.E.(B)\SPR\2018 19\AMP 2018 19\A.M.P. 2018 19 01 10 2018\AMP-Non-Res./Old NR
4.3)
P8_6/43
i\drlrg (/r
R&B ) Division No. Required
(1) {7) (3) (4) (5)
77 SlR to E procurement Ce[[ buitding at Unit-
V,Bhubaneswar such as chamber of EE Design-4
at 6th ftoor with provision watl panetting and
fixing of flush door and other repairs.
78 S/R to I & P.R Deptt. (Lokasampark Bhawan) atUnit- V, Bhubaneswar such as grad'ing concrete& ptastic fett to roof New Buitding
S/R to l&. P.R Deptt. ( Studio Section)
Renovation work such as gypsum ceiling,corner beading, ftush door, watl paneting etc.for 2nd phase Unit-V
80 S/R to I &. P.R Deptt. (Lokasampark Bhawan) atUnit- V, Bhubaneswar such as rotten btinds,
Novapan board partition watt, fite cabinet,tabte, painting
81 S/R to I & P.R Deptt. (Lokasampark Bhawan) atUnit- V, Bhubaneswar such as grading concrete& ptastic fett to roof New Buitding
4.14
3.38
79 4.82
7.15
2.75
82 S/R to I & P.R Deptt. (Lokasampark Bhawan) at 3.01
Unit- V, Bhubaneswar such as grading concrete&. ptastic felt to roof Otd Buitding
83 S/R to I & P.R Deptt. (Lokasampark Bhawan) atUnit- V, Bhubaneswar such as grading concrete'&. ptastic fett to roof Otd Buitding
84 S/R to I & P.R Deptt. (Lokasampark Bhawan) atUnit- V, Bhubaneswar such as computer tabte,and ftush door etc.
85 rSlR to I & P.R Deptt. (Lokasampark Bhawan) atr
Unit- V, Bhubaneswar such as door paneting,
fite cabinet, painting work etc. tabte and ftush
door etc.
7.56
3.9s
3.36
86 S/R to E Procurement Cett Buitding at Unit- V,
Bhubaneswar such as fixing of tite in landingand risers and painting work in stair case (Right
slde ) and other worl$
87 S/R to E Procurement Cet[ Buitding at Unit- V,
Bhubaneswar such as fixing of step tite instair case (Right side) and other works
4.80
2.99
E:\C.E.(B)\SPR\2018-19\AMP 2018-19\A.M.P.-2018 19-01-10-2018\AMP-Non-Res./Old NR Pg_7 /43
:r.No(f &B i Division Req u ired
(4)
4.30
4.00
3.28
(7) (3)
88 Si R to I & P.R Deptt. (Lokasampark Bhawan) atUnit- V such as improvement and renovationof D.l. & P.R.O. in lst Ftoor (plastering & Wa.[
Panetting)
89 5/R to I & P.R Deptt. (Lokasampark Bhawan) atUnit- V such as improvement and renovationof D.l. & P. R.O. in 1st Floor (Fite Cabinet, workstation & btinds etc)
90 S/R to I & P.R Deptt. (Lokasampark Bhawan) atUnit- V such as improvement and renovationof D.l. & P. R.O. in 1st F[oor (wat[ paneting;,
ftush door, painting , Vitrified Tile and Doubte
Skin Partition, gypsum ceiting etc
(s)
Total 349.59S/R to.. ...
Bhubaneswar-ll 1 Sub-OrdinateStaffsetection Commission
Jagaj ivan Ram Adivasi Hostel
Saheed Laxman Nayak Hostel
Adivasi Exhibition Ground
7
3
4
5
5.00
5.OO
5.00
5.00
Drug ware house of Capitat Hosp'ital., 2.50Bhubaneswar.
6 C T Scan centre and cathtab of Capitat 5.00
Hospitat, Bhubaneswar.
7 Capitat Hospital such as internal roads 2.50
8 Administrative buitding CapitaI HospitaI Unit-\rlBBSR
4.50
9 Capitat Hospital Bhubaneswar (such as repair ofcompound watt)
3.00
'10 Capitat Hospital Bhubaneswar (such as repair ofgarage)
4.30
11 Odisha Btood Bank at Capita[ HospitalBhubaneswar (Doner Waiting shed)
3.80
12 Sub-Cottector office buitding (Outside repair) 4.90
13 Tahasil office buitding (lnside repair)
14 Tahasil office buitding (Outside repair)Seed testing laboratory (First ftoor interna[)
Seed testing laboratory (Outside repair andparntlng)
4.60
3.80
15
16
4.30
4.90
17 R.l. Office at Dakabanqala Chhaka, BBSR
18 Veterinary dispensary at otd town, BBSR
19 Sub-Division Office
3.90
3-00
E:\C. E.(B)\SPR\2018-1g\AM P 2018 19\A. M.P..2018-19-01-10-2018\AM P-No n-Res./Old N R
3. 50Pc-8 43
(1)
'R&B) Division No.
(1)Required
(2) (3) (4) (s)
20 BBSR (R&B) Division No-ll office Buitding,BBSR 5.00
Tota[ = 83.50S/R to.....
Bhubaneswar-lll 1 Director of Sports Buitding, , Nayapatti, BBSR 10.00
2 DPI Community Centre Stage in Unit-8, BBSR
3 Govt. lTl Buitding, Unit-8; BBSR (suctr aiCycteStand, C.C. ptat form profile sheet )
4.00
5.00
4 Govt. P9!ytec!1Q Bhubaneswar 15.00
5 Mumtaz ati High Schoot, Nayapalti, BBSR 3.50
6 N4 Govt. High School, IRC ViLtage, BBSR 2.70
3.007 Rait Vihar High Schoot, C.S.Pur, BBSR
8-9
Rai[ Vihar High Schoot, C.S.Pur, BBSR 4.00
-najanaq19!teg9, qlsn 4.80
10
11
Rajdhani coltege, BBSR 5.00
Damana High Schoot Buitding , C.S.Pur, BBSR
(Such as grading concrete , uttra tile ftooring ,
cycte shed, C.watl raising , stiding window,outside inside ptaster and cotour )
s.00
12 Damana High Schoot Buitding , C.S.Pur, BBSR
(Such as grading concrete , uttra tite ftooring ,
cycte shed, C.watl raising , stiding window,outside inside ptaster and cotour )
5.00
13 Damana High Schoot Buitding, C.S.Pur, BBSR
(Such as tile flooring and stiding windows )
s.00
'14 Gopabandhu Academy of Administration,BBSR(Such as repair to parking area)
9.00
Total= 81.00S/R to.....
Bhubaneswar-lV 1 R.D. Women's University 4.93
L%2 Utkat Sangeet Mohavidyataya at Unit-lV3 State Archive Buitding at Unit-lV 1.96
4"n4 Veteranary Office Buitding at Saheed Nagar
5 Ananya Hostel of RD Women's University 4.93
6 Utkat Sangeet Mohavidyataya at Unit-lV 1.47
7 SCERT Hostel Building at Unit-lV 3.92
8 Capital High School at Unit-lX 1.11
9 Repair of stage NCC Ground of sainik school
10 Assembty Guest House D/S Btock No.20 (Room
No.402, 403) in Unit-lV
0.68
0.99
E:\C.E.(B)\5PR\2018,19\AMP 2018-19\A.M.p.-2018-19-01-10-2018\AMp-Non-Res./Otd NR PC_g/43
R&B) Division No.-'. -U LL
Requiredre(1) \7) (3)
11 EX MLA Guest House Btock No.19 ln Unit-lV A LA
Cotony such as constn of qate piltar ptinthprotection repair & cotouring
'12 Saheed Nagar High school at Saheed nagar Titeftooring at Cycte stand
13 D/S Btock No.20 asebly Guest House MLACotony
14 D/S Btock No.20-Room No.401 , 407, 403verandah Assembly Guest House, MLA Colon1,,BBSR
t4t I tsl
15
16
BBSR(R&B) Sub Divn-lllBRAHMAPUTRA HOSTEL
3.97
2.48
7.87
1.13
3.00
2.19
2.0017 DEAF & DUMB GALVANIZED SHEET STORE ROOTVT
18 GOMATI HOSTEL 2.2619 Capitat High schoo[ cteaning and [evetting 5.00
temporary East side ground
ZO
21
Sainik School Anti Termite TreatmentGodavari, Kauvery, Suttez, Brahmaputra andAnnapurna mess
22 Compound wa[[ Garbage road side of SainikSchooI
1.14
oio
1.12
1 .5023
24
Mess Annapurna of Sainik School
SAINIK SCHOOL COMPOUND WALL ANNAPURN,A
MESS
25 Capitat High Schoot at Unit-lx at Bhubaneswarfor 2017-18 (Such as painting to main buitding)
26 Zonal dispensary at Unit -lX(RZ) BBSR such asptastering and fixing tile,and shutter of 'lst
ftoor East Btock .
7.49
2.80
4.00
27 Govt. Hospital in Unit-lV (such as wa[[ tites infront corridor & fatse ceiting in Doctorschamber)
28 Rabindra mandap in Unit-lV (Such as earthwork, cement concrete, fatse ceitinp,decorative cornice, painting by weather coat tiptastic paint, ename[ paint, fixing of vitrifie,Jand gra naite tites )
/9 HhM 5tate Lrbr ary rn Urrrt-lV lsuclt as gr adrngconcrete on 3rd Floor)
1.00
2.00
l.2l
E \C.E.(B)\SPR\2018 19\AMp 2018 19\A.M.p.-2018,19-01-10-2018\AMp-Non,Res./Otd NR Pg L0/a3
)r,
.i&B) Division No. Required
(4) (s)(2) (3)(1)
30 State Archive buitding in Unit-lV (such as
vitrified tite flooring, watI painting, false
ceiling and watt panetting etc)
31 District Homoeo & Ayurvedic office buitding inUnit-lV (such as repair and renovation of back
side watt with other repair works)
32 Utkat Sangeet Mohavidyataya in Unit-lV, BBSR
33 Utkat Mandap in Unit-lV (such as replacementof Kota Stone of dias)
34 Utkat Sangeet Mohavidyataya in Unit-lV, BBSR
(such as providing shetves / cup board inexamination ha[[ counter)
35 District Homoeo &. Ayurvedic office buitding in
Unit- lV (such as cement concrete, fixing watl
tite, window, false ceiting, enamel paint,ptastic paint, fixing door / window doubte leafshutter, fixing design gritt gate)
36 SR to gate to lndira Gandhi S.T. Hoste[ Unit-g,Bhubaneswar for 2017 -18
2.96
4.00
2.86
4.00
1.98
2.00
5.00
Bhubaneswar-V 1
Total= 92.244.20Repair of Ctass Room Buitding West side of BK
cottege art & Crafts BBSR such as painting and
watl & Floor repair
6 Repair of Class Room Btock South side ofTapoban High School such as wa[[ crack repairand painting
7 Reparr ot Class Room Btock North slde oITapoban High Schoot such as watl crack repairand painting
2 Repair of Ctass Room Buitding East side of BK
cottege art & Crafts BBSR such as painting and
watt & Ftoor repair
3 Repair of Ctass Room Buitding North side of BK
cottege art & Crafts BBSR such as painting and
watt & Floor repair
4 Repair of Sarba shikshya Abhijan Buitding of
,Tapoban High Schoot such as grading and
painting
5 Repair of Ward no. 3 Buitdi ng of Bijupattnaik 4.98
open Air Ashram at Jamujhair such as grading
and painting
3.90
4.00
4.50
4.80
4.]0
Total= 31.08
E:\C. E.(B)\5PR\2018'19\AM P 2018-19\A. M. P. -2018-19-01-10-2018\AM P-Non-Res /Old NR Pg-!r/43
) Required
(4)
4.55
2.77
2.30
5.00
4.50
5.00
kar'n,b . (aail Division I no. I
(1)
Cuttack-l
\7J (J)
S/R to.. . ..1 JKBK Govt. Cot[ege, Cuttack (C.Watt at North
side)
2 DPMU Office, Buitding, CDA, Sector-2, Ctc (3rCftoor)
3 BOSE Ladies Hostel No.l, Cuttack(Distempering, painting)
4 Chairman Chamber of OpSC, Ctc5 N.H. Sub-Division office, Otd Sectt, CuttackO f'fCC Office main buitdinq, Otd Sectt, Ct:
(Recretion Club)
7 Transit House, Vigilance, Ctc 4.98
5.00
9
8 D.H.H. Buitding, City Hospitat, Ctc (Medicin,:Warehouse)
20 beded Eye Ward, City Hospitat, Ctc (Repairof ftoors)
10 Mate Ward ofCuttack
ri Gw ,raitn orSCBMCH, CtC
f- fmergency OfSCBMCH, CtC
Surgery Btock (GF), SCBMCH, 4.80
Compted of Sugery Btock, 5.00
Complex of Surgery Btock, 4.OO
'13 Surgery Femate Ward, SCBMCH, Cuttack (zn(jftoor)
'14 Seminar Hat[ in Orthopedics Dept, SCBMCH, Ctr 5.00
.005
4.00
15
16
Nephrotogy Deptt, SCBMCH, Cuttack 5.00
4.OO
s.00
A.R.T. Centre, SCBMCH, Crc'17 Urotogy Deptt, SCBMCH, Ctc18 Nrusing Hostel in SCBMCH, Ctc (Gradinrl 4.50
concrete)
19 Mutti-Utitity Comptex, SCBMCH, Ctc20 Mental Heatth lnstitute, SCBMCH, Ctc (Securitv
room near main gate)
21 Class-lV Union Office, SCBMCH, Ctc22 RegionaI SpinaI lnjury Centre, SCBMCH, Ctr;
(Director room & Reception counter at GF)
2i Putmonary Medicine (otd), SCBMCH, Cuttacl:(Outside painting)
^14 Swrmmrng Poot of SCtsMCH, Ctc 1C.wa[t)ZS Antl T.B. Buitding, SCBMCH, Cuttack (Grouncl
2.80
fIoor)
zO t-zunCry p[ant of SCBMCH; Cutiacf
3.50
4.50
4.80
3.30
4.80
4.40
E:\C.E.(B)\SpR\2018 19\AMp 2018-19\A M.p.-2018-19 o1-10-2018\AMp Non_Res./Otd NR
3. 50
PC_tz/a3
(5)
r\E iilc'l f-:
R&B) Division No.
(7)
Required el(3) (4) (5)
27 NCC Office of SCBMCH, Cuttack (Store room) 4.50
28 Anatomy Deptt of SCBMCH, Ctc (Grading
concrete)
29 Skin & VD Deptt of SCBMCH, Cuttack (Ptinth
protection, 2/4wheeter parking with CC &Urocon tite)
30 Radiotogy Deptt, SCBMCH, Ctc (X-Ray Room &
Dark room at 1st ftoor)
31 O.&G.Deptt, SCBMCH, Ctc (OPD side ptinthprotection with Eurocon tile)
32 Post-Partum Unit of SCBMCH, Ctc
33 Famity Wetfare Deptt, SCBMCH, Cuttack(Urocon tite fixing)
34 Ladies Hostet, SCBMCH, Cuttack (Renovation ofrooms)
4.60
4.90
2.50
3.50
4.50
4.50
4.80
35
36
New Gents Hostel of SCBMCH, Ctc (Dining )
Otd Gents Hostet, SCBMCH, Ctc (Dining)
4.00
4.50
37 Otd Gents Hostet, SCBMCH, Ctc (Basket Ba[t 4.00ground)
38 Dental Buitding (Otd), SCBMCH, Cuttack (Ptinthprotection with CC &, Urocon tite)
4.70
39 New Superintendent Office, SCBMCH,
(Hospitat manager room)
40 Physiotogy & Bio-Chemistry (New) Deptt of 4.50
SCBMCH, Ctc (Outside painting)
Ctc 4.50
41 Principat office (Lecture Theatre) of SCBMCH,
Ctc (painting & fatse ceiting to Exam hatt)
, 42 Pharmacy Wing of SCBMCH, Ctc
Pharmacotogy Deptt, SCBMCH, Cuttack (At.
Partition watting & jatLy at 1st ftoor)
4.80
4.00
43 4.80
44 lJ.G. Hostet (New) in SCBMCH, Cuttack (back
side CC road)
4.80
45 PWD Section office, SCBMCH, Cuttack (Two
wheeler parking shed)
46 Femate Ward of Cardiotogy Buitding, Cuttack 4.70
3.00
47
48
49
4.50
3.90
ICCU of Cardiotogy Buitding, Cuttack
CTVS ot Cardiology lnstitute, Ctc (ICCU)
50
Ladies Hostel (u.G.) of scBMcH, cuttack (GF to 4.80
3rd ftoor)
Cun."r. IPD of AHRCC, Cuttack 4.50
E:\C.E.(B)\SPR\2018-19\AMP 2018-19\A.M.P.-2018-19-01-10-2018\AMP-Non-Res /Old NR Pg_B/a3
. (1)
f4. '(R&B) D juirion I No. I Required I
( \2) (3) (4) (s)51 lndoor Btock of Femate Ward, AHRCC, Cuttack 4.40
52 Annexe Buitding of O.T. Comptex, AHRCC, Ctc 4.ZO
53
54
55
Pain & Pattiative of AHRCC, Ctc
RNT Cottege, Cuttack (Al-. stiding window [rpainting & changing of choukath &. shutter)Katha.lodi Womens Hostet of RNT Cottegt:(Grading concrete to roof, RCC drain, cemenIconcete to lnternal road, choukath & shutter,fixing ceramic ftoor & watl ti[e)
56
57
JKBK Cottege (Ctass room), CuttackArts Btock of JKBK Cottege, Cuttack
58 Staff & Lecture Common room, JKBK Co[tege,Cuttack
59 Girls Hoste[ Buitding, JKBK Cottege, Cuttack
4.00
5.00
5.00
4.93
4.93
4.si
4.9660
61
SB Womens Coltege (Science Btock), Ctc 5.00S.B. Womens Cottege (New Hostet), Cuttack(door window reptacing, outside painting)
62 S.B. Womens Cottege (P.G. Hostet), Cuttack 5.00
63 DPO Office Buitding, Darghabazar, Ctc 3.0064 Padhiary Pathagar, Choudhury Bazar, Cuttack
(Reptacement of damaged watting)
65 Directorate of lndustries, Kitta maidan, Ctc 5.0066 Odisha Administrative TribunaI
Cuttack (Ftoor & Ceiting repair)Buitding, 4.00
s.00
5.00
67 Central Administrative Tribunal Buitding, Ct<:
(Ftoor & Ceiting repair)
68 Conference hat[ of DPMU, Cuttack (3rd ftoorlArmstrong ceiting
69 Rural S.P. Office Buitding, Ctc (Repair o..C.Watt)
70
71
72
Phase-ll P.S., Sec-1 1, CDA
M.M. Das Comm'ission office, CuttackSpecial Branch office, Cuttack
73 DFSL Office, Cuttack74 Main Buitding of Cotlectorate, Cuttack (Roor'
Grading)
75 Main Buitding of Cottectorate, Cuttack (Outsider
Ira in t rl g)
76 Main BuiLding of Collectorate (2nd ftoor r
(Repair of door & window and inside painting)
4.00
5.00
5.00
5.00
5.00
5.00
4.60
5.00
5.00
5.00
E:\c.E.(B)\SPR\2018 19\AMp 2018 19\A.M.p.-2018-19 01 10 2018\AMp-Non-Res./otd NR P8-]4/43
'RftB) Division No.
