Société en commandite Gaz Métro Projet de raccordement d ...

4
SERVICES CONTRACT - D4: STABLE SERVICE Account No.:To corne Contract Date: July 18, 2014 BETWEEN GAZ MÉTRO LIMITED PARTNERSHIP, Acting through its General Partner Gaz Métro inc. with its principal place of business located at 1717, du Havre Street, Montréal (Québec), H2K 2X3 ("Gaz Métro") AND IFFCO CANADA ENTERPRISE LTD, 600, boui. de Maisonneuve ouest, Suite 2810, Montréal (Québec), H3A 2J2 ("Customer") Gaz Métro and Customer are individually referred to as "Party" and jointly referred to as "Parties". 1. The Customer requires that Gaz Métro provides, and Gaz Métro undertakes to provide, the services described herein to deliver natural gas to the equipment in the Fertilizer Plant located at the following service address: 7000 Boulevard Raoul-Duchesne, Bécancour, (Québec) ("Service Address"). 2. NATURAL GAS SUPPLY AND TRANSPORTATION SERVICES NATURAL GAS SUPPLY AND COMPRESSOR FUEL SERVICES The Customer agrees to supply Gaz Métro with the natural gas withdrawn at the Service Address as well as with the compressor fuel needed for the transportation thereof in accordance with the Conditions of Natural Gas Service and Tariff approved by the Régie de l'énergie ( « Conditions and Tariff » ). TRANSPORTATION SERVICE The Customer agrees to purchase from Gaz Métro the transportation service needed to move the Customer's natural gas from a receipt point located out of the territory of Gaz Métro to a receipt point located in the territory of Gaz Métro for distribution at the Service Address. The transportation price is the price established in the transportation rate of the Conditions and Tariff. The transportation minimum annual obligation assumed by the Customer for each contractual year is the obligation set out in the Conditions and Tariff. 3. LOAD-BALANCING SERVICE The Customer agrees to purchase from Gaz Métro, and Gaz Métro agrees to provide to the Customer, the load- balancing service needed to manage on a daily basis the natural gas the Customer withdraws at the Service Address. The load-balancing price is the price established in the load-balancing rate of the Conditions and Tariff. 4. DISTRIBUTION SERVICE The Customer agrees to purchase from Gaz Métro, and Gaz Métro agrees to provide the Customer with, the 04: STABLE distribution service within the parameters set out below: Decision in Rate Effective delivery Maximum hourly flow Projected annual volume effect at zone pressure (m 3 /h) (m3) preparation of (kPa) this Contract -- D-2014-088 South 3550 106 000 For the first year: 482 628 000 Starting the second year: 760 124 000 Subscribed Minimum annual obligation Use Service start-up T erm of services volume (MAO) (New Address) date (months) (m 3 /day) (m3) (MM/DDNYYY) 2 226 000 nia Process 09/01/2017 240 As additional information, the application of these parameters results in the following: Minimum daily obligation Reduction according to Contract term ( <t/m3) (%) 1,351 26 5. DURATION OF THE CONTRACT This Contract shall take effect on the date all conditions stipulated in paragraph 6 .1 are met and shall cease to be in effect once all of the services stipulated in the table included in the "Distribution Service" clause above have corne to an end. SOb" "'" (NO" 20rn) .!- Société en commandite Gaz Métro Projet de raccordement d'IFFCO Canada, R-3898-2014 Original : 2014.08.12 Gaz Métro - 1, Document 4 (4 pages en liasse)

Transcript of Société en commandite Gaz Métro Projet de raccordement d ...

~ GazMétro SERVICES CONTRACT - D4: ST ABLE SERVICE

Account No.:To corne

Contract Date: July 18, 2014

BETWEEN GAZ MÉTRO LIMITED PARTNERSHIP, Acting through its General Partner Gaz Métro inc. with its principal place of business located at 1717, du Havre Street, Montréal (Québec), H2K 2X3 ("Gaz Métro")

AND IFFCO CANADA ENTERPRISE L TD, 600, boui. de Maisonneuve ouest, Suite 2810, Montréal (Québec), H3A 2J2 ("Customer")

Gaz Métro and Customer are individually referred to as "Party" and jointly referred to as "Parties".

