Solar Installation Manual - Premier€¦ · these three positions allow the solar panel to capture...

16
Solar Installation Manual

Transcript of Solar Installation Manual - Premier€¦ · these three positions allow the solar panel to capture...

Page 1: Solar Installation Manual - Premier€¦ · these three positions allow the solar panel to capture the maximum light emitted from the sun. Step 1 Determine which angle the solar panel

Solar Installation Manual

Page 2: Solar Installation Manual - Premier€¦ · these three positions allow the solar panel to capture the maximum light emitted from the sun. Step 1 Determine which angle the solar panel
Page 3: Solar Installation Manual - Premier€¦ · these three positions allow the solar panel to capture the maximum light emitted from the sun. Step 1 Determine which angle the solar panel

3

Contents

©Copyright 2015 Hunter Douglas Limited [ABn 98 009 675 709] 10/15

1 GettinG Started

1.1 Verify pACkAge Contents ....................................................................................................................................................4

1.2 tooLs requireD ....................................................................................................................................................................4

2 PartS deScriPtion

2.1 BAttery pACk / reCeiVer unit ...............................................................................................................................................5

2.2 soLAr pAneL / BrACkets .......................................................................................................................................................5

2.3 power CABLe / extension CABLes ........................................................................................................................................6

2.4 remote ControL ...................................................................................................................................................................6

3 inStallation / SetuP

3.1 inserting motor in tuBe .....................................................................................................................................................7

3.2 AttACHing soLAr pAneL to BAttery pACk/motor DriVe unit .............................................................................................8

3.3 optimum position for soLAr pAneL ....................................................................................................................................9

3.4 mounting tHe soLAr pAneL ................................................................................................................................................10

mounting on HeADBox .......................................................................................................................................................10

mounting remoteLy (gutters, fAsCiA, etC) ......................................................................................................................11

3.5 ConneCting power CABLe from motor to BAttery pACk/reCeiVer. ...............................................................................11

3.6 pAiring & progrAmming remote ........................................................................................................................................12

3.7 CHAnge motor DireCtion ...................................................................................................................................................12

3.8 setting motor Limits .........................................................................................................................................................13

3.9 Dry ContACt/ AutomAtion ..................................................................................................................................................13

3.10 timer remote ......................................................................................................................................................................14

4 HintS & tiPS ..................................................................................................................................................................................15

5 troubleSHootinG .......................................................................................................................................................................15

remote ControL is not working witH Awning ................................................................................................................15

Awning is moVing sLow ......................................................................................................................................................15

Page 4: Solar Installation Manual - Premier€¦ · these three positions allow the solar panel to capture the maximum light emitted from the sun. Step 1 Determine which angle the solar panel

4

A. solar panel (solar panel kit) B. Battery pack / receiver unit (receiver kit) C. 3m power extension cable (included in receiver kit) D. remote control (ordered separately) e. screws and brackets for solar panel (included receiver in kit)

1.2 tools required:

the general tools required when installing the solar powered awning motor are: • power drill & drill bits ( 3mm & 10mm) • philips head screw driver • measuring/levelling tools

1. Getting Started

k

J

i

5m 10m

C.

D

B

A

e

H

fg

f. Dry Contact Cable 30cm (included receiver in kit)g. 3.5mm mono to usB cable, 1m ((included receiver in kit)H. Cable clips with double sided tape (included receiver in kit)i. Crown & Drive wheel, 78mm (ordered separately)J. motor (motor kit)k. extension cables 5m, 10m (order separately)

1.1 Verify Package contents:

Page 5: Solar Installation Manual - Premier€¦ · these three positions allow the solar panel to capture the maximum light emitted from the sun. Step 1 Determine which angle the solar panel

5

2.1 battery Pack / receiver unit

the battery pack / receiver unit is what drives and controls the motor.

there are 2 components within this housing. • Battery, this is where the power/charge is stored and supplies the motor with power to operate. the battery is

recharged via the solar panel and power management electronics • receiver unit, this contains the electronics that communicate with the motor, remote control and automation

system.

2. Parts description

Panel angle adjustable (0, 20,40 degree)

Charging current checking button

Charging current indicator LED

Solar panel input

Left Right

Programming button

Dry contact port/Automation

Output to motor

Programming IR

2.2 Solar Panel

the solar panel is required to charge the integrated battery which powers the awning motor.

when mounting the solar panel, make sure it is located to capture as much direct sunlight as possible. this may not be where the awning is located, in which case extension cables may be required.

