Soal Latihan Network Planning - PERT

7
S oal La t i han N et wor k Planni ng - PE R T [email protected]  - 1 / 6 TI Unpas Kode Aktivitas Optimistic Time (o) Most Likely Time (m) Pessimistic Time (p) Predecessor t  2 A 1 4 7 - 4 1.0000 1.0000 B 6 14 16 A 13 1.6667 2.7778 C 2 5 8 A 5 1.0000 1.0000 D 1 2 3 A 2 0.3333 0. 1111 E 3 12 21 D 12 3.0000 9.0000 F 5 7 9 B 7 0.6667 0.4444 G 3 4 5 C & E 4 0. 3333 0. 1111 H 1 5 9 F & G 5 1.3333 1.7778 1.

Transcript of Soal Latihan Network Planning - PERT

Page 1: Soal Latihan Network Planning - PERT

7/30/2019 Soal Latihan Network Planning - PERT

http://slidepdf.com/reader/full/soal-latihan-network-planning-pert 1/6

Soal Lat ihan Network Planning - PERT 

[email protected]  - 1 / 6

TI Unpas

KodeAktivitas

OptimisticTime (o)

Most LikelyTime (m)

PessimisticTime (p)

Predecessor t  2

A 1 4 7 - 4 1.0000 1.0000B 6 14 16 A 13 1.6667 2.7778C 2 5 8 A 5 1.0000 1.0000D 1 2 3 A 2 0.3333 0.1111E 3 12 21 D 12 3.0000 9.0000F 5 7 9 B 7 0.6667 0.4444G 3 4 5 C & E 4 0.3333 0.1111H 1 5 9 F & G 5 1.3333 1.7778

1.

Page 2: Soal Latihan Network Planning - PERT

7/30/2019 Soal Latihan Network Planning - PERT

http://slidepdf.com/reader/full/soal-latihan-network-planning-pert 2/6

Soal Lat ihan Network Planning - PERT 

[email protected]  - 2 / 6

TI Unpas

Page 3: Soal Latihan Network Planning - PERT

7/30/2019 Soal Latihan Network Planning - PERT

http://slidepdf.com/reader/full/soal-latihan-network-planning-pert 3/6

Soal Lat ihan Network Planning - PERT 

[email protected]  - 3 / 6

TI Unpas

Page 4: Soal Latihan Network Planning - PERT

7/30/2019 Soal Latihan Network Planning - PERT

http://slidepdf.com/reader/full/soal-latihan-network-planning-pert 4/6

Soal Lat ihan Network Planning - PERT 

[email protected]  - 4 / 6

TI Unpas

2.Kode

AktivitasOptimisticTime (o)

Most LikelyTime (m)

PessimisticTime (p)

Predecessor t  2

A 1 4 7 4 1.0000 1.0000B 6 11 16 A 11 1.6667 2.7778C 2 5 8 A 5 1.0000 1.0000D 1 2 3 A 2 0.3333 0.1111

E 3 12 21 D 12 3.0000 9.0000F 5 7 9 B 7 0.6667 0.4444G 3 4 5 C & E 4 0.3333 0.1111H 1 5 9 F & G 5 1.3333 1.7778

Page 5: Soal Latihan Network Planning - PERT

7/30/2019 Soal Latihan Network Planning - PERT

http://slidepdf.com/reader/full/soal-latihan-network-planning-pert 5/6

Soal Lat ihan Network Planning - PERT 

[email protected]  - 5 / 6

TI Unpas

3.Kode

AktivitasOptimisticTime (o)

Most LikelyTime (m)

PessimisticTime (p)

Predecessor t  2

A 6 14 16 13 1.6667 2.7778B 1 4 7 4 1.0000 1.0000C 2 5 8 A 5 1.0000 1.0000D 1 2 3 A 2 0.3333 0.1111E 3 12 21 C 12 3.0000 9.0000F 5 7 9 B & D 7 0.6667 0.4444G 3 4 5 E & F 4 0.3333 0.1111H 1 5 9 E & F 5 1.3333 1.7778

Page 6: Soal Latihan Network Planning - PERT

7/30/2019 Soal Latihan Network Planning - PERT

http://slidepdf.com/reader/full/soal-latihan-network-planning-pert 6/6

Soal Lat ihan Network Planning - PERT 

[email protected]  - 6 / 6

TI Unpas

4.Kode

AktivitasOptimisticTime (o)

Most LikelyTime (m)

PessimisticTime (p)

Predecessor t  2

A 2 5 8 5 1.0000 1.0000B 2 3 4 3 0.3333 0.1111C 1 2 3 A 2 0.3333 0.1111D 2 4 6 B 4 0.6667 0.4444

E 1 4 7 C 4 1.0000 1.0000F 1 2 9 C 3 1.3333 1.7778G 3 4 11 D & E 5 1.3333 1.7778H 1 2 3 F & G 2 0.3333 0.1111