(1) (2t
77
7B
81
83
Required 2t\(3)
Garage of Co[lectorate
Record room of Collectorate (Repair of ftoors &inside and outside painting)
Civit Suppty Office of Cottectorate(Workstation)
Board of Revenue (Main buitding), Cuttack(Replacement of fibre sheet and At. jattypartition )
OLd Ra.1as*a Bhawan Btdg (Entrance gate &
outside painting)
Sub-Cottector office Buitding (Ftoor, wat[ repair& inside painting)
3.00
5.00
80
79 5.00
82 Canteen &. Watchman shed of RDC (CD), 5.00
Cuttack
5.00
5.00
4.00
84 Sub-Registrar Office Buitding, Cuttack
85 TahasiI office, Cuttack (Raiting, At. stidingwindow)
86 Setttement Office, Jobra, Ctc
87 Consotidation Range-3, Jobra, Ctc
88 Printing Press of SMP, Jobra, Ctc
89 New Circuit House, Machhua Bazar, Ctc
_ i.004.00
4.95
4.55
i.gt4.98
90 R.l. Training Centre, Jobra, Ctc 4.90
:.oo91 Kitchen Block & Dining of R.G. Schoot, Cuttack
92 Kitchen & Dining of Kazibazar Girts High 5.00
Schoot, Ctc
93 Marwadi High Schoot (Btock-B) 5.00
94 Municipal High Schoot, Mansinghpatna (Vitrifiedftoor ti[e, At. stiding window & painting)
s.00
95 O.P. High School, Cuttack (Kitchen room) 5.00
96 DTET Office, Kitta maidan, Ctc 5.00
97 BOSE Main Buitding, Cuttack 4.96
98 Etectrical Deptt, Btdg, BOSE, Cuttack 4.92
99 Workshop Buitding (Fitter), BOSE Campus, 4.91
Cuttack
100 Workshop Buitding (Mechanicat), BOSE Campus,
Cuttack
4.94
101 Automobite Btdg, BOSE, Ctc
102 Gents Hosrel No.l, ts05E, Ctc
103 Ladies Hostel No.2, BOSE, Cuttack104 BPFTIO Gents Hostet, BOSE, Ctc
105 Workshop Btdg, BOSE, Cuttack
4.63
4.99
4.93
E \C.E.(B)\SPR\2018 19\AMP 2018-19\A.M.P.-2018-19-01-10-2018\AMP-Non-Res./Old NR
4.05
4.92Pg_7s/43
((R&B ) Division lr" I
(3)
106 A4adhudan ITI Class room, BOSE Campus, Ctc
107 Main Buitding of J.N. lndoor Stadium, Cuttact((back side C.watt- LHS)
108 Main Buitding of J.N. lndoor Stadium, Cuttacl<(reptacement of door window)
109 Watking Track of Satyabrata Stadium, Cuttack(Painting of Kerb walts)
Required
(4) (5)(1) (2t
Cuttack-ll
5.00
5.00
TOTAI_ 495.25
2.02
a.s5
4.98
5.00
4.85
4.83
S/R to.....1 CDVO Office at Khapuria Cuttack2
3
7 BBR and B firm8 Rty Setttement high SchooL
9 BBR and B firm
4
5
6
District Labour Offcie Building
Quatity ControL Division OfficeConstruction of CC Road
R and B Sub Division Office at OMP Square
Jagatpur High Schoot
4.95
3.49
4.79
4.39
3.12
4.7510
11
Madhusudan Girls High School
Madhusudan Girts High School
Concrete Road in front of GodownDeputy Director of Agricutture office
14 Govt lTl Btdg
15 Govt Press Building Madhupatna
2.31
2.4612
13 3.57
4.05
3.0716 Compound wa[[ repair &. cotour washing of
S.D.H. Banki for 2018-19
17 fixing Paver Block of 5.D.H. Banki for 2018-19 5.00
18
5.00
4.00Retaining watt & C.C. Road of S.D.H. Banki for2018-19
19 repair of Eye Hospitat of S.D.H. Banki for 2018-19
20 C.C. Road & Paver Btock of B.K. Bidyapitha atBanki for 2018-19
21 Grading of roof & colour washing of B.K.Bidyapitha at Banki for 2018-19
27 C.C. Pavement inside schoo[ premises of Govt.Girts Highschool at Banki for 2018-19
NR buitding of OSAP 6th Bn at OMP Square,Luttack reparr ot lCompany NO-3
Boys Hostel of Govt. lTl at Khapuria, Cuttacki.s. Outside Cotouring Works .
5.00
5.00
5.00
23
25 Smart Class Room of Govt. lTl, Cuttack .
74
5.00
3.50
4.00
E.\C.E.(B)\SPR\2018-19\AMp 2018-19\A.M p.-2018-19-01-10 2018\AMp Non Res./Otd NR
5.00Pg_ 43
/R&B) Division No.
(1)
Required d9(4\ (5)(2) (3)
76
77
28
5.00
5.00
5.00
New Academic Btock of Govt. lTl, Cuttack .
Conference Hat[ of Govt. lTl, Cuttack.lmprovement of Front Yard and Drain of Govt.
lTl, Cuttack .
Principat and Vice-Principat Chamber of Govt.
lTl, Cuttack .
Ptacement Cett and t"tinistiiat Office Section ofGovt. lTl, Cuttack .
Gandarpur Potice Cotony of Chautiaganj,Cuttack .
30
31
29 5.00
32 Deputy Director, Agricutture Office at 5.00
Nayabazar, Cuttack .
33 OGP Paper Godown used as Central School-ll,Cuttack .
4.00
5.00
5.00
34 BBR &. BM Firm (LBD firm) Khapuria, Cuttacksuch as raising of ftoor & renovation of CattteShed No-8 .
35 BBR & BM Firm (LBD firm) Khapuria, Cuttacksuch as raising of ftoor & renovation of CattteShed No-9 .
36 BBR &. BM Firm (LBD firm) Khapuria, Cuttacksuch as constructing Green House Shed overAjota Feeds
37 CDVO Office buiLding, Khapuria .
38 ADVO Office buitding, Khapuria.
3.00
3.00
4.00
4.00
3.00
39 Duck Breeding Firm Khapuria, Cuttack . 4.50
40 Ctininicat lnvestigation Laboratory, Khapuria, 4.5O
Cuttack .
41 Forzen Semen Bank, Khapuria, Cuttack. 5.00
47 Store room with verandah for equipment &.
Chornicats of Hydroponics Unit Khapuria,Cuttack .
3.00
43 PHC buitding, Nayabazar, Cuttack.44 Sr to Veternary Hospital at Nayabazar, Cuttack
3.00
3.00
Total= 183.00
Kendrapara 1 Sub-Registraroffice, Pattamundai
2 Agricutture Deptt. at Kendrapara
3 DAO office Buitding Kendrapara
5.00
8.0-3.00
Total= 16.00
S/R to.....
E:\c.E.(B)\SPR\2018-19\AMP 2018-19\A-M.P.-2018-19{1-10'2018\AMP-Non-Res./old NR Pg_T'? /43
B) Divisron No
Jagatsinghpur
11
Required
(1) (7) (j)
1 Composite Offjce (Revenue) buitding,Jagatsinghpur
2 Gynic & Pediatrics Ward of DHH, Jagatsinghpur
3 (R e B) 5ub-division office building atManijangha, Jagatsinghpur
Sjnskruti Bhawan at Jagatsinghpur
District Emptoyment Office buitding atJagatsinghpur
(R& B) Section Offcie at Niati
1!a al segtion 9ff9l" at LqlryrEye Hospitat of DHH, Jagatsinghpur
D.A.O. office buitding, Jagatsinghpur
Treatment Shed of District Vety.Jagatsinghpur
Tahasit Office , Jagatsinghpur
Office,
(4)
5 .00
s.00
4.00
5.00
(5)
4
5
4.00
5.00
6
7
8
9
s.00
3.00
4.00
4.0010
Panikoiti 1
2
3
S/R to.....Dist, Agricutture Office (Storage Godown 1
Tahasit Office JajpurReiord Room oilajpui rahasit
4 Renovation of existing PWD Office Buitding Jajpur
S nenovation of Section Office Jajpur6 SDVO'sOffice(Vetenary)Jajpur
VAS'sOff ice(Vetenary)Jaj pur
Area nospltat,Jajpui road
DDM Office at Jajpur Road
Total,=
3.00
4.003.00
5.00
3.OO
4.00
-l8
9
4.O0
4
3
3
00
00
00'10 Su5 -P"tirt"r, Dolipur
11 Sp[ Treasury,Jajpur Road
Tota[=
3.00
39.00
Dhenkanal 1
S/R to.....f Off.O offi.e at ft,'naoi
l4
5
2 S.E office buitding at Dhenkanat.
Tahasil office buitding at Dhenkanat.Civit suppty office buitding at Dhenkanal.
Tahasit office at Bhuban.
Sarangadhar High Schoot at K. nagar.
4.00
10.00
5.00
5.00
6
5.00
4.00
Total= 33.00
Angul
S/R to.....i Talrasil r.lf irue, ,urguI
2 DHH, Angul such ur r"nouatlon of femate ward5.00
i.oo
E \C.E.(B)\SPR\2018-19\AMP 2018-19\A.M.P. 2018 19 01-10-2018\AMp-Non Res./Otd NR Pg_La/43
4.00aa.oo
'R&B) Division No
(1)Required
3 S/Rward
DHH, Angut such as renovation of male 5.00
OPD btock at DHH, Angut
Janata hostel, NKC CTE, Angut
DAO office, Angut
District Culture office at Angul
Renovation of lnfection ward at DHH, angut
P.W. D. Division office, AnguI
PWD Division store at Angul
rtr)\2
4
5
6
7o
9
5.00
2.005.00
3.OO
5
5
3
5
00
oo
10
11
00
o0kitcnEn,alnnini niii &. cycte shea at angut High
Schoot, Angul
12 Computor room & raising of compound watl atAngut High Schoot
5.00
13
14
Boys hostel No.l of Govt. Cottege, AnguI 5.00
Boys hostel No. ll of Govt. Cottege, Angul 3.00
(2) (3) (4\
15 Repair of Auditorium & IGNOU buitdingGovt. College, Angul
16 ADAO office at Athmattik17 Storage godown of R & B Dept at Athmattik18 Drainage System to Medical Staff Quarter at
PatIahara'19 Construction of Separate Toilet Btock of S.D.H
Pa[[ahara
to 5.00
5.00
2.00
.L___
s.00
s.00
20 Revenue Rest Shed Pattahara s.00
Total= 88.00S/R to.....
Charbatia 1 Asst. Executive Engineer Office Building at, 5.00Athagarh (R&B) Sub-division
2 Sub-divisionat Hospitat at Athagarh such as 5.00repair door, window &. cotouring
3 Sub-cotlector office buitding at Athgarh 5.00
4 S.T. School at Athagarh 4.505 Sub-divisionaI Hospita[ at Athagarh such
cotpt. Of front approach CC roadas 5.00
6 Veterinary Hospital at Athagarh 5.00
7 FirO Station, Athagarh (Such as repair & 5.00cotouring)
8 Fire Station, Athagarh (Such as constn. of 5.00backside approach CC road)
Total= 39.50S/R to.....
1 Government Potytechnic (North btock ) at 5.00
BerhampurGanjam-l
E:\C.E.(B)\SPR\2018-19\AMP 2018 19\A.M.P.-2018-19-01-10-2018\AMP-Non-Res./Old NR Pg_79/43
B ) Division
(1)
No. Required
(7 (3) t4)
5.00
(s)
7
3
4
5
6
8
9
Engg. School NCC Btock at Berhampur
Govt. Potytechn ic Girts Hoste[ at Berhampur
Revenue l.B Compound WattNear Engg Schoolat Berhampur
G.E.D. 5ub - Divn.Office at Berhampur
House Officers Hostel of MKCG MC&H atBerhampur
Cottege of Nursing Hostel inside MKCG MC&H atBerhampur
Govt. Potytechnic Auditiorium hatt itBerhampur
aualtiorium Uatt of Covi Potytechni- atBerhampur
Govt. Polytechnic South watl of Auditioriurrhatl at Berhampur
Cottege of Nursing Hostet of MKCG MC&H atBerhampur
D.P.l.& R Pathagara at Berhampur
ENT OPD B[ock of MKCG MC&H at Berhampur
5.00
5.00
s.00
2.00
4.00
7
3.00
10
11
12
li
4.00
4.00
5.00
2.00
5.00
14 Leprosy unit of skin & V.D Ward of MKCI3
MC&H at Berhampur
15 it in a V.O Wara of rtlXCC trtC&n at aerharnpur 5.00
16 Library Buitding of MKCG MC&H at Berhampur 4.O0
5.00
'17 New ICU of New lndoor Btock of MKCG &. MCH
Berhampur'18 Pediatric new lndoor of MKCG &. MCH
Berhampur'19 Cottege of Nursing inside Btdg.of MKCG MC&H
at Berhampur
2.00
3.00
2.00
20 Government Polytechnic (South btock )
Berhampur
21 t.T.l. ru9lgl Hqtt4,.t Berhampur
22 U.C.P.Engineering Schoot, Main BuitdingBerhampur
Z: Vigitance S.P.Office at Berhampur
at 2.00
5.00
at 5.00
4.00
24 Ladies hoste[ of K.K.Cottege at Berhampur
)5 K.K.Cottege,Physrc B[ock at Berhampur
26 K.K.CoLtege, Botony Lab. Btock at Berhampur
5.00
2.00
E:\C.8.(B)\SPR\2018-19\AMP 2018-19\A. M. P.-2018-19-01 10-2018\AMP-Non,Res./Otd NR
2.00
PC_zo/43
/R&B) Division No. Required(1 I) \ \
(7\ (3) (41 (s) i27 Vigitance S. P. Office, (Meeting Hatl)
Berhampur
28 K.K.Cottege,RCM HosteI at Berhampur.29 Binayak Acharjya coltege,Compound watl
Berhamur
at 5.0O
at5.00
5.00
30 K. K-Cottege, Engtish Btock at BerhampurRevenue l.B. watcher shed at Berhampurfanqslaa1ofnce Ouitaing at BerhampurR.C.M Hostet of K.K.Cottege, at Berhampur
s.00
5.00
5.00
31
32
33 4.5034 S.V.N Ladies Hostel Khatikote Cotlege,
Berhampur4.50
35 Revenue l.B (Compund waIt)Berhampur 5.0036 U.C.P.Engineering School Lecturer Common 4.00
roomat Berhampur
37 Soit Chemistry Office at Berhampur 3.00
Total = 151.00S/R to.....
Ganjam-ll 1 Circuit house at Chatrapur 10.002 Sub-Cottector & Otd Tahasit
Chatrapur.Office at 5.00
3 Sub-Registrar Office &. Record Room 5 004 Sub-Registrar office at Purushottapur 5.00
5.005 Tahasil office at Purushottampur6 Onslow lnstitution at Chatrapur. 5.00
5.007 Science college at Chatrapur.8 N.D. High Schoot at Purushottampur 10.009 Hotriculture office at Chatrapur. 3.0010 Treasury office at Chatrapur. 5.0011 RTO office at Chatrapur. 5.0012 R.l.T.l. At Khattikote. 3.0013 CHC at Khatlikote. 3.0014 CHC at Kodata 5.0015 PHC at Ganjam 5.00
3.0016 Special R.l.T.E. Buitdings at Rangeitunda such.as reptacement of doors and windows of bathroom and construction of cycte stand for theYear 2018-19
17 Special Office of the Ganjam (R&B) DivisionNo. - [t, Berhampur
5.00
Total= 87.00S/R to.....
Bhanjanagr 1 Sub-Divisional Hospital at Bhanjanagar 5.002 Tahasil office at Potasara 2.50
c.E.(B)\SPR\2018 19\AMp 2018 19\A.M.p.-2018-19{1-10-2018\AMp-Non,Res-/otd NR PC_2I/43
1
B ) Divrsion No Required
(1)
Phulbani
t7) (3) (4)
8.50
2.00
5.00
3.00
16.00
(5)
3
4
5
6
7
TahasiI office at Aska
G.T. High Schoo[ at Beltaguntha
TahasiI Of fice at Sorada.
Lingaraja Girls High School at Potasara
Somanth Praticjng high schoo[ at Bhanjanagar
Block Veterinary Office btdg. at Buguda
(R&B)Section office at K.S. Nagar.
GED Section office btdg at KS Nagar
Btock Veterinary Office bldg. at Potasara
Btock Veterinary Office btdg. at Aska
8
9
10
11
lz
5.00
3.0-3.00
4.00
s.oa
3 -0013 Govt. Niranjan Women''s Cottege at Aska (Otd)
Govt. Secondary Training Schoot atBhanjanagar
Hostet buitding of Govt. ieiondaiy frainlngSchool at Bhanjanagar
14
15
5.00
3.00
'16 Sub-Registrar office at Bhanjanagar
17 PWD (R&B) section off ice at Bettaguntha
Total= 78.00
S/R to.....1 S/ R to Non Res buiLding such as main buitdirrg
of Co[lectorate Phutbani.
2 S/R to Kalinga Mahavidyataya at G. Udayagiri 4.62
3 S/R to store inside PWD Section Office at 3.31
Katinga.
4 S/R to Dist. Education Office, Phutbani. 0.78
5 S/R to Non Res buitding such zts 0.30
Orthopaediccorrection centre DHH Phutbani.
3.00
2.00
0.32
6 S/R to Non Res building such as back side
compound wa[[ raising at DHH Phulbani.
7 S/R to Non Res buitding such as Apanga Kendra
at Phutbani.
8 S/R to Non Res buitding such as leak Medicineward DHH at Phutbani.
9 S/R to Non Res buitding iucf, at PWD sectionOffice at Phulbani.
i0 SrR to Non Res burlding suclt as parttlltg tocabins of DHH at Phutbani.
11 SiR to Non Res buitding such as leak repairMedicine ward DHH at Phutbani.
0.66
1 .50
1.96
0.45
1.00
E:\c.E.(B)\5PR\2018 1g\AMP 2018-19\A.M.P.'2018-19{1 10-2018\AMP-Non Res./old NR
1.31
PE_27/43
'R&B) Division No.
(1) (7t
17
13
Required
1 .00
1 .50
1 .50
1.04
2.11
1.53
."t
14
15
S/R to Non Res buitding such as washing toCottectorate buitding at Phulbani.
S/R to Non Res buitding such as hostel buitdingof ANM training centre at Phulbani.
S/R to Govt. Girts High Schoot Phutbani.
S/R to Girts High School of S.M WomeniCoItege, Phutbani.
S/R to Non Res buitding such as raising ofcompound walt of Circuit House at Phulbani.