Brackets have been designed to adjust at 0°, 20° & 40° to angle to the best position to capture direct sunlight

image 1 image 2

f. Dry Contact Cable 30cm (included receiver in kit)g. 3.5mm mono to usB cable, 1m ((included receiver in kit)H. Cable clips with double sided tape (included receiver in kit)i. Crown & Drive wheel, 78mm (ordered separately)J. motor (motor kit)k. extension cables 5m, 10m (order separately)

RF Antenna

Page 6: Solar Installation Manual - Premier€¦ · these three positions allow the solar panel to capture the maximum light emitted from the sun. Step 1 Determine which angle the solar panel

6

2.3 Power cables the power cables come in three lengths, 3m, 5m and 10m.

Depending upon the location of the solar panel, you may need to mount the panel remotely from the Awning to capture the optimum sunlight for charging; extension cables are used to for this purpose.

2.4 remote control the remote control used to operate the solar powered Awning is the platinum remote control. this remote has four individual rf channels, allowing the individual operation of 4 Awnings. it is also possible to group mulitple awnings to one chanel.

2.4 Remote control

The remote control used to operate the Solar powered Awning is the Power Rise Platinum remote. This remote has four individual RF channels, allowing the individual operation of 4 Awnings.

Parts description

3mpart: 34.232.000

10mpart: 34.234.000

5mpart: 34.233.000

Page 7: Solar Installation Manual - Premier€¦ · these three positions allow the solar panel to capture the maximum light emitted from the sun. Step 1 Determine which angle the solar panel

7

3.1 inserting motor in tube

The following step is only required if you have not ordered a complete blind.

Before the motor is inserted into the Awning tube, both Crown and Drive wheels will need to be attached to the motor.firstly slide the Crown wheel over the motor and match up the notch on the Crown wheel with the spline on the motor collar.

Attach the Drive wheel to the shaft of the motor and slide the lock-in clip onto the end of the shaft.

once Crown and Drive wheel are attached to motor, slide the motor into the Awning tube.

3. installation / Setup

Page 8: Solar Installation Manual - Premier€¦ · these three positions allow the solar panel to capture the maximum light emitted from the sun. Step 1 Determine which angle the solar panel

8

3.2 attaching Solar panel to battery pack/receiver unit

the solar panel, brackets and battery pack/receiver all come as individual components that need to be assembled together.

the solar panel brackets are mounted onto the battery pack/receiver in three different positions, 0°, 20° and 40°. these three positions allow the solar panel to capture the maximum light emitted from the sun.

Step 1Determine which angle the solar panel will sit at and attach the brackets to the battery pack/receiver; there are three holes on the bracket (0°, 20° & 40°). Line up one out the three holes on the bracket with the battery pack receiver.

make sure the tabs on the bracket face outwards from the battery pack/receiver.

Installation / Setup

3.1 - Attaching Solar panel to Battery pack/Motor drive unit

The solar panel, brackets and battery pack/receiver all come as individual components that need to be assembled together.

The solar panel brackets are mounted onto the battery pack/receiver in three different positions, 0°, 20° and 40°. These three positions allow the solar panel to capture the maximum light emitted from the sun.

Step 1

Determine which angle the solar panel will sit at and attach the brackets to the battery pack/receiver; there are three holes on the bracket (0°, 20° & 40°). Line up one out the three holes on the bracket with the battery pack receiver.

Make sure the tabs on the bracket face outwards from the battery pack/receiver.

Insert small screw to secure bracket.

insert small screw to secure bracket.

Installation / Setup

3.1 - Attaching Solar panel to Battery pack/Motor drive unit

The solar panel, brackets and battery pack/receiver all come as individual components that need to be assembled together.

The solar panel brackets are mounted onto the battery pack/receiver in three different positions, 0°, 20° and 40°. These three positions allow the solar panel to capture the maximum light emitted from the sun.

Step 1

Determine which angle the solar panel will sit at and attach the brackets to the battery pack/receiver; there are three holes on the bracket (0°, 20° & 40°). Line up one out the three holes on the bracket with the battery pack receiver.

Make sure the tabs on the bracket face outwards from the battery pack/receiver.

