SNII Meeting, UCLA 13-02-01 N.J.T.Smith: RAL PPD Boulby Facility and Programme N.J.T.Smith...

29
SNII Meeting, UCLA 13-02-01 N.J.T.Smith: RAL PPD Boulby Facility and Boulby Facility and Programme Programme N.J.T.Smith Rutherford Appleton Laboratory. Facilities and Expeiments at the U.K. Boulby Mine Current facilities JIF Expansion Experimental Programme

Transcript of SNII Meeting, UCLA 13-02-01 N.J.T.Smith: RAL PPD Boulby Facility and Programme N.J.T.Smith...

Page 1: SNII Meeting, UCLA 13-02-01 N.J.T.Smith: RAL PPD Boulby Facility and Programme N.J.T.Smith Rutherford Appleton Laboratory. Facilities and Expeiments at.

SNII Meeting, UCLA 13-02-01N.J.T.Smith: RAL PPD

Boulby Facility and ProgrammeBoulby Facility and ProgrammeBoulby Facility and ProgrammeBoulby Facility and Programme

N.J.T.SmithRutherford Appleton Laboratory.

Facilities and Expeimentsat the U.K. Boulby MineFacilities and Expeimentsat the U.K. Boulby Mine

Current facilitiesJIF ExpansionExperimental Programme

Current facilitiesJIF ExpansionExperimental Programme

Page 2: SNII Meeting, UCLA 13-02-01 N.J.T.Smith: RAL PPD Boulby Facility and Programme N.J.T.Smith Rutherford Appleton Laboratory. Facilities and Expeiments at.

SNII Meeting, UCLA 13-02-01N.J.T.Smith: RAL PPD

BDMC CollaborationBDMC CollaborationBDMC CollaborationBDMC Collaboration

QMW: J. C. Barton University of Surrey: E. Morton, P. Sellin

CERN/Padova: A Pietropaulo ITEP: D Akimov, V Lebedenko, A Danilov

Coimbra: A Policarpo, M Salete Leite, R Ferreira Marques, V Chepel

UCLA: D Cline, M Atac, H Wang, J K Woo, J Park Columbia: C Hailey, J Hong, E Aprile, A Castellina

UCSD: K Griest, G Masek, K BucklandTemple University: C J Martoff, P Ambrozewicz, E Kaczanowicz

University of Sheffield: T. Gamble, V. A. Kudryavtsev, T. B. Lawson, M. J. Lehner, P. K. Lightfoot, J. E. McMillan, B. Morgan, M. Robinson, N. J. C. Spooner, L.. Thompson, D. R. Tovey

Rutherford Appleton Laboratory: G. J. Alner, E.G. Capocci, S. P. Hart, J. D. Lewin, R. Lüscher, R. M. Preece, J. W. Roberts, N. J. T. Smith, P.F. Smith

Imperial College of Science, Technology and Medicine: B. Ahmed, A. Bewick, D. Davidge, J. V. Dawson, A. S. Howard, I. Ivaniouchenkov, W. G. Jones, M. K. Joshi, V. Lebedenko, I. Liubarsky, T. J. Sumner, J. J. Quenby

Torino: P Picchi, L Periale, G Mannocchi, C Taricco, C Castagnoli, A CurioniSaclay: G. Gerbier

Occidental College: D Snowden-Ifft, T Ohnuki, N Villaume, J Burwell LLNL: B Craig, M J Lehner

Page 3: SNII Meeting, UCLA 13-02-01 N.J.T.Smith: RAL PPD Boulby Facility and Programme N.J.T.Smith Rutherford Appleton Laboratory. Facilities and Expeiments at.

