Software Tools for MPSKajetan Fuchsberger
MPP Workshop, 2013, Annecy
Many thanks for input fromM. Zerlauth, J. Wenninger, R. Schmidt,
G. Kruk, V. Baggiolini, G. Papotti, D. Jacquet and the TE-MPE-MS Software Team
![Page 2: Software Tools for MPS](https://reader036.fdocuments.in/reader036/viewer/2022062321/56814043550346895dabb19a/html5/thumbnails/2.jpg)
Software Tools for MPS
The solution for everything ;-)
![Page 3: Software Tools for MPS](https://reader036.fdocuments.in/reader036/viewer/2022062321/56814043550346895dabb19a/html5/thumbnails/3.jpg)
3Kajetan Fuchsberger MPP Workshop Annecy, 2013-03-13, Software Tools for MPS
Content
Tests & Procedures
Early detection of failures
Aperture Meter
![Page 4: Software Tools for MPS](https://reader036.fdocuments.in/reader036/viewer/2022062321/56814043550346895dabb19a/html5/thumbnails/4.jpg)
4Kajetan Fuchsberger MPP Workshop Annecy, 2013-03-13, Software Tools for MPS
Content
Tests & Procedures
Early detection of failures
Aperture Meter
![Page 5: Software Tools for MPS](https://reader036.fdocuments.in/reader036/viewer/2022062321/56814043550346895dabb19a/html5/thumbnails/5.jpg)
5Kajetan Fuchsberger MPP Workshop Annecy, 2013-03-13, Software Tools for MPS
Tests and Procedures
Currently: Sharepoint Sites
Disadvantages: Order not enforced
(scheduling done ‘on the fly’).
Nothing enforces the tests to be really done.
No real overview, what was done, what still has to be done?
![Page 6: Software Tools for MPS](https://reader036.fdocuments.in/reader036/viewer/2022062321/56814043550346895dabb19a/html5/thumbnails/6.jpg)
6Kajetan Fuchsberger MPP Workshop Annecy, 2013-03-13, Software Tools for MPS
The AccTesting Framework
Designed from the experience of Hardware Commissioning.
Successfully Used in HWC Campaigns 2012, 2013
Enforces Correct Order of Tests
Many additional features: Automatic Scheduling Constraints Statistics
![Page 7: Software Tools for MPS](https://reader036.fdocuments.in/reader036/viewer/2022062321/56814043550346895dabb19a/html5/thumbnails/7.jpg)
7Kajetan Fuchsberger MPP Workshop Annecy, 2013-03-13, Software Tools for MPS
AccTesting Concept
Migrate of MPS Commissioning Procedures: 1) Transform all the MPS comissioning steps to
AccTesting (simple sign-only tests). 2) Replace one by one with automated tests.
Test-Phases.
Tests
![Page 8: Software Tools for MPS](https://reader036.fdocuments.in/reader036/viewer/2022062321/56814043550346895dabb19a/html5/thumbnails/8.jpg)
8Kajetan Fuchsberger MPP Workshop Annecy, 2013-03-13, Software Tools for MPS
Barriers
When the commissioning of a system reaches a Barrier Point, it has to wait until all other systems (which have the same barrier) reach it also.
QPS IST1
BLM IST2 IST3 IST4 INJ1 INJ2
BIS IST5 IST6 IST7 INJ3
LBDS IST8 INJ4
RQTL… IST10 IST11 POW1 POW2
Ready for Powering
Ready for Injection
Knowledge of System-Dependencies required!
![Page 9: Software Tools for MPS](https://reader036.fdocuments.in/reader036/viewer/2022062321/56814043550346895dabb19a/html5/thumbnails/9.jpg)
9Kajetan Fuchsberger MPP Workshop Annecy, 2013-03-13, Software Tools for MPS
Interlocks based on Test Plan?
Examples: Prohibit, that circuit can be powered, before all the tests are done. Do not allow injection of beam before all necessary MPS tests are
done.
Possibly: Enforce Tests after changes: E.g. Which tests have to be executed, after a change of a QPS –
card? Pre-defined test plans or (partially) auto-generated? Knowledge about System-Dependencies required!
What to interlock? E.g. Additional Circuit lock on PIC level which allows tests? Injection interlock?