16
17 S/R to Govt. Auto Cottege, Phutbani.
18 S/R to Non Res buitding such as main buitding &one toitet room of Coltectorate at Phulbani.
19 S/R to Non Res buitding such as lsotation wardDHH at Phutbani.
20 S/R to Non Res buitding providing cycte shed infront of Geratric ward of DHh at Phutbani.
21 S/R to Non Res buitding such as raisingcompound walt of Vigitance DSP office atPhutbani.
72 SlR to Non Res buitding such as PDS center andSub-DivisionaI Election office at Phutbani atPhutbani.
4.65
3.75
4.15
4.88
4.35
(l) (4\ (s)
23 S/R to Non Res buitding such as famity btdgfrontage & cycte shed at Eye ward DHH at
, Phutbani.
24 5/R to Non Res buitding such as GNM hostelbuilding at Phutbani.
25 S/R to Non Res buitding such as ANM trainingschool at Phutbani.
26 5/R to Non res btuilding such as washing toCottector buitding at Phutbani
4.93
4.26
3.29
4.85
Total= 64.00S/R to.....
Boudh 1 Cotlectorate Office Buitding Boudh
2 Otd Circuit House (Gate Portion )
3 Rev Rest Shed Boudh
Otd Btock Office Boudlr
5 Sub Registar Office Boudh
6 Treasury Office Boudh
7 Otd R&B Sub-Division Office
5.00
4
3.40
2.00
5.00
5.00
3.00
E:\C.E.(B)\sPR\2018-19\AMP 2018-19\a.M.p.,2018 19 o1-10-2018\AMp-Non-Res./otd NR
3.00
PE_23/43
1R&B ) Divisron No
(1) (3)
B
o
10
11
12
Tahasi[ Off ice Boudh
Dist. Head Quater Hospitat Buitding Boudh
5.D.V.O.Office Boudh
C.D.M.O Office Boudh
5R to R&B Divisron Office Such as Approach
Road. Boudh
D.A.O.Office Boudh
Cottector Office Boudh
Total =
13
14
S/R to.....Balliguda 1 S/R Girts High Schoot such as repair to RCC
Roof for first floor Class-room at Batliguda.
2 Horticutture offie such as repair to compound 5.00
watl & leack repair
3 Soi[ Conservation Office such as repair ofBuitding with Cotour Washing
4 PWD (R&B) Division Office Batliguda such as
renovation of Urinal and Latrine Btock.
5 S/R to S.D.H at Battiguda such as Eye war<i. 2.00
(Spitt over)
6 S/R to Govt. Girts High Schoo[ at Battiguda such
as Ti[e Ftooring to the Ctass room. (Spitl over)
S/R to.....Koraput 'l Renovation of Office Buitding at Coltectorate
2 Renovation of Boy's Hostel buitding at sport's
Comptex
3 Renovation such as painting to central [ibraryand gatlary at Govt. Cottege, Koraput
4 Renovation of stage and two wheeter stand atGovt. cottege.
5 lmprovement to DAVCTE Cottege buiLdirg(Front side approach)
6 Repair & renovation of Administrative buitdingof CoItectorate.
7 Repair &. renovation of iront gate (Fixing ofA.C.P Dr.rar d) of GovL. Cutiege, Kor aput
8 Repair of Boundary wa[[ at Govt. Cotteger,
Kpt.
9 Repair &. renovation of R.T. Office
E.\C.E.(B)\SPR\2018-19\AMP 2018-19\A.M.P.-2018-19-01-10-2018\AMP-Non-Res./Old NR
00
PC_24/43
Required
t4) 5
2.40
5.00
4.003.00
4.90
3.00
5.00
53.70
10.00
5.00
4.00
4.00
Total= 30.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5
\7t
(R&B) Division No.
(1
Required4-
) (2) (3) (4t (s)10
11
boundary wa[[ of R.T OfficeRepair & renovation of Deputy Director Miningoffice building at Koraput
Repair & renovation of Storage godownoccupied by Amta Sangha atsunabeda
Repair & renovation of Zonal laborotorybuitding, sunabeda
5.00
4.00
12 4.00
13 5.00
'14 Repair & renovation of T.V retay centre, 5.00Koraput
15 S/R to Nandapur Section office 3.00
4.@16
17
5/R to Mixed Farm at Semiliguda
S/R to Pottangi (R&B) Section Office at 2.00sunabeda
18 Storage Go-down near Jaganatha Mandir inAEF Colony Sunabeda.
5.00
19 Conference Hat[ in AEF Cotony Sunabeda. 5.0020 VPHL Buitd[ng at sunabeda s.00
Total= 92.00S/R to... ..
Jeypore 1 S/R to D.D.A Office Buitding at Jeypore s.00
2 Tahasil Office at Jeypore 4.003 S/R to Womens College (Compound wa[t) at
Jeypore.3.00
4 Si R to Womens Coltege (Drain) at Jeypore. 4. 005 S/R to Womens Cotlege (Ptinth protection) at 4.00
Jeypore.
6 S/R to Civit Suppty office at Jeypore. 3.007 S/R to Civit Suppty Office (Cycte Stand) at
Jeypore.4.00
8 S/R to Legal Secretary AID at Jeypore. 2.009 Repair & Renovation of Eye Btock at SDH, 4.00
Jeypore. (Part-A)
10 Repair &. Renovation of Eye Block at SDH,, 4.00Jeypore. (Part-B)
11 Repair & Renovation of Administrative Officeat SDH, Jeypore.
3.00
12 Repair & Renovation of Btood Bank at SDH,
Jeypore.7.00
13
l.iCHC Buitding at Kotpad
Sub Tr easury Oifice Buil,ding al Kotpaci
5.00
4.00
51.00S/R to.....
Nawarangpur 1 lndoorward,D.H.H.,Nabarangpur s.00
E:\c.E.(B)\sPR\2018-19\AMp 2018-19\A.M.p.-2018-19-01-10-2018\aMp-Non-Res./Otd NR PB_2s/a3
"(R&B) Division lNo Required
(1) 17t (3)
G.E.D., Of f ice Buitding, Nabarangpur
Drug lnspector Office, Nabarangpur
Vigitlance Off ice, Nabarangpur
Excise Charge Office, Nabarangpur
Nabarangpur (R.&B) Sub-Division Office
Eye Ward, D,H.1., Nabarangpur
C.H.C. Buitding, Umerkote
D. N.K. Hospitat, Umerkote
Fire Station Buitding at Umerkote
S.T. Schoot at Umerkote-xcG
Range Office at Umerkote
Dabugam (R&B) Section OfficeExcise Charge Off ice, Umerkote
\4) (s)
7
3
4
5
6
7
8
9
10
11
12
13
14
4.004.00
4.004.00
4.005.00
5.00
5.00
3.00
i.oo3.00
s. oo
3.00
Tota[ 57.00
4.00S/R to.....
Malkanagi ri 1 New Cottectorate Buitding at Malkjangiri
2 Govt Boys High Schott Buitding at Matkangiri 4.00
3 Govt Girts High School Building at Matkangiri 4.00
Total = 12.00S/R to.....
Rayagada-l Sub Register Office Rayagada 2.00
District agricutture Office Rayagada 4.00TahasiI Office Rayagada 4.00
SoiI conservation Office Rayagada 2.00
Division No-ll Rayagada 3.00
Labour Office at Rayagada 3.00
1
2
3
4q
6
7 CTO Office at Rayagada, Such as Distemperin3'
and Weather Coat
8 Old Excise office at Rayagada
Otd buitding of DHH at Rayagada
3.00
2.00
-r.oo9
10
11
Excise Charge Office at Rayagada 2.00
DWO Office at Rayagada 4.00
Total.= 32.00S/R to.....
Rayagada-ll S/R to Peadiatric building of SDH Gunupur 3.001
2j
4
S/R to Blood bank buitding of SDH Gunyqur
S/R to shed for Boys high school at GudariMDM
R/R to otd iihasit office or Dewan office a[
3 .00
.003
4.00gunupur
5 S/R to Fire station buitding at Gunupur
Er\C.E.(B)\SPR\2018-19\AMP 2018-19\A M.P.-2018-19-01-10-2018\AMP-Non-Res./Old NR
4.00Pg*26/43
rRftB) Division No.
(1)Required \4
(2) (3) (4) (5)
6 ST school and Hostel buitding at gunupur
7 Old Record room Tahasil office at Gunupur
Total=S/R to.....
1 Repaii of Sub-Treasury Btdg. at Kasinagar
2 Repair & Maintenance of Veterinary Hospitat,Kasinagar
3 Repair & Maintenance of PWD ( R&B) Divisionoffice at Pkd
4.00
2.00
23.00
Pa ralakhem u ndi 3.00
3.50
5.00
4 SiR toNew Cotlecttorate office Btdg. at 5.00Paratakhemundi
Tresury Office at 3.005 Renovation of Sub
Paralakhemundi.
6 S/R to fust. Commisioner commersial tax officeat Paratakhemundi.
5.00
7 Repair &. Maintenance of Veterinary office 2.00Building at Paralakhemundi.
8 Repair & Maintenance of (R&B) Section officeat Ramagiri.
2.00
9 Repair & Maintenance of A.E.office at 2.00Harabhangi.
10 Repair & Maintenance of Sub-Divn.& sectionOffice at R-Udayagiri.
3.00
Total= 33.50S/R to.....
Sambalpur-l 1 RDC Office Buitding at Sambatpur. 5.00
4J02 E.E (R&B) Division No-l Sambatpur.
3 District Treasury office at Sambalpur. 4.204 Otd Collectorat office buitding at Sambatpur. 3.90
5 District Agricutture office at Sambalpur. 5.006 Horticutture office at Sambatpur. 4.907 DIC office at Sambalpur. 4.008 Sub-Cottector office Buitding at Rairakhol.
9 Tahasil office at Rairakhot
3.00
3-00
10 Sub-Treasury office at Rairakhot.
11 Sub Register office at Rairakhot.12 Vigitance office at Sambalpur.
13 Repair & Renovation such as wa[[ paneting withA.C.P Sheet ot Ottice ot the Deputy lnspectorGeneral (Northern Range) Registration atCo[tectorate, Sambatpur. (Right Side)
3.00
3.00 -
4.70
2.00
E:\C.E.(B)\5PR\2018-19\AMP 2018,19\A.M.p. 2018-19-01,10-2018\AMp,Non-Res./Otd NR Pg_27 43
R&B ) Division No. RequiredOrL
(1)
Samba lpu r- ll
(2) (3) (4) (5) ^14 Repair & Renovation such as watl Paneting wi ,h
ACP Sheet of Office of the Deputy lnspectrrrGenera[ (Northern Circle) Registration Offi(:eat Cottectorate, Sambatpur.
1 5 5/ R such as Providing watt PenaIting arrd
structural gtazing to the S.E.N.C. Offir.eBuitding at Sambatpur.
16 Renovation of RDC ND office BuitdingSambatpur. (Such as approach roadconstruction of drain)
S/R to Tahasil office at Sambalpur.
CSB ZitLa tirgn Scfroot ai Sambatpur
atard
4.00
4.00
5.00
4.0017
18
19 G.M Co[tege at Sambatpur.
20 Vigitance office at Sambatpur.
21 Lady Lewis Girt's High Schoot at Sambatpur.
22 P.frf iraining Cothge at Sambatpur.
4.00
5.OO
4.00
4.00
4.00
Total- 88.00
3.60
S/R to.....'l N/R buitding such as apptying putty ,plastic
emutsion paint & painting to doors & windovrs& fixing of Mosquito net to 1st Medicine ward(Mate) of lndoor Hospitat of VlMSAR,Burta .
2 N.R. Buitding such as repair to back side areaof Ladies Hoste[ No.1 0f v55 IMSAR, Burta
4.88
3 N/R buitding such as apptying putty ,ptastjcemulsion paint &. painting to doors &. windou,s&. fixing of Mosquito net to 2nd & 3rd Medicineward (Mate) of lndoor Hospitat of VIMSAR,Burta
4 N/R buitding such as apptying putty ,ptasticemutsion paint & painting to doors & windorn,s
& fixing of Mosquito net to 4th &. 5th Medicineward (Mate) of lndoor Hospital of VIMSAR,Burta
5 N.R. Buitding such as providing mosquito n€twith aluminium frame to Boys Hosterl
No. llGround iLoor u tst f toor ) of VIMSAR, tjurla
5.00
5.00
E:\C.E.{B)\sPR\2018-19\AMP 2018 19\A. M. P.-2018-19-01- 10-2018\AM p-Non-Res./otd NR
4.81
Pg_28/43
lRttB) Division No. Required 1?(1) (7) (3) (4) (5)
6 N/R buitding such as applying putty ,ptasticemulsion paint of Ground floor corridor (Leftwing) of lndoor Hospitat of VIMSAR, Burta .
7 N/R buitding such as apptying putty ,plasticemulsion paint of 1st f loor corridor (Left wing)of lndoor Hospitat of VIMSAR,Burta .
8 N/R buitding such as repairing to canteen,otddrug ware house & painting to passage fromout door to Indoor Hospital of VIMSAR,Burta .
N/R buitding such as provision ofM.S.Grilt,granite flooring, earth fi[[ing forgarden in front of OUT door Building ofVll"1SAR, Burta .
10 N/R buitding such as apptying watlputty, ptastic emutsion painting to Cardiotgydepartment of VIMSAR,Burla .
11 N/R buitding such as apptying waltputty,ptastic emulsion painting to pediatricdepartment of VIMSAR,Burla .
12 N.R. Buitding such as repair to compound watl& partition watL to Ladies HosteL No.l & PG
Hoste[ of VIMSAR, Burta
13 N/R buitding such as providing & fitting M.S.
Gritls to new orthopedic buitding of VIMSAR
5.00
5.00
5.00
9 5.00
5.00
5.00
4.69
5.00
14 5.00
15 N/R buitding such as repair & renovation toOLD TB ward of VIMSAR
16 N/R buitding such as repair a ienovation tol 5.00the Psychiatric department of VIA,ISAR
N/R buitding such as providing & fixingdesigner tites for approach to the col[egebuitding of VIMSAR.
17 N/R buitding such as repair & renovation toSkin & VD department of VIMSAR
18 N/R buitding such as repair &. renovation tothe cancer ward of VIMSAR
19 N/R buitding such as leak proof treatment toNursing Schoot,Burta .
20 N/R buitding such as Repair & renovation toNursing Schoot,Burta .
5.00
I
5.00
5.00
5.00
5.00
E:\C.E.(B)\SPR\2018'19\AMP 2018-19\A.M.P.-2018-19{1-10-2018\AMP Non Res./Old NR Pg_29143
(naa) oiuiston No. Requiredf (1) \7) (3) t4t (s)21
')?
L1
25
26
NiR buitding such as Repair & renovattonNursing Hostet,Burla .
N/R buitding such as Repair & renovationBoys Hostel No-1 of VIMSAR,Burta .
N/R buitding such as Repair & renovationBoys Hostel No-2 of VIMSAR,Burla .
U7n nuitdlng such as Repair & renovationBoys Hostel No-3of VIMSAR,BuT[a .
N/R buitding such as Repair & renovat.ionLadies Hostel No-1 of VIMSAR,Burla .
N/R buitding such as ntpilr a renovationLadies Hoste[ No-2 of VIMSAR,Burta .
27 N/R buitding such as repair & renovation ofSPM & FMT Dept. of VtMSAR,Burta .
28 N/R buitding such as renovation to doctorsseating area in fema(e medicine of lndoorhospital of VIMSAR,BuT[a .
N/R buitding such as Repair & Renovation toPWD Subdivision office,Burta .
N/R buitding such is providing & fixinr3designer tites in front of PWD Subdivisionoffice, Burla .
31 N/R buitding such as Repair & Renovation toGED JE office, Burta .
32 S/R (R&B) Sub-Division office Kuchinda33 S/R (R&B) Section office Kuchinda
to
to
to
to
to
tc
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
2.60
3.60
29
30
5.00
34
35
S/R (ReB) Section office Bamra
Si R (R&B) Quatity Control office Kuchinda36 Agricutture Office at Kuchinda37 S/R (R&.8) Store at Kuchinda
38 S/R Revenue Rest Shed at KuchindaAdministrative office Building such
proof treatment of ITI at Hirakud
S/R such as Painting works outsideHostel at Hirakud ( 1st Ftoor)
41 SDH at Kuchinda such as renovation of OtdNRHM office.
4.69
TOTAL= 190.45
5.00training centre at 3.00
3.50
2.50
z.la4.90
4.50
3.88
5.0039
40
as leak
oi eoyt
5.00
5.00
Deogar h
S/R to. ....LollectoraLe Bur[ding
Ladies hostel of mMDeogarh
7
E:\C.E.(B)\SPR\2018 19\AMp 2018 19\A.N4.p.-2018 19-01-10-2018\AMp Non_Res./Old NR Pg_30/43
(7) (3) (4) (s)
(R&B) Division No.
(1)Required
5.00
7.00
10.00
10.00
3.00
2.00
3.00
\i/
3 Academic btock ANM traininq centre atDeogarh
4 Admistrative b[ock of ANM training centre atDeogarh
5 District Traserl Buitdlng at Deogirh6 Dy. Director of Haticuttur office atDeogarh
7 lndiragandhi Stadium8 Town high schoo[ at Deogarh
9 'l st ftoor Conf rance Hat[ of Town high schoo[ atDeogarh
10 Fire station buitding at Deogarh 5.00
Total = 48.00S/R to.....
Jharsuguda 1 CTO Office 5.00
2 DPMU Jharsuguda
3 Mateward Jharsuguda JaiI
4 Out side cotouring of Engineering Buitding
5 Vigitance unit Office at Jharsuguda
5.00
5.00
5.00
5.00
6 Veterinary imspection buitding (FPL & DDL)
7 Maternity centre at DHH, Jharsuguda
5.00I --
5.00
8 Paediatric Ward DHH, Jharsuguda s.00
9 Betpahar Hospital 10.00
Total= 50.00S/R to.....
Baragarh 1 S.T.Schoot Bargarh such as repair, renovation 3.00
2 Panchayat Cottege Bargarh such as repair to,Compound watl and approach to Ladies Hostel
rOtd Library Buitding at PanchayatBargarh .
4.00
t Col.t e 3.00
4 Vigilance Office Bargarh such as repair and 4.00renovation.
5
6 A.D.T. Office Buitding such as washing andpainting.
7 D.l. Ottrce Burlding such as washing andpainting.
8 Govt. Girts High School Bargarh such as repairand renovation to Girts Hostet.
Excise Deptt. Otd Office Buitding such as 7.00flooring washing and painting
2.00
2.00
E:\C.E.(B)\sPR\2018-19\AMP 2018-19\A.M.p.-2018-19-01-10-2018\AMp-Non-Res./otd NR
3.00
PB.Y./a3
l-r(R&B ) Divisjon I tlo
IRequired
(1) (7i
9
(3i
20 Suppty officeBargarh.
H.E.T.C. Buitding Barpali such as CementConcrete approach road to Office Buitdrng
Cotlectorate at Bargarh such as (otd irrigaticnGodown ).