SNII Meeting, UCLA 13-02-01N.J.T.Smith: RAL PPD

UK(B)DMC ProgrammeUK(B)DMC ProgrammeUK(B)DMC ProgrammeUK(B)DMC Programme

NaIsmall array

20 kg

NAIADhigh rate array

50 kg

UK-Saclay20 kg

(1) NAIAD (1) NAIAD arrayarray

existing

ZEPLIN-Isingle phase

PSD4 kg

ZEPLIN-IIion-scint

two phase Xe30 kg

ZEPLIN-IIIIon-scint

two phase Xehigh field

6 kg

(2) ZEPLIN (2) ZEPLIN arrayarray

under construction

existing

under construction

DRIFT 1directional

1 m3

(3) DRIFT (3) DRIFT arrayarray

ramp down

ZEPLIN-AXEion-scint

two phase Xe1000 kg

MULTINATIONAL

concept

DRIFT 10directional

10 m3

MULTINATIONAL

concept

2000 2002 2003 2004+2001

Page 4: SNII Meeting, UCLA 13-02-01 N.J.T.Smith: RAL PPD Boulby Facility and Programme N.J.T.Smith Rutherford Appleton Laboratory. Facilities and Expeiments at.

SNII Meeting, UCLA 13-02-01N.J.T.Smith: RAL PPD

Boulby Potash MineBoulby Potash MineBoulby Potash MineBoulby Potash Mine

• Working potash / Working potash / rock salt minerock salt mine

• Easily modified Easily modified cavern structurecavern structure

Plymouth

London

Birmingham

Liverpool

Newcastle

Edinburgh

Inverness

Belfast

Dublin

Redcar

Hartlepool

Peterlee

Middlesbrough

Billingham

Newton Aycliffe

Stockton

Darlington

Page 5: SNII Meeting, UCLA 13-02-01 N.J.T.Smith: RAL PPD Boulby Facility and Programme N.J.T.Smith Rutherford Appleton Laboratory. Facilities and Expeiments at.

SNII Meeting, UCLA 13-02-01N.J.T.Smith: RAL PPD

Boulby U/G FacilitiesBoulby U/G FacilitiesBoulby U/G FacilitiesBoulby U/G Facilities

50m

Stu

b 2

Stu

b 2

a

‘H’

Are

a

JIF

Are

a

1995

- 1

50m

2

1998

- 9

00m

2

2000

- 2

500m

2

1988

- 3

00m

2

Page 6: SNII Meeting, UCLA 13-02-01 N.J.T.Smith: RAL PPD Boulby Facility and Programme N.J.T.Smith Rutherford Appleton Laboratory. Facilities and Expeiments at.

SNII Meeting, UCLA 13-02-01N.J.T.Smith: RAL PPD

Cosmic Ray Cosmic Ray Flux FluxCosmic Ray Cosmic Ray Flux Flux

• Cosmic ray Cosmic ray generate neutrons through spallation and generate neutrons through spallation and evaporationevaporation

• Surface Surface flux attenuated by 10 flux attenuated by 1066

• Comparable to Kamioka and Gran SassoComparable to Kamioka and Gran Sasso

10-13

10-11

10-9

10-7

10-5

10-3

10-1

0 1000 2000 3000 4000 5000 6000 7000 8000

Muon FluxNeutron Production

Depth (mwe)

10-13

10-11

10-9

10-7

10-5

10-3

10-1

10 100 1000

Muon FluxNeutron Production

Depth (mwe)

Page 7: SNII Meeting, UCLA 13-02-01 N.J.T.Smith: RAL PPD Boulby Facility and Programme N.J.T.Smith Rutherford Appleton Laboratory. Facilities and Expeiments at.

SNII Meeting, UCLA 13-02-01N.J.T.Smith: RAL PPD

Neutron BackgroundsNeutron BackgroundsNeutron BackgroundsNeutron Backgrounds

• U and Th U and Th contaminationcontamination

– alpha interactions and fission (10-5 of flux)

• Cosmic ray muonsCosmic ray muons– spallation and

evaporation

10 -7

10 -6

10 -5

10 -4

10 -3

10 -2

10 -1

100

101

102

10-7

10 -6

10 -5

10 -4

10 -3

10 -2

10 -1

100

101

102

Est

imat

ed E

vent

Rat

e (k

g-1da

y-1)

U - Th ContaminationGenerated

Cosmic Ray MuonGenerated

Target & Detector Materials

SurroundingRock

WithinShielding

WithinSurrounding

Rock

HydrogenousShielding

HydrogenousShielding

Muon VetoPurification

Page 8: SNII Meeting, UCLA 13-02-01 N.J.T.Smith: RAL PPD Boulby Facility and Programme N.J.T.Smith Rutherford Appleton Laboratory. Facilities and Expeiments at.