1. The Customer requires that Gaz Métro provides, and Gaz Métro undertakes to provide, the services described herein to deliver natural gas to the equipment in the Fertilizer Plant located at the following service address: 7000 Boulevard Raou l-Duchesne, Bécancour, (Québec) ("Service Address").

2. NATURAL GAS SUPPL Y AND TRANSPORTATION SERVICES

NATURAL GAS SUPPL Y AND COMPRESSOR FUEL SERVICES The Customer agrees to supply Gaz Métro with the natural gas withdrawn at the Service Address as well as with the compressor fuel needed for the transportation thereof in accordance with the Conditions of Natural Gas Service and Tariff approved by the Régie de l'énergie ( « Conditions and Tariff » ).

TRANSPORTATION SERVICE The Customer agrees to purchase from Gaz Métro the transportation service needed to move the Customer's natural gas from a receipt point located out of the territory of Gaz Métro to a receipt point located in the territory of Gaz Métro for distribution at the Service Address. The transportation price is the price established in the transportation rate of the Conditions and Tariff. The transportation minimum annual obligation assumed by the Customer for each contractual year is the obligation set out in the Conditions and Tariff.

3. LOAD-BALANCING SERVICE

The Customer agrees to purchase from Gaz Métro, and Gaz Métro agrees to provide to the Customer, the load­balancing service needed to manage on a daily basis the natural gas the Customer withdraws at the Service Address. The load-balancing price is the price established in the load-balancing rate of the Conditions and Tariff.

4. DISTRIBUTION SERVICE

The Customer agrees to purchase from Gaz Métro, and Gaz Métro agrees to provide the Customer with, the 04: ST ABLE distribution service within the parameters set out below:

Decision in Rate Effective delivery Maximum hourly flow Projected annual volume effect at zone pressure (m3/h) (m3)

preparation of (kPa) this Contract

--D-2014-088 South 3550 106 000 For the first year: 482 628 000

Starting the second year: 760 124 000

Subscribed Minimum annual obligation Use Service start-up T erm of services volume (MAO) (New Address) date (months) (m3/day) (m3) (MM/DDNYYY)

2 226 000 nia Process 09/01/2017 240

As additional information, the application of these parameters results in the following:

Minimum daily obligation Reduction according to Contract term ( <t/m3) (%)

1,351 26

5. DURATION OF THE CONTRACT

This Contract shall take effect on the date all conditions stipulated in paragraph 6.1 are met and shall cease to be in effect once all of the services stipulated in the table included in the "Distribution Service" clause above have corne to an end.

SOb" "'" (NO" 20rn) • .!-

Société en commandite Gaz Métro Projet de raccordement d'IFFCO Canada, R-3898-2014

Original : 2014.08.12 Gaz Métro - 1, Document 4 (4 pages en liasse)

() GazMétro

6. MISCELLANEOUS

6.1 The coming into force of the present contract is conditional upon all of the authorizations (governmental, environmental, regulatory or of any other kind) required by Gaz Métro for the transportation and the distribution of natural gas to the Service Address being granted by August 30, 2015 at the latest, or such other dates as may be agreed by Customer and Partnership acting reasonably.

6.2 Customer shall be able to postpone the Service start-up date, if it is of the opinion, acting reasonably, that its Facilities will not be completed and operational with a natural gas design by that date. A written notice of the new Service start-up date must be given to Gaz Métro at least 3 months before the Service start-up date. Any postponement by Customer of the Service start-up date shall not, in any case, exceed 3 months.

6.3 The Parties recognize that any postponement of a date pursuant to paragraph 6.1 will delay the Service start-up date, provided for in paragraph 4, which will, in that case, be adjusted accordingly by Partnership acting reasonably.

6.4 The Customer shall be able, at any time before the Service-start-up date provided herein, with a written notice sent to that effect and received by Gaz Métro prior to the Service start-up date, to terminate this Agreement if and only if the construction of the Fertilizer Plant has not started and is definitively abandoned.

