Manual ofOptrarional Procedures (or Flood Miligation lit Wivcnhct: Dam and Somerset Dam 47
Somerset Dam Emergency Procedure
In the event of communications loss with the Flood Operations Centre, the Dam Supervisor at Somerset Dam is to assume responsibility for flood releases from the Dam. Once it has been established that communications have been. lost, the Dam Supervisor at Somerset Dam is to:
• Take all practicable measures to restore communications and periodically check the lines of communication for any change;
• Undertake the actions sel out below to release flood water from Somerset Dam;
• Log all actions in the Event Log;
• Ensure the dam is at full supply level at the end of the event;
• Remain in the general vicinity of the dam while on duty.
The actions to be undertaken to release flood water are:
• If communications with Wivenhoe Dam are lost, the level in Wivenhoe Dam is to be assumed as the level shown on gauge boards located downstream of Somerset Dam.
• The radial gates are to be kept raised to allow uncontrolled discharge.
• The regulators are to be closed if the tail water level exceeds EL 68.60 and are generally kept closed. The only exception to this is if the regulators are used to prevent overtopping of the dam.
• Sluice gates are operated as either fully opened or fully closed. The order of operntion for opening the sluice gates is LMKNJOIP. Sluices are to be closed in reverse order of opening. Any inoperable sluices are to be dropped from the opening or closing sequences. The sluice gates are to be operated in accordance with the following procedures:
o . Case 1 - the level in Somerset Dam is below EL 100.45; or
o Case 2 - the level in Somerset Dam is above EL 100.45.
These procedures are described below.
Revtsion No: 7 o.~: Novanber 2009
SOQ.001.001.4140
Manua1 ofOpcl1lcionsl Procedures for Flood MiCi8fllion at WiV1:nhoe Darn Md Somerset Dam 48
Case 1 Prooedure !Level in Somerset Dam is below EL 100.45)
The sluice gates are to be operated in accordance with the following table:
SOMERSET DAM LOSS OF COMMUNICATIONS
CASE 1 PROCEDURE
CONDITIONS AT SOMERSET ACTIONS AND WIVENHOE DAMS
Level in Somerset Dam is below Sluice gates are to be opened Ilt intervals of not less EL 100.45, Level in Wivenhoe than 120 minutes, provided the number of open sluice Dam is below EL 70.0 and falling. gates does not exceed that shown in the "SOMERSET
DAM - MAXIMUM SLUICE GATE OPENING" table. Once a sluice gate is opened, no further sluice gate operations are to be undertaken for 120 minutes.
Level in Somerset Dam is below Sluice gates are to be closed at intervals of not less EL J 00.45, Level in Wiv~llhoe than 180 minutes. Once a sluice gate is closed, no Dam is below EL 70.0 and rising. further sluice gate operations are to be undertaken for
180 minutes.
Level in Somerset Dam is below Sluice gates are to be closed at intervals of not less EL 100.45, Level in Wivenhoe than 60 minutes. Once a sluice gate is closed, no Dam is above EL 70.0. further sluice gate operations are to be undertaken for
60 minutes.
SOMERSET DAM MAXIMUM SLUICE GATE OPENING
SOMERSET DAM LEVEL MAXIMUM NUMBER OF SLUICE GATES ALLOWED TO BE OPEN
Revision No: 7 Da~: Noyember 2009
SOQ.001.001.4141
MllnlJ:1i arOperntianal Proceduru CO( Flood Miliprion 11 Wivcnboe Dam and Somcucl Dam 49
Case 2 Procedure CLevel in Somer.etDem is above EL 100.45)
The sluices gates are to be operated in accordance with the following graph :
CASE 2 • TARGET LINE FOR OETERMI>4f:IG SLUICE GATE OPERATIONS
81 ~-------r--------~-------'--------'--------'r-----~,
~h$ ulltprq;fe~;l'dy
+ __________ j __________ -t4~~~t~e~ cf~~~u I-____ +-______ ~~--------~ 79 wh~qI.f1I.~ a:._Ih~
O~f:)r[~ l:lf'let LI,..:,
.B
rn 99 101 103 IDS 107 109 111
SomeflldDamLev.1 tm AHD)
Sluices are progressively closed at one hour intervals if operating above the Operating Target Line and progressively opened at one hour intervals if operating below the Operating Target Line. The aim is always to follow the Operating Target Line as closely as possible.