SNII Meeting, UCLA 13-02-01N.J.T.Smith: RAL PPD

Gamma BackgroundsGamma BackgroundsGamma BackgroundsGamma Backgrounds

• Cavern radioisotope impuritiesCavern radioisotope impurities– Halite intrinsically low U/Th levels

• Low radon levels comparable to Gran Sasso ~5 BqmLow radon levels comparable to Gran Sasso ~5 Bqm-3-3

• NaI Detector total event ratesNaI Detector total event rates– Unshielded: >2e5 kg-1day-1

– Shielded: 6e3 kg-1day-1

Page 9: SNII Meeting, UCLA 13-02-01 N.J.T.Smith: RAL PPD Boulby Facility and Programme N.J.T.Smith Rutherford Appleton Laboratory. Facilities and Expeiments at.

SNII Meeting, UCLA 13-02-01N.J.T.Smith: RAL PPD

Gran Sasso ComparisonGran Sasso ComparisonGran Sasso ComparisonGran Sasso ComparisonGran Sasso Boulby

Facility Road Tunnel Working Mine

Depth (wme) 3800 3300

Altitude (m) 1000 -1100

Temperature Cavern 18˚CRock 6˚C

Cavern 26˚CRock 40˚C

Humidity (%) 50 37

Rock Type Limestone Halite

U(ppb) 500 10Th(ppb) 60 100

RockImpurity

K(ppm) 100 600

n(α, fissio )n (cm-2s-1) 5 x 10-7 2 x 10-7

c. . r flux (cm-2s-1) 1 x 10-8 5 x 10-8

n(spalln, evapn) (g-2s-1) 3 x 10-11 1 x 10-10

Ambient 5 - 15Radon(Bqm-3) Shielded 3 - 5A ir flow (m-3hr-1) 30 000 20 000

Permanent Staff 64 2

Page 10: SNII Meeting, UCLA 13-02-01 N.J.T.Smith: RAL PPD Boulby Facility and Programme N.J.T.Smith Rutherford Appleton Laboratory. Facilities and Expeiments at.

SNII Meeting, UCLA 13-02-01N.J.T.Smith: RAL PPD

Boulby Potash MineBoulby Potash MineBoulby Potash MineBoulby Potash Mine

Page 11: SNII Meeting, UCLA 13-02-01 N.J.T.Smith: RAL PPD Boulby Facility and Programme N.J.T.Smith Rutherford Appleton Laboratory. Facilities and Expeiments at.

SNII Meeting, UCLA 13-02-01N.J.T.Smith: RAL PPD

Stub 2 Pre-JIFStub 2 Pre-JIFStub 2 Pre-JIFStub 2 Pre-JIF

Page 12: SNII Meeting, UCLA 13-02-01 N.J.T.Smith: RAL PPD Boulby Facility and Programme N.J.T.Smith Rutherford Appleton Laboratory. Facilities and Expeiments at.

SNII Meeting, UCLA 13-02-01N.J.T.Smith: RAL PPD

JIF ExpansionJIF ExpansionJIF ExpansionJIF Expansion

• JIF (Round2) SuccessfulJIF (Round2) Successful• Surface facilitiesSurface facilities

– Workshop, offices, etc.

• Underground facilitiesUnderground facilities– New clean area, upgrade existing

Page 13: SNII Meeting, UCLA 13-02-01 N.J.T.Smith: RAL PPD Boulby Facility and Programme N.J.T.Smith Rutherford Appleton Laboratory. Facilities and Expeiments at.

SNII Meeting, UCLA 13-02-01N.J.T.Smith: RAL PPD

Area LocalityArea LocalityArea LocalityArea Locality

Page 14: SNII Meeting, UCLA 13-02-01 N.J.T.Smith: RAL PPD Boulby Facility and Programme N.J.T.Smith Rutherford Appleton Laboratory. Facilities and Expeiments at.

