Soil Compaction

Topic I

Topic I

Page 2: Soil Compaction Topic I. Success of Embankment Proper preparation of foundation. Use of suitable materials. Proper placing working and compacting of materials.

Success of Embankment

• Proper preparation of foundation.

• Use of suitable materials.

• Proper placing working and compacting of materials.

Topic I

Page 3: Soil Compaction Topic I. Success of Embankment Proper preparation of foundation. Use of suitable materials. Proper placing working and compacting of materials.

Proper Preparation of Foundation

• Clear and grub area• Cut vegetation• Remove perishable material• Strip and stockpile• Compact area

Topic I

Page 4: Soil Compaction Topic I. Success of Embankment Proper preparation of foundation. Use of suitable materials. Proper placing working and compacting of materials.

Suitable Materials

• Rock• Sand• Silt• Clay• See Standard specifications list

Topic I

Page 5: Soil Compaction Topic I. Success of Embankment Proper preparation of foundation. Use of suitable materials. Proper placing working and compacting of materials.

Unsuitable Materials

• Organic soils should not be used as embankment or subgrade material.

Topic I

Page 6: Soil Compaction Topic I. Success of Embankment Proper preparation of foundation. Use of suitable materials. Proper placing working and compacting of materials.

Proper Placement and Compaction

• Placing layers

• Placing in marsh

• Placing rock

Topic I

Page 7: Soil Compaction Topic I. Success of Embankment Proper preparation of foundation. Use of suitable materials. Proper placing working and compacting of materials.

Placing Layers

• The maximum thickness of a layer should not exceed 8 inches loosely placed.

• 8 inch lifts

Topic I

Page 8: Soil Compaction Topic I. Success of Embankment Proper preparation of foundation. Use of suitable materials. Proper placing working and compacting of materials.

Placing Layers

• Compact each layer

• Level each layer

• Parallel

Topic I

Page 9: Soil Compaction Topic I. Success of Embankment Proper preparation of foundation. Use of suitable materials. Proper placing working and compacting of materials.

Placing in Marsh

• Typically in wet marsh excavations WisDOT allows for marsh backfill to be end dumped into excavation and “surged” down into the excavation with a bulldozer until above water level.

Topic I

Page 10: Soil Compaction Topic I. Success of Embankment Proper preparation of foundation. Use of suitable materials. Proper placing working and compacting of materials.

Topic I

Page 11: Soil Compaction Topic I. Success of Embankment Proper preparation of foundation. Use of suitable materials. Proper placing working and compacting of materials.

Topic I

Page 12: Soil Compaction Topic I. Success of Embankment Proper preparation of foundation. Use of suitable materials. Proper placing working and compacting of materials.

Topic I

Page 13: Soil Compaction Topic I. Success of Embankment Proper preparation of foundation. Use of suitable materials. Proper placing working and compacting of materials.

Placing Rock

• No end dumping• Bulldozed or shoved into position• Various sizes• When placing rock all voids must be filled with

finer material.

Topic I

Page 14: Soil Compaction Topic I. Success of Embankment Proper preparation of foundation. Use of suitable materials. Proper placing working and compacting of materials.

Topic I

Page 15: Soil Compaction Topic I. Success of Embankment Proper preparation of foundation. Use of suitable materials. Proper placing working and compacting of materials.

Principles of Compaction

1. Decrease future settlements

2. Increase shear strength

3. Decrease permeability

4. Increase stability

Topic I

Page 16: Soil Compaction Topic I. Success of Embankment Proper preparation of foundation. Use of suitable materials. Proper placing working and compacting of materials.

Not Achieving Compaction?Solutions

• Increase compaction effort–Compaction equipment

• Change soil moisture content–Optimum moisture content

Topic I

Page 17: Soil Compaction Topic I. Success of Embankment Proper preparation of foundation. Use of suitable materials. Proper placing working and compacting of materials.

Figure 1: Compaction Equipment

Topic I

Page 18: Soil Compaction Topic I. Success of Embankment Proper preparation of foundation. Use of suitable materials. Proper placing working and compacting of materials.

Figure 1: Compaction Equipment

Topic I

Static smooth drum roller works well for sealing subgrades after the days grading operations are complete.

Doesn’t work well on clay soils.

Page 19: Soil Compaction Topic I. Success of Embankment Proper preparation of foundation. Use of suitable materials. Proper placing working and compacting of materials.

Standard Compaction

• Embankment compaction

Topic I

Page 20: Soil Compaction Topic I. Success of Embankment Proper preparation of foundation. Use of suitable materials. Proper placing working and compacting of materials.

Special Compaction

• Density tests–Sand Cone Method–Nuclear Method

• Minimum frequency

Topic I

Page 21: Soil Compaction Topic I. Success of Embankment Proper preparation of foundation. Use of suitable materials. Proper placing working and compacting of materials.