![Page 10: Software Tools for MPS](https://reader036.fdocuments.in/reader036/viewer/2022062321/56814043550346895dabb19a/html5/thumbnails/10.jpg)
10Kajetan Fuchsberger MPP Workshop Annecy, 2013-03-13, Software Tools for MPS
Automation?
Automate whatever can be automated! (Avoid Errors, Reproducibility)
First steps: Concentrate on systems, where many interlocks of same type: BIC/PIC: Already dedicated tool, in the pipeline to be integrated with
AccTesting Collimators
Integrate BIS connection Test? Do we really have to look ‘by eye’ on lossmaps? Could there be a Hierarchy-check without a reference?
Vacuum BLMs:
E.g.: Test Of Latency: Close collimators: Done in pt3, pt7: Could be done for more, if automatic.
Others?
![Page 11: Software Tools for MPS](https://reader036.fdocuments.in/reader036/viewer/2022062321/56814043550346895dabb19a/html5/thumbnails/11.jpg)
11Kajetan Fuchsberger MPP Workshop Annecy, 2013-03-13, Software Tools for MPS
System Dependencies & Information
Key Concept: Use existing Sources!
Prototype in place
Possible Cooperation between TE-MPE-MS software team and BE-CO-DO (S. Jensen, D. Csikos).
System Information
Server
System Providers:• Lsa• Layout Db• …
Dependency Providers:• Layout Db• Runtime info (JMS)• Java code analysis• …
Information Providers:• Status• Issues (Jira)• Deployments • Faults? …
Clients (e.g. AccTesting, Diamon, ….)
![Page 12: Software Tools for MPS](https://reader036.fdocuments.in/reader036/viewer/2022062321/56814043550346895dabb19a/html5/thumbnails/12.jpg)
12Kajetan Fuchsberger MPP Workshop Annecy, 2013-03-13, Software Tools for MPS
Test Analysis
Vision: Simple description of test-expectations (assertions) on signals
resulting from tests (Java).
Universal GUI components to visualize problems.
First Implementation: Cooperation between TE-MPE-MS software team and BE-CO-
DA (R. Gorbonosov, A. Jalal) Used in AccTesting could be used e.g. in future PM modules. (Maybe also in
sequencer tasks and other checks?)
![Page 13: Software Tools for MPS](https://reader036.fdocuments.in/reader036/viewer/2022062321/56814043550346895dabb19a/html5/thumbnails/13.jpg)
13Kajetan Fuchsberger MPP Workshop Annecy, 2013-03-13, Software Tools for MPS
Data Analysis
TE-MPE-MS Vision: More general Data Analysis Framework
Key Concept: Perform analysis as close as possible to the data!
(Potential) Collaboration with BE-CO-DA to optimize resources, avoid duplication of efforts
First Implementation in place.
Analysis Framework (Cluster?)
Logging DB
Hadoop Cluster?
Post MortemClients (e.g. AccTesting, Timber, Custom Analysis….)
Others?
![Page 14: Software Tools for MPS](https://reader036.fdocuments.in/reader036/viewer/2022062321/56814043550346895dabb19a/html5/thumbnails/14.jpg)
14Kajetan Fuchsberger MPP Workshop Annecy, 2013-03-13, Software Tools for MPS
Content
Tests & Procedures
Early detection of failures
Aperture Meter
![Page 15: Software Tools for MPS](https://reader036.fdocuments.in/reader036/viewer/2022062321/56814043550346895dabb19a/html5/thumbnails/15.jpg)
15Kajetan Fuchsberger MPP Workshop Annecy, 2013-03-13, Software Tools for MPS
Early detection of Failures
YASP
LSA Server
trim
PcInterlockGUI
PCPC
PC
trim subs
crib
e
SIS
monitor
Dump!
?
?Not Allowed!
PcInterlock Server
![Page 16: Software Tools for MPS](https://reader036.fdocuments.in/reader036/viewer/2022062321/56814043550346895dabb19a/html5/thumbnails/16.jpg)
16Kajetan Fuchsberger MPP Workshop Annecy, 2013-03-13, Software Tools for MPS
LSA: The natural place to check
LSA Server
Applications: YASP Lumi-Scan
application Others…
Checks: Power Converter
Currents Collimator Settings BPM readings (actual +
predictions) online modeling?
Others?