6.5 Gaz Métro shall be also able to terminate this Agreement, if, on December 31, 2014, which date can be extended by mutual agreement of the Parties, IFFCO has not put into place the necessary financing for the construction of the Fertilizer Plant at the Service Address and has not confirmed the financing of the project to Gaz Métro by written notice to that effect. To terminate this Agreement, Gaz Métro shall send a written notice of the termination to IFFCO. The termination shall then occur at the date specified in the said notice.

6.6 If, as provided for in paragraphs 6.4 or 6.5, the Customer or Gaz Métro decides to terminate this agreement, the Customer agrees to reümburse to Gaz Métro, upon demand, all expenses incurred by Gaz Métro related to the connection of the Service Address to Gaz Métro's natural gas distribution network up to the date of receipt of the said written notice of termination, excluding any cost incurred in connection with any transportation Service. A Work Schedule is attached as Schedule B to this Contract. Partnership will inform Customer as soon as possible prior to making any change to that Work Schedule.

6.7 For the duration of the Contract, Gaz Métro and the Customer agree that for the purposes of the Contract the day as defined in the Conditions and Tariff commences at 10 a.m. EST (Eastern Standard Time).

6.8 The Customer expressly renounces to and waives any unilateral right of resiliation of this contract, or any contract related thereto, it might have pursuant to article 2125 of the civil code of Québec.

6.9 Gaz Métro agrees to deliver natural gas to the service address without mercaptan, subject to the Régie du bâtiment's approval.

6.10 Where applicable, charges will be invoiced to the Customer in accordance with the Conditions and Tariff. These charges are taxable.

6.11 This contract replaces all other contract of agreement between the parties related to the subject matter hereof.

6.12 Schedule A - General conditions and Schedule B - Work Schedule are integral part hereof.

This Contract is subject to revision or cancellation by Gaz Métro should it not be signed by the Customer and received by Gaz Métro within 30 days of the aforementioned Contract Date.

Signed at: _;M..:..:...::..o_;nt'-re"""'a:....I _ ________ _

This J_L_ day of _J_u ..... ly._ __ _ 2014

GAZ MÉTRO LIMITED PARTNERSHIP ::· i~G•nf~~r: Name Luc Génier

J.. ~i~Mét*e-president \} /V/ C 'sales and

0Market Develo

---at11tiales 1'- ô l-

ment

Title: President and chief Executive Officer

Signed at: t1 r:> '" l- v e '6-1 This lS_ day of 1v1 \1

I

IFFCO CANADA ENTERPRISE L TD

By: ~-Name

Title:

By:

Name

Title:

Stable Rate {Nov. 2010)

® F.1294 (09/2003)

®

~

1\)

'e g i~

·-·-

·-·•

-•-

Dur

ée

i D

èb

ut

Fin

r

3111

3 Jul

07

'13

Oct

13~

4 Jan

19

i14

Avr

27

114

Ao

j) 0

314

Nov

09

15 F

év

15 115

Ma

l 24

]15

A,o

û 3

01

5 D

éc

00

16 M

ar 1

31

6 J

ui

19

116

Se

p 2

5Ï17

·--

---'

·-·

-·-

_ .

s_l.L

LM

.lJL.

L\L

J .. MJ.J,_L~

J_J_

'dJ_J

LL'L

LM .. LLL~-

-LL"

LLQJ

.Jll

M..LLLs_L

_,1 _M

..Lq_

'l-1M

J. .. .U

s ~4

Q l:;

~;ep•:

;~e ·--

------

-·-·-. -

---·

2 P

lan

nin

g

s ··3-·-

1ffil]

E

xert

and

not

anze

pur

chas

e o

f la

nd 1f

req

uire

d

4 Ja

P

ret1m

mar

y e

ngm

eenn

g b

y G

az M

étro

_

_ ___

J

5 !

-si 7~

--~

8 '

... _J

9 :_1

1 .. :

: l

·-il] ~4-

15

-16

-~-:-1 -;1

~j

2

3

24

125

26

1 1-- 1-:~

.