10.4 Equipment Failure
In the event of equipment failure the aClion to be taken is indicated in Appendix E for Wivenhoe Dam and Appendix F for Somerset Dam.
Revision No: 1 Dale. November 2009
SOQ.001.001.4142
Manual orOpcrational Procedures ror Flood Mitipllon at Wlvenhoe Dam end Somersel Dam 50
APPENDlXA AGENCIES HOLDING CONTROLLED COPIES OF THIS MANUAL
Revision No: 7 Dale: Novembr2" 2009
SOQ.001.001.4143
Manual of Operational Procedures for Flood Mitigation at Wivumoe Dam and Somersel Dam 51
APPENDIXB KEY REFERENCE GAUGES
1974 MlnorFlood Moderate Flood Major Flood Gauge
Gauge Zero Giluge Gauge Gauge Location Flow Flow Flow Height Height Height Height
mARD m m rn"s m m',s m m',s
Revision No: 7 Dale: November 2009
SOQ.001.001.4144
Manual orOperational Procedures ror Flood Mitigation 81 Wivenitoe Dmn and Somerset Dam
Revision No: 7
APPEJ'I.'DIX C WlVENHOE DAM TECHNICAL DATA
52
Date: November 2009
SOQ.001.001.4145
Manual of Operational Procedures rot Flood Mitigation al WiveMOC DIII1l and Somusel Dam 53
~vision No: 7 Dale: Navtmbec 1009
SOQ.001.001.4146
SOQ.001.001.4147
8 I'i ,;
" • ~ '" ~ • e 0 8 ~
6 .~
'" .. . ~
~ ~ " ~
'" D • .. e ] j ~ ~ • i £ ..
" • @ ~ ~
~ " ii; .~ • ~ - .~ 0 .. •• ~ >
,l!
SOQ.001.001.4148
Manual of Operational Proccdutn rot Flood Miti,.tion at WiveMOC Dam and Somerset Dim 56
SOQ.001.001.4149
Manua] ofOpemrioo81 Procedures for Flood Mitigation Rt Wivenhoc Dam and Somcrsd Dam 57
W1VENHOE DAM AUXILIARY SPILLWAY RATING TABLE
Rc.vision No: '1 Date: November 2009
SOQ.001.001.4150
Manual orOpcrationl1 Procechns fOt' Flood Miliption et Wivnlhoc Dam and Somtttel Dam
Rt'vision No: 7
APPENDIXD SOMERSET DAM TECHNICAL DATA
58
Date: Novcmbcr2009
SOQ.001.001.4151
Manuel ofOpemtionDl Pnxc:dttrCs for Flood Miliga\lorl at Wivenhoe Dam and Somcrset Dllm 59
Revision No: 7 Dale: November 2009
SOQ.001.001.4152
Mlloual ofOpcrarional Procedures (or Flood Mifi~ion at Wivenhoc Oam and Somerset Dam 60
APPENDIXE WIVENHOE DAM GATE OPERATION CONSIDERATIONS
Revision No: 7 Dlte: November2009
SOQ.001.001.4153
Manual ofOperZlDonal Procedures ror Flood Mitigation at Wivt:nhoc Darn and Somerset Dam 61
Revision No: 7 Date: November 2009
SOQ.001.001.4154
Manual afOperational Proccdlns for Flood Mitigation el Wivenhoc Dam and Somencl Dam 62
Revision No. 7 pare: NQvember 2009
SOQ.001.001.4155
Manual ofOpemrlonnl Procedures for Flood Mitigation 81 Wivcnhoe Dam nnd SomtrSt( Dam 63
SOQ.001.001.4156
Manual ofOpenuionai Proccd~ for Flood Mitigation at Wivenhoe Dam and Somerset Dam 64
Rovislon No: 7 0810. Novembcr2D09
SOQ.001.001.4157
ManlJ8l or OpenlUcnal Procedures for Flood MitiGAtkln lit Wivmhoe Oem and Somerset Dam 65