Insert small screw to secure bracket.

installation / Setup

Page 9: Solar Installation Manual - Premier€¦ · these three positions allow the solar panel to capture the maximum light emitted from the sun. Step 1 Determine which angle the solar panel

9

Step 2Attach the solar panel to the brackets with the nuts and set screws supplied, the cable coming from the solar panel needs to be on the side of the ‘solar panel input’ port on the battery pack/receiver unit.

the head of the set screw sits on top of the solar panel and the nut is screwed on behind the solar panel, once attached plug the cable from the solar panel into the ‘solar panel input’ port on the battery pack/receiver.

3.3 optimum position for solar panel

the location of the solar panel should be in direct sunlight for the longest period of the day, this will ensure the battery can be fully charged.

it is possible to mount the solar unit on the front cover of the Awning headbox. this is generally the simplest installation and does not require any extension cables.

if this is not possible due to the location of the awning, optional extension cables may be used to remote locate the solar unit. these are available in lengths of 3, 5 and 10 metres.

when looking for the best location for mounting the solar unit, the panel should point due north to ensure year round sun coverage.

if north is not possible from the installation location, north east or north west may also be used.

A southern facing solar panel or a solar panel located underneath a roof or ceiling will not be sufficient to charge and enable use of the motor on a regular basis.

The iphone App ‘Sun Seeker’ can be used to find the best location for installing the solar panel by showing the travel path of the sun.

installation / Setup

Page 10: Solar Installation Manual - Premier€¦ · these three positions allow the solar panel to capture the maximum light emitted from the sun. Step 1 Determine which angle the solar panel

10

3.4 Mounting the solar panel

it is essential to ensure the panel is mounted in a location that receives at least a few hours of sunlight each day.

Mounting on Headboxif the solar panel can be mounted on the head box, there are two positions.

• front or top of headbox if face fitted • front of headbox if fitted in reveal

when installing the solar panel on the head box a 10mm hole will need to be drilled to pass through the power cable from the battery pack / receiver. two 3mm holes are also required to fit it onto the headbox. mount the solar panel to the side where the motor is located on the Awning and mark where the holes need to be drilled.

it is possible to minimise the exposed 10mm hole by mounting the receiver unit 5mm further right before mounting. this enables the power cable hole to be partially covered.

3.3 – Mounting the solar panel

Based on the positioning of the solar panel to capture as much sun as possible, this will determine where it will be mounted.

Mounting on Headbox

If the solar panel can be mounted on the head box, there are two positions.

-Front or top of headbox if face fitted

-Front of headbox if fitted in reveal

When installing the solar panel on head box a 10mm hole will need to be drilled to pass through the power cable from the battery pack / receiver and also two 3mm holes to fit it onto the headbox. Mount the solar panel to the side where the motor is located on the Awning and mark where the holes need to be drilled out.

Drilling holes into headbox

Passing through power cable

Solar panel mounted onto headbox with two screws

Drilling holes into headbox

3.3 – Mounting the solar panel

Based on the positioning of the solar panel to capture as much sun as possible, this will determine where it will be mounted.

Mounting on Headbox

If the solar panel can be mounted on the head box, there are two positions.

-Front or top of headbox if face fitted

-Front of headbox if fitted in reveal

When installing the solar panel on head box a 10mm hole will need to be drilled to pass through the power cable from the battery pack / receiver and also two 3mm holes to fit it onto the headbox. Mount the solar panel to the side where the motor is located on the Awning and mark where the holes need to be drilled out.

Drilling holes into headbox

Passing through power cable

Solar panel mounted onto headbox with two screws

passing through power cable

3.3 – Mounting the solar panel

Based on the positioning of the solar panel to capture as much sun as possible, this will determine where it will be mounted.

Mounting on Headbox

If the solar panel can be mounted on the head box, there are two positions.

-Front or top of headbox if face fitted

-Front of headbox if fitted in reveal

When installing the solar panel on head box a 10mm hole will need to be drilled to pass through the power cable from the battery pack / receiver and also two 3mm holes to fit it onto the headbox. Mount the solar panel to the side where the motor is located on the Awning and mark where the holes need to be drilled out.

Drilling holes into headbox

Passing through power cable

Solar panel mounted onto headbox with two screws

solar panel mounted onto headbox with two screws

installation / Setup

Page 11: Solar Installation Manual - Premier€¦ · these three positions allow the solar panel to capture the maximum light emitted from the sun. Step 1 Determine which angle the solar panel

11

Mounting remotely (Gutters, Fascia etc)if the solar panel needs to be positioned away from the Awning so that it can capture the optimum sunlight, there are a few options for mounting.

the ideal mounting locations would be on the gutter or fascia of the building, the solar panel and battery pack / receiver in total weigh less than 1kg.

when mounting remote from the Awning, always try to position the solar panel to capture the maximum amount of sunlight for the longest period of the day (most cases, this will be a true north position). Also tilt/angle the solar panel once installed to fine tune it’s positioning.

optional power extension cables are available to allow for long distance external mounting (up to 10 meters). when running the power cable it is a good idea to place it under the gutter/eve so that it is tucked away from water and other external weather conditions.

