Solar Smart Program

12
Solar Smart Program

description

Solar Smart Program. Building Renewable Energy Solutions. About Greener Product LLC. Company Overview - PowerPoint PPT Presentation

Transcript of Solar Smart Program

Solar Smart Program

Company OverviewGreener Product LLC, is a professional services and project developing firm providing renewable energy through photovoltaic (“PV”) and solar thermal technologies.

Greener Product LLC model is to Build, Own, Operate and maintain solar generation facilities as small as 50 KW and utility scale facilities in the Gigawatt range.  In the Solar Smart model, we build all facilities with no cost to the customer. 

Tennessee Valley Authority (TVA)The Tennessee Valley Authority, a corporation owned by the U.S. government, provides electricity for 9 million people in parts of seven southeastern states at prices below the national average. TVA, which receives no taxpayer money and makes no profits,

TVA's Mission and VisionTVA has renewed its vision to help lead the Tennessee Valley region and the nation toward a cleaner and more secure energy future, relying more on nuclear power and energy efficiency and relying less on coal.

The Generation Partners Pilot ProgramGeneration Partners supports homeowners and businesses that install small-scale renewable generating sources – solar panels or wind turbines, for example – on their property. Generation Partners puts ordinary users of TVA power into business generating renewable energy.

Click here to see TVA Video

Note: Only the area highlighted in yellow are eligible for program

   Increases the property value between 3% to 4% according to the NBER - 9/11 report

Reduces our dependence on foreign oil Provides stable future energy costs Improve our environment through reduction

of harmful gases Creates new green jobs in our communities Benefit American Business

What if you could install a solar system at no cost, earn $1000 immediately and save on future energy cost?

Greener Product LL is offering homeowners, schools, businesses, non-profit organizations and municipalities in Tennessee and certain areas of the neighboring states (NC, GA, MS, AL, GA, KY) an opportunity to participate in the Solar Smart program.

Under the program Greener Product leases your roof-top or land and shares the guaranteed revenue for 20 years.

To qualify the participate must;• Have an available area of 10,000 sq. feet

on a roof-top or land• Premises must be available for lease i.e.

20 years• Area must be free of shade all year• Roof (if applicable) must be structurally

sound• Accessible metered location

GP installs, operates and maintains system No Capital Cost Revenue is shared with the host Receive $1000 upon activation Stable energy costs Option to purchase the system Revenue guaranteed for next 20 years

50 kW System

Note: Chart represents the estimated host revenue expressed as a present value in each year of agreement with assumed 5% interest rate.

1. Sign a Letter of Intent – indicating that you want to participate in Solar Smart Program

2. Greener Product will do a site review and approvethe site for an installation

3. The parties enter into a 20 year lease agreement

4. The Solar System will be designed 5. TVA and local utility approvals obtained6. System is inspected and energized

Project Evaluation & Assessment• Completion of LOI

(2 weeks after application)

Documents completed & approved•Lease•System designed•Utility application•PPA completed(4 weeks after LOI received)

System Built •Completed PPA•Utility approved

(3 weeks after approvals)

System Inspected & Energized•Utility inspects and approves system•Connection Completed

(2 weeks after system built)

Engineering (Electrical, Structural for roof mounts )-------------------------------------------------------------------30 daysPermitting------------------------------------------------------------------------------------------------------------------------14 to 60 daysProduct Procurement ----------------------------------------------------------------------------------------------------------14 daysSite Preparation (grading, trenches, etc)---------------------------------------------------------------------------------- 7 daysConstruction (including wiring, etc) ----------------------------------------------------------------------------------------7 to 14 daysEnergizing System----------------------------------------------------------------------------------------------------------------7 daysCommissioning--------------------------------------------------------------------------------------------------------------------7 days

Many activities can be completed at the same time. Normally from time of signed LOI to commissioning it requires 60 to 90 days.

1 2 3 4

5

To apply for the program and start receiving the benefits of the Solar Smart program contact:

Tel: 1-843 -576-0112 x 121

Email: [email protected]

To apply online go to : www.greenerproduct.com