APPENDIXF SOMERSET DAM AUXILIARY EQUIPMENT
Revision No: 7 Date: November 2009
SOQ.001.001.4158
Manual otOpcrauorW rrocedw'e! ror Flood Miligalion at Wivtnhoe Dam:and SomUV( Dam
Rcvl!lion No: 7
APPENDIXG HYDROLOGIC INVESTIGATIONS
66
Dale: No\'cmber2009
SOQ.001.001.4159
ManUII ofOperalional Proccdurc.s foe Food MiliGBlion at Wivcnhoe Dam and Somerset Dam
Revision No: 7
APPENDIXH WIVENHOE DAM
PLANS, MAPS AND PHOTOGRAPHS
67
Oltl:: Novtmbu 2009
SOQ.001.001.4160
~
• .~
• ." ~ g Ii: Ji ~ ] .. • .., i Q ... 1 ...
~ • ~
.~
.S
~
SOQ.001.001.4161
<;; :z
!I·~ ~
SOQ.001.001.4162
SOQ.001.001.4163
SOQ.001.001.4164
• !
SOQ.001.001.4165
! I ! 1 ~ 1 .1 •• • ! I > ~ ~ •
-.J ! L 1 .
~
! ~ ~
1 >
SOQ.001.001.4166
Manual of Ope ratione 1 Procedures for Flood Mitigillion et Wivenhoe Dam and SomCl'$Cl Dam
Revision No: 7
APPENDIX I SOMERSET DAM
PLANS, MAPS AND PHOTOGRAPHS
74
Date: November 2009
SOQ.001.001.4167
~
'" " • ~ Jl 1 e • '" 8 ~ c v .< ,. a 6 .~
• .:§
~ ] ;;; .!! f • ."
~ " .. .~
~
<; ! z ~
.~ 0 .. • ~
'" • c • :.
SOQ.001.001.4168
SOQ.001.001.4169
!
i !
, , I I , • , j • -! , , 1 • , 1 , , • ,
• ! j , , • • , , , •
SOQ.001.001.4170
SOQ.001.001.4171
SOQ.001.001.4172
Manual ofOperalicnaJ Prccedun:s for Flood Miligalion at Wivcnhoe Dam and Somerset Own 80
APPENDIXJ WIVENHOE DAM - FUSE PLUG BREACH SCENARIOS
SOQ.001.001.4173
)
SOQ.001.001.4174
Mllnunl orO~l'alional Procedwcs for Flood MtugaJ.j~n &1 Wivenhoc Dam and Samaset Dam 82
Revision No: 7 Thllc: November 2009
SOQ.001.001.4175
Milnual OfOpClIltioml Procedures for Flood Miugalion at Wivenhoe Dam IUld Somersel Dam 83
Revision No. 7 Dale: November 2009
SOQ.001.001.4176
Manual ofOperationaJ Proccdul'U for Flood Mitigation at Wivenhoe Dam IlrId SometSc:t Dam 84
RevlS)on No: 1 Dale; Novembcr2009
SOQ.001.001.4177
Manual ofOpeflltianl1\ ProcedutC, for Flood MiUption al Wivcrthoc Darn IUld SomeJXt OMrl 85
RC:'Yision No: 7 o..le: NovtlTJbct 2009
SOQ.001.001.4178
GULF OF
CARPENTARIA
SOUTH
AUSTRALIA
e Queensland Government
----,-"' ............ .. ........ ""'-..... ................ -.. _ ... R_ W __ ...... ...-"'_ ....... -"._ .... ..-110\\_ .. _"""", __ ...,_ .. ...--...._ ........ -.0-.-._ .. -.) ..... --.... -.-.~- .. - ... _ J ___ ... __ ... _ ..... ___
.. --.. ...,-_ ...... -_<xoo.l._._._~ _ ... ,.." .""' ...... -,~ .. ---"'"'-1'1):101'
'OERM-18'
Department of Environment and Resource Management (OERM) Streamflow Gauging Stations and Bureau of Meteorology (BaM) Flood Alert Stations
PIIb,""on dt\tl; 23 F"bruery 2011
D. N
'M * ~ --. ""'Ie<_: ~Geogor_
__ O_'_o.1""'of ..... _' .. (GO~ .. )
.. .' . "", " .
