Agenda
About software Product
Addressing Defects
Role of software testing
The Goal of software testing
Software Test Life Cycle [STLC] - Phases
Software testing types - different kinds
Writing Test Strategy, Test plan and Test cases Defect reporting standards
-
7/31/2019 Software Testing v1.0
3/65
Typical Software Product
-
7/31/2019 Software Testing v1.0
4/65
A good software product is expected to meet the following
criteria:
Fulfill all the Customer and end user requirements like:
Functional requirements
Non functional requirements
Fit for the environment and fit to use
Zero defects and acceptable bugs
Good Software Product
-
7/31/2019 Software Testing v1.0
5/65
Addressing Defects
-
7/31/2019 Software Testing v1.0
6/65
Software Testing Definitions
Process of exercising or evaluating a system or system
component by manual or automated means to verify that it
satisfies the specified requirements - (IEEE 83a)
Structured process that uncovers the defects in a software
product (Myers)
Destructive in nature - dismantling the wishful assumption that
the code is bug-free (Boris Byzer)
Testing is a process of executing a program with the intent of
finding errors (Myers)
-
7/31/2019 Software Testing v1.0
7/65
Roles of Software Testing
Primary role
Verification -are we doing things right? (Process)
Validation - are we doing the right things? (Requirements)
Secondary role
Confidence to Ship the Product
Insight into software process
Improve the software testing process
-
7/31/2019 Software Testing v1.0
8/65
The Goal of Software Testing
The goal of Software Testing process is to ensure the verification
and validation of the following:
Verified for:
Testability
Test factors
Validated against:
Specified requirements
Users expectations
Product success criteria
-
7/31/2019 Software Testing v1.0
9/65
Testability and Test Factors
Testability
Operability
Controllability
Observability
Simplicity
Understandability
Suitability
Stability
Accessibility
Navigability
Scalability
Context sensitivity
Structural continuity
Test Factors
Ease of use
Continuity of processing
Coupling
Portability
Performance
Correctness
File Integrity
Service levels
Authorization and access control
Compliance
Reliability
Audit trail
-
7/31/2019 Software Testing v1.0
10/65
Attractive Software:
Pleasant to use and attractive to the prospective user
Attractive and consistent visual design
Efficient Software:
Should meet the end users expectations
Fit to use by design and by nature Should not monopolize hardware or software
resources
Compatible Software:
Should run on all intended hardware platforms
Should run on all intended software configurations
Should not interfere with the operation of other software
Should work with earlier versions of the same software
Reliable Software:
Should not crash
Should not cause loss of life, money or property
Should not cause loss or alteration of data
If fails, should do so Gracefully
If fails, should recover from its failure easily
Users Expectations
Usable software:
Should not annoy its intended user
Consistent in its design and not confusing
Not be overly complex to learn
Support documentation like online help
Always indicate to the user what is happening
Should not take control away from the user without
any indication
Installable Software:
Should be able to install quickly and easily
Should not interfere with any other software
Follow the principles of good softwareAvailability of additional information for unsuccessful
installations
Uninstall in a clean fashion
-
7/31/2019 Software Testing v1.0
11/65
Product Success Criteria
The success of a product may be dependent on some key factors ofthe product. This may be different for each type of product, based
on the targeted user market, user culture, season, price factor etc.
Some major product success criteria are:
Functionality
Usability
Likeability
Maintainability Interoperability
Reliability
-
7/31/2019 Software Testing v1.0
12/65
Testers Role Today
-
7/31/2019 Software Testing v1.0
13/65
Testers Thinking
Are the requirements complete?
Is the design scalable?
Will the software be Maintainable?
How would be the User Experience?
Are the Builds stable?
Is the product Ready?
If the number of bugs Acceptable?