![Page 17: Software Tools for MPS](https://reader036.fdocuments.in/reader036/viewer/2022062321/56814043550346895dabb19a/html5/thumbnails/17.jpg)
17Kajetan Fuchsberger MPP Workshop Annecy, 2013-03-13, Software Tools for MPS
LSA checks - proposal
Vision: Have an API like ‚isAllowed(TrimRequest request)‘
First implementation: Use ‚TrimPostProcessor‘ mechanism of LSA. Executed after trim saved in DB, on error LSA will
do a rollback. Incorporation = Trim Same mechanism to avoid
propagating trims, which would otherwise e.g. fail during ramp.
Override for MDs.
![Page 18: Software Tools for MPS](https://reader036.fdocuments.in/reader036/viewer/2022062321/56814043550346895dabb19a/html5/thumbnails/18.jpg)
18Kajetan Fuchsberger MPP Workshop Annecy, 2013-03-13, Software Tools for MPS
Further securing LSA
LSA Method protection Currently: Only basic protection (Sending of timing
events, Trim, Drive) Every method in LSA should be reviewed, if it can do
harm or not and protected appropriately
Protect reference Cycles for PcInterlock/SIS: First approach: TrimPostProcessor which evaluates
RBAC roles
![Page 19: Software Tools for MPS](https://reader036.fdocuments.in/reader036/viewer/2022062321/56814043550346895dabb19a/html5/thumbnails/19.jpg)
19Kajetan Fuchsberger MPP Workshop Annecy, 2013-03-13, Software Tools for MPS
Content
Tests & Procedures
Early detection of failures
Aperture Meter
![Page 20: Software Tools for MPS](https://reader036.fdocuments.in/reader036/viewer/2022062321/56814043550346895dabb19a/html5/thumbnails/20.jpg)
20Kajetan Fuchsberger MPP Workshop Annecy, 2013-03-13, Software Tools for MPS
Aperture Meter
![Page 21: Software Tools for MPS](https://reader036.fdocuments.in/reader036/viewer/2022062321/56814043550346895dabb19a/html5/thumbnails/21.jpg)
21Kajetan Fuchsberger MPP Workshop Annecy, 2013-03-13, Software Tools for MPS
Aperture Meter - Status
Prototype Operational Proved to be very useful during MDs Follows the operational cycle (optics, BP, time in BP) Listens to (some) LSA trims
What is missing? Improvements of User Interface Performance Improvements Tighter integration with Operational changes
(Collimator offsets after alignment, BPM usage from Yasp) Could be used as another source for LSA trim-verification
(e.g. large collimator movements, Collimator Hierarchy)
![Page 22: Software Tools for MPS](https://reader036.fdocuments.in/reader036/viewer/2022062321/56814043550346895dabb19a/html5/thumbnails/22.jpg)
22Kajetan Fuchsberger MPP Workshop Annecy, 2013-03-13, Software Tools for MPS
Summary
MPS Commissioning: Tracking in Acctesting Framework. Automate! (Step by Step) Candidates?
Preview: Two new frameworks: Tracking of system dependencies (Test-) Data Analysis
Early detection of potential problems could be done in by additional trim checks in LSA.
Aperture Meter: Useful prototype, but needs improvements.
![Page 23: Software Tools for MPS](https://reader036.fdocuments.in/reader036/viewer/2022062321/56814043550346895dabb19a/html5/thumbnails/23.jpg)
23Kajetan Fuchsberger MPP Workshop Annecy, 2013-03-13, Software Tools for MPS
Tools, Tools, Tools, Tools, Tools, …?
…Tools do not solve everything! Culture & communication
(High Quality) Software is not for free!
Challenges: Large part of Software manpower goes already into maintenance. A lot of ‘grown’ projects, partly written by un-experienced programmers
(E.g. Students).
How to improve? Reliability = Maintainability = Quality
(Self explaining code + Automated Testing, Testing, Tes…. ) Supervision of any SW projects from two sides: System Expert + SW
expert (‘Mentoring’) Who has the overview and can judge what is already out there and into
which framework a certain requirement would fit best? Communication!
Who is authorized to define priorities? Resources?
![Page 24: Software Tools for MPS](https://reader036.fdocuments.in/reader036/viewer/2022062321/56814043550346895dabb19a/html5/thumbnails/24.jpg)
24Kajetan Fuchsberger MPP Workshop Annecy, 2013-03-13, Software Tools for MPS
Thank you for your Attention!