DRAFT For discussion purposes only
Flood station data not validated
~: ott; • ... , • ,0
0
ll$l.O~f. CAlNO _ 11""'101'"
Legend
• BoM and councK flood alert stalions (real-time data vie radio telemetry)
• OERM gauging stations
Population ~ntr8
Rlllsr I creek.
c:::l Drainage basin
N~: TIw toc.lIonI oIltloe 8 ..... "'\1 of Mol~ (801.4) al'lCl c:oundlllood lllllofl. lhown on I," map_o soureed d~ "om !he BoM _belle (www.bom.gov.aul_!'wI"" not be.., ullC~lod
SOQ.001.001.4179
o m ;:0 s:
I ..... (0
SOQ.001.001.4180
'DERM-20'
QUEENSLAND FLOODS COMMISSION OF INQUIRY
DEPARTMENT SUBMISSIONS FOR STATE OF QUEENSLAND
Department of Environment and Resource Management (DERM)
ATTACHMENT DERM-18 WEBLINKS
DERM Links - Publicly available
Coporate Brochure http://www.derm.qld.gov.au/aboutlorganisation/pdf/corporate brochure.pdf
Flood Mitigation Manual for a Dam http://www.denn.gld.gov.aulabout/policy/documents/3991 Iwir 2009 3991 .pdf
Spatiallnfonnation http ://www.denn.gld .gov.aulservices resources!category.php?class id=8
oee - Report http://www.climatechange.gld.gov.au/pdf/gayndah-policy-report.pdf
Flood Risk Management http ://www.denn.gld.gov.aulwaterlregulationlflood risk management.html
Water Resource Plans and Resource Operations Plans http://www.denn.gld.gov.aulwrp/catchments.html
Resource Operations Licences and Interim Resource Operations Licences http://www.denn.gld.gov.aulwater/management/rols irols .html
Other Entity Links - Publicly available
Murray Darling Basin http://www.mdba.gov .aul http://www.nwc.gov.aulwwwlhtmI/20-other-water-initiatives.asp
National Flood Risk Advisory Group (NFRAG) http://www.ga.gov.aulhazards/governance/national-committees-hazards/nationalflood-risk-advisory-group .html
National Water Initiative http://www.nwc.gov.aulwwwlhtmIlI17-national-water-initiative.asp http://www.nwc.gov.aulresources/documents/lntergovernmental-Agreement-on-anat i onal -water -ini tia ti ve. pdf
SOQ.001.001.4181
National Water Commission http://www.nwc.gov.auiwwwlhtml17-home-page.asp
Water for the Future http ://www.environmenLgov.auiwater/australiaiindex.html
Australia' s Biodiversity Conservation http://www.environmenLgov.au/biodiversity/ http://www.environment.gov.au/biodi versi t y/pu b I i cat i ons/ strategy -2 01 0-30/index.html
Bureau of Meteorology www.bom.gov.au
Emergency Management Queensland http://www.emergency.gld.gov.auiemg
State Counter Disaster Plan http://www.health.gld.gov.auiemerg serv/default.asp
State Disaster Management Group www.disaster.g ld.gov.au
Webbe-Weller Review http://wv..W.premiers.gld.gov.auigovemment/boards-committees/review/reviewpanel.aspx http://wv..W.derm .gld.gov.auiwateriregulation/webbeweller/index.html
SOQ.001.001.4182
QUEENSLAND FLOODS COMMISSION OF INQUIRY
DEPARTMENT SUBMISSIONS FOR STATE OF QUEENSLAND
Department of Environment and Resource Management (DERM)
SEQWB (South East Queensland Water Board) 1993 Study (Commercial in Confidence) Volume Index
SEQWB (South East Queensland Water Board) 1993 Study (Commercial in Confidence)
REPOR Title
2
REAL TIME FLOOD OPERATIONS MODEL REPORT
Report on the Feasibil ity of a Real Time Flood Warning Model.