Moisture Control

• Proper moisture conditions are essential for the efficient compaction of earth embankments. Satisfactory moisture conditions almost always are specified in relation to the optimum moisture content for a standard laboratory compaction test.

Topic I

Page 22: Soil Compaction Topic I. Success of Embankment Proper preparation of foundation. Use of suitable materials. Proper placing working and compacting of materials.

Moisture Control

• Discs for wet cohesive soils

• Blade crown on surface

• Mixed

Topic I

Page 23: Soil Compaction Topic I. Success of Embankment Proper preparation of foundation. Use of suitable materials. Proper placing working and compacting of materials.

Documentation- Cut sections

• Excavated proper grade• Frost susceptible materials• Compaction• EBS• Drainage• Proper disposal

Topic I

Page 24: Soil Compaction Topic I. Success of Embankment Proper preparation of foundation. Use of suitable materials. Proper placing working and compacting of materials.

Documentation- Embankments

• Preparation of foundation

• Soils utilized

• Placing and compacting of materials

Topic I

Page 25: Soil Compaction Topic I. Success of Embankment Proper preparation of foundation. Use of suitable materials. Proper placing working and compacting of materials.

Documentation-Entries

• Soil type• Moisture content• Layer thickness• Drying or wetting• Routing pattern

Topic I

Page 26: Soil Compaction Topic I. Success of Embankment Proper preparation of foundation. Use of suitable materials. Proper placing working and compacting of materials.

Earthwork Equipment

• Hauling• Leveling• Aerating• Compacting

Topic I

Page 27: Soil Compaction Topic I. Success of Embankment Proper preparation of foundation. Use of suitable materials. Proper placing working and compacting of materials.

Figure 2: Track Dozer

Topic I

Page 28: Soil Compaction Topic I. Success of Embankment Proper preparation of foundation. Use of suitable materials. Proper placing working and compacting of materials.

Track Dozer

• Track Dozers are not to be used as compaction equipment.

• Used to level lifts of fill.

Topic I

Page 29: Soil Compaction Topic I. Success of Embankment Proper preparation of foundation. Use of suitable materials. Proper placing working and compacting of materials.

Subgrade Care

Topic I

Page 30: Soil Compaction Topic I. Success of Embankment Proper preparation of foundation. Use of suitable materials. Proper placing working and compacting of materials.

Topic I

Page 31: Soil Compaction Topic I. Success of Embankment Proper preparation of foundation. Use of suitable materials. Proper placing working and compacting of materials.

Topic I

Page 32: Soil Compaction Topic I. Success of Embankment Proper preparation of foundation. Use of suitable materials. Proper placing working and compacting of materials.

Figure 3:Disc Drying

Topic I

Page 33: Soil Compaction Topic I. Success of Embankment Proper preparation of foundation. Use of suitable materials. Proper placing working and compacting of materials.

Disc Drying

• Drying of wet soils is necessary and can be accomplished by using graders, discs or harrows.

• Aeration of the soil• Necessary for compaction

Topic I

Page 34: Soil Compaction Topic I. Success of Embankment Proper preparation of foundation. Use of suitable materials. Proper placing working and compacting of materials.

Figure 4: Rubber Tire Dozer

Topic I

Page 35: Soil Compaction Topic I. Success of Embankment Proper preparation of foundation. Use of suitable materials. Proper placing working and compacting of materials.

Rubber Tire Dozer/Scrapers

• Hauling, Leveling and Compacting

Topic I

Page 36: Soil Compaction Topic I. Success of Embankment Proper preparation of foundation. Use of suitable materials. Proper placing working and compacting of materials.
Page 37: Soil Compaction Topic I. Success of Embankment Proper preparation of foundation. Use of suitable materials. Proper placing working and compacting of materials.
Page 38: Soil Compaction Topic I. Success of Embankment Proper preparation of foundation. Use of suitable materials. Proper placing working and compacting of materials.
Page 39: Soil Compaction Topic I. Success of Embankment Proper preparation of foundation. Use of suitable materials. Proper placing working and compacting of materials.
Page 40: Soil Compaction Topic I. Success of Embankment Proper preparation of foundation. Use of suitable materials. Proper placing working and compacting of materials.
Page 41: Soil Compaction Topic I. Success of Embankment Proper preparation of foundation. Use of suitable materials. Proper placing working and compacting of materials.
Page 42: Soil Compaction Topic I. Success of Embankment Proper preparation of foundation. Use of suitable materials. Proper placing working and compacting of materials.
Page 43: Soil Compaction Topic I. Success of Embankment Proper preparation of foundation. Use of suitable materials. Proper placing working and compacting of materials.
Page 44: Soil Compaction Topic I. Success of Embankment Proper preparation of foundation. Use of suitable materials. Proper placing working and compacting of materials.