3.5 connecting Power cable from Motor to battery Pack/receiver

once the location of the solar panel has been established, the power cable will need to be connected between the motor and battery pack / receiver.

the box will contain a 3m extension power cable, 5m and 10m extension power cables can be purchased separately.

if the solar panel is to be mounted on the headbox, use the supplied cable holders. peel and stick the cable holder on the inside of the head box and clip the power cable into onto it.

installation / Setup

3.4 - Connecting power cable from motor to battery pack/receiver.

Once the location of the solar panel has been established, the power cable will need to be connected between the motor and battery pack / receiver.

The box will contain an extension power cable if requested at the time of ordering the product; the lengths are 3m, 5m and 10m.

If the solar panel is to be mounted on the headbox, an extension power cable is not required. A power extension cable is required if the solar panel is to be mounted away from the Awning.

Mounting on headbox, extension cable not required. Plug power cable from battery pack/ receiver into motor power cable.

Mounting on headbox, extension cable not required. Plug power cable from battery pack/ receiver into motor power cable.

Page 12: Solar Installation Manual - Premier€¦ · these three positions allow the solar panel to capture the maximum light emitted from the sun. Step 1 Determine which angle the solar panel

12

installation / Setup

3.6 Pairing & Programming remote

Complete steps 2-5 in less than 8 seconds. 1. press the ‘programming button’ on the battery / receiver unit, this will send the awning down. Allow the awning to

travel 500mm from the top and press the ‘programming button’ to stop at this position. this will stop the awning from traveling beyond its top limit prior to the limits being set. refer to image 2 (page 4)

2. press and hold the ‘programming button’ on the battery / receiver unit3. while still holding the ‘programming button’, select the channel on the remote control that you want the Awning to

operate on.4. now press and hold the ‘up’ button. the Awning will jog to indicate that it has paired with the remote control.5. release the ‘programming button’ on the battery pack /receiver 6. to operate the Awning, select the channel (make sure the green light is illuminated) and press the up/down button.

To remove a previous programmed channel, complete the same process as above; however press the DOWN button instead of UP.

3.7 change Motor direction

if the motor motor is mounted on the right-hand side, the motor direction will need to be changed to operate the Awning.1. select the channel that the Awning is paired withto.2. press and hold the ‘ALL’ button for six seconds; the LeD indicator L.e.D on the top of the remote will start flashing

green.3. point the remote at the ‘programming ir’ located on the right-hand side of the battery pack / receiver unit. press

and hold the ‘up’ button on the remote; the Awning will jog to indicate the direction has been changeds.4. press the ‘ALL’ button on the remote to save the motor direction.

Page 13: Solar Installation Manual - Premier€¦ · these three positions allow the solar panel to capture the maximum light emitted from the sun. Step 1 Determine which angle the solar panel

13

3.8 Setting Motor limits

the motor limits are set manually with the hex screw driver provided or with a tool that the installer uses to set switch motors with.

Below is a table that shows a motor positioned on the left or right side of the tube and the direction to turn the hex screw to adjust the top and bottom limits.

the solar receiver unit is supplied with enough charge from the factory to enable limit settings and several days of operation before sunlight is required to re-charge the battery.

the set the top limit, press the up button on the remote control, as the blind starts to move, turn the open limit on the motor head using the Hex driver tool to increase or decrease the limit. if you continually turn the limit fast enough (by hand using the tool) the awning upper limit will creep up in small increments. if the power times out, select the channel button on the remote control and press the up button again.

remember the green LeD light must be illuminated on the remote control after selecting the correct channel for the motor to respond.

Complete the same process above, but in the down position on the remote and using the Close limit Hex screw on the motor head to set the bottom limit.

3.9 dry contact/ automation

Home automation is supported via the use of dry contact (open, Common, Close); the port for dry contact is located on the side of the battery pack / receiver.

each unit will be supplied with a dry contact cable that plugs into the battery pack / receiver for home automation control.

there is a rubber cap that sits over the dry contact port to protect it from water and debris; this will need to be removed before the dry contact cable can be plugged in.