Env

iron

men

tal s

tud

y

Ap

pro

va

l

App

<ova

l MD

OE

FP

Re

que

sts

for

Hyd

ro Q

ueb

ec a

nd

for

Com

mun

icat

k:>n

s

Mu

nic

ipa

l ap

pro

val

En

gin

ee

rin

g a

nd

ord

éf'a

Det

aJle

d e

ng

ine

eri

ng

by

Ga

i:Me

tro

Req

uest

Fo

r P

ropo

sais

pro

cess

Pur

chas

ing

proc

ess

of l

ong

deliv

ery

mat

eria

ls

Pur

chas

ing

pro

cess

of s

ho

rt d

eliv

ery

ma

teri

a.ts

Rea

lizat

ion

Aw

ard

of t

he c

on

stru

ctio

rl c

on

tra

ct

Mob

Hiz

atio

n

Site

p<

ep8f

atio

n

Oe!

iver

y o

f mat

eria

ls

Pre

fab

rica

tlon

W01

1<sh

op

Inst

alla

tion

of e

qu

ipm

en

t an

d b

uild

ings

at t

he

srt

e

Pip

e in

stal

latio

n a

nd

co

nn

ect

ion

lnte

grit

y c

he

ekl

ng

Ele

ctric

al &

co

mm

uni

catio

ns w

ori<

Fln

atlz

e ln

stl\J

men

tatlo

n

Reh

abili

tatio

n o

f Site

Dem

obêl

i.zat

lon

con

trac

tor

De

mo

blli

zatio

n G

az

Me

tro

Ta

che

Frac

tionn

emen

t

Pro

jet:

IF

FC

0_

201

40

52

2_E

N_

RH

Ja

lon

Rée

apltu

lativ

e

ea

pitu

latif

du

pro

jet

28

5jo

urs

Lu

n 1

5·1

0-0

5 V

en

16-

11-0

4

180

jou

ro L

un

15

-10.

05

Ve

n 1

6-06

-10

10 jo

urs

Lu

n 1

5-1

0-0

5

Ve

n 1

5-1

0-1

6

30

jou

rs

Lun

15

-10

-05

Ve

n 1

5-11

-13

15

jou

rs

Lun

15

-10-

19

Ve

n1

5-1

1-0

63

10

0 jo

uro

Lu

n 1

5-11

.()9

Ve

n 1

6-03

-25

100j

ours

Lu

n 15

-11·

09 V

en 1

6-03

-25

5

60

jou

rs

Lun

15-1

1-1

6 V

en

16

-02

-05

4

60

jou

rs

Lu

n 1

5· 1

1-1

6 V

en 1

6-0

2·0

5 4

;5

175

jou

ro t

.un

15

-10

-12

Ve

n 1

6-0

6-1

0

1 6

0jo

urs

L

un

15

-11

-16

Ve

n1

6-0

2-0

54

40

jour

s L

un

16

-02

.01

V

en 1

6-03

-25

1 lF

D-5

jou

rs

17

5jo

urs

L

un

15

-10

-12

Ve

n H~06-10400+5jours

30

jou

rs

Lu

n 1

6-0

2-1

5 V

en

16-

03-2

51

1F

D+

5 jo

urs

16

0 jo

urs

Lu

n 1

6-0

3-2

8 V

en

16

-11

-04

5 jo

urs

M

er

16

-08

-22

1

Mar

16

-06

-28

18F

D+

1 jo

ur,

14

;13

1 !

5 jo

urs

Lun

16.

Q3.

28

Ve

n 1

6-0

4.0

11

2

5 jo

urs

L

un

16-

05-0

2 V

en

16

-05

-06

16

FD

+20

jou

rs;6

30

jou

rs

Ma

r 1

6-0

5-1

0

Lu

n 1

6-0

6-2

01

7F

D+

1 j

our

60

jou

rs

Lu

n 1

6-0

4-0

4 V

en

16

-06·

24 1

4FD

+5

Jou

rs

60

jou

rs

Lun

16

-08

-27

Ve

n 1

6--0

9-16

20

;18

25 jo

urs

M

er

16

-08

-29

M

ar

16-

08

-02

19;1

8

5 jo

urs

L

un

16

-09

-19

Ve

n 1

6-0

9-2

3 2

2;2

1

15 jo

urs

L

un

16

-05

-30

Ve

n 1

6-0

6-1

7 8

;21

00-

20

jou

rs

30 jo

urs

Lu

n 1

6-0

9-1

9 V

en

16

·10

-28

24

;21

10

jour

s M

er

16-0

8-03

M

ar 1

6-0

8-1

6 2

2

5 jo

urs

L

un

16

-09

-26

V

en

16.