SNII Meeting, UCLA 13-02-01N.J.T.Smith: RAL PPD

Construction TechniqueConstruction TechniqueConstruction TechniqueConstruction Technique

ZEPLIN

NaI

NaI

20m

DirtyStores

ElectricDarkrm

Clean Room

Experimental Halls - partitioned as required

Mess/Change

Stores

Wshop

Control Room

Transfer

Clean-off8m

20m

47m14m

8m

6m

Runningboards

Page 15: SNII Meeting, UCLA 13-02-01 N.J.T.Smith: RAL PPD Boulby Facility and Programme N.J.T.Smith Rutherford Appleton Laboratory. Facilities and Expeiments at.

SNII Meeting, UCLA 13-02-01N.J.T.Smith: RAL PPD

Boulby Surface BuildingBoulby Surface BuildingBoulby Surface BuildingBoulby Surface Building

Page 16: SNII Meeting, UCLA 13-02-01 N.J.T.Smith: RAL PPD Boulby Facility and Programme N.J.T.Smith Rutherford Appleton Laboratory. Facilities and Expeiments at.

SNII Meeting, UCLA 13-02-01N.J.T.Smith: RAL PPD

-80

-60

-40

-20

0

20

40

60

-2000 -1000 0 1000 2000 3000 4000

Temperature Extremes of an Astroparticle Physicist

Extreme Temperature (˚C)Adiabatic Temperature (˚C)

Temperature (˚C)

Altitude (m)

South PoleSouth Pole

Boulby MineBoulby Mine

My OfficeMy Office

They never told me this….They never told me this….They never told me this….They never told me this….

20.0

25.0

30.0

35.0

40.0

45.0

50.0

55.0

60.0

50000.0 50500.0 51000.0 51500.0 52000.0

0 365 730 1095 1460 1825

Stub 2 Cavern Ambient Temperature (˚C)

Stub 2 Temp (˙C)20.0

25.0

30.0

35.0

40.0

45.0

50.0

55.0

60.0

Temperature (˚C)

Modified Julian Date

1996 1997 1998 1999 2000

Page 17: SNII Meeting, UCLA 13-02-01 N.J.T.Smith: RAL PPD Boulby Facility and Programme N.J.T.Smith Rutherford Appleton Laboratory. Facilities and Expeiments at.

SNII Meeting, UCLA 13-02-01N.J.T.Smith: RAL PPD

DAMA Annual ModulationDAMA Annual ModulationDAMA Annual ModulationDAMA Annual Modulation

• NaI @ Gran Sasso: 9 x 9.7kg crystals.NaI @ Gran Sasso: 9 x 9.7kg crystals.– Annual modulation few % of signal

• High energy (>90keV) no modulation, rate High energy (>90keV) no modulation, rate = 0.1% = 0.1%

• No recoil discrimination– PMT noise rejection

-0.10

-0.05

0.00

0.05

0.10

300 600 900 1200 1500 1800

DAMA Annual Modulation 2-6 keV Bin

ResidualDAMA Fit

Residual (kg

-1

day-1

keV-1

)

Day Number

INFN/AE-00/01

Page 18: SNII Meeting, UCLA 13-02-01 N.J.T.Smith: RAL PPD Boulby Facility and Programme N.J.T.Smith Rutherford Appleton Laboratory. Facilities and Expeiments at.

SNII Meeting, UCLA 13-02-01N.J.T.Smith: RAL PPD

DAMA 1-2 Rates (replotted)DAMA 1-2 Rates (replotted)DAMA 1-2 Rates (replotted)DAMA 1-2 Rates (replotted)Gaitskell 1999

Expected WIMPRecoil spectrum

Average overall crystals

Modulation inLow energy bins - threshold fluctuation?

Page 19: SNII Meeting, UCLA 13-02-01 N.J.T.Smith: RAL PPD Boulby Facility and Programme N.J.T.Smith Rutherford Appleton Laboratory. Facilities and Expeiments at.