BRISBANE RIVER AND PINE RIVER HYDRAULIC MODEL REPORT Report on Review and Evaluation of Hydraulic Models.
3 REAL TIME FLOOD OPERATIONS MODEL REPORT Report on the Evaluation of Available Hardware Platforms.
DERM-20 SEQWB (South East Queensland Water Board) 1993 Study (Commercial in Confidence) Volume Index
Date
Nov-90
Nov-90
May-91
Page I of9
c m ;0 3: I ~ ~
SOQ.001.001.4183
4a PINE RIVER FLOOD HYDROLOGY REPORT VOLUME [ Aug-91 Report on Runoff-Routing Model Calibration.
4b PINE RIVER FLOOD HYDROLOGY REPORT VOLUME 11 Aug-91 Report on Design Flood Estimation.
4c PINE RIVER FLOOD HYDROLOGY REPORT VOLUME ill Aug-91 Appendix A Runoff-Routing Model Data files Appendix B Bureau of Meteorology PMP Report
5 PINE RIVER FLOOD HYDROLOGY REPORT December 1991
Report on North Pine Dam -Post Dam Flood Frequency Analysis.
6 BRISBANE RIVER AND PINE RIVER FLOOD HYDROLOGY REPORT Apr-92 Report on Warragamba Dam EIS Flood Study.
7a BRISBANE RIVER FLOOD HYDROLOGY REPORT VOLUME I Sep-92 Report on Runoff-Routing Model Calibration.
7b BRISBANE RIVER FLOOD HYDROLOGY REPORT VOLUME Il Sep-92 Appendix A Comparative Plots.
7c BRISBANE RIVER FLOOD HYDROLOGY REPORT VOLUME III Sep-92
DERM-20 SEQWB (South East Queensland Water Board) 1993 Study (Commercial in Confidence) Volume Index Page 2 of9
SOQ.001.001.4184
Appendix B Runoff-Routing Model Layouts.
7d BRISBANE RIVER FLOOD HYDROLOGY REPORT VOLUME IV Sep-92 Appendix C Runoff-Routing Model Data Files.
8a BRISBANE RIVER FLOOD HYDROLOGY REPORT VOLUME I Mar-93 Report on Design Flood Estimation.
8b BRISBANE RIVER FLOOD HYDROLOGY REPORT VOLUME 11 Mar-93 Appendix A Probable Maximum Precipitation Estimates.
8c BRISBANE RIVER FLOOD HYDROLOGY REPORT VOLUME 1II Mar-93 Appendix B Flood Frequency Analysis Results .
8d BRISBANE RIVER FLOOD HYDROLOGY REPORT VOLUME IV Mar-93 Appendix C Runoff-Routing Model Layouts.
9a PINE RIVER SYSTEM HYDRAULIC MODEL REPORT VOLUME I Apr-93 Report on Model Calibration.
9b PINE RIVER SYSTEM HYDRAULIC MODEL REPORT VOLUME II Apr-93 Appendix I Pine River Cross-Sectional Data
9c PINE RIVER SYSTEM HYDRAULIC MODEL REPORT VOLUME III Apr-93
DERM-20 SEQWB (South East Queensland Water Board) 1993 Study (Commercial in Confidence) Volume Index Page 3 of9
SOQ.001.001.4185
9d
10
Ila
II b
llc
lId
12
Appendix II Lateral Inflows Appendix TlI Time Series Plots
PINE RIVER SYSTEM HYDRAULIC MODEL REPORT VOLUME IV Appendix IV Hydraulic Model Data Files.