Limit settings can be adjusted using a limit setting tool, hex key or flat head screwdriver. Power must be supplied to the motor in the direction required in order to set the limits. Turn the limit screws in the direction indicated above to increase or decrease blind travel.

installation / Setup

Page 14: Solar Installation Manual - Premier€¦ · these three positions allow the solar panel to capture the maximum light emitted from the sun. Step 1 Determine which angle the solar panel

14

3.10 timer remote (optional)

Please note: the Awning system is not designed to operate in high wind conditions. please consider the local environment in the immediate vicinity of the awning when choosing to use the timer function. if the timer was to deploy an awning when unattended in high wind conditions, the products could be damaged or destroyed.timer should only be used on product in sheltered areas away from direct wind.

configuring the correct product when setting the timer for use with the Awning, the ‘set the Advanced operation mode for specific shade types’ setting must be configured to product ‘1’.failure to set the timer to the correct product may cause faulty operation from the product.

refer to the instructions below to setup the correct product number.Use the instruction provided with the Timer for the rest of the setup process.

installation / Setup

Step. 1 Step. 3

Step. 2 Step. 4

* ensure number 1 is selected for solar Awning motor.

Page 15: Solar Installation Manual - Premier€¦ · these three positions allow the solar panel to capture the maximum light emitted from the sun. Step 1 Determine which angle the solar panel

15

• while installing the Awning, plug the solar panel into the battery pack / receiver and sit it in the sun to charge the battery.

• the motor has a ‘fabric tensioning’ feature which allows for lock-down bolts or straps to be applied and the awning operated without causing damage to the Awning or structure it is secured.

the motor will pull the Awning up and automatically torque stop, then back off the fabric by 2mm so that the fabric is not stretched, but is kept tight.

• tilt the solar panel on an angle to help water and debris slide off and not build up on solar panel. • when mounting the solar panel externally from the Awning, always try and position it to capture the maximum

amount of sunlight for the longest period of the day. this will usually be facing a true north position. Also keep in mind to position the solar panel to capture sunlight during the winter season.

• there is no need for mains power, this unit operates on 24v DC • the ‘Charging current checking button’ located on the battery pack / receiver is set to display 2 stages of

current charge. orange LeD, indicates that the battery has between 15-29mA of current. green LeD indicates that the battery has 30+mA of current. this will only operate and indicate in direct sunlight.

if the LeD does not light up this indicated that the battery is at less than 40% of its capacity. • once or twice a year, it is recommended to clean the solar panel. over a period of time dust, dirt, pollen, bird

droppings and other debris can negatively affect solar panel efficiency. to clean the solar panel, fill a container/bucket with some warm water and soap (no other special chemicals

required). Clean the surface of the solar panel with a cloth, only clean the solar panel surface.

reMote control iS not workinG witH awninG • make sure channel on remote control is selected (solid green light illumined on remote control) prior to pressing

the up/down button. • remote control is out of range, the range (open area without any obstructions) for the remote control is about

15m-20m. • Check to make sure there is power/charge in the battery pack/ receiver. this can be done two ways. - press and hold the ‘programming button’ on the battery pack / receiver, the Awning will open or close if there

is power/charge. - press the ‘Charging current checking button’ on the battery pack / receiver. An orange light appears, this indicates that the battery has between 15-29mA of current. A green light appears, this indicates that the battery has 30+mA of current. if a light does not appear and the Awning is still operating, this indicates that the battery is at less than 40% of

its capacity.

awninG iS MoVinG Slow• Battery could be not charged or not receiving enough sunlight to re-charge.• press the ‘Charging current checking button’ on the battery pack / receiver. An orange light appears, this indicates that the battery has between 15-29mA of current and the solar panel is

receiving enough light to charge the battery. A green light appears, this indicates that the battery has 30+mA of current and indicates the solar panel is

currently receiving sufficient light to charge the battery. if a light does not appear and the Awning is still operating, this indicates that the solar panel is not currently

receiving sufficient sunlight to charge the battery• make sure the solar panel is positioned in the best possible location to capture sunlight, if not it may need to be

relocated.

4. HintS & tiPS

5. troubleSHootinG

Page 16: Solar Installation Manual - Premier€¦ · these three positions allow the solar panel to capture the maximum light emitted from the sun. Step 1 Determine which angle the solar panel