SNII Meeting, UCLA 13-02-01N.J.T.Smith: RAL PPD

NaI unencapsulatedcraneglove

box

NaI encapsulated

to JIF area

H area

H 1

H 2

crystal NaIAD unit status

DM68 NaIAD-1 removedDM74 NaIAD-2 runningDM72 NaIAD-3 runningDM75 NaIAD-4 runningDM76 NaIAD-5 runningDM77 NaIAD-6 runningDM78 NaIAD-7 returnedDM79 NaIAD-8 testingDM80 NaIAD-9 orderDM81 NaIAD-10 collabDM48 back-up testing

Status as 09/00

control room + daq

NaAID ProgrammeNaAID ProgrammeNaAID ProgrammeNaAID Programme

• 35 kg Unencapsulated surface controlled NaI35 kg Unencapsulated surface controlled NaI

• 15 kg Encapsulated high light yield NaI15 kg Encapsulated high light yield NaI

• 20kg Saclay crystal20kg Saclay crystal

Page 20: SNII Meeting, UCLA 13-02-01 N.J.T.Smith: RAL PPD Boulby Facility and Programme N.J.T.Smith Rutherford Appleton Laboratory. Facilities and Expeiments at.

SNII Meeting, UCLA 13-02-01N.J.T.Smith: RAL PPD

CDMS ResultsCDMS ResultsCDMS ResultsCDMS Results

• Thermal/ionisation Ge/Si detectorsThermal/ionisation Ge/Si detectors

• Ge: 10.6 kg-day, 13 nuclear recoils, 4 multiple scattersGe: 10.6 kg-day, 13 nuclear recoils, 4 multiple scatters

• Si: 1.6 kg-day, 4 nuclear recoilsSi: 1.6 kg-day, 4 nuclear recoils

Gammas (source)

Neutrons (source)

Phonon threshold

Gammas

Nuclear recoils

Surface electrons

DataCalibration

Page 21: SNII Meeting, UCLA 13-02-01 N.J.T.Smith: RAL PPD Boulby Facility and Programme N.J.T.Smith Rutherford Appleton Laboratory. Facilities and Expeiments at.

SNII Meeting, UCLA 13-02-01N.J.T.Smith: RAL PPD

Current Direct Detection LimitsCurrent Direct Detection LimitsCurrent Direct Detection LimitsCurrent Direct Detection Limits

• Sensitivity ≈ 10Sensitivity ≈ 10-6-6 pb pb– DAMA: annual modulation of rate

– CDMS: neutron background subtraction

– UKDMC: ‘anomalous’ events preclude limit

http://cdms.berkeley.edu/limitplots/

-

-

-

-

-

Page 22: SNII Meeting, UCLA 13-02-01 N.J.T.Smith: RAL PPD Boulby Facility and Programme N.J.T.Smith Rutherford Appleton Laboratory. Facilities and Expeiments at.

SNII Meeting, UCLA 13-02-01N.J.T.Smith: RAL PPD

ZEPLIN IZEPLIN IZEPLIN IZEPLIN I

Xe*

+Xe

Xe2*

Triplet27ns

Singlet3ns

2Xe2Xe

175nm175nm

Xe** + Xe

Xe2+

+e-

(recombination)

Xe+

+Xe

Page 23: SNII Meeting, UCLA 13-02-01 N.J.T.Smith: RAL PPD Boulby Facility and Programme N.J.T.Smith Rutherford Appleton Laboratory. Facilities and Expeiments at.

SNII Meeting, UCLA 13-02-01N.J.T.Smith: RAL PPD

ZEPLIN I UndergroundZEPLIN I UndergroundZEPLIN I UndergroundZEPLIN I Underground

Pb shielding

Top of ZEPLIN I veto

Boulby stub 2 laboratory

xenon purification

Stable operation demonstrated

Counts vs. time

Xe temp vs. time

room temp vs. time

Page 24: SNII Meeting, UCLA 13-02-01 N.J.T.Smith: RAL PPD Boulby Facility and Programme N.J.T.Smith Rutherford Appleton Laboratory. Facilities and Expeiments at.

SNII Meeting, UCLA 13-02-01N.J.T.Smith: RAL PPD

More PhotosMore PhotosMore PhotosMore Photos

Page 25: SNII Meeting, UCLA 13-02-01 N.J.T.Smith: RAL PPD Boulby Facility and Programme N.J.T.Smith Rutherford Appleton Laboratory. Facilities and Expeiments at.

