Some cryostat scintillator slides for Monday’s meeting Michigan State University.
-
Upload
adriana-leak -
Category
Documents
-
view
214 -
download
1
Transcript of Some cryostat scintillator slides for Monday’s meeting Michigan State University.
Some cryostat scintillatorslides for Monday’s meeting
Michigan State University
D4D5 D6
B11 B12 B13 B14
A12 A13 A14 A15 A16
B15
E1,2
E3,4
E3 C10 B11 E1 D5 A14 - A15 B14 D6 A16 - -
D4 A12 A13 B12 - B13 - - - - B15 -
1.0 1.1
1.2
1.4
1.6
ITC Scintillators
(cryostat (or crack) scintillators)
(gapscintillators)
Crack Scintillator (E3, E4)
ATLAS IC Scintillator
R. Miller
Dimensions are in mm with a tolerance of ± 0.1 unless stated otherwise. Dimensions in parentheses are in Inches
DRAWNDATEPROJECTMATERIALTITLEDWG. NOSCALE
NOTES:
1.
MICHIGAN STATE UNIVERSITY HIGH ENERGY PHYSICS
REV
ASSEMBLY
A
HEP-B-025-368
227
140
885
Mounting bracket
Outer End piece Optical connectorsockets (2) pinned and sealed into end piece
Bottom cover panel is epoxied to end pieces.Black felt light seals line the surfaces in contact with fibers or scintillator edges.Top cover panel overlaps the bottom cover and end pieces and is taped at the edges.
Compression plate with set screws in same holes as mounting screws
6 mm thickPVT Scintillator, wrapped in Tyvek
OpticalIsolators on edges as necessary
(6) WLS Fibersfor cell E3
Inner End piece
Cell E3478
Cell E4362
19 8-14-01
1:5
C(1/8 x 3/4) pin
E4E3
(6) WLS Fibersfor cell E4
Mounting Proposal
ATLAS ITC Scintillator
R. Miller
MICHIGAN STATE UNIVERSITY HIGH ENERGY PHYSICS
REVDRAWNDATEPROJECTMATERIALTITLEDWG. NOSCALE
HEP-B-025-
227
DR = 885
140
Z=3560
Z=3540
R=1453
GAPSCINTILATOR
INTER-CRYOSTAT SCINTILLATOR MOUNTING
137.
117.
R-PHI VIEW R-Z VIEW
Pin aligns inner end to slot in next ctr.
9-21-01 E
MOUNTING
1:5
Dimensions assume 2 mm between Ctrs.
Cell E4362
Cell E3478
371
E4E3
8*
15*
25
13
20
R=2313
MOUNTING DETAIL
50
10
(2) M4 x 15Socket Hd. CS attaches crack ctr. to bracket
(2 ) M8 x 30Flat Hd. CS Ctrsunk attaches bracket and gap ctr. to EB end plate
Shim as neededto clear LAr Cryost.
eta=1.20
Bracket
R=2288
R=2260
CRACKSCINTILLATOR
* Indicates Envelope DimensionNOTES:
Bar is Integral to crack ctr.
Bar is Integral to gap ctr.
LAR CRYOSTAT
TILECAL EB
View of 2 cryostat shells
mounting bracket
Closeup
Bracket in final position
Bracket in final position
ATLAS ITC Scintillator
R. Miller
MICHIGAN STATE UNIVERSITY HIGH ENERGY PHYSICS
REVDRAWNDATEPROJECTMATERIALTITLEDWG. NOSCALE
HEP-B-025-
227
DR = 885
140
Z=3560
Z=3540
R=1453
GAPSCINTILATOR
INTER-CRYOSTAT SCINTILLATOR MOUNTING
137.
117.
R-PHI VIEW R-Z VIEW
Pin aligns inner end to slot in next ctr.
9-21-01 E
MOUNTING
1:5
Dimensions assume 2 mm between Ctrs.
Cell E4362
Cell E3478
371
E4E3
8*
15*
25
13
20
R=2313
MOUNTING DETAIL
50
10
(2) M4 x 15Socket Hd. CS attaches crack ctr. to bracket
(2 ) M8 x 30Flat Hd. CS Ctrsunk attaches bracket and gap ctr. to EB end plate
Shim as neededto clear LAr Cryost.
eta=1.20
Bracket
R=2288
R=2260
CRACKSCINTILLATOR
* Indicates Envelope DimensionNOTES:
Bar is Integral to crack ctr.
Bar is Integral to gap ctr.
LAR CRYOSTAT
TILECAL EB
Special ITC brackets
Inner radius
Counters held together by pins in one module fitting into slots in neighbor module
Cryostat scintillator status as of 2004
Optics, PMT’s, electronics and even mechanical shells were available
Scintillator purchase was a victim of management contingency and the cryostat scintillators were on the upgrade path
In the last few months, thanks to Marzio and Howard Gordon, the money is now available for construction and installation
…but, construction has to be complete by the end of this FY
Completed counters will be sent to CERN at the end of 2005
when does installation make sense?
…and,to save money, we will use polystyrenescintillator provided by Dubna, rather thanthe PVT scintillator from Bicron;factor of 2 less light yield, i.e. more like 2-3 pe/mip calibration issues
Same WLS fibers as for gap scintillators
MBTS countersCompletion of cryostat counters made possible by tying this project in with MBTS counters
Scintillator
Dubna has already produced the scintillator for all of the MBTS counters awaiting some final decisions regarding clearances,
then scintillator will be shipped to CERN->MSU construction will also take place this summer, available
for shipping this fall (September) testing of prototype counter with ATLAS electronics
currently taking place at the University of ChicagoDubna is currently producing cryostat scintillator
to arrive at MSU by May 1 construction will take place this summer, available for
shipping this fall (September) testing with ATLAS electronics to take place on a similar
time-scale