Figure 5: Sheepsfoot Imprint

Topic I

Page 45: Soil Compaction Topic I. Success of Embankment Proper preparation of foundation. Use of suitable materials. Proper placing working and compacting of materials.
Page 46: Soil Compaction Topic I. Success of Embankment Proper preparation of foundation. Use of suitable materials. Proper placing working and compacting of materials.

Sheepsfoot Imprint

• Optimum moisture–High volume compaction

• Lower water content–Increase soil surface

• Cohesive and semi-cohesive soils

Topic I

Page 47: Soil Compaction Topic I. Success of Embankment Proper preparation of foundation. Use of suitable materials. Proper placing working and compacting of materials.

Figure 5: Motor-Grader

Topic I

Page 48: Soil Compaction Topic I. Success of Embankment Proper preparation of foundation. Use of suitable materials. Proper placing working and compacting of materials.

Motor-Grader

• Aerates and levels

• Takes out ruts

• Not for compaction

Topic I

Page 49: Soil Compaction Topic I. Success of Embankment Proper preparation of foundation. Use of suitable materials. Proper placing working and compacting of materials.

Figure 6: Solid Subgrade

Topic I

Page 50: Soil Compaction Topic I. Success of Embankment Proper preparation of foundation. Use of suitable materials. Proper placing working and compacting of materials.

Solid Subgrade

• Keeps subgrade bladed up.• Keeps ruts out.

Topic I

Page 51: Soil Compaction Topic I. Success of Embankment Proper preparation of foundation. Use of suitable materials. Proper placing working and compacting of materials.

Figure 7: Excessive Rutting

Topic I

Page 52: Soil Compaction Topic I. Success of Embankment Proper preparation of foundation. Use of suitable materials. Proper placing working and compacting of materials.

Topic I

Page 53: Soil Compaction Topic I. Success of Embankment Proper preparation of foundation. Use of suitable materials. Proper placing working and compacting of materials.

Excessive Rutting

• Material too wet• Solutions:

–Motor-grader– Tractor–Disc

Topic I

Page 54: Soil Compaction Topic I. Success of Embankment Proper preparation of foundation. Use of suitable materials. Proper placing working and compacting of materials.

Figure 8: Embankment construction

Topic I

Page 55: Soil Compaction Topic I. Success of Embankment Proper preparation of foundation. Use of suitable materials. Proper placing working and compacting of materials.

Embankment Construction Equipment

• Dozer

• Tamping Roller

• Motor-Grader

Topic I

Page 56: Soil Compaction Topic I. Success of Embankment Proper preparation of foundation. Use of suitable materials. Proper placing working and compacting of materials.

Figure 9: Dumping and Leveling

Topic I

Page 57: Soil Compaction Topic I. Success of Embankment Proper preparation of foundation. Use of suitable materials. Proper placing working and compacting of materials.

Dumping and Leveling

• Firm and unyielding support.• Prior to first lift.

Topic I

Page 58: Soil Compaction Topic I. Success of Embankment Proper preparation of foundation. Use of suitable materials. Proper placing working and compacting of materials.

Figure 10: Tamping Virbratory Roller

Topic I

Page 59: Soil Compaction Topic I. Success of Embankment Proper preparation of foundation. Use of suitable materials. Proper placing working and compacting of materials.

Tamping Vibratory Roller

• “Dry”, bony material doesn’t stick.

Topic I

Page 60: Soil Compaction Topic I. Success of Embankment Proper preparation of foundation. Use of suitable materials. Proper placing working and compacting of materials.

Figure 11: Excellent Material

Topic I

Page 61: Soil Compaction Topic I. Success of Embankment Proper preparation of foundation. Use of suitable materials. Proper placing working and compacting of materials.

Excellent Material

• Dry and granular• Some rock• Imprints stand out• Not common in WI

Topic I

Page 62: Soil Compaction Topic I. Success of Embankment Proper preparation of foundation. Use of suitable materials. Proper placing working and compacting of materials.

Figure 12: Good Conditions

Topic I

Page 63: Soil Compaction Topic I. Success of Embankment Proper preparation of foundation. Use of suitable materials. Proper placing working and compacting of materials.

Good Conditions

• Back tire of grader is not sinking.

Topic I

Page 64: Soil Compaction Topic I. Success of Embankment Proper preparation of foundation. Use of suitable materials. Proper placing working and compacting of materials.

Figure 13: Scraper End Dumping

Topic I

Page 65: Soil Compaction Topic I. Success of Embankment Proper preparation of foundation. Use of suitable materials. Proper placing working and compacting of materials.

Scraper End Dumping

• Pushed into wet area.–Granular material

• Seal first lift• Don’t trap unstable soil in embankment.

Topic I