PINE RIVER FLOOD HYDROLOGY REPORT Report on North Pine Dam Rating of Spillway Gates.
PINE RIVER SYSTEM HYDRAULIC MODEL REPORT VOLUME I Report on North Pine Dam Dambreak Analys is.
PINE RIVER SYSTEM HYDRAULIC MODEL VOLUME II Appendix I Flood Height Profiles and Flood Inundation Maps.
PINE RIVER SYSTEM HYDRAULIC MODEL VOLUME III Appendix I! Wave Set Up and Wave Run Up Estimation. Appendix III Time Series Plots for Selected Locations. Appendix IV Cross-Sectional Data
PINE RIVER SYSTEM HYDRAULIC MODEL REPORT VOLUME IV Appendix V Hydraulic Model Data Files.
BRISBANE RIVER AND PINE RIVER HYDRAULIC MODEL REPORT
Report on Validation of RUB1CON Hydrodynamic Modelling System.
DERM-20 SEQWB (South East Queensland Water Board) 1993 Study (Commercial in Confidence) Volume Index
Apr-93
Apr-93
Jun-93
Jun-93
Jun-93
Jun-93
Jun-93
Page 4 of9
SOQ.001.001.4186
13
14a
14b
14c
14d
15
16a
BRISBANE RIVER FLOOD HYDROLOGY REPORT Report on Downstream Flooding.
PINE RIVER SYSTEM HYDRAULIC MODEL REPORT VOLUME I Report on Sideling Creek Dam Dambreak Analysis.
PINE RIVER SYSTEM HYDRAULIC MODEL REPORT VOLUME II Appendix I Flood Height Profiles and Flood Inundation Maps.
PINE RIVER SYSTEM HYDRAULIC MODEL REPORT VOLUME 1Il Appendix II Wave Set Up and Wave Run Up Estimation. Appendix III Time Series Plots for Selected Locations. Appendix IV Cross-Sectional Data
PINE RIVER SYSTEM HYDRAULIC MODEL REPORT VOLUME IV Appendix V Hydraulic Model Data Files.
PINE RIVER SOIL MOISTURE ACCOUNTING MODEL REPORT Report on Model Calibration.
BRISBANE RIVER SOIL MOISTURE ACCOUNTING MODEL REPORT VOLUME I Report on Model Calibration.
DERM-20 SEQWB (South East Queensland Water Board) 1993 Study (Commercial in Confidence) Volume Index
Aug-93
Oct-93
Oct-93
Oct-93
Oct-93
Nov-93
Nov-93
Page 5 of9
SOQ.001.001.4187
16b
16c
17a
17b
17c
17d
18
BRISBANE RIVER SOIL MOISTURE ACCOUNTING MODEL REPORT VOLUME II Appendix I Daily Stream flow Plots.
BRISBANE RIVER SOIL MOISTURE ACCOUNTING MODEL REPORT VOLUME III
Appendix [] Daily and Monthly Flow Duration Curves and Monthly Scatter Diagrams.
BRISBANE RIVER SYSTEM HYDRAULIC MODEL REPORT VOLUME I
Report on Somerset Dam to Wivenhoe Dam Hydraulic Model Calibration.
BRISBANE RIVER SYSTEM HYDRAULIC MODEL REPORT VOLUME II Appendix I Cross-Sectional Data.
BRISBANE RIVER SYSTEM HYDRAULIC MODEL REPORT VOLUME III Appendix II Calibration Event - Time Series Plots.
BRISBANE RIVER SYSTEM HYDRAULIC MODEL REPORT VOLUME IV Appendix III Somerset Dam to Wivenhoe Dam Hydraulic Model Rubicon Data Files.