-
7/31/2019 Software Testing v1.0
14/65
Aspects that Hinder Effective Testing
Optimism
Negative attitude towards effective testing
Ego
Do not want to fail
Conflict between testers and developers
Testing is least structured
Testing is expensive
Delivery commitments
Lack of proper resources
-
7/31/2019 Software Testing v1.0
15/65
Software Test Management and Test Process
Effective test process
Characteristics
Test approach
Collaborative approach
Concept of STLC
Testing tasks
Test deliverables
Test audit
-
7/31/2019 Software Testing v1.0
16/65
Software Test Management
Step #1: Initial Test Planning Activities
Verification at every phase
Appropriate and required level of testing
Step #2: Defining and Managing the Test Objectives
Identification of:
Functions and logics to be tested
Program constraints
Software states
Input and output data conditions
Usage scenarios
Driven by concerns, risks, and business logic
-
7/31/2019 Software Testing v1.0
17/65
Software Test Management (Contd)
Step #3: Test Progress Monitoring Activities Accurate time accounting information
Product and test quality tracking activities
Step #4: Test Configuration Control Activities
Identifying and managing key test work products
Require careful planning and configuration control practices
Deal with test artifacts
Result: Quality and Productivity Improvements
C
-
7/31/2019 Software Testing v1.0
18/65
Collaborative Approach
Developer briefs tester on:
How the product/ module works ?
Intentions of each feature
Areas of features which are more
error/ risk prone Schedule for delivering the
remaining feature sets
Concerns about hidden/ abstract
activities
Tester briefs developer on:
Test coverage including types and
levels of testing
Feature(s) as understood by the
testers
Required information so as to make
feature(s) more granular
Testing phases and schedule
What testers expect from the
development team
Methods/ details of status reporting/
defect tracking
Roles of Developers and Testers are as follows:
S f D l Lif C l
-
7/31/2019 Software Testing v1.0
19/65
Software Development Life Cycle
S ft T t Lif C l (STLC)
-
7/31/2019 Software Testing v1.0
20/65
Software Test Life Cycle (STLC)
C t f STLC
-
7/31/2019 Software Testing v1.0
21/65
Concept of STLC
Software Testing Life Cycle, STLC is the road map to the
project/ product success
It involves the continuous testing of the system during the
development cycle of the project
In STLC, the results of the development process are evaluated
to determine the correctness of the implementation
STLC T k
-
7/31/2019 Software Testing v1.0
22/65
STLC Tasks
To standardize the testing process
Eliminate redundancy in functional testing
To enforce defect prevention activities
To incorporate configuration control
STLC is a systematic approach
STLC Ph
-
7/31/2019 Software Testing v1.0
23/65
STLC Phases
Prepare Test plan
Test case designing
Testing or test execution
Bug reporting, analysis and regression testing
Inspection and release
Customer acceptance
Test Summary analysis & Test metrics
P i T t Pl
-
7/31/2019 Software Testing v1.0
24/65
Preparing Test Plan
Preparing the Test Plan involves the following activities:
Analyze scope of the project
Product/ test requirement document
Develop risk assessment criteria
Identify acceptance criteria
Document product definition, testing strategies
Define problem reporting procedures
Preparation of master Test plan
T t C D i i
-
7/31/2019 Software Testing v1.0
25/65
Test Case Designing
This involves the following activities:
Set up test environment
Design test cases: Requirement based and Code-based test
cases
Decide if any set of test cases to be automated
T ti T t E ti
-
7/31/2019 Software Testing v1.0
26/65
Testing or Test Execution
Test execution involves:
Testing initial test cycles, bug fixes and re-testing
Final testing and implementation
Setup database to track components of the automated testing
system i.e. reusable modules
-
7/31/2019 Software Testing v1.0
27/65
Inspection and Release
-
7/31/2019 Software Testing v1.0
28/65
Inspection and Release
The activities are:
Maintaining the configuration of related work products
Final review of testing
Metrics to measure improvements
Replication of the product
Product delivery records
Evaluate test effectiveness
Customer/ Client Acceptance
-
7/31/2019 Software Testing v1.0
29/65
Customer/ Client Acceptance
