Page 1: Software Engineering Project: Research Expert Prabhavathi Kumarasamy Joshua Thompson Paul Varcholik University of Central Florida.

Software Engineering Project:Software Engineering Project:Research ExpertResearch Expert

Prabhavathi KumarasamyJoshua ThompsonPaul Varcholik

University of Central Florida

Page 2: Software Engineering Project: Research Expert Prabhavathi Kumarasamy Joshua Thompson Paul Varcholik University of Central Florida.

Presentation OutlinePresentation Outline J. Thompson……………Concept of Operations

P. Varcholik……Software Requirements Specification

J. Thompson……………Test Plan

P. Kumarasamy …………Project Management Plan

Page 3: Software Engineering Project: Research Expert Prabhavathi Kumarasamy Joshua Thompson Paul Varcholik University of Central Florida.

Concept of OperationsConcept of Operations

Proposed SystemProposed SystemNeeds

◦ Web-Based system for organizing academic papers

◦ Search and browsing◦ Meta-data

Keywords, author, publication source, abstract (full-text), date of publication

◦ User-provided reviews◦ Annotated references to related

documents◦ Multi-user collaboration◦ Multiple repositories

Page 4: Software Engineering Project: Research Expert Prabhavathi Kumarasamy Joshua Thompson Paul Varcholik University of Central Florida.

Concept of OperationsConcept of Operations

Proposed SystemProposed SystemUsers and Modes of Operation

◦ Read-Only User Can view, but not modify items in a repository

◦ Read-Write User Can add, modify and delete items in a repository

◦ Admin User Can manage repository membership and permissions

◦ Repository Owner The user who initially established the repository, though

ownership may be transferred to another user by the site administrator

Can assign admin privileges to other users of the repository

◦ Site Administrator Controls the operations of the entire web application Resolves technical issues, deletes users and repositories, and

transfers repository ownership

Page 5: Software Engineering Project: Research Expert Prabhavathi Kumarasamy Joshua Thompson Paul Varcholik University of Central Florida.

Software Requirements SpecificationSoftware Requirements Specification

OverviewOverviewSoftware to be Produced:

◦ Web-based user interface (ASP.NET/C#, HTML and CSS)

◦ Database API (C#)◦ Database (SQL)

Assumptions◦ Client Side

Microsoft Internet Explorer 7 (IE7)

◦ Server Side Windows Vista, Windows Server 2003, or Windows Server 2008 Microsoft Internet Information Server 7 (IIS7) w/ ASP.NET

configuration Microsoft SQL Server 2005 (any edition, including SQL 2005

Express) .NET 2.0 Framework

Page 6: Software Engineering Project: Research Expert Prabhavathi Kumarasamy Joshua Thompson Paul Varcholik University of Central Florida.

Software Requirements SpecificationSoftware Requirements Specification

OverviewOverviewStakeholders

◦ Chris Centelle – Customer/User◦ Academic Research Community – Users

55 Requirements◦ 42 Functional◦ 3 Interface◦ 3 Physical Environment◦ 1 Users and Human Factors◦ 2 Documentation◦ 3 Resource◦ 1 Security

Page 7: Software Engineering Project: Research Expert Prabhavathi Kumarasamy Joshua Thompson Paul Varcholik University of Central Florida.

Software Requirements SpecificationSoftware Requirements Specification

Use CasesUse Cases

Page 8: Software Engineering Project: Research Expert Prabhavathi Kumarasamy Joshua Thompson Paul Varcholik University of Central Florida.

Test PlanTest Plan

OverviewOverviewVerify that the system satisfies all

requirementsTesting will be done on standard PCs

with IE7Testing Phases

◦ Test Sessions Run after coding milestones

◦ Beta Period Begins after system is ‘feature complete’

◦ Acceptance Testing Begins after all show-stopper and normal bugs are

addressed

Page 9: Software Engineering Project: Research Expert Prabhavathi Kumarasamy Joshua Thompson Paul Varcholik University of Central Florida.

Test PlanTest Plan

Stopping CriteriaStopping CriteriaTesting Session

◦ All tests have been run (passed or failed)◦ Fatal error occurs preventing further

testingBeta Period

◦ Only known-shippable bugs remain, and code coverage > 70%

Acceptance Testing◦ Customer approves of the system◦ Budgeted time exhausted

Page 10: Software Engineering Project: Research Expert Prabhavathi Kumarasamy Joshua Thompson Paul Varcholik University of Central Florida.

Project Management Plan:Project Management Plan:

Software Lifecycle ProcessSoftware Lifecycle Process

Outline Description

Specification

Development

Validation

Initial Version

Intermediate Version

Final Version

Concurrent activities

Evolutionary Development

Page 11: Software Engineering Project: Research Expert Prabhavathi Kumarasamy Joshua Thompson Paul Varcholik University of Central Florida.

Project Management Plan: Project Management Plan:

Applicable StandardsApplicable StandardsCoding Standards

Microsoft .NET Design Guidelines for Class Library Developers http://msdn.microsoft.com/en-us/library/czefa0ke.aspx

Artifact Size MetricsC#/ASP.NET◦ Lines of Code (code, comments, blank lines)◦ Number of classes, files, and assemblies

Database◦ Number of tables, views, and stored procedures

Testing◦ Number of unit tests

Page 12: Software Engineering Project: Research Expert Prabhavathi Kumarasamy Joshua Thompson Paul Varcholik University of Central Florida.

Project Management Plan: Project Management Plan:

Technical Progress MetricsTechnical Progress Metrics Requirements Phase

◦ Total number of requirements, the number of requirements by priority divided into high, normal and low, total number of tests created.

Design Phase◦ Number of design documents produced, total number of tasks

generated.

Implementation Phase◦ Estimated time vs. actual time (measured in 1 hour increments).

◦ Number of on-time tasks and over-estimated tasks.

◦ Running list of tasks (number of tasks): Not started, In-Progress, Completed, Cancelled.

Testing Phase◦ Number of tests runs, passed and failed.

Deployment Phase◦ Number of submissions sent to the customer.

Page 13: Software Engineering Project: Research Expert Prabhavathi Kumarasamy Joshua Thompson Paul Varcholik University of Central Florida.

Project Management Plan: Project Management Plan:

PERT ChartPERT Chart

M3

Coding

Testing

Specification

Design Plan

Test Plan

M1 M2Start

09/17/08

Requirement Analysis

10/01/08 11/05/08

Finish 12/05/08

14 days

14 days

14 days 30 days

30 days

30 days

Beta (Testing & BugFixing)

26 days

Final Documentation

Deployment

9 days 9 days

11/6/08 – 12/1/08

M1, M2,M3 – Milestones

- Critical path