BRISBANE RIVER AND PINE RIVER FLOOD HYDROLOGY REPORT
DERM-20 SEQWB (South East Queensland Water Board) 1993 Study (Commercial in Confidence) Volume Index
Nov-93
Nov-93
May-94
May-94
May-94
May-94
Jun-94
Page 6 of9
SOQ.001.001.4188
19
20
21a
21b
21c
21d
22
23a
RepOlt on Regional Loss Model Relationships.
BRISBANE RIVER SYSTEM HYDRAULIC MODEL REPORT Report on Historical Flood Data.
BRISBANE RIVER SYSTEM HYDRAULIC MODEL REPORT Report on Somerset Dam - Dam Failure Modes.
BRISBANE RIVER SYSTEM HYDRAULIC MODEL REPORT VOLUME I Report on Somerset Dam - Dam Failure Analysis.
BRISBANE RIVER SYSTEM HYDRAULIC MODEL REPORT VOLUME TI Appendix A Flood Height Profiles and Inundation Maps.
BRISBANE RIVER SYSTEM HYDRAULIC MODEL REPORT VOLUME 1Il Appendix B Time Series Plots.
BRISBANE RIVER SYSTEM HYDRAULIC MODEL REPORT VOLUME IV Appendix C Somerset Dam to Wivenhoe Dam Hydraulic Model Rubicon Data Files.
BRISBANE RIVER SYSTEM HYDRAULIC MODEL REPORT Report on Wivenhoe Dam - Dam Failure Modes.
BRISBANE RIVER SYSTEM HYDRAULIC MODEL REPORT Report on Wivenhoe Dam Hydraulic Model Calibration.
DERM-20 SEQWB (South East Queensland Water Board) 1993 Study (Commercial in Confidence) Volume Index
Jun-94
Jun-94
July 1994
July 1994
July 1994
July 1994
July 1994
VOLUMEl
Page 70f9
SOQ.001.001.4189
23b
23c
23d
24a
24b
October 1994
BRISBANE RIVER SYSTEM HYDRAULIC MODEL REPORT VOLUME 1I Appendix A Volume of A3 Figures
BRISBANE RIVER SYSTEM HYDRAULIC MODEL REPORT - Volume ill Appendix B Derivation of Wivenhoe Dam Discharges
BRISBANE RIVER SYSTEM HYDRAULIC MODEL REPORT Volume IV Appendix C Cross-sectional Data
BRISBANE RIVER SYSTEM HYDRAULIC MODEL REPORT VOLUME I Report on Wivenhoe Dam - Dam Failure Analysis.
BRISBANE RIVER SYSTEM HYDRAULIC MODEL REPORT VOLUME II Appendix A Volume of A3 Figures
24c BRISBANE RIVER SYSTEM HYDRAULIC MODEL REPORT VOLUME III Appendix B Wivenhoe Dam Wind Set Up and Wave Run Up Appendix C Time Series Plots
24d BRISBANE RIVER SYSTEM HYDRAULIC MODEL REPORT VOLUME 11 Appendix 0 Hydraulic Model Data Files
24e BRISBANE RIVER SYSTEM HYDRAULIC MODEL REPORT VOLUME V
Appendix IV Wivenhoe Dam to Moreton Bay Hydraulic Model - Rubicon data Fi les
DERM-20 SEQWB (South East Queensland Water Board) 1993 Study (Commercial in Confidence) Volume Index
October 1994
October 1994
October 1994
October 1994
Oct-94
Oct-94
Oct-94
Page 8 of9
SOQ.001.001.4190
25 BRISBANE RIVER AND PINE RIVER HYDRAULIC MODEL REPORT
26
27
Report on Brisbane River and Pine River Geographic Information System
BRISBANE RIVER AND PINE RIVER FLOOD STUDY REPORT Executive Summary Report.
REAL TIME FLOOD OPERATIONS MODEL REPORT 'FLOOD' USERS MANUAL User Manual and System Manual.
DERM-20 SEQWB (South East Queensland Water Board) 1993 Study (Commercial in Confidence) Volume Index
Oec-94
May-95
Page 9 of9
SOQ.001.001.4191