Soal Lat ihan Network Planning - PERT
[email protected] - 1 / 6
TI Unpas
KodeAktivitas
OptimisticTime (o)
Most LikelyTime (m)
PessimisticTime (p)
Predecessor t 2
A 1 4 7 - 4 1.0000 1.0000B 6 14 16 A 13 1.6667 2.7778C 2 5 8 A 5 1.0000 1.0000D 1 2 3 A 2 0.3333 0.1111E 3 12 21 D 12 3.0000 9.0000F 5 7 9 B 7 0.6667 0.4444G 3 4 5 C & E 4 0.3333 0.1111H 1 5 9 F & G 5 1.3333 1.7778
1.
7/30/2019 Soal Latihan Network Planning - PERT
http://slidepdf.com/reader/full/soal-latihan-network-planning-pert 2/6
Soal Lat ihan Network Planning - PERT
[email protected] - 2 / 6
TI Unpas
7/30/2019 Soal Latihan Network Planning - PERT
http://slidepdf.com/reader/full/soal-latihan-network-planning-pert 3/6
Soal Lat ihan Network Planning - PERT
[email protected] - 3 / 6
TI Unpas
7/30/2019 Soal Latihan Network Planning - PERT
http://slidepdf.com/reader/full/soal-latihan-network-planning-pert 4/6
Soal Lat ihan Network Planning - PERT
[email protected] - 4 / 6
TI Unpas
2.Kode
AktivitasOptimisticTime (o)
Most LikelyTime (m)
PessimisticTime (p)
Predecessor t 2
A 1 4 7 4 1.0000 1.0000B 6 11 16 A 11 1.6667 2.7778C 2 5 8 A 5 1.0000 1.0000D 1 2 3 A 2 0.3333 0.1111
E 3 12 21 D 12 3.0000 9.0000F 5 7 9 B 7 0.6667 0.4444G 3 4 5 C & E 4 0.3333 0.1111H 1 5 9 F & G 5 1.3333 1.7778
7/30/2019 Soal Latihan Network Planning - PERT
http://slidepdf.com/reader/full/soal-latihan-network-planning-pert 5/6
Soal Lat ihan Network Planning - PERT
[email protected] - 5 / 6
TI Unpas
3.Kode
AktivitasOptimisticTime (o)
Most LikelyTime (m)
PessimisticTime (p)
Predecessor t 2
A 6 14 16 13 1.6667 2.7778B 1 4 7 4 1.0000 1.0000C 2 5 8 A 5 1.0000 1.0000D 1 2 3 A 2 0.3333 0.1111E 3 12 21 C 12 3.0000 9.0000F 5 7 9 B & D 7 0.6667 0.4444G 3 4 5 E & F 4 0.3333 0.1111H 1 5 9 E & F 5 1.3333 1.7778
7/30/2019 Soal Latihan Network Planning - PERT
http://slidepdf.com/reader/full/soal-latihan-network-planning-pert 6/6
Soal Lat ihan Network Planning - PERT
[email protected] - 6 / 6
TI Unpas
4.Kode
AktivitasOptimisticTime (o)
Most LikelyTime (m)
PessimisticTime (p)
Predecessor t 2
A 2 5 8 5 1.0000 1.0000B 2 3 4 3 0.3333 0.1111C 1 2 3 A 2 0.3333 0.1111D 2 4 6 B 4 0.6667 0.4444
E 1 4 7 C 4 1.0000 1.0000F 1 2 9 C 3 1.3333 1.7778G 3 4 11 D & E 5 1.3333 1.7778H 1 2 3 F & G 2 0.3333 0.1111