Questions?
Small Steps-
Big Visions!
![Page 25: Software Tools for MPS](https://reader036.fdocuments.in/reader036/viewer/2022062321/56814043550346895dabb19a/html5/thumbnails/25.jpg)
25Kajetan Fuchsberger MPP Workshop Annecy, 2013-03-13, Software Tools for MPS
Fail Fast!
Actual BP: Would a certain trim exceed some limits?
Check before functional BP: Collimator-limits prediction Corrector Interlocks vs. Lsa settings Check at incorporation time
![Page 26: Software Tools for MPS](https://reader036.fdocuments.in/reader036/viewer/2022062321/56814043550346895dabb19a/html5/thumbnails/26.jpg)
26Kajetan Fuchsberger MPP Workshop Annecy, 2013-03-13, Software Tools for MPS
Single Source for „Operational State“
For certain applications BeamMode is not enough!
Combination of: Beam Mode, Beam Process, Time within BP, (Optics)
Currently (at least) 2 implementations: Combination of Beam Modes and PC state
changes(Aperture Meter)
Dedicated timing events (PcInterlock) Both not optimal. Reference
Implementation required.
![Page 27: Software Tools for MPS](https://reader036.fdocuments.in/reader036/viewer/2022062321/56814043550346895dabb19a/html5/thumbnails/27.jpg)
27Kajetan Fuchsberger MPP Workshop Annecy, 2013-03-13, Software Tools for MPS
Fail Fast!
„A fail-fast system is designed to immediately report […] any failure or condition that is likely to lead to failure. ”
[Wikipedia]
![Page 28: Software Tools for MPS](https://reader036.fdocuments.in/reader036/viewer/2022062321/56814043550346895dabb19a/html5/thumbnails/28.jpg)
28Kajetan Fuchsberger MPP Workshop Annecy, 2013-03-13, Software Tools for MPS
Data Analysis Mandate in BE-CO-DA (C. Roderick) to provide Data Analysis Solutions
Currently in Use Case Analysis Phase
Aim to be as easy as possible for users to specify: What to produce for an analysis case (e.g. signal names, units, description) What are the inputs (signals and sources) Which algorithms should be applied When analysis should be performed (event driven e.g. fill / beam mode, time
interval driven e.g. every 15 minutes)
Without user needing to: Configure a specific development environment Care about compilation and deployment Look elsewhere for signal names etc. i.e. provide directory of signals and sources
Key concept: Perform data analysis as close as possible to the data!
![Page 29: Software Tools for MPS](https://reader036.fdocuments.in/reader036/viewer/2022062321/56814043550346895dabb19a/html5/thumbnails/29.jpg)
29Kajetan Fuchsberger MPP Workshop Annecy, 2013-03-13, Software Tools for MPS
MPS Commissioning
What is missing? Dependencies between Systems (e.g. ELQA for a
circuit is ready, when the test are done for all magnets within the circuit)
Global Phases?
QPS IST1
BLM IST2 IST3 IST4 INJ1 INJ2
BIS IST5 IST6 IST7 INJ3
LBDS IST8 INJ4
RQTL… IST10 IST11 POW1 POW2
IST Powering Injection
![Page 30: Software Tools for MPS](https://reader036.fdocuments.in/reader036/viewer/2022062321/56814043550346895dabb19a/html5/thumbnails/30.jpg)
30Kajetan Fuchsberger MPP Workshop Annecy, 2013-03-13, Software Tools for MPS
System Dependencies Vision: Central Instance (Server?) to answer questions like:
Which magnets are connected to a certain power converter? (AccTesting – ELQA) What is the common point for a set of crates? (Diamon) What systems have to be potentially re-tested if e.g. a QPS card is changed?
(AccTesting) What systems are potentially affected by a OS upgrade on a certain host? (SUWG)
![Page 31: Software Tools for MPS](https://reader036.fdocuments.in/reader036/viewer/2022062321/56814043550346895dabb19a/html5/thumbnails/31.jpg)
31Kajetan Fuchsberger MPP Workshop Annecy, 2013-03-13, Software Tools for MPS
Interlocks during functional BPs
In place for orbit correctors. Ready to be extended to other circuits.
Potentially useful for other systems, e.g. Collimator movements?