Customer acceptance testing includes:
Software installation
Provide support during acceptance testing
Analyze and address the Error/ Defect/ Bug
Track changes and maintenance
Final testing and implementation
Submission to Customer and signoff
Update respective process documents
STLC: Best Practices
-
7/31/2019 Software Testing v1.0
30/65
STLC: Best Practices
Test process is complex, time consuming. So testing life cycle
should start at the same time as the development life cycle
starts, else it may lead to:
Affect the time schedule
Delay in exposing gaps/ flaws in application definition
Testing Tasks
-
7/31/2019 Software Testing v1.0
31/65
Testing Tasks
Regular tasks
Ongoing activities
Test deliverables
Test audit
Regular Testing Tasks
-
7/31/2019 Software Testing v1.0
32/65
Regular Testing Tasks
Test strategy
Test planning - Unit, Integration and System
Test design
Test execution and Status reporting
Report Test results
Test deliverables
Test audit
Test metrics
Ongoing Activities
-
7/31/2019 Software Testing v1.0
33/65
Ongoing Activities
Configuration Management and Change Control
Independent Verification and Validation (IV&V)
Interim reviews
Milestone reviews
Group reviews
Peer reviews
Quality Processes Compliance Check
-
7/31/2019 Software Testing v1.0
34/65
Test Deliverables
-
7/31/2019 Software Testing v1.0
35/65
Test Deliverables
Test Scripts/ Cases/ Scenarios
Post Test Validation Form
Test Summary Report
Benchmarking Report
Records on Test Process
Test Deliverables ( Contd)
-
7/31/2019 Software Testing v1.0
36/65
Test Deliverables (Contd)
Frozen configuration items in Configuration Management tool
Problem reports indicating list of open bugs
Release sign-off
Test metrics
Test Library for future use
Test Audit
-
7/31/2019 Software Testing v1.0
37/65
Test Audit
To verify the adherence to test process in a project
To ensure tests are practical, understood and followed
To identify adherence to plans
To ensure integrity of status reports To ensure test deliverables
To ensure review records
To ensure risk mitigation
To record the findings
Improving test process
Test Strategy
-
7/31/2019 Software Testing v1.0
38/65
Test Strategy
Should be developed for each project separately
Defines the scope and general direction for testing of the project
High-level, prepared together with the project plan
What are the trade-offs?
Who will conduct the testing? (Org Level)
How much testing will be done?
What tools will be used?
Test Exit Criteria
-
7/31/2019 Software Testing v1.0
39/65
Test Exit Criteria
Executed at least once?
Requirements been tested or verified?
Test Documentation
Documents updated and submitted
Configuration Manager
Test Incidents
Testing Techniques
-
7/31/2019 Software Testing v1.0
40/65
Testing Techniques
Specification based (Black box Testing/ Functional)
Equivalence partitioning
Cause effect graphing
Boundary value Analysis
Category partition
Formal Specification based
Control Flow based criteria
Data flow based criteria
Testing Techniques ( Contd)
-
7/31/2019 Software Testing v1.0
41/65
Testing Techniques (Contd)
Fault Based
Error guessing
Mutation
Fault seeding
Usage Based
Statistical testing
Specific Techniques
Object Oriented testing
Component Based testing
Testing Techniques ( Contd)
-
7/31/2019 Software Testing v1.0
42/65
Testing Techniques (Contd)
Code Based (White Box Testing/ Structured)
Statement coverage
Edge coverage (Branch coverage)
Condition coverage
Path coverage
Cyclomatic complexity
Software Testing Phases
-
7/31/2019 Software Testing v1.0
43/65
Software Testing Phases
Unit testing
Functional testing
Integration testing
System testing
Acceptance testing
Interface testing
Regression testing
Special testing
Unit Testing
-
7/31/2019 Software Testing v1.0
44/65
Unit Testing
Purpose
Typos
Basic Logic problems
Syntax errors
Assumptions/ Pre-conditions
Developer should test basic functionality and normal
processing paths
Unit Testing ( Contd)
-
7/31/2019 Software Testing v1.0
45/65
Unit Testing (Contd)
Expectations
Every path/ line of code new or modified should be
executed, tested
Code inspection should verify functionality
Possible values be tested for data entry fields
Error cases to be verified and required to end gracefully
Unit Testing (Contd)
-
7/31/2019 Software Testing v1.0
46/65
Unit Testing (Contd)
Return values
Data accuracy
Decimal places
Help screens