Sma[[ saving office & Sports Office such :rs
change of Roof at Bargarh
Revenue lnspector office at bargarh.
SP Office at Bargarh.
ITJ at Bargarh-
Ladies Hostel of lTl at Bargarh.
DAO Office at Bargarh.
Vigitance Office at Bargarh.
Sub-Register office at Bargarh.
otd revenue l.B. functioning C.D.P.O.(Urban)office at Bargarh.
(Sub-CoItector campuii e
10
11
17
13
14
15
16
17
18
19
21
22
Red Cross Bhaban at Bargarh.
District Disaster Management Unit at Bargarh.
23 Tahasit Record Room at Attabira.Matinity ward at Attabira.Dispensary & HospitaI Buitding at Attabira.Vetnary Dispensary at Attabira.
27 PWD Section office at Attabira.28 A.R.C.S. Office Buitding (Co-Op. Deptt.) at
Bargarh.
29 Dist. Ptanning Office Bargarh such as 3.00Construction of Cycte shed
30 D.P.M.U. Office Bargarh.
31 Tahasil office Buitding Barpati for 2018-19 such
as repair and renovation with provision cfAltum'inium Doors and Window shutter, washingpainting to Office Buitding.
32 R.l. office at Padampur
S/R to.....1 Regional lnstitute for Technical Education an,l
Training Balangir
2 Godown and sorI Laboratory (Agritcu[tur,3Deptt) at Batangir
3 Cotd storage unit of Horticuttuie Deptt atBalangir
24
25
26
Bolangir
E:\C.E.(B)\SPR\2018-19\AMP 2018-19\A M.P.-2018-19-01-10-2018\AMP-Non Res./Old NR
4.00
Pc_3 43
i (4) (5)
,t 4.00
3.00
3 .00
4.00
2.00
5.00
3.00
4.00
3.00
4.OO
3.00
3.00
2.00
2.00
2.00
3.00
4.00
s.oo
s.00
2.OO
2.00
2.00
4.00
Total,= 100.00
4.50
4.00
(R&B) Division No
(1) (2t
Required tY(3) (4t (s)
4
5
6
7
8
9
Boys hostel of DIET at Batangir
Sub collector office Batangir
Renovation of office of the DIET
Fire office batangir
Agriculture rest shed at Balangir
Revenue Rest shed, Batangir
9!EH office !ulqlng ,BatangirGED office buitding at Batangir
4.00
2.00
4.00
4.004.00
4.00
3.00
3.00
4.00
10
11
1Z
, Batangir
R&B sub division and section office buitding
13
14
15
, Batangir
Dist Agricutture office Batangir 5.00
3.00
4.00
R.l office buitding,BatangirGinning unit of Agriculture dept. , Batangir
16
17
Co[d storage unit of Horticutture Deptt at Batangir 4.00
4.OODistrict Potlutory farm, Balangir
18
19
20
21
Revenue Rest Shed at Sindho[ 3.00
Dl office at Sonepur 1 .50
2.00C.D.V.O. Office at Sonepur
S.T. School Ottd buiLding at Sonepur 3.00functioning as Central School
22
2iVAS Office Buitding at Binka 2.00
VAS Office BuiLding at Birmaharajpur 2.00
24 Vetarinary Office at Sonepur 2.00
25 Rl Office at Birmahrajpur 2.00
26 D.l. Offce at Birmahrajpur 2.00
77 D.l. Offce at Sonepur 2.00
Total= 86.00
Kantabaniji 1 Boys high Schoot at Kantabanji 4.00
2 Tititagarh (R&B) Sub-Division office at; 5.00
Titilagarh
3 Patnagarh(R&B) Sub Division office, Patnagarh 3.00
4 Kantabanji (R&B) Division office at Kantabanji 5.00
Total= 17.00S/R to.....
Sonepur 'l Dl office at Sonepur 3.00
4.00
3.{J0
2 GED Section Office at Sonepur
3 Sub-Regrstar Oifice at Sonepur
4 C.D.V.O. Office at Sonepur 5.00
5 S.T. School Otd buitding at Sonepur functioningas Central School
5.00
E:\C.E.(B)\sPR\2018-19\AMP 2018-19\A.M.P.-2018-19-01 10-2018\AMp-Non Res./Otd NR Pg_33/43
S/R to.....
fi Required
| (4) (s)
3 .00
3.00
5.00
4.00
4.00
s.00
4.00
4.00
5.OO
57.00
5.00
4.50
3.50
4.50
4.00
3.00
3.00
5.00
5.00
4.50
4.50
4.50
4.50
3.50
5.00
3.00
i.oo81.00
5.00
5.00
5.OO
(*au ir,",',on(1)
No
(2) (l)6
7
8
9
'10
11
12
13
14
Sub-Treasury Office at Birmaharajpur
5 u b- Registrar Office at Birmaharaj pur
Sub-Divisionat Hospital at Birmaharajpur
Asst. District Taxtite Office at Sonepur
District Education Office at Sonepur
Community Health Centre at Tarbha
Veterinary D'ispensory at Tarbha
Tahasit Office at Binka
CUC at SinlG
Total=S/R to.....
Kalahandi 1 Sub-Cottector Office Buitding at Bhawanipatna 4.50
2 DHH at Bhawanipatna
3 District 5ub-Registrar Office at Bhawanipatna
4 Joint Commercial Tax Office at Bhawanipatna 4.00
5 District Circuite House at Bhawanipatna
O R.l.otflce cum-res at Bhawinipatna7 Eye ward of DHH at Bhawanipatna
8 East Hostel of Govt.Autonomous Cottege ert
Bhawanipatna
9 Sub-Cottector Office at Dharamgarh
10 Sub-Co[tector Office at Bhawanipatna
11 Administrative Buitding of Agricutture Cottege, 2.50
at Bhawanipatna
12 Coltectorate Buitding at Bhawanipatna
13 GED Office at Dharamagrh
14 GED Office at Bhawanipatna'l 5 Female ward of TB hospita[ at Bhawanipatna
16 Revenue Rest Shed Buitding at Dharamgarh.
17 Tahasit Office Buitding at Kesinga
18
19
R.l. office buitding at Kesinga
Govt. Girts High Schoot at Kesinga
20 Dist. Etection Office at Bpt
S/R to.....Khariar C. H.C- buitding:t Khariar.
Main Hospitat Ulqgg, t{uapi-a.PHC out door at Khariar Road.
1
2
3
E:\C.E.(B)\SPR\2018-19\AM P 2018' 19\A. M. P.'2018' 19 01-10-2018\AM P-No n-Res./Old N R
TOTAL
Pg_34/43
(R&B) Division No.
(1)Requ'ired
(7) (3) (4) (5)
7
8
9
-o
3.00
3.00
s.00
4.004.OO
4 Eye ward of D.H.H.Nuapada.
5 Horticutture office Btdg.at Khariar.6 Veterinary Dispensary office btdg.at Khariar.
D.A.O.Office at Khariar.
Training hatt of Agrt.Office at Nuapada.
Treasury buitding at Nuapada-
D.W.O.Office btdg.at Nuapada.
3.00
3.00
Total= 40.00
Renovation to TahasiI Office 5.00such as record room and
Balasore-lS/R to.....
1 Repair and
Buitding at Soro (
office)
2 Repair and Renovation to R.l Office at Soro 5.00
3 Repair and Renovation to Sub-Treasury Officebuitding at Soro
5.00
4 Repair and Renovastion to Vetrinary Dispensary 4.00at Soro
5 Repair and Renovation to Excise office buitdingat Soro such as site devtopment & watchmanshed
5.00
6 Repair and Renovation to Fire Station buildingat Soro such as site devtopment & ptinthprotection
5.00
7 Repair and Renovation to Horticalture Nursery 5.00at Soro (Such as site devtopment &Compoundwatt)
8 Repair and Renovation to Tahasil Office 3.93Buitding and Construction of Gate at Nitgiri for2018-19
9 Repair and Renovation to Sub-Treasury OfficeBuitding ( Ground Ftoor and First Ftoor) atNitgiri for 2018-19
2.21
10 Renovation to Fire Station at Nitgiri such asrepair to Compound watt
11 Repair and Renovation to Sub-Register OfficeBuitding and Construction of Compound wal[ atNitgiri
12 Repair and Renovation to Sub-DivisionalHospital at Nilgiri such as Construction of Gate
4.20
2.75
2.00
E:\C.E.(B)\SPR\2018-1g\AMp 2018 19\A.M.p.-2018-19 O1 10-2018\AMp-Non-Res./Old NR Ps_3s/a3
/ (R&B) Division t',lo Required(1) \7t (3)
13 Repair and Renovation to Gapabandhu Chhatrabasat Nitgiri Plaster, Roof, Wa It, colour , Door & Windcwdamaged etc.
14) (s)
14
15
16
Repair and Renovation to Sub-Registrar Offi<.e
buitding at Nitgiri such as
Plaster, Roof ,Watt,cotour, Door & Windowdamaged etc.
Repair and Renovation to ofEf buitding ;rtPodasuI with atl Btocks.
Repair and Renovation to Fire Station Buitdingat Nitgiri such as Plaster, Roof ,Watt,cotour, Door
& Window damaged etc.
7.00
3.00
3.00
2.00
2.00
2.00
'17 Repair and Renovation to (R&B)Office buitdirgat Nitgiri such as Ptaster, Roof ,Watl,cotour, Door& Window damaged etc.
18 Repair and Renovation to Circuit House zrt
Nitgiri such as Ptaster, Roof ,Watt,cotour, Door IWindow damaged etc.
19 Repair and Renovation toBuitding at NitgiriPlaster, Roof , Wat[, colour, Doordamaged etc.
SDPIRO officesuch as
& Windour
2.24
20 Repair and Renovat'ion to Veterinary Dispensary
Office Buitding and Compound watl at Nil.giri2.00
Total= 67.33
S/R to.....Balasore-ll 1 A.D.A.O. office Buitding at Jateswar
2 E!!9$qllub!'ul,o!.3 Batiapat(R&.8)Section.
4 RedCross Cabin at DHH ,Balasore5 A.N.M Hostel buitding at Balasore
4.00
3.00
6 SR to Garage & store room of Dist. Horticuttur,:Office Euilding, Balasore.
Dist Oevtopmen!lffi1e BLritding. Batasore
Dist Ptanning Office Buitding,Balasore (Such
Repairing & Cotouring)
7
8
9
3.00
5.00
s.0b
3.OO
4.00
3003.00
10 Dist Welfare Office Buitding,Batasore
E:\C.E.(B)\SPR\2018-19\AMP 2018-19\A M.p.-2018 19-01-10-2018\AMp-Non-Res./Otd NR
as
3.00
P9_36/a3
(RFIB ) Division No.
(1)Required \6
(5)(2) (3) (4)
11 Garrage & drain of (R&B )Division- llOffice, BaIasore
DHH at Balasore (repair to cow catcher )
T.B Hospital at Batasore (Such as repair to C
watt)
Batasore R&B Division-ll Office Buitding such as
renovation of meeting hatt.
5.00
17
13
5.00
5.00
14 5.00
Total= 56.00S/R to.....
Bhadrak 1 Cotlectorate buitding at Bhadrak 5.00
2.002 Sub-Register office buitding at Basudevpur (
Repair of Record Room & Computer Room)
3 Sub-Treasury Office buitding at Basudevpur 2.004 Treasury Office Buitding at Dhamnagar. 2.005 S/R to Treasury Office Buitding, Dhamanagar 2.00
2.ob6 Commercial Tax Office at Bhadrak.7 Storage Godown at Bhadak 3
2
.008 Storage Godown at Bye-Pass Bhadak. 00
9 Assistant Engineer Office buitding at Bhadrak. 2.0010 Junior Engineer Office buitding at Barikpur. 2.OO
2.OO11 Junior Engineer Office buitding at Tihidi12't3
Assistant Engineer Office buitding at Chandbali. 2.00S/R to P.W.D Office at Dhamanagar 2.00
14 Junior Engineer Office buitding at Basudevpur 2.00
15
16
Assistant Engineer Office buitding at Basudevpur 2.00Assistant Engineer Office buitding at Basudevpur. 2.00
17 Ass!.lcicutture Officer at Dhamnaqar 3.0018 Vigitance Unit Office at Bhadrak(Such as
construction of approach road)5.00
19 Fire Station Buitding at Charmpa atBhadrak.(Such as Compound Wa[t)
3.00
20 D.t.c Bui[ding Bhadrak 2.0021 B9pqf!q9y9!9! g qqlak 4!!gryq'ou-s cotl_ece 10.0022 Zilla Schot at Bhadrak 3.00
3.0023 B.M. Bagq!:a! tfiCI Schoo[ at bhadrak24 {.C, Hlgh lc-hoot Ultarbahini 2.0025 Mandari Boys High Schoot. (Repair of Ctass Room) 2.0026 Mandari Girts High Schoot, Mandari (Such as
Repair & Renovation)
27 S/R to Girts High Schoot, Dhamanagar (cate)
2.00
3.00
S/R to. .. . .
Total= 74.OO
E:\C.E.(B)\5PR\2018-19\AMP 2018-19\A.M.p.-2018-19-01-10-2018\AMp-Non Res./Otd NR Pg_37 /43
)Divjsion No Requlred
(1)
Mayu rb hanj
(2) (3) (4)
4.00
5.00
(5)
5 S/R such as fixing of Paver btock near znd Gate 3.00
at D.H.H,.Baripada.
6 Orthopedic Deptt. At DHH,Baripada .
1 Si R such as reparr & renovation to Room T.BHospita[, Baripada .
2 Lady Hamilton Nodal High School at Palbani,(Fixinq of floor tites)
3 C.D.V.O.Office at Baripada .
4 Providing fitting & fixing of floor tites in Cta:;s
room for Lady hamilton Nodal High Schoo.,
Baripada.
7 M.P.C Jr. Cottege hosteI buitding, Baripad;r.(Change of wooden Beam & Burgas)
8 M.P.C Jr. Cotlege hoste[ buitding, BaripadeL.
(Change of wooden Beam & Burgas)
9 Maintenance Deptt. Of D.H.H Baripada
10 Lady Hamitton High Schoot at Palbani, Baripacia
for (Reparing & painting to Class roonr,
Boundry wa[[ and gate)
11 Dixing of Atuminium jatty, Atuminium Door,
Atuminium Penetting & Gypsum boad ceittingor DEIC Bl.dg. at D.H.H, Baripada Mayurbhanj .
12 M.P.C Jr. Cottege Hostel building at Baripadalor
'13 Eye ward of D.H.H at Baripada (Such as outsidesurface)
14 Geology Deptt. Of Govt. Women's coltege atBaripada.
15 D.A.o.office & godown at Baripada for the year
16 Preparation room and store room & Chemistrydeptt. for M.P.C Junior Cotlege, Baripada.
19 M.P.C. Junior Cottege Hoste[ buitding lst. FtocrBaripada.
20 Govt.Women s College Comnrerce depLt. C[a:,s
room at Baripada .
21 Roof treatment for M.P.C. Junior cottegegatlery portion, Baripada .
4.00
3.00
3.00
3.00
3.00
3.00
5.00
3.00
3.00
3.00
3.00
4.00
2.00
17 S/R such as repair to 2 Nos gae for Agricultureoffice at Patbani, Baripada.
18 Microbiotogy Deptt. Of RDC Ist. Floor of D.H.]J 2.00
Baripada .
4.00
2.00
2.00
E:\C.E.(B)\SPR\2018 19\AMP 2018-19\A.M.P.-2018 19 01-10-2018\AMP-Non-Res./Old NR
4.00
PE_38/a3
(R&B ) Division No
(1 \7)
Required (}') (3) (4) (s)
72
L)
24
4.00
4.00
4.00
ANMTC Office & Ctass room at Baripada
C.Wal.t of M.P.K girts High Schoo[, Baripada.
M.P.K. Girt's high schoot, Baripada (Such as
stage roofing fixing Atuminium Jatty & out sideptastering & Painting)
Back side ptinth portection for M.P.C Jr.Cottege at Baripada for lthe yar (Fixing ofC.C.Tite)
26 OPD of Ent.Deptt. At DHH, Baripada . 3.0027 SlR such as repair & painting to C.Wat[ of
A.T.D.C.at Baripada .
28 Administrative Building & Computer Ctass room 4.O0of M.P.K Girt's High Schoot, Baripada.
29 Repair & renovation of Arnapurna Hotel in thecampus of D.H.H at Baripada
3.00
30 Govt. Women's Coltege tibrary buitding repairand painting
4.00
25 5.00
3.00
31 D.H.H at Baripada (Such as fixing of M.S. grittsin corridor) P-ll.
32 Eye Hospital ofBaripada
D.H.H. at Bhadudibandh, 1.00
33 A.T.D.C. Buitding at Baripada (Such as 4.00construction of gate & C.C.Path)
34 Otd O.P.D at D.H.H Baripada . 2.@
1.00
35 Govt. Women's Cottege Arts Btock at Baripada . 2.OO
36 Work shop Buitding of A.T.D.C. Patbani Baripada 2.0037 5/R staff common room of M.P.K. girts High
Schoot, Baripada .2.00
38 S/R Such as fixing of Paver Btock near 1st gate'at D.H.H Baripada .
4.00
39 Sub-Cottector Office at Baripada . 2.0040 M.P.C Jr. coltege Hostel building, Baripada .
(Change of Wooden beam, burgas in room)3.00
41 Work shop Buitding of P.C.l.T.l PalbaniBaripada . (constn. of Approach Path)
4.00
42^,t.P.C
Jr. cottege Hostel Chemistry Department,Baripada.
S/R such as repair to Dinning shade for M.P.K. girtsHieh Schoot, Baripada. (South side)
Construction of Portico of New AdministrativeBuitding of MPC (Auto) College at Takatpur .
4.00
43 3 00
4.0044
E:\C.E.(B)\SPR\2018-19\AMP 2018-19\A.M.p.-2018-19 o1-10-2018\AMp-Non Res./Otd NR Ps_39/a3
Y4' (R&B) Division No.
(1) (2)
46
(3)
45 Stage of A4PC (Auto) Cottege at Takatpur . (CC path)
4748
Construction of Cycte Stand of DDA Off ice
Buitding at Takatpur, Baripada .
Boys HosteL No. -ll of MPC (Auto) Cottege at TakatPur.
Repairs to D.l.C. Buitding at Takatpur-,
Baripada . 1q.!" Shed andPath way)
Total=
Rairangpur 1
S/R to.....TahasiI Office buitding at Rairangpur
Horticutture Office buitding at Rairangpur
3 Sub-Ttreasury Office buitding at Rairangpur
4 P.W.D (R&B) Sub-Division Office, Rairangpur
5 Fire Station buitding, Rairangpur
6 Cycte stand at Govt Boys High Schoot, Rairangpur
7 Training Hatt of District Agricutture Officer,
Rairangpur
8 Dining Hatt of SSD Girts High Schoo, Rairangpur
9 Repair to cycte stand of Govt Girts school zrt
Karanjia
S/R to Sub-Cot[ector office buitding at Karanjia
S/R to Govt High schoot block No.3 & Kitchen
at Karanjia
Total
2
10
11
S/R to.....Keonjhar 1 Sub-Cottector Office Buitding at Keonjhar.