Q9-

30

26;

21

;23

5Jo

urs

L

un.

16-1

0-31

V

en

16·

11-0

42

5

0U

(ée

uni

quem

ent

..•

, •••

•••

.••

. , .•

~

Re

po

rt ré

eapl

tula

til m

&n

uet ~

• R

éeap

rtul

atif

ma

nu

el

+

• • ..

• .. ..

.. ..

• • .

. •

bu

t un

ique

me

nt

...,,

"'

che

s e

xte

rne

s

Jalo

ns

exte

rnes

Jalo

n in

actif

ea

pitu

lallf

lna

etîf

che

man

uelle

F

in u

niqu

emen

t

'--~~~~~~~~~~~~-~~~~~~~~~~~~~~~~~~~

-Page+

T è

ches

ext

erne

s

Jalo

ns e

xter

nes

Ava

ncem

ent

Ech

éa

nce

.()

.

j

î M

11l

L~ r

~

0 (/)

::0

(")

" :c

CJ

> m

("

) 0

:cc

m

r

cm

CO

J

r m

~

G')

OJ

N s (D,

r-t- a

t) GazMétro

RIDER N° 1 PRE-COMMISSIONNING PERIOD SERVICES CONTRACT - D4: ST ABLE SERVICE (the "Contract")

Rider Date: July 18, 2014

Contract Date: July 18, 2014 (the "Contract")

BETWEEN GAZ MÉTRO LIMITED PARTNERSHIP, acting through its General Partner Gaz Métro inc.

Account N°: To corne

with its principal place of business located at 1717, du Havre Street, Montreal (Québec) H2K 2X3. ("Gaz Métro")

AND IFFCO CANADA ENTERPRISE L TD, 600, bou ~.de Maisonneuve ouest, Suite 2810, Montréal (Québec) H3A 2J2 (the "Customer")

Gaz Métro and the Customer are individually referred to as "Party" and jointly referred to as "Parties".

WHEREAS the Customer will built a new plant at the Service Address, Gaz Métro and the Customer agree that adjustments to the Subscribed volume may become necessary during the pre-commissioning of the plant;

IN WITNESS WHEREOF, the Parties agree to the following dispositions:

1. Pre-commissioning Period

For a period of 4 months starting on the Service start-up date ("Pre-commissioning Period"), the subscribed volume will be at least of 10 000 m3/day. As the needs for natural gas may be unpredictable during the Pre­commissioning Period, Gaz Métro agrees to authorize the Customer to increase its subscribed volume every month during that period. ln such a case, the Customer must inform Gaz Métro in writing of the new Subscribed volume for the current month no later than the 151h day of each month starting as of the Service start-up date. If no notice has been received by Gaz Métro by the said date, the Subscribed volume shall remain unchanged for the current month.

The Pre-commissioning Period may be extended upon Customer's written request, in which case the extension shall not exceed 90 days. The request for the extension of the Pre-commissioning Period shall be received by Gaz Métro no later than 90 days after the beginning of the Pre-commissioning Period.

2. Minimum daily obligation

For each new subscribed volume, the minimum daily obligation will be recalculated for billing purposes.

3. Ali other clauses of the Contract remain unchanged.

4. This Rider is an integral part of the Contract.

5. This Rider is binding upon the Parties only when it has been accepted in writing, in the prescribed spaces below, by signature of its authorized representatives.

6. This Rider is subject to revision or cancellation by Gaz Métro if it has not been signed by the Customer and received by Gaz Métro within thirty (30) days of the Rider Date mentioned above.

Signed at: _M_o_nt_re_a_I _________ _ Signed at: H () "- r v -t. ~ 1

This .Jl!_ day of _J_u_.ly ___ _ 2014 This 12._ day of I

IFFCO CANADA E

By: By:

Name Luc Génier Name

~) Gflt'&:vl é t r<wice-president

1 {., Sales and Market Develo~ment

ütialcs f> . ..-"'\\ y: ''--- '

Title:

By:

Name

Title: President and chief Executive Officer Title:

@ F.1294 (09/2003)