SNII Meeting, UCLA 13-02-01N.J.T.Smith: RAL PPD

QuickTime™ and aGIF decompressor

are needed to see this picture.

U/G Results - ZEPLIN IU/G Results - ZEPLIN IU/G Results - ZEPLIN IU/G Results - ZEPLIN I

85Kr < 10-17 atoms/atom

Not optimum performance

Page 26: SNII Meeting, UCLA 13-02-01 N.J.T.Smith: RAL PPD Boulby Facility and Programme N.J.T.Smith Rutherford Appleton Laboratory. Facilities and Expeiments at.

SNII Meeting, UCLA 13-02-01N.J.T.Smith: RAL PPD

ZEPLIN II DesignZEPLIN II DesignZEPLIN II DesignZEPLIN II Design• Scintillation/Ionisation detector: proven technologyScintillation/Ionisation detector: proven technology

• Two phase operationTwo phase operation– Ionisation from electroluminescence in gas region

• 30kg target under construction30kg target under construction

• Deploy 2001/2Deploy 2001/2

• 7x 5” PMTs7x 5” PMTs

• PTFE LinerPTFE Liner– Improve light yield

– Define E-field

PMT

Gas phase

Liquid target

Page 27: SNII Meeting, UCLA 13-02-01 N.J.T.Smith: RAL PPD Boulby Facility and Programme N.J.T.Smith Rutherford Appleton Laboratory. Facilities and Expeiments at.

SNII Meeting, UCLA 13-02-01N.J.T.Smith: RAL PPD

ZEPLIN III DesignZEPLIN III DesignZEPLIN III DesignZEPLIN III Design

• Scintillation/ionisation detectorScintillation/ionisation detector

• High E-fieldHigh E-field– Ionisation from nuclear recoils

• 1kg test chamber 1kg test chamber

• 6kg LXe target6kg LXe target

• Under constructionUnder construction

• Deployment 2001/2Deployment 2001/2

• Compton vetoCompton veto

• 19x 2” PMTs19x 2” PMTs– Fast timing

– Additional discrimination

– Position information

Page 28: SNII Meeting, UCLA 13-02-01 N.J.T.Smith: RAL PPD Boulby Facility and Programme N.J.T.Smith Rutherford Appleton Laboratory. Facilities and Expeiments at.

SNII Meeting, UCLA 13-02-01N.J.T.Smith: RAL PPD

• DRIFT: low pressure gaseous TPCDRIFT: low pressure gaseous TPC– Recoil direction correlation– CS2 minimises diffusion

• 1 foot cube detector @6keV1 foot cube detector @6keV– 99.9% gamma rejection– 95% alpha rejection (from wires)

• DRIFT 1mDRIFT 1m33 Module under construction Module under construction– 200m wire chamber 2cm pitch– 20m MWPC readout 2mm pitch

• CSCS22+Xe,Ar at 10-80 Torr+Xe,Ar at 10-80 Torr

DRIFT DesignDRIFT DesignDRIFT DesignDRIFT Design

gammas

recoil discrimination

C recoils

S recoils

gammas

recoil discrimination gammas

alphas

S recoil region (>90%)

alpha discrimination

Page 29: SNII Meeting, UCLA 13-02-01 N.J.T.Smith: RAL PPD Boulby Facility and Programme N.J.T.Smith Rutherford Appleton Laboratory. Facilities and Expeiments at.

SNII Meeting, UCLA 13-02-01N.J.T.Smith: RAL PPD

Boulby Facility and ProgrammeBoulby Facility and ProgrammeBoulby Facility and ProgrammeBoulby Facility and Programme

• Boulby Mine Facility StatusBoulby Mine Facility Status– Deep site

– Medium scale experiments

– Original areas refurbished

– JIF funded facility• Surface facility started (Jun 2001)

• U/G facility designed (Nov 2001)

• Boulby Experimental StatusBoulby Experimental Status– UKDMC: NaI

• DAMA assessment

– BDMC: NaIAD, ZEPLIN, DRIFT• ZEPLIN I : 2000

• ZEPLIN II/III:2001/2

• DRIFT: 2001

-

-

-

-

Limits expected from current detectors

Limits expected from future detectors (known technology)