2 R.l. Office-cum-Res at Keonjhar.
3 Otd D.S.W.O. Office Buitding at Keonjhar.
4 R.T.O. Office Buitding at Keonjhar.
5 DIET otd AC Sheet roof buitding at Keonjhar.
6 Town Girts High School at Keonjhar.
7 GopabandhuChhatrabasa
Required
(4)
3.00
2.00
(5) .-l
4.q03.00
't 52.00
2.00
2.00
2.00
3.00
5.00
5.00
2.00
2.00
4.95
2.qq7_.05
32.00
3.00
2.00- -
z.oo
5.00I-
5.00
3.00
5.00
8 Compound watl of New library of D.D (Auto) 5.00
Coltege at Keonjhar
9 Veterinary Hospital at Keonjhar
10 Dy Director Agriculture Office, Keonjhar
11 Assistant Textite office, Keonjhar
Assistant Sericutture Office, Keonj har12
13
14
15
District Soi[ Conservation Office, Keonjhar
Sub-Cotlector Off ice at Champua
Tahasil Office at Champua
16 Horticutture Off ice at Champua
17 Veterinary dispencery at Champua
18 S.D.H. with Subsidiar Btd . at Cham pua 6.00
6.00
5.OO
4.00
3.00
4.00
s.bb
3.00
4.00
5.00
i\dltrc 'Jl L,'J \'s, i\l n:l I ldi r\>
{R3B) Division No. Required.\,
(3) (4) (5)(1) (7t
1970
21
22
23
24
BLood Bank & Administrative Btock of S.D.H. Champua
10 Beded Ward for SDH Champua
Sub-Treasury Off ice at Champua
Revenue Rest Shed at BarbiI
Office cum store at Matkambeda High Schooi
Dispensary btdg at Barbit2 Nos. extra room at Govt. Dispensary btdg at Barbit
30 beded Hospiiai it Loda
5.005.00
4.00
4.00
4.00
5.00
75 8.005.0026
27
28
29
Sub-Treasury office btdg at BarbiI
8.00
5.00
New D.C.C.T. Office Buitding at BarbiI 3.00
Total= 131.00S/R to.....
GhatagaOn 1 sR to lrlain gate & Back side c.watl of s.T schoot at Fakjrpur 5.00
2 SR to Kitchen Slock E Dining of 5.T School Building at Faktrpur 3.003C gmpoqld watt of D.l Offi_qe,at Anandapu[. 5..09
10.004 S.N. High schoo[ Buitding at Padampur.
Total = 23.00S/R to.....
Sundargarh 1
2
Town High Schoot Buitding at Sundargarh 2.00
Rani Janaki Girts High School at Sundargarh 2.00
3.003 Municipal Gadhi High School at, Rajgangpur.
4 Math, Education Department at Govt. Cottege Sundargarh 2.005
6
Geotogy Department of Govt. Cottege, Sundargarh 2.00Otd Ladies Hostel Bui(ding at Govt. Cottege, Sundargarh 2.00
7 Library Hatt at Govt. Cottege, Sundargarh 2.008 Govt. Cottege Buitding at Sundargarh 2.00
9 UGC Hostet Buitding of Govt. Co[ege at Sundargarh 2.00
10 Sub-Registrar Office Buitding at Sundargarh 4.0011 Cottectorate Buitding at Sundargarh (Leak Repair) 5.00
12 Renovation & Repair of Etectrical works of Revenue 4.00,D"p"I!r"nt
13 R&B Executive Engineer Office (Conferen ce Hatt,office)
4.00Rajgangpur Setting Office, Hemgir - Sub Division
14 S.P. Office, Sundargarh 4.0015 50 bedded Hostel Buitding at Dist
Bhawanipur, Sankara, SundargarhSports Comptex at 3.00
16 Ga(tery Btock at Dist. SportsBhawanipur, Sankara, Sundargarh
17 Gvmnasium Hatt ji Dist. SportsBhawanipur, Sankara, Sundargarh
Comptex at 7.00
Complex at 2.00
18 Otd DIPRO Office Buitding at Sundargarh 3.00
S/R to.....Total = 50.00
t-
I
-\r4'l iR&B) Division I
No
AmoutIRequired
(1)
Rourkela
(2) (3)
1
7
3
4
5
6
78
DlPRO,PanposhUGIE boys hostet(T/5)RKLAgriutture office office PanposhSoiI Conservation office PanposhGED Sub division off ice, RKL
Girts Hostel No 1, UGIE
B.E D. Cottege at Rou rketa.lnstitution buitding at Rourketa.
S.K. D.4.V. at Rourketa.G.E.D. Section Office. qt bonaiS.D. Hospital at Bonai .
P.W.D. Sub division Office at Bonai.
t.T9
10
11
17
13 R.G.H.Rourketa1! -Govt. Qls Hig[lgtroo|, Aona,L1I Ggyt. Grts High Sslqq! , B_qamltlqpgr16 Office-Cum-Sp!!y!y Office at Udjtnag,ar.17 Civit Suppty Office at Rourketa.18
19
GovL Autonomous Cqll.eS RourketaOffice cum res buitding,Koira section
21 l.T.l. workshop buitding at Rourketa.S.K.D.A.V. Girts hostet no-3 at Rourketa.22
23 Ugie Boys hostet(t/s)S.D. Hospital at Bonai .74
25 P.W.D. Section Office at lahunipada26 R.G.H.Rourketa2728
Observation Home at RourkelaFire Statiel1Qtric! q!!!qins at lqqrketa.
29 Rourketa Cotle rketa.3! =ltintg qlrce eq lSlrt1gq.31 Sub-Co[tector office at Rourkela.
(4t (5r
2.004.O03 .003.003.004.q04.094.004.002.003.O0
4.O04.00
1.0!3.002.002.005.002.005.004.004.005.005.00
3.005.002.004.005.002.002.003.004.00
?.!q2.002.004.00
4 004.004.00
4.004.OO
5.00
4.OO
4.004.00
4.00
32 l.T.t COE buildtlg, Rourketa33 Main School Buitdinq at U.G.l.E. Rourketa34 R.l. Office at Bondamunda.35 PWD Sub-Division Office at Bonai.
19 t lCb:TJg_elq1y,Qffice at Biramitrapur37 Munici t Cot lege Roqrketa38 RD.L !l!sh School s at Bonai.39 R.D.D High Schoot hostel building,bonai40 Basanti High Schoot
41 Town High Schoo[
47
43
Sakti Nagar High Schoo[ shaktiragarNAC st Highschool sector 20
MunicipaI Hieh School
Acharya HariHar High Schoot, ptantsiteMadhusudan high Schoot Banda MundaChhend Housing cotony Highschoo-NAC S.T high schoot sector6
44
45
46
47
48on- e5
4.00
20 Ladies Hostet of Govt. Autonomous Col[ege
51,
Nc
Il a:.'t= Ci il-a \',::i-r,S A- c L.r::
Req ui red(t_ R8ts ) Division
(1) (7)
f-:::=(3)
Nayabazar highschool MunicipaI High SchootUtkatnrani.NAC S.T htgh school Deogaon
NAL 5.T high schooi secror.lNAC S. T high schoot sector '1 6
NAC S.T high school LaukeraNAC S.T high schoot Titkanagar
49
50
51
57
53
54
.1.00
4.004.004.004.004-00
193.00Total=S/R to Non-Residential euitalng; =
Grand Tota[=L''ff*{
(4) (5)
1714.35741 .5
\024 s
Chief Engineer (Buildings)Odisha, Bhubaneswar
i:\c E.(B)\sPR\2c18-19\AMp 2018-19\A.M.p. 201s 19 2,i-07 -lo 1g-cD\\ANlp Nor-Res./oid NR Pg_4sias
" \\ ---}}Y,{'
?STATEMENT
Other Agency-non-Residential Bui tdi ngs
Name of the Works
(Rs. in Lakhs)
Name of the (R&B)
Diviston
SI. N
o
Amou n tRequired
Remarks
(1) (7) (3 ) (4) (s)
S/R to.....Puri 1
2
l
Survitlence Unit at D.H.H, Puri 5.00
Urban P.H.C near Sea Beach at Puri 5.00
Kamadevi Maternity Hospita|., Pu rl 4.004 Doctor's Rest Shed C.H.C. at Nimapara 5.00
Total= 19.O0
S/R to.....Cuttack-l 1 Super special OPD, SCBMCH, Cuttack 2.00
'l -502 BPFTIO Workshop cum Academic Btdg, BOSE
Campus, Ctc
3 Civit Deptt, Btdg, BOSE, Cuttack 5.00
4 Canteen Buitding, BOSE, Cuttack 5-00
5 SPIU Office Btdg, BOSE, Cuttack 2.50
4noZoo
6 BPFTIO Ladies Hostel, BOSE, Ctc
7 BPFTIO Academic Btdg, BOSE, Ctc
8 Admn. Btdg, BPFIO, BOSE campus, Ctc 5.00
9 Mutti-purpose Studio, BPFTIO, Ctc 4.00
Tota[ = 33.00S/R to.....
Kendrapara 1
2
3
D.H.H. Kendrapara 3.00
U.G.P.H.C. Pattamundai 2.O0
D.P.O. Kendrapara 3.00
Total= 8.00S/R to.....
Jagatsinghpur 1 D.l.C. office buil.ding, Jagatshinghpur 5.00
Total=i 5.00S/R to.....
Angul 1 S/R to CDMO. ADMO &. RKS office at DHH,
AnguI4.00
2 S/R to D.l.C. office buitding at AnguI 5.00
Total= 9.00S/R to.....
Ganjam-l 1 U.C.P. Engg. Schoot NCC and Mechanical 5.00Deptt at Berhampur
2 Govt. Po[ytechnic Auditorium hatt of at 3.00Berhampur
3 House Officers Hostel Roof Stab of MKCG 4.O0
MC&H at Berhampur
PsJ'/aElCEl3)\5P;i.20iS.:91;t'1c2a18.)9, a tlt? z)it'i9-)4 0i )013 CD\.AMP Non Fe! Otie.iD4rry,\.r;i
3(2)(1)
l.rame ol ine (Rt-A )
utvlsron
SI. N
o
l.tame of tne vr orks AmountRequirecj
F,eir,ai-k:
(3) (5)
4 Re.vune l. B at Berhampur
5 U.C.P. Engg. School Industnat Engg^ L,rbs
Facutty Rooms at Berhampur
6 Government women Potitechnic Berhamput.
7 U.C.P. Engg. Schoot Bio Tech. Deptt. L,rb.
at Berhampur
5.00
5 .00
5.00
5.00
S/R to.....Bhanjanagar 1 C.H.C at Aska
2 C.H.C at K.S Nagar
Tot.rl = 32.00
4.00
5.00
3 C. H.C at Potasara 4.00
4 C.H.C at Buguda 3.00
5 C.H.C at Sorada. 3.00
6 C.H.C. Office at Betlaguntha 3.00
Tot;rl= 22.OO
Balliguda
S/R to.....S/R to JaiL
repair toWashing
2 S/R to Non-Res Buitding such as repair toPolice station at Battiguda.
S/R to Police Station at Battiguda such as
Repa'ir to the Potice Barrack. (Spitt over)
Buitding at Batliguda such as
ward, Tite flooring & Cotour5.00
5.00
3 4.00
Total= 14.00
S/R to.....Nawarangpur 1 DHH at Nabarangpur 5.00
Total= 5.00S/R to.....
Ma Ikanagi ri 1 D.H.H Buil.ding at Matkangiri 5.00
Paralakhemund i
2 SDPO Office Euitding Matkangiri 5.00
Total= 10.00
S/R to.....1 S/R to DPO comptex at Ranipentha 5.00
Paratakhemundi
2 S/R to District Consumer D'isputes Redressal
Forum court at paratakhemindi
J i.!/.lr; ii r\\J,.,.L,rJi,wL.J, i,,c r.-.1!',, tJ-,.-,15
at Betaguda.
3.00
i.vw
i la [ /J/].irii-lrl-. LJltr'!'r'''al.l t2\,,\ N1 P 2018 i9 24 O/.-?0,18 aOi..1r"]t tu.r 42. Orr.'r.1..r.! 11?
Tota l= 'l 1 .00
Pe_2/a
1
st.
No.
Name of the Works
(1) (2) (3) (4) (5)
Sambalpur-lS/R to.....
1 Matinety ward at sub-divisional hospital atRatakhol.
2 Btood Bank sub-divisionat hospitat at Rairakhol.
5.00
5.00
3 A.N.M Training Centre at Sambatpur.
4 Eye ward at D.H.H. Sambatpur.
5.00
5.00
20.00Total =
Jharsuguda 1
S/R to.....si R to SNCV DrHH Jharsugudi 5.00
2 OPD & ward Btock at DHH, Jharsuguda 5.00
Total= 10.00S/R to.....
Baragarh 1 Co-Operative Training lnstitute Bargarh (Co-
Op. Deptt.) such as renovation to Compoundwatl and approach road.
5.00
2 A.C.C.T Office Buitding Bargarh such as 2.00washing and painting.
3 S/R to Fire Station office Buitding Barpalisuch as repair of compound wat[, washing,painting.
3.00
4 S/R to C.H.C. Buitding Barpali for 2018-19. 3.00
5 S/R to Govt. Girts High Schoot Buitding Barpati 3.00
2.OO6 5/R to Govt. Boys High School Buitding Barpati
7 S/R to Matrumngat Buitding in DHH at 3.00Bargarh.
8 S/R to Eye Ward in DHH at Bargarh. 3.00
Total= 24.OO
S/R to.....Kantabaniji 1 Main Hospital Buitding at Titilagarh (Extra
Stair case for 1st Ftoor Repair work)5.00
2 Btood Bank at Titilagarh 3.00
3 SDH Buitding at Patnagarh 3.00
4 S/R to Patient ward at SDH Patnagarh 3.00
5 Si R to Drug Ware House (1st Ftoor) at SDH
Patnagarh2.00
6 CHC at Kantabanji 5.00
Total= 21.OO
S/R to.....Sonepur 1 DHH at Sonepur
Tota 1=
5.00
5.00
Name of the
1R&B1 DlvrsionAmou n t
RequiredRemarks t\il
E:\C.E (B)\SPR\2O18 19\AMP 2018 19\A-M-P -2018.19-01.1O2018\AMP-Non.Res.Other Agency.NR Pg_3/4
0;
Knariar !!).043.00
500
)
f
a
), l\ Lu- -. -.
J n (u I rrs >Ldli 'ru J-.d.
S/F. to Fire statron at Khariar Road.
S/R to A.C.C.T.Offlce bldq.at Khariar Road
S/R to l.T.l.AdmintstrativeH oste I at Khariar Road.
B ldg. for Lache s
Total= 17.OO
S/R to. ....Keonjhar 1 Repair to Diploma Ladies Hostel of O.S.M-i
at Keonj har
5.00
2 Repair to O.S.M.E. SchooL Buitding Zrt 5.00
Keonj har (Extension Buitding)
3 Reparr to E-S.1. Hosipital at barbil 5.00
4 Repair to Hostel Btdg of lTl at Barbil 5.00
Total= 20.00
Ghatagaon 1 R/R to S.D.Hospital Anandapur at Ghasipura. 5'00
2 R/R to P.H.C. buitdings at Anandapur. 5.00
3 Ri R to P.H.C. bui[dings Anandapur Fakirpur 5.00
4 R/R to Fire station Buitding Anandapur zrt 5.00
)dtdPdud.
5 R/R to Ftre station Building at Anandapur . 5-00
Total = 25.00
S/R to.....Rourkela 1 U.G.l.E. lnstutiton bui[ding at Rourke[a.
2 SKDAV Potytechnic at Rourkela
5.00
5.00
3 Barrack At RP tine 5.00
Total= 15.00
Grand Total= 320.00
\ \L.\
Chief Engtnee (Buildings)Odi:;ha, Bhubaneswor
Pg_a/a:\caltllsP;i-2ot5i9\A!.1.:,::::9:: I?.. iil:.:9:rr t7 2l:3 cc\al\u! tior'p"s !.re' lozncv NF
..\STATEMENT
Judiciary-Non-Residential Bui tciings
Name of the Works(Rs.in Lakhs
Name of the(RftB) Divjsjon
st.
NoAmou ntIlu'..,.i;..J
Remarks
(1) (2) (3) (4) (5)S/R to.... .
Puri 1 Otd Civit Court Buitding 3. 00
:. oo
3.bo
2
3
New Civil Court BuitdingS.D.J.M Court
4 C.J.M Court 4.005Renovation of Famity Court & Libra ty 3.006 Court Buitding at Konark 3.007 Court Buitding at Nima pada 4.008 Civi[ Court Buitding at Nimapada 4.00
Total= 27.OOS/R to.....
Cuttack-l 1 High Court Guest HouseOutside painting)
in CB-ll (lnside & 3.00
2 Civit Court Buitding, Cuttack 2.00
c.oia3 4nos SDJM Courts, Civil Court BLdg ilnsiA-painting & provision of fite cabinets)
4 4nos SDJM Courts, Civit Court Btdq (Repair of 4.00roof, fa[se watting & ceil.ing)
5 New Civit Court (Heritage Btdg), Cuttack (At. door) 4.006 New Civil Court (Heritage Btdg), Cuttack (Door 3.00
ndow repair and inside painting)7 New Civil Court (1st track
(provision of ceiting)court), Cuttack 4.00
8 3storied Bui[ding of New Civil Court, Cuttack 4.00(lnside ptastering & painting)
9 3storied Buitding of New Civit Court, Cuttack 3.00(S'ite development)
10 Odisha
Cuttackipainting)
Administrative Tribunat(Repair of fatse watting
Buitding,& inside
3.00
Total = 34.00S/R to.....
Kendrapara 'l Civit Court Buitding, Kendra para 3.002 NDJ Court, Buitding, 7.003 CJ,I Cou!!, Buitdrng
Gari'age bLritding
Hazat Buitding
1.00/1.00
5 2.006 Dist- Judge Court Buitding (New) 3.00
Totat= 12.00E \C.E (ts)\5PR\2018.)9\AMp 2A1B-tg\A.^, p. 2o1a E 24 07 2O1B-CD\A^tp Nan R?s-t t(jiL,a,r.NR Pc 1/6
(,6I
(5) \
s
No.