Performance tests
Memory leaks
Specialized hardware
Unit Testing (Contd)
-
7/31/2019 Software Testing v1.0
47/65
Unit Testing (Contd)
Affected documentation
Interface
Local data structures
Boundary conditions
Independent paths
Error handling paths
Functional Testing
-
7/31/2019 Software Testing v1.0
48/65
Functional Testing
Purpose
Small groups of modules that are functionality related
Expectations
Passing parameters
Functional outputs or module exit values
Error cases gracefully
Functional Testing (Contd)
-
7/31/2019 Software Testing v1.0
49/65
Functional Testing (Contd)
Report formats
Help screens
Performance tests
Clean up
Memory leaks
Documentation
Integration Testing
-
7/31/2019 Software Testing v1.0
50/65
teg at o est g
Purpose
Test all functional groups and areas
Testable requirements
Hardware/ Software specifications
External interfaces
Performance tests
Documentation
System Testing
-
7/31/2019 Software Testing v1.0
51/65
y g
Purpose
Test the entire system as a whole
Assumptions
Completed:
o Unit Testing
o Functional Testing
o Integration Testing
System Testing (Contd)
-
7/31/2019 Software Testing v1.0
52/65
y g ( )
Expectations
Verification of the system
Software requirements
Business workflow perspective
Final verification of requirements and design
System Testing (Contd)
-
7/31/2019 Software Testing v1.0
53/65
y g ( )
External interfaces
Performance tests Affected documents
Non-testable requirements
-
7/31/2019 Software Testing v1.0
54/65
Interface Testing (Contd)
-
7/31/2019 Software Testing v1.0
55/65
g ( )
Both normal cases and exceptions should be tested, on
both sides of the interface (if both sides exchange data).
The interface should be tested for handling the normal
amount and flow of data as well as peak processing
volumes and traffic.
If appropriate, the batch processing or file transmission
window should be tested to ensure that both systems
complete their processing within the allocated time
Performance Testing
-
7/31/2019 Software Testing v1.0
56/65
g
Purpose
The purpose is to verify that the system meets the
performance requirements
Assumptions/ Pre-conditions Completed system testing successfully
Ensure no unexpected performance
Prior to acceptance testing
Tests should use business cases including normal, error
and unlikely or ad-hoc cases
Performance Testing (Contd)
-
7/31/2019 Software Testing v1.0
57/65
g ( )
Performance Tests are:
Load Test
Stress Test
Volume Test
Test Data
Response Time
End-to-end Tests and workflows should be performed
Tracking tool for comparison
Regression Testing
-
7/31/2019 Software Testing v1.0
58/65
g g
Purpose
Purpose of regression testing is to ensure that areas that
were modified and not directly modified have not been
adversely or unexpectedly affected by the changes made
while bug fixing
Assumptions/ Pre-conditions
System testing completed
High priority errors are fixed
Regression Testing (Contd)
-
7/31/2019 Software Testing v1.0
59/65
g g ( )
Expectations
End-to-end
Few targeted test cases
Typical tests include:
Normal/ typical work flows
High volume exceptions
Affected areas
Results from the previous releases should be compared
(User) Acceptance Testing
-
7/31/2019 Software Testing v1.0
60/65
Purpose
Purpose of acceptance testing is to verify the system from
users perspective
Assumptions/ Pre-conditions
Completed system and regression
Configuration manager
(User) Acceptance Testing (Contd)
-
7/31/2019 Software Testing v1.0
61/65
Test data
Final versions of all documents are ready
Overview of the testing procedures
Exit decision
Specific procedures
Acceptance criteria must be documented
(User) Acceptance Testing (Contd)
-
7/31/2019 Software Testing v1.0
62/65
Expectations
Verification from users perspective
Performance testing should be conducted again
Extra time
User manuals to the testers
Non-testable requirements
Review with the sponsor and user
Plans for the implementation
Field Testing
-
7/31/2019 Software Testing v1.0
63/65
Purpose
Purpose of field testing is to verify the systems in actual
user environment
Assumptions/ Pre-conditions
System and acceptance testing successfully completed
Field Testing (Contd)
-
7/31/2019 Software Testing v1.0
64/65
Expectations
Verification of the systems working in the actual user
environment
Pilot test with the final product
Pilot system should work during a problem
Thank You
-