Nanre ci ihe V/ci't'ls An ouni fl6,rnir!5Nai-;- e of iie
(RAB) Divrsion
iJagatsinghPur
Angul
(3)
R.equrrecl
4 .00
4.00
4.50
1 JMFC court Buitding, Jagatsinghpur
2 SDJM Court buitding at JsPUr
I ADJ court building at Jagatsinghpur Near
CottectarateTotal= 12.50
5/R to.....'t Couri ouiLaing at A;gut
2 Repair of ADR center at District Court, AnguI
3.00
i. oo
3 District Court building at AnguI 3.00
4 Otd ADJ court buitding at Angul 3.00
3.005 District Judge chamber at Angul
(2)(1)
6 Court bui[q,n93! Alllqltik (!q:J:4r cogr-t) 3.00
7 Addt. Office room for court buitding a
AthmaLtik
3.00
8 Court Buitding at Pattahara
9 Court BuiLding at Talcher.Total'=
S/i to iJb Judge -ourt eriLaing at Athagarh
Tota['= 5.00
S/R to.....1 District Civit and Sessions Court at Berhampur 3.00
3.00
3n027.O0
5.00Charbatia 1
I
Ganjam-l
2 District Judge Court (Vutnerabte
Centre) at BerhamPur
3 Dist.Civit and Sessions Court at Berhampur
(Generator shed)
4 District Civi[ &. Sessions Court,Berhampur
Witness 3.00
3.00
3.00
5 S-D.J.M Court,BerhamPur 3.00
6 A. D. R.Centre, at BerhamPUr 7.00
7 Mututip lex Court Buitding at BerhamPur 3.00
8 Fast Track Court at BerhamPur 4.00
9 Court Hazat Buitding,at Berhampur 3.00
10 M.A.C.T.,Court at BerhamPur 3.00
11 J.M.F.C. Court Buitding, DigapahndiTotal =
S/R to.....qL"!! !ry1 buitdrng at Bhanjanaqar_
S/R to J.M.F.C. Court Buitding at Sorada such
as construction of C.Watt
CiviI Court Buitding at Aska
CiviI Court Buitding at Aska
3.00
3 3.00
Bhanjanagar 13.00
3 .00
3.00
3.00
12.00
7
3
4
E la ! /81\5P31:rr.q r9\A/.,lP2A18 E\A.M F 2O1E 79:4 A7 )0i3 CD\'AMP Nan Res tudicicry NR
Total=
Pc_2/6
AmountRequired
st.
No
Name of the Works
(4)(2) (3) (s)
Name of the-EB) Division
S/R to.....'l S/R to JMFC Court Buitding such as washing &
painting, repair to Door & window and leakproof at Battiguda
2 S/R to Sub-Judge Court Buitding such as
washing & painting, repair to Door & Windowand leak proof at Battiguda
3 Sln to the Advocate's Chamber & Library (Otd
Buitding)
4 S/R to otd Buitding of J.M.F.C at Battiguda such
as repair to Compound watt. (Spitt over)
:.-. (1)
Balliguda 3.00
4.00
3.00
002
Total= 12.OO
JeyporeS/R to.....
'I S/R to Dist. Court Buitding such as paintingworks at Jeypore.
2 S/R to Dist. Court Buitding (Boundary watt) atJeypore.
3 Construction of Madhu Babu Statue at Dist.Court Buitding at Jeypore.
4 S/R to CJM Court Buitding at Jeypore.5 S/R to First Track Court Buitding at Jeypore.
3.00
3.00
3.00
4.003.00
6 S/R to Famity Court Buitding at Jeypore. 3.00
7 S/R to SDJM Court Buitding at Jeypore. 2.00
s.oo8 5/R to ADR Buitding at Jeypore.9 S/R to JMFC Buitding at Kotpad 4.00
Total = 28.00
Naw
S/R to.....--arangPur Renovation of Record Room in the premises of 3.001
D.J. Court, Nabarangpur
2 District Judge Court Buitding at Nabarangpur 4.00
3 J.M.F.C & Famity Court Buitding at Nabarangpur 3.00
4 J.M.F.C Court Buitding at Umerkote 3.00
5 Sub-Judge Court Building at Umerkote
S/R to.....
3.00
Total = 16.00
Malkanagi ri 1
7
J
S.D.J.M Court Buitding at Matkangiri
A.D.J Cuurt Buit,jirrg at Mir[kangir i
Oistrlcttourt Auitaing at t*atXangiri
3.00
i . rJlJ
i.ooTotal = 9.00
Remarks rab'\
E.\C.E.(B)\SPR\2018-19\AMP 2018-19\A.M.P--2018-19.01-10 2018\AMP-Non-Res.ludiciory-NR Pc_3/6
l)(Raa)
5t.
\o.ollS
Name of the Works
(3)
Si R to.....1 Repair to Sub-Judge court buitding at Gunupur
2 Fast Track court buitding at Gunupur
3 Repair to SDJM court at Gunupur
4 Repair to Cycle Shed , Car shed & rest Shed atcourt comptex at Gunupur
5 A/A to ADJ & SDJM Court buitding at Gunupur
Total=S/R to.....O.S.W.N Buitding
Distric!lourt buitding at Deogarh
District Seson Judge court buitding at
Total--
AmountRequrrecl
(41
5,00
Remarks
(s) \,&
Rayagada-ll
Deogarh 1
4.00
4.00
3.00
1.00
17.OO
7
oeoErtr
3.00
iooi.ool
Kantabaniji
Total = 13.00S/R to.....
Jharsuguda 1 Si R to SDJM Court Buitding at Jharsuguda 5.00
Total= 5.00S/R to.....
1 Court Buitding at Tititagarh Renovation of Legal
fornt office with in Court Btdg.
2 Court Buitding at Tititagarh Renovation of 3.00
Library btdg &. JMFC Court Bldg.
3 Sub - Judge office buitding at Patnagarh 3.00
4 Munsaf Office (Judicial)at Patnagarh 2.00
5 Court Butding of Add. Dist. Judge,Patnagarh 4.00
6 Crimina[ Bar Association buiding, Patnagarh 2.00
7 JMFC Court building at Kantabanji
3.00
3.00
20.00S/R to. ....
Kalahandi 1 S/R to JMFC Court Buitding at Bhawanipatna 4.00
2 S/R to Vigitance Court Buitding at Bhawanipatna 2.00
3 Si R to Famity Court Buitding at Bhawanipatna
4 S/R to CJM Court Buitding at Bhawanipatna
5 S/R to SDJM & ADJ Court Buitding at Bpt
Judge court Buitding at3.00
3. O06 S/R to Session
Bhawanipatna
S/R to ADJ Court Btt at Ofrarimgarh 3.00
2.008 S/R to Sub-divisional Bar Office Buitding atDlrar arrrag;rlrr
9 5/R to Residentia! i]fice of Sub-Judge at Dharamagrh
10 5/R to Court Building at Dharamgarh
3.00
4.OO
2 00002.
E \C.E.(B)\SPB\2018-19\AMP 2O18-19\A M.P 2018 19-01-10-2O18\AMP Non Res.Judiciory-NR
Total = 28.00
Pg_a/6
'l )ame of the
(1) | tzr
AmountRequireo
RemarksName of the WorkstSName of the1&B) Division No
(4\(2) (3) (5)'(t (1)
S/R to.....1 S/R to J.M.F.C.Court Btdg.at Khariar.
2 S/R to Civit Court Btdg.at Nuapada.
1 A.D.J Court Buitding at Rairangpur
J ota couri Buitding , Riirangpur
Khariar
Rairangapur
Total=
5.00
5.00
10.00
4.OO
4.00
Keonjhar
3 A.D.J Court Buitding at Karanjia 4.00
Total = 12.00
S/R to.....1 Repair to District Consumer Disputes Redressal
Forum Office Building at Keonjhar.
2 Repair to CJM Office Buitding at Keonjhar. 4.00
3 Repair to District Judge Court Building at 3.00Keonjhar.
4 Repair to District Judge Court Garrage &. Rest
Shed Buitding at Keonjhar.3.00
5 Repair to Fast Track Court Buitding & Matkhanaat Keonj har.
6 Repair to court sadc. *ith its Subsldiary-tagl 3.00at Champua
7 Repair to Civil & Criminal Court at Champua 4.00
4.00
3.00
8 lGpa-i. to orrrce-auitaing or.JMrc at airbi 3.00
Total= 27.OO
S/R to.....Ghatagaon 1 ,R/R to Compound wall of
Buitding at Anandapur .
Judicial court 4.00
3
2 Court with subsiary Buitding at Anandapur. 3.00
SR to Vechicte shed at Anandapur Judicial 4.00court Buitding .
4 Court ASI office & Hazat of Judicial Buitding atAnandapur.
4.00
5 R/R to S.D..l.A^. office bLritding at Anandaprrr
6 R/R to J.M.F.C. court buitding at Anandapur.
Tota[ = 21.00
3,00
i.oo
alt
E'\C.8.(8)\SPR\2018-19\AMP 2o18-19\A.M.P.-2o18-19-o1-1G2018\AMP-Non-Res.Judiciory-NR Pg_s/6
t
-'r!; 11; r: i.:a
"rYra-is))' (i.;L, ll- r:L9 (1) llt r (3) (4) (5) ' i
Total . 21 .OO
S/ R. to.....1 Cjvil Sessjon Court BuitclingRourkela 3 .00
4.00
2. oo
2.oo
2 ADJ Court at Rourketa.
3 SDJM(S/D) Court at Rourkela
4 Fast Track court Bi[ding , Bonai
\
Chief Engineer Buildings)Odisha, Bhubaneswar
5 Fast Track court Bilding , Rourkela
6 Subj udge court buiiding
3 .00
7 ACJM Court Buitding at Rourkela
3 .00
4.00
Tota[=, 21 .OO
Grand Total=, 4O1 .50 --'
i:\,c a (E)\5?P\201:; i9\.!ttlr2ciE19\;tiP 2Oig i9 2!.O7.2A1l'fr\AN-tP \'a. Res )rDr.)a,v NR Pe 516
lo',STATEMENT
30 Years College Buitciings
Name of the Works
(Rs. in Lakhs)
Name of the (R&B)
DivisionSI Amou nt
Requ iredRemarks
No.
(1) (2) (3) (4) (s)
S/R to.. ...Puri 1 Govt.Women's Cottege at Puri 5.00
2 S
s
C.S.Coltege at Puri 5.00
5.00I C.S. (Junior)Cotlege at Puri
Total= 15.00S/R to.....
Cuttack-l 1 RNT Co[tege, Cuttack (Roof grading concrete & 4.00dismantting chajja, fins
2 Kathajodi Boys Hoste[ of RNT (Gradingconcrete to roof, changing of choukath &shutter &. painting outside & inside)
4.00
3 JKBK Cottege, Cuttack 15.00
4 SB Womens Cottege Main Buitding (Arts Btock),Ctc (Grading & Door window, plastering)
5.00
Total= 28.00S/R to.....
Dhenkanal 1 S/R to Govt Auto Coltege at Dhenkanat. 4.00Total= 4.OO
S/R to.....Ganjam-l 1 K.K.Cottege at Berhampur 1 5.00
2 Binayak Acharya Cotlege at Berhampur 10.00
3 Khattikote Junior Cot[ege,at Berhampur 5.00
4 5.8.R. Women's Cottege at Berhampur 10.00
Total = 40.00Ganjam-ll 1 Science Cottege at Chatrapur 5.00
Tota 5.00Phulbani 1 Govt Auto Cottege Phutbani
2 5.M Womens Cottege Phutbani
; 5.00
6.00
Total = 'l 1.00S/R to.....
Baliguda 1 Adivasi Cottege Ba[tiguda 10.00
Total= 10.00SiR to.....
Jeypore 1 S/R to V.D. Cottege at Jeypore. 10.00
E:\C.E.(B)\SPR\2018.19\AMP 2O18-19\a M P 2A18-19.24-O7 201&CD\AMP-Non Res 30 yeot Colteqe
Total= 10.00
Pg_L/a
(1) (7)
Y-,,an e of rhe rRLB)
Dr viston
(i Nane of tne \VCr-(s A'n a Lr. IRequlreci
(4)
R:na.ksNO
(3)
S/R to. . ...I iienovalron oi v\omu.r] s Hostel ior- )L o ) i
students of SKCG Cottege at Paratakhemundi.
2 Renovation of Padmanava Mohana Naik Hostelof SKCG Coltege at Paratakhemundi.
Para lakhem uncii :.0t)
5.00
Total= 10.00S/R to.....
Sambalpur-l 1 NSCB Cottege at SambaLpur. 5.00
2
3
G.M Cottege at Sambalpur. 10.00
Women's Cottege at Samba[pur. 5.00
Total = 20.00S/R to.....
Kalahandi 1 S/R to Govt.Women's Cotlege at Bhawanipatna 10.00
Totat= '10.00
Keonj har
S/R to.....1 D.D (Auto) Cottege at Keonjhar (Administrative
Btock)5.00
2 D.D (Auto) College at Keonjhar (Main Buitdingr 5.00
3 D.D (Auto) Cottege at Keonjhar (IGNOU Btock) 3.00
4 D.D (Auto) Cottege at Keonjhar (Madhusud:Ln
S.T. / S.C. Hostet)2.00
5 Women's Cottege at Keonjhar (Otd Library 3.00Buitding)
6 Women's Cottege at Keonjhar (Abhipsa Womer'sHostet)
2.00
Total= 20.00S/R to.....
Rourkela 1 Rourketa Cottege at Rourkela
2 S.G. Women's Coltege at Rourkela.
10.00
10.00
3 Govt. Auto Coltege at Rourketa. 12.00
Total= 32.00G.P.H.-lt 1 S/ R to P. H work of G.M Cottege Staff Toit(,t
(Gents) 5ambatpur.
- ) h '.0 r .li \\O: l'. Jl U..\\ LJ..aiL )i;,11 rO,,i i
(Ladies) Sambatpur.
3 Renovation oi F.H Wort< of Girts Hoste[ of Gov..Autonomous Cotlege at AnguI
2.76
o
ege
1 .98
\i.rame of the (R&B)
Divl sion
(1)
4 5/R to P.H work of G.M Cottege Common StaffToil.,L at Sa,rbaipL,,.
Renovation o( P.H work of Girts Hoste( ot Govt.Autonomous Cottege at Angu|..
S/R to P.H work of G.f"f University ViceChancelLer Toitet Chamber at Sambatpur.
2.75
1.98
0.50
5
6
7 S/R to P.H work of Administrative Block BED
Co[tege at Sambalpur.0.55
8 5/R to Govt. Womens Cottege at Sundargarh 3 .00
9 lmprovement to P. H Work of Gents Hostel ofRajendra Cottege at Bolangir
10 lmprovement to P. H Work of Lad'ies Hostel ofRajendra Cottege at Botangir
3.00
3.00
11 lmprovement of P.H Work to Govt. Auto 3.00Cotlege at Bhawanipatna
12 lmprovement of P.H Work to Govt. Cot[ege atNuapada
3.00
SI
No.Remarks
(71
AmountRequired
Name of the Works
(3) (4t (s)
1 3 lmprovement of P. H Work to Govt. College at 2.00Khariar
14 lmprovement of P.H Work to Govt. Coltege atKesinga
3.00
15 lmprovement of P.H Work to Govt. Cottege atM. Rampur
3.00
16 lmprovement to P.H Work of Commerce Btock
of Rajendra Cottege at Botangir2.50
17 lmprovement to'P.H Work of Science Btock ofWomens Cottege at Botangir
18 lmprovement to P.H Work of SM Womens,Cottege at Phutbani
19rlmprovement to P.H Work of Govt. AutoCottege at PhuIbani
20 lmprovement to P.H Work of Govt. Co[tege at'Dhenkanat
3.00
3.00
3.00
3.00
21 lmprovement to P.H Work of Govt. Co[lege atAnguI
3.00
27 lm provementRourketa
irrpt ouenrentSundargarh
P.H Work
P.ii Wor k
Co[[ege
- ;-rorIege
to
lo
of
UI
Govt.
GovL.
at
ai
3.00
L) 3 .00
24 lmprovement to P.H Work of Govt. College atPhutbani
2.50
ame of the (R&B )r Si Na;-le cf the \#orks AmounlRequrred
(4)
7.50
3 .00
P: n a i-k:
(i:Division No
25
76
(3)
lmprovement to P.H Work of Govt. Cotlege atEaIlrguua
lmprovement to P.H Work of Govt. WomensCottege at Boudh
27 lmprovement to P.H Work of Govt. Adivasi 3.00CoItege at Battiguda
28 Improvement to P.H Worti ofWomens Coltege at Botangir
Hostel of 3.00
Total = 73.77
Grand Total= 288.77
(1) (2)
Ps a/aE:\C.E (B)\SPR\2018 ig\AMP 20t8 19\A M p .2018 19 24 07 2O18 CD\AMp Non.Bes.3A yeor Cotleqe
Stt
Name of the(R.hD) Diur'i,rir
Pu ri
St Name of the Worksil-
S/R to.....1 Bjswambiar Bidya Prtha
2 Govt. Girls High School
3 Markandeswar Sahi Girls Hiqh Schoot
4 Gangadhar Bidya Pitha
5,00
5.00
5.00
5 Govt.Boy's High Schoot at Nimapara
5.00
5.006 Otd Boy's High School at Nimapara
7 Govt. Girt's High School at Puri5.00
5.008 Batagandi High Schoo[ at Puri 4.009 Govt. Boys High school at Konark
10 Damodar Girt's High School at Konarkl.0q
5.00
Total= 49.00S/R to.....
Khurda 1 Practising High Schoot,Khordha 5.00
2 Govt Girts High Schoot, Khordha 5.00
STATEMENT
30 Years School Bui ldings(Rs. in Lakhs )
Amou n t
ll\:'qUiir'\.i
Rem a rks
(1 ) | rzl (3) (4) (s)
3 Govt Girts High School, Jatni 5.00
4 Govt Girts High Schoot, Banapur 4.005 Govt Girl.s high school at Khurda
6 Gurujanga Nodal highschoot at Khurda5.00
5.00Total= 29.OO
S/R to.....Nayagarh 1 Brajendra High Schoot buitding at Nayagarh 1.00
2 Govt. GirL's High School buitding at Nayagarh . 1.00
3 Brajendra High school building at Nayagarh usedas CentratSchooI 1.00
4 Head Master office buitding of B.H Schoo[ atNayagarh.
, 1.00
5 R.C.High Schoot at Khandapada. 1.00
6 Raghunath Bidyapith at Odagaon. 1 .507 Science Room for R.N.Bidyapitha at Odagaon. 1.00
8 R.K.Girts High School at Odagaon 1 .50
9 Govt.High School at Daspatta. 2.00'10 Govt.Girts High School at Daspatta
11 Satapatna High Schoot at Daspatta.'12 Radhamohanjew Hiqh School at Daspatta.
l3 tsC High Sciroo[ aL R.anpur .
2.00'l .50
2.00
2.0014 Govt.Girls High Schoot at Ranpur. 2.00
t \C E (B)\SPR\ZO1E 19\AMP 2OtB 19\A.M.P.-2A18 E 24 A7 2A18.CD\,AMP-Nor.Res 3C ypor Schaol
Total = 20.50
Pg_L/M
(1) (7t
-9Name of the
(R&3) Division
BBSii No.ll
,5i Na rne cf tle S/orks An'ouitR.equrred
t4l
Remark-l\io.
(3)
S/R to. . ...i >r R 6.M. hrgh schooL, Llrruoaneswai'
2 5i R to Govt Boys High Schoot
3 5/R to Govt Girts High School
4 Si R to Pipiti High Schoot PipiIi Approachpainting work
5 Jawahar AiayipitfralOtal6 JawaharBidyapitha(New)
:::
and
5.00
2.50
).502.50road
2. 50
3.00
iaroBBSR No.lll
Tota l='l S/R to Govt. High Schoot, Power House co.ony
Unit-8, BBSR
4.00
2 5/R to Govt. Boys High Schoot, Unit-8, BBSR(S,uch
as construction of RCC flooring, ramp and cyc[estand , fixing C.C. uttra tite)
3 S/R to Govt. Boys High Schoot, Unit-8, BBSR(Such
as fixing of gritl gate , door and window shutter,colouring and weather coat painting)
4 S/R to Govt. Boys High Schoot, Unit-8, BBSR(Such
as improvement to main gate and stage vvithACP)
5.00
5.00
5.00
5 S/R to Govt. Boys High Schoot, Unit-8, BBSR(Such
as improvement to staircase , ctass room andcorridor of schoo[ buitding )
5 .00
6 S/R to Govt. Boys High Schoot, Unit-8, EBSR(Such
as improvement to fountain stage approach,tndentry point
4.00
7 S/R to Govt. Boys High Schoot, Unit-8, BIISR
(Such as improvement to main gate and frontelevation with ACP
4.00
8 S/R to Govt. Boys High Schoot, Unit-8, BBSR(Such
as ptint protection, cement repair work, fixingof choukath shutter and outside weather ccatpainting )
Tota l=
5.00
BBSR No.lV 1 Capital High Schoot such as ctosing of compoundwatI
2 S/R to Capitat high School such as lmpvt of 1.500LL!,lLr' LL rJ!:,
3 Capitat High Schoot Wat[ panetting to VocationalRoom
37.O0
1 .500
E \C E (B)\SPR\2018.19\AN1P 2Oi8.1,o\A.M P 2018.i9 U.A7 2C16 CD\AMP.Noh.R?s 30yeor Sthoat
5 .000
Ps 2/L4
\>7Name of the
(R&B) Division
4 Saheednagar High School Repair of Compound 2.500
'.v,: l. i.
Unit -{X Gir(s High schoo( Bui(ding 4.000
Unit-lX Boys High School such as Plastering 4.000
distempering and paintinq
5
6
7 Rasulgarh Ashram School such as Repair to Ctass
room and Staircase roofing of left side schoolBuiLding, BBSR
1.000
B Rasutgarh Ashram School such as repair toGround floor class room no-1&2 of left sideschool Buitding
1.000
9 VSS Nagar Government High School, BBSR 5.000'10 Saheed Nagar High School Repair Renovation of
MDM room, BBSR
'l 1 Saheed Nagar High School Repair & roofing toOpen Stage
1.500
4.000
Total= 31.00
SI
No
Name of the Works Amou n tRequired
Remarks
(1) (2) (3) (4) (5)
S/R to.....Cuttack-l 1 Ravenshaw Girts High School, Cuttack 5.00
7 Kazibazar Girls High Schoo, Ctc (outisde painting) 1-50
3 Hostel of R.G. Schoot, Ctc (lnside & outside 5.00painting)
4 Kazibazar Girts High Schoot, Cuttack5 Marwadi High Schoot (Btock-A)
6 Senior Standing Counsel of RNT (Ftoor repair) s-00
7 Tutasipur Govt. High School 5.00
8 Raveshaw Cotlegiate School, Cuttack
9 Ol.d Boys Hostel of Ravenshaw Cottegiate School,Cuttack
: 10 ;Ranihat High Schoot, Ctc
5.00
3.00
4.50
Tota[ = 44.OO
S/R to.....Cuttack-ll 1 rSR to BNC High School at Badambadi, Cuttack 5.00
2 5R to Chhatrabazar High Schoot at Cuttack 4.00
3 SR to Govt. Girls' Hiqh Schoot at Badambadi, 5.00Cuttack
4 SR to Secondary Board High Schoo[ at Ranihat,Cuttack
E \C E (B)\SPR\2018 19\AMP 2O18-19\A M P 2O1E 19 24-A7-2O1q-CD\AMP-Non-Res.3A reo. School
5.00
PE_3/L4
__ 5.00
5.00
(1) (7)
Name of the
1R&E1 Division51.
lloName of the Works Arnount
Required
4.00
Remark.
(3)
5 SR to BNC High School at Badambadi, Cuftack 5.00
i:ulir as 'Lile iloor r,rg 3 ir,,.i,rs ot g ill) io, 'ilrc ,"eai2018-19.
6 SR to Govt. Girt's High Schoot ai Badamt,adi. 5.00Cuttack
7 SR to Kamalakanta Bidyapitha, Kudasahi such as
renovation of front court yard
8 5R to Nayabazar High Schoot at Cuttack 5 .00
s-009 SR to Badambadi High Schoot at Cuttack10 SR to Budhimangata High Schoot at Cuttack 5.001'1 SR to Kamatakanta Bidyapitha at Cuttack s.00
12 5R to Madhusudan High
CuttackSchoot, Khapuria, 5.00
13 SR to Khannagar High Schoot, Khapuria, Cuttack 3.00
14 SR to OGP Press Colony, High Schoot, Cuttack 4.00
15 SR to Gopalpur High Schoot, Cuttgck16 SR to Nimpur High School at Jagatpur, Cuttack
2.00
5.00
17 Govt. Girts High Schoot buitding (o|.d) at Banki 5.00
To1-a[ = 77.OO
Kendrapara 1 Gir[s High Schoot Pattamundai
2 Girls High Schoot Kendrapara5.00
5.003 Boys High Schoo[, Kendrapara 5.00
I Batadevjew High Schoot, Kendrapara s.005 lchhapur High Schoot, Kendrapara
6 M.N.High School, Pattamundais.00
2.00
Total= 27 -OO
S/R to.....Jagatsinghpur 1 Govt. Girl.s High School, Jagatsinghpur
2 Purohitpur High Schoot, Jagatsinghpur
8.00
7.00
Total = 'l 5.00S/R to.....
Panikoili 1 V.N. High school at Jajpur Road 5.002 NC. High school at Jajpur Road 5.003 Sasibhusan Girts High School at Jajpur Road
4 Govt. Girt's High School Jajpur5 B.D. High School Jajpur6 Zr[[a SchooI bur[drng at JaJpur
S/R to.....
2.00
3.00
3.00
5.00
23.00
E.\C.E (8)\SPR\2O18 19\AMP 2O18.19\A.M P 2018 La 24 07 2A18 CD\ANlp Non Res3Areorschoot
Total=
Pe-4/M
*t;t
(\>
Charbatia 1 KaLinga Vidyapitha at Choudwar
2 Gopabancjnu High Schoot at anoudwar
3 Nigamananda Vidyapitha at Daulatabad,
Choudwar
4.00
5 .00
5.00
5.004 Joteswar High School at Mundmal, Choudwar
5 S/R to B.N.Bidyapitha at Athagarh 5'q0
o iln io cwt. clrts tiigfi icnoot, Athagarh 4.50
Total= 28.50
Dhenkanal 1 S/R to S.D Girts High Schoot at Dhenkanal. 4.00
2 S/R to Govt Girts High Schoot at K.nagar. 4.00
3 rSlR to Alutuma High Schoot at K.nagar. 4.00
Total= 12.OO
S/R to.....Ganjam-l 1 Govt. Girts High School at Mititary [ane,
Berhampur
2 Sahid Laxman Nayak Govt. High School at
Courtpeta, BerhamPur
4.00
4.00
3 Govt. Girts High School at Digapahandi 4.00
AmountRequired
RemarksSL.
No.
Name of the Works
(4\ (s)(7\ (3)
Name of the(R$B ) Division
(1)
4 Mother Sarojini Govt.High School
Berhampur
Ankuti at4.00
5 Government High School inside Medical campus
at Berhampur2.00
6 Sahid Laxman Nayak Govt. High school
courtpeta at Berhampur4.00
7 Government Girts high school at Berhampur 2.00
8 R.R.Bidyapitha at Chikiti9 Queen of the Mission High School at Berhampur
4.00
2.00
10 Govt. Girts High School front Gate at Berhampur
11 Mother Sarojani Girts High Schoot, Berhampur
5.00
5.00
12 Sahid Laxman High School atBerhamur
13 Girts' High Schoot,Mititary Lane at Berhampur 5.00
Courtpeta, 5.00
14 Govt. Girts High School at Hinjiti 5.00
15 Brundaban Vidyapitha at Hinjiti1 6 Ctass Rooms of R. R. Vidyapitha at Chikiti
1Z V.V, Giri Girts High School at Berhampur.lS Gov[. Gir ls High School, Digapahandi
5.00
s.00'10.00
5.00
19 B.K High School, Digapahndi s.00
E \C.E.(B)\SPR\2o18-19\AMP 2O18-19\a.M P 2Ai8 fi'24-07'2018 CD\AMP Non Res 30veorSchool Pg-s/L4
Total = 85.00
\(\ Name of rhe
iRtoD1 Divisron
ist. / Na rne of the Wcrkst.l o.
(2t
Amou r, :
Requlred
I o^- - -r
'i>(3)
Ganjam-iiS/R to.....Govr. Gtr[s Htgn ichooi aI aharrapurGovt. Boys hrqh schoot at RambhaS.M. High School at KhallikoteK.M. High School ar KhatiikoteGovt. High Slhoot at Kodata
S./t. High SchooI at Kodala
S/R to.....Bhanjanagr 'l Gopobandhu High Schoot at potasara,
2 U.B. High school at Bhanjanagar
2
3
4
5
6
5.00
5.00
5.00
5.00
5.00
s.00Total= 30.00
6.00
3 Govt, G.T. High school at Be[agunthas,9o
5.00
(1)
4 Govt. Girts High School at Aska 5.00Tot.al = 21.00
S/R to.....Phulbani S/R to AJO High Schoot, Phutbani 1 .50
2 5/R to Govt Girls High Schoot phutbani
Tola[ =
2.00
3.50s.bo
s.oo
b.oo
Boudh 1 Jogindra Dev High Schoo[ Boudh2 Jogindra Dev High School Hostet Boudh3 Govt.Grits High Schoot Boudh
4 Govt.Grits High School Hostet Boudh 5.00
Tota[ = 20.00S/R to.....
Baltiguda S/R to Girts High Schoot such as repair to theMeeting Hat[, Six Numbers Ctass Rooms, repair toDoors & windows & cotour washing, painting etc.at Battiguda
',0.00
Total= '10.00
S/R to.....Koraput 1 Construction of Science Laborotory Girt's Figh
School at Koraput10.00
Total= 10.00S/R to.....
Jeypore 1 Govt. Boys High School at Jeypore2 Govt. Girts High School at Jeypore.3 S/R
Jeypoto Chandanabad Govt. High Schoot at
5.00
e(
5.00
3.00
5.00)J
ii tc -1;gijrsh Licyapiiha Goir. iiigir ihoc. aieypore.
E \C E.(8)\SPR\2A18 E\AMP 2013 19\A ^.1_p
.2oJS 19 24 A7 2A1B CD\AMp.Non Res.3C yeot Schaal
Tota I = '18.00
PE_6/la
\5Name of the
{F&.B ) DivlsionSI
No.
Name of the Works
(1)
Nawarangpur
Malkanagiri
S/R to. .. ...l
R.CD Hrgh Schoo[, Nabarangpur
2 Govt. Girts High Schoot, Nabarangpur
I S.S.. Boyl HrSh Schoot at Umerkote
4 Govt. Girts High Schoot, Umerkote
S/R to.....t Boys High ichoot Buitaing ut Matkangiri
:. Otl
5.00
5.00
s.00
Total = 20.00
5.00
Amou n tRequired
RemaiT6
(4) (s)(2) (3)
2 Govt Girts High School at Matkangiri 5.00
-+.oo3 Govt Boys High School at Balimela
Total = 14.00S/R to.....
Rayagada-l 1 S/R to GCD High schoot, additional ctass room No
1&.25.00
2 S/R to Govt Girts High Schoot at Rayagada
Rayagada-ll 1 Govt. Girts High School at Gunupur
5.00Total= 10.00
5.00
2 Boys high school gunupur 5.00
3 Repair to Govt. girts high school & Hostel atgudari 5.00
4 Govt.high school at gudari 4.005 Boys high school at gunupur
S/R to.....Paralakhemundi 1 Varanashi High School at Kasinagar.
2 MR Girts Hostel at Paralakhemundi.
s.00
Total= 24.OO
10.00
3.00Total= 13.00
Samba [pur- | 1 Lady Lewis Girl's High Schoot Sambatpur.
2 CSB Zitta High Schoot Sambatpur
3 Rani Arnnpurana Girt's High School at Rairakhol
4.00
4.00
3.00
Total = 11.00S/R to.....
Sambalpur-ll 1 S/R Govt. Boys High Schoot, Kuchinda
2 S/ R Govt. Girls High School., at Kuchinda
3 S/R to Govt. High School at Hirakud
4
s.00
s.00
s.00
5
6
S/R to N.R. Buitding such as repair andrenovation to Btind School Burla
SrR to Govt. Hiqh Schoo[ at Hrrakud such as
fitting, fixing of doors
Govt. Boys Hlgn schoot, euria
4.O0
5.00
5.00
a \C.E.(B)\SPR\2O1E La\AMP 2A18 19\A.M.P..2O18-19 21-07 2O1E CD\AMP Non Bes.30 year Schoot Pg 7/M
ttName oi :he
(R&81 Drvisron
SI Na n':e of ihe \Yorks
(3)
AitrCUnl:
RequiredRema rl. -i
(1)
No
(7) .-.-\]7
o
Govt. Girts High schoot, Burta
dir,,; s.irooi h tL.llovai]ort ro ie.lr,dunlb school , ;uria
3.00
4.00
Total = 36.00
3.00
5.00
2.00
Total = 10.00
Deogarh
S/R to.. . ..1 D. R.C Gentes Hostet
2 D.R.C Ladies Hostet
3 D.R.C class Room a otti..
Jharsuguda 1 Boys High School Jharsuguda
2 Girt High Schoo[, Jharsuguda
5.00
5.00
3 Orient cotliary High schoot, Budhijam, 5.00Brajarajnagar
4 OPM Girts'High school, Brajarajnagar s.005 OPM Boys'High school, Brajarajnagar 5.00
6 Gondaghora high schoot, Brajrajnagar 5.00
7 Town High Schoot, Jharsuguda
8 Panchapada High Schoot, Jharsuguda
s.00
s.00
Total= 40.00
Baragarh
S/R to.....1 George H'igh Schoot Bargarh such as repair and
renovation to Geeta Hostel Btock.
2 S/R to Attariba Boys Hlgh School
3 S/R to Girts High School at Attabira
10.00
1 5.00
1 5.00
Total= 40.00S/R to.....
Kantabaniji 1 Hindi High Schoot at Tititagarh 10.00
2 Girls High Schoot at Kantabanji 10.00
3 Boys High Schoot at Kantabanji 12.00
Total= 32.00S/R to.....
Kalahandi '1 S/R to Govt. High School at Junagarh 4.002 S/R to Govt. High School at Dharamagh 2.003 S/R to Kesinga Vidyapitha at Kesinga 3.00
Toral= 9.00
KhariarS/R to.....S/R to Gopabandhu High School at Khariar Road. 5.00
I S/R tr Govt GirL: Hiqh Srhool 3t Kh:.jar Rcaa 5,!C
5.00
5.00
3 S/R to Govt.Girts High Schoo[ at Nuapada
4 S/R to Govt.Girts High Schoot at Khariar
i \C E.(B)\SPR\zoiE 1.o\AMP 2A1E E\\A.tt1 P 2018 1924.07.2AjECD]AMF.Nan-Re\.3Cveo.Sthool
Tol.a[= 20.00
Pg 8/14
AmounlRequireo
Name of th: \{torks Rema,ks
(4)(1) I rzr (3) (5)
5\Name of the
(iEB) Division
Balasore-l
st.
No
1
2
3
4
S/R to. ....S.N. High schoot Brtding at Soro
Zitta School BuiLding at Batasore
HosteI Buitding of Zitta SchooI Buitding
Batasore
office ai c6is Room J s.N Htgti S.l,oot at Soro
2.00
2.00
at 1.00
5 Vocational buitding of S.N High School at Soro
5.00
5.00
6 R.N Bidyapitha at Soro 5.00
5,00 -7 Maudamani High School at Soro
8 Repair and Renovation to Hemoprava High Schoot
at Soro
5.00
9 Repair and Renovation to the Hostet BuitdingBarabati Girts High School Balasore
10 Repair and Renovation to Compound wa[[ of 2.00Govt. High School at Nitgiri
1.00
11 lmprovement to Gopabandhu Chhatrabas of K.C
High Schoot such as Earth fitting infront of theChhatrabas Nitgiri
2.00
12 Govt. Girts High School at Nitgiri 5.00
Total= 40.00S/R to.....
Bhadrak 1 S.S.M High School Chandan Bazar
2 D.N Girls High Schoot, Bhadrak.
2.00-z.io
3 Zitta Schol at Bhadrak 2.00
4 Govt. Girts High Schoo[ at Bhadrak. 3.00
5 B.M. Bagurai High Schoot at bhadrak
6 N.C. High School at Bhadrak.
7 RCBL High Schoot at Bharak.
8 Charampa Girts High School at Bhadrak.
Govt. Girls High Schoo[, at Basudevpur'10 Mandari Girts High School, Mandari9
2.00
3.00
3.00
3.00
2.50
11 Boys High School at Dhamnagar.
12 Dakha High schoot,Chandabali 3.00
13 S/R to Girts High Schoo[, Dhamanagar 3.00
Total= 29.00S/R to.....
Rairangapur 1 30 seated Hostet buiidingScirooi, iiairairgpur
of Govt Girts High 3.00
2 Kitchen Block ofRairangpur
SSD Girts High Schoot, 2.00
ErlC!.f3)ISPFlz0iS -19\AMP 2A|E 1-a\a.M P 2018 19 24 07-2018.CD\AMP Non Res.3A veo. Schaol Pc_9/7a
,4
(1)
i: : .l =
(Kiir ) L,lVlSlOn
Keonjhar
l.lo
Nar: ci -sn: i.'1r115 A-a-a,.Rec u irec
(2) (3)
3 Dinjng Hatt of SSD Girts High Schoo[. Rairangpui-
4 Knalunsagar 5agar High scnooi at Karan.]ia
Tol.al =S/R to.. ...
'l Reparr to Town Gtrts High School at Keonjhar
2 Repair to D.N. High Schoot Hostet Buitdin3 atKeonj har.
3 Repair to Govt. GirtsKeonjhar.
High Schoot Buitdinrl at
4 Repair to lnternal Road of Govt. Girls High School
Buitding at Keonjhar.
5 .00
5.00
15.00
2.00
5.00
3.00
2.00
5 Repair to Kata Mandap of Govt. Girts High ScrootBuitding at Keonj har. 4.00
6 Repair to Main Gate of Govt. Girts High Sc roolBuitding at Keonjhar. 2.00
7 Repair to Mochibandha High Schoot at Keonjh,rr.
8 Repair to D.N. H'igh Schoot (Headmaster Room,Staff Common room) at Keonjhar.
2.00
s.00
9 Repair to D.N. High Schoot (Dinning hatt ofGeneral Hostet) at Keonj har. 5.00
10 Repair to Mahatab High school Hostel atChampua
'1 1 Repair to Mahatab High Schoot Hostel Kitchenroom at Champua
4.O0
4.O0
12 N.S. Potice High School at Keonjhar 2.0013 Repair to Girts High Schoot at Champua 3.00
14 Repair to Govt. Girt High School at Joda 3.0015 Repair to Matkambeda Govt. High Schoot'16 Repair to OSME Schoot buitding at Keonjhar
3.00
2.00'17 Repair to OSME School hostel buitding at
Keonjhar 2.00
18 Repair to Janhabi Women's Hostel at Keonjhar 2.00
Ghatagaon
19 Repair to D.N. High Schoot (Cycte Stand) atKeonjhar.
Tot al=S/R to.....
1 S.N.Hrgh school ai Padampur
- C,t ,S iii5lr !:;',u,. -- 1,,..,;y-: .
3 Brajabandhu High school buitding at Anndapu
Total =
s.00
6o.oo
1 5.00
ii.jjs. oo
PE 7A/laE'\C E (E)\.SPR\2Oi8 19\AMP 2A18 79\A.^1 P 2018 19 24 07 2Ot3 aD\AMP ^ion
Re!, 3A vec, schoot
30.00
(4) (s)
rl
Name of the(6++B) Division
Remarks
(1)
Rourkela
G.P.H. No-l
S/R to.....1 Govt. Girls Hrgh School , Udit nagar
2 Govt boys high schoot, Biramitrapur
3 Govt GirLs high schoot,, Biramitrapur
Total=1 S/R to pfl wort< to Nagpat Ne* Cout.ff[n ichoot
5 .00
5 .00
5.00
15.002.00
at Udata.
2 S/R to PH work of Rairangpur Boy's High Schoot. 4.00
ct
No.
(2)
AmountRequrred
Nan-re of the Works
(3) (4) /Sl
3 5/R to PH work of MKC High School hostel atBaripada.
5.00
4 5/R to PH work of Bhanjpur Girts High School atBaripada.
3.00
5 S/R to PH work of Govt. Girt's High School atKaranjia.
3.00
6 S/R to P.H work to Bhanjpur High schoot at 3.00Baripada. ( Ladies toitet )
7 S/R to P.H work to tedy Hemiltol girts High 2.00School at Baripada.
8 S/R to P.H. work of Kasanta High School 1.50Buitding at Pattamundai
9 5/Rto P.H. workof M.N. High School Buitding at 1.00
Pattamundai
10 S/R to P.H. work of Boys High School Buitding atKendrapara.
2.00
1.00
17 5/R to P.H. work of Biraja High School Buitding 2.00at Jajpur town
13 5/R to P.H. work of Vyasanagar High School 2.00Buitding at Jajpur road
14 S/R to P.H. work of N.C.'at Jajpur road
High School Buitding 1.50
15 S/R to P.H. Work of Ravenshaw Coltegiate 1 .50Schoo[, Cuttack.
16 S/R to P.H. Work of Bhakta Madhu Bidyapitha,Cuttack.
1.00
17 S/R to P.H. Work of Secondary board High 2.10)Lr lLlUr, Ltr L LJrl\.
18 S/R to PH work ofJagatpur, Cuttack.
Nimpur High School at 1.70
E \C f (B)\SPR\2A1t 19\A,\/1P 2O13 19\A.M.P. 2O18.19 24.A7 201g-CD\AMP Non.Res.30 year Schaol Pg LL/1.4
11 S/R to P.H. work of Girls High Schoot Buitding atKendrapara.
t7)(1)
Name oi i le(R&E1 Drvision
5i
1t.lo
Name of rhe \&ork,< AmountRequirecl
7.00
5.00
1 .30
5.00
Rerlai-r.-
(3) (s)
19 5/R to P.H. Work of Practisrng Grrts Hrgh Schoot,
LU Ltack.
20 Construction of toi[et btock for tadies and g,:ntsand renovation of tadies toitet at Unit-l Boys tlighschool Unit-l Bhubaneswar (lnternal PH work )
21 Construction of toilet btock for ladies and gt:ntsand renovation of ladies toitet at Unit-l Boys tlighschool Unit-l Bhubaneswar (lnternal PH work )
22 M/R to Ph work of Government girls high schoolUnit lX Bhubaneswar (lnternal PH work )
(4)
23 M/R to Ph work of Government girts high schoolUnit lX Bhubaneswar (External PH work )
2. 50
24 Renovation of ladies toitet and gents toitet blockschool pipiti PH work
5.00
25 M/R to Ph work B.M.High school old town 4.30bhubaneswar
26 M/R toPh work of Government girts high scl-oolUnit- lV Bhubaneswar
4.30
27 MlR to PH work of Mumtaz ati High school atNayapatti Bhubaneswar
2.00
28 M/R to Ph work of Deaf and dumb school at Urrit-3 Bhubaneswar
4.00
29 M/R to PH work of Jagamara High school at 3.00Nayapatti Bhubaneswar
30 M/r to PH work of government high school atMedical campus Berhampur
1.00
31 S/R to PH work to examination ha[ first ft,)orand staff toilet of High school at Nayagarh
33 S/R to PH work of Govt. otd Boys High school atNimDara
34 S/R to Ph work of Gopabandhu High sch:olChoudwar
4.90
32 S/R to Ph work of Girts High schoo[ at Nimpara 4.00
4.00
Er\a.E16l15P8i.?OlSig\tAMP20iSi9\A.MP-2A18-19.24-072018CC\aMP!\tonRet3Avea.S.haoj
2.00
PE_72/14
tName of the
(B.ftB) Divisron
5t.
No
Name of the Works Amou n tRequired
1.00
96.60
(1)
15 S/R to PH workC irouciwar
of Government high schoot 2.00
G.P.H. No-ll
36 S/R to PH work of BN Bidyapitha at Athaqarh
Total =
1 S/R to P-H work ofSchool, SambaIpur.
Ladies Toilet C.5.8 ZiI.[a 0.55
2 lmput. to P.H work to C.S Cotony School at 1-98
Sambatpur.
3 S/R to P.H work of G.N.M SchoolNabarangpur.
Buitding at 1.11
4 lmpvt. to P.H work to Girts High School at 1.98
Sundargarh.
5 S/R to P.H Work to Govt. Boys High School atSundargarh
1 .50
6 S/R to P.H work of Lady Lewis High School atSambatpur.
1.00
7 lmprovement of P.H Work to Govt. Boys High
Schoo[ at DhenkanaI
7.00
Remark5
(7\ (3) (4) (s)
8 lmprovement of P. H Work to Govt. Boys High
Schoo[ at Boudh
1.35
9 lmprovement of P.H Work to Govt. Boys HighSchool at Bolangir
1 .50
10 lmprovement of P. H Work to Govt. Boys High
School at Angul2.00
1 1 lmprovement of P. H Work to Govt. Boys High
School at Ma[kangiri2.50
12 lmprovement of P.H Work to Govt. High Schootat Jeypore
2.00
'13 lmprovement of P.H Work to R.V High School atRajgangpur
2.00
14 lmprovement of P.H Work to Gopabandhu High 2.00School at Rajgangpur
15 lmprovement of P.H Work to Govt. Girts High
School at Attabira1 .50
'16 lmprovement of P.H Work to Govt. Girts High
School at Bargarh
1.30
17
1E
lmprovement of P.H
School at Bijepur
lnrpr ovenrenI of P.llSchoot at Barpa[i
Work to Govt.Boys High 1.20
Woi k 1.o Gor,[.Boys Higlr 1.00
E \C.8.(8)\SPB\2A18 19\AMP 2078 19\A.tr.P. 2018.L9-24 07 2A18 CD\AMP Non Res-30 yeor Schoot PB_t3lM
)k Name oi the(R&81 Dlvision
SI Name of the Works Amou n tRequirecl
200
2.00
3.00
2.00
iRernarl,No
(3)
19
70
21
72
lmprovement to P. H Work of Govt. Girts -ligh
S.lrr.,l ot l' ru',-ra, i r
lmprovement to P-H Work of Govt. Boys lighSchool at Phutbani
lmprovement of P.H Work to Govt. High Scrootat Nuapada
lmprovemeni of P.H Work to Govt. High Scrootat Khariar
23 lmprovement of P. H Work to Govt. High Sc-roo[
at Kesinga3.00
Total = 40.47
07.6
(1) (7)
S/R to Non-Residentia[ (30 years College & Schoo[ Buildings) =
Totat (30 years School Buildings) = 1711.23vi,*'t 4fl
Total (30 years College Buildings) -- 288.77Grand Total (30 years Coltege + School Buildings) = 000.0
lq42,3r.l
\ \qa
Chi ef Engineer (Bui ldings)Oclisho, Bhuboneswar
E:\C.E (B)\SPR\2A18 19\AMP 2O1t 19\a M P..20:E 19 24 A7 2o18.Co\\AMP Non ees 3Ayeor s.haat Pg_L4/74
l4\ (5)
(yLSTATEMENT
50 Years College Buitdings
Name of the WorksName of the(R&B) Drvtsjon
Puri
Rs, in Lakhst.
No.A..not lnI
RequiredRlmlikr
S/R to... ..
5.00
s.00
5.00
Total= 15.00S/R to.....
Angul 1 Govt. Angul 10.002 Govt. Co[[ccaAtclt (P.G.b_!g!o 5.003 Govt. Cotteqe Angut (MBA btock 5.004 Class rooms of GovtLottege, Angut s.00Total= 25.00
S/R to.....Jeypore 1 S/R to V.D.Cottege at Jeypore sucn E-constn
-ZJ:Oof counter shed
2 S/R to V.D. Cottege (Science Btock) at Jeypore.
1 MBA & BBA btock of S.C.S Cottege, puri2 PG Btock of 5.C.S.Cottege at purj3 New Btock of S.C.5. Cottege at puri
3 S/R to V.D. Cottege (Administrative Ato-t<) atJeypore.
4.00
4.0)O
4S /R to V.D. Cotlege (P.G Btock) ar Jeypore. 4.50
(1) (7) (3) (4) (s)
Total= 15.005/R to.....
Kalahandi 1 Govt Autonomous Cotle ge at Bhawani2 East Hostel Govt.
Bhawanipatna
patna 10.00Autonomous cottege at 4.OO
3 West Hostel Govt.Bhawanipatna
Autonomous Cottege at 3.00
Total= 17.OOS/R to.....
Balasore-l 1 F.M Autonomous Cottege Batasore 10.002 Hostet Building of KKS Women's Coltege Batasore 5.00
3 New Boys Hostel attachedCottege Batasore
to FM Autonomous 5.00
Keonj harS/R to.....
1 Repair to D.D (Autol Cottege2 Repair to Women's Cottege at KeonjharI Repair to Audrtorjum of womens cottege, Keonjhar
Tota[=Grand total=
Total= 20.00
1 5.00
ro.oo
5.00
30.00121.00
E:\C E (ts)\SPF\2A18- j9 \Are1p 2018 1g\A.M p_rAU D 24_A7 2O1B_CD\AMp Non.Res.50 veot Coleae Pg-1/1
STATEMENT
50 Years Schoot Buildines
Name of the Works
(Rs. in Lakhs)Name of the Si
i lo.\, 'qr / u,Y,ilv' r
AmountRequired
Remarks
(1) (2) (3) (4) (5)
Puri 1
S/R to.... .
Gadadhar H,gh Sci,oot atPuri ZiLta Scfrooi at Fuii
Pu ri 5.002
3s.00
Bhotanath Bidyapitha at puri 5.00Total= 15.00
S/R to.....Khurda 'l P.N high school at Jatani 5.00
2 Govt. Girts high schoot at Jatani 5.003 BJB high school at Khurda 5.00
Total= 15.00S/R to.....
BBSR No.ll 1 S/R to Girts Schoot Unit-6 BBSR 4.002 S/R such as repa'ir and renovation to Computer 4.00
and Library room of Govt boys High Schoot Unit_6 BBSR
3 S/R such as repair and renovat.ion to ctass room 3 00of Govt boys High Schoot Unir-6 BBSR
4 SiRtoGovt Boys High School Unit -l such as 5.00renovation of Dining Shed
5 S/RtoGovt Girts High Schoot Unit -l such as 5.00Constn of Front Gate
6 5/R to BM High SchooL Otdrepair and renovation
town BBSR leak 3.00
7 S/R to Jawahar vidyapitha Pipiti otd Buitding 5.008 S/R to Pipit i High School Pipiti Reptacement of s.00
AC Sheet
Tota[= 34.00BESR No.-V 1 C ompound watl raising & painting of Tapovan 10.00
High Schoot (ESTD - i964)
Total= 10.00S/R to.....
Cuttack-l 1 P.M. Academy Buitding, Ctc 2.002 Bhaktamadhu Vidyapitha, Ctc 5.003 Raghunath Jew Vidya pith, Ctc 4.00
4.OO
4.00
4 Jobra High School, Jobra, Ctc5 Hostel Btdg of Jobra High
CuttackSchoo[, Jobra,
Total = 19.00E \c-t (8)\\SPR\2018.19\aMp 2018.19\A M p .2C18 19.24_O7 2O1B_CD\AMp Non.Res Soyeot Schoot PE_1/4
\\,i),-Name of the(R&B ) Divtsion
JagatsinghPur
si.
No
l(aire of ihe lVorks Ai-rou r t
Required
Qeri,.ar-ks
(3)
S. K. academY at JagatsinqhPur.
N.K.L. Gtrts Hlgn 5cnoot, ParaoecP
(4)
10.00
Total= 20.00
3 .00
I .00
3.00
Total= 9.00
5.00
5.00
s.00
Totat= 15.00
(s)\L)
1
I
7
!/R to..,..Panikoiti 1 Zilta School Btdg JajPur
Zilta School Hostet Btdg JajPur
3 Biraja High Schoot JajPur
S/R to.....Angul Govt. Girls High Schoot at Angul1
2 Mahendra High Schoot at Athma ttik
3 Girts High Schoot at Athmattik
S/R to.....Govt. G.T. High school at Bettaguntha 3.00Bhanjanagr 1
2B:s
. N GirLs High Schoot at Buguda
/ R to Govt. Grits High School at Sorada
4.00
3.00
Total = 10.00
S/R to.....Battiguda 1 5/R to BoYs High School such as washing, 5.00
painting, Door &. window rePai r at Bat[iguda
Constructi on of Ladies & Gents Toitets (7 Nos.) tor 5.00
5tudents of Boys' High Schoot Battiguda
Tota l= 10.00
z
5/R to.....Improvement to Govt. Boys High schooI at Jeypore. 2.00Jeypore 1
2 S/R to BoYs High School at KotPad 3.00
3 S/R to Girls High School at KotPad 2.00
Total = 7.00
5/R to.....angpu r 1 RCD High Schoot, NabarangPur 5.00
2 Govt. Girts High Schoot, Nabarangpur 5.00
Total = 10.00
S/R to.....yagada-l 1 S/R to GCD High school at Rayaga
roofing, painting and ptastering workda such as 4.00
7 S/R to GCD High school at RaYagada 5.00
Total= 9.00
Deogarh
!rP to. ...1 R.B.D High Schoot at Deogarh
2 Govt. Cirt't High School at Deogarh
4.00
l.oo1.oo
€:\C E.(8)\SPR\2018 1s\AMP 2C1E 19\A M P 2018 19'24 07 2A18-CD\AMP Non'Re5 sjYeot School
Tota I =P g-2 4
(1)
st.No
Name of the Works AmountRequired
Remarks
(1) (2\ (3) (4) (s)
l:It'Name of the.(R&B )Division
S/R to. ....th-rr.r,^rr I.1 lr;,; Si,:ooi, jia, s,guca
S/R to.... .
Kantabaniji A9y1 [igh Schoot at TititagarhGirts High Schoo[ ar TiritagarhGovt. 3sy5 Ramai Hiqh school at patna garhGovt. Girts High schoot at patna garh
Total=5. 00
5.OO
1.001
2
3
4
2.00
2.00
2.005 G irts High School at Kantaban Jr 2.00
Total= 9.00S/R to.....
Kalahandi 1 A/R to B.M. h igh Schoo[ at Bhawanipatna 2.002 A/R to Manikeswari
Bhawanipatnahigh School at 3.00
3 A/R to Town h igh Schoot at Bhawan ipatna 3.004 S/R to Govt.Girts high School at Bhawanipatna 2.00
Total = 10.00S/R to.....
Khariar 1 S/RtoRaja A. T. High Schoot at Khariar 5.002 S/RtoN ational High Schoo[ at Nua pada. 5.00
Total= 10.005/R to.....
Rairangapur 1 Main Buitding Govt Girts High Schoot, Rairangpur 3.00
2Govt Boys High Schoot at Karan Jla 2.003 Govt Gir[s High School at KaranJla 2.00
Total = 7.oorS/R to.....
Keonjhar 1 Repair to D.N. High SchootKeonjhar.
,Admn. Buitding at Z.OO
Repair to D.N. HiKeonjhar.
gh Schoot Office Buitding at 2.002
2 Repair to Mahatab High School at Cham pua 2.004 Repair to Girts High Schoot at Champua 3.005 Repair to Govt. Gir[ High Schoot at Joda 5.00
Total= 14.00S/R to.....
Ghaiagaorr 1 0.N.High schtri.ll ai Ariarrda 5.00B.N.High schoot Hostet Buitding at Anandapur
pul .
2
E)C t.(B)\'PR\2O18 1g\AMP 201a-E\A.M.p. 2A18 rc 24-07.2O18-CD\AMp_Non-Re9Soyeor Schoat
4.00
Pg-3/a
Name cf t-he
(R&B) Divlslon
siNo
3
Na rne cf the Works Amo u ntRequlred
(4)
4.00
3.00
(s)L|
(3 )
R/R to Govt. Girls High school at AnandaPur 3.00
(lienovaiioll oi A.L silae! DiJur.i
4 Fakirpur boYs High school
Fakirpur. (Renovation to A.C'sheet roofing)
5 R/R to Jhadeswar High school Buitding
Ghasipura.
lt
at
Toral = 19.00
S/R to.....Rourketa 1 R.D.D High Schoot at Bonai. s.00
2 Govt, Girts High School , Bonai 5.00
Chief Engi
\.Buildneer
Odisha, Bhubonesw
ings)or
3 Govt. Girls High Schoot, Rourke Ia 5.00
Total= 15.00
Totat (50 years School Buitdings) 278.00
Totat (50 years College Bui tdings) = 122.00
ciand Totat (50 Years College & School Buildings) = 400.00 ,
E:\C.E.(8)\sPR\2O18-tg\AMP 2A18 19\a M P'2A1$19 24'A7'2A18 CD\AMP Noh Res sovcarschootPe_4/a
iRemarks