SNC-Lavalin Atkins 16x9 Template€¦ · Staging Presentation Phase 3 version 1 3 The Cambridge...

13
Cambridge Depot

Transcript of SNC-Lavalin Atkins 16x9 Template€¦ · Staging Presentation Phase 3 version 1 3 The Cambridge...

Page 1: SNC-Lavalin Atkins 16x9 Template€¦ · Staging Presentation Phase 3 version 1 3 The Cambridge Project will provide a larger, upgraded stabling and servicing facility at the Cambridge

Cambridge Depot

Page 2: SNC-Lavalin Atkins 16x9 Template€¦ · Staging Presentation Phase 3 version 1 3 The Cambridge Project will provide a larger, upgraded stabling and servicing facility at the Cambridge

Agenda

1. Introduction

2. Project delivery set up

3. Proposed location

4. Programme

5. Q&A from December meeting

6. Any other questions

2

Page 3: SNC-Lavalin Atkins 16x9 Template€¦ · Staging Presentation Phase 3 version 1 3 The Cambridge Project will provide a larger, upgraded stabling and servicing facility at the Cambridge

1. Introduction

Staging Presentation Phase 3 version 1

3

The Cambridge Project will provide a larger, upgraded stabling and servicing

facility at the Cambridge Depot – necessary for Thameslink, Great Northern

and Greater Anglia trains.

The provision of a new 12-car carriage wash facility in the north area to

replace the previous 8-car carriage wash in the south area via a new

connecting road will provide the functionality required from both operators.

In addition to the above, new train servicing will also be provided in the south

yard.

Page 4: SNC-Lavalin Atkins 16x9 Template€¦ · Staging Presentation Phase 3 version 1 3 The Cambridge Project will provide a larger, upgraded stabling and servicing facility at the Cambridge

2. Project Delivery Set Up

Staging Presentation Phase 3 version 1

4

Page 5: SNC-Lavalin Atkins 16x9 Template€¦ · Staging Presentation Phase 3 version 1 3 The Cambridge Project will provide a larger, upgraded stabling and servicing facility at the Cambridge

3. Proposed Site layout

Staging Presentation Phase 3 version 1

5

Page 6: SNC-Lavalin Atkins 16x9 Template€¦ · Staging Presentation Phase 3 version 1 3 The Cambridge Project will provide a larger, upgraded stabling and servicing facility at the Cambridge

3. Proposed Site layout

Staging Presentation Phase 3 version 1

6

Page 7: SNC-Lavalin Atkins 16x9 Template€¦ · Staging Presentation Phase 3 version 1 3 The Cambridge Project will provide a larger, upgraded stabling and servicing facility at the Cambridge

3. Proposed Site layout

Staging Presentation Phase 3 version 1

7

Page 8: SNC-Lavalin Atkins 16x9 Template€¦ · Staging Presentation Phase 3 version 1 3 The Cambridge Project will provide a larger, upgraded stabling and servicing facility at the Cambridge

4. Programme – target key dates

Staging Presentation Phase 3 version 1

8

Start on site June 2018

South side of depot part operational (stabling only) May 2019

Accommodation building operational Spring 2020

Carriage Wash construction commences (proposed) Spring 2020

Carriage Wash operational Summer 2020

South side of depot fully operational (CET/Tanking/Sanding) Summer 2020

Page 9: SNC-Lavalin Atkins 16x9 Template€¦ · Staging Presentation Phase 3 version 1 3 The Cambridge Project will provide a larger, upgraded stabling and servicing facility at the Cambridge

5. Questions from December 2019 meeting with residents

Staging Presentation Phase 3 version 1

9

1. What type of chemicals are to be used in the carriage wash?

Greater Anglia are still reviewing which chemicals to use. Part of the review process includes any potential environmental impact from the proposed chemicals when used, to both operational staff and the local surroundings.

2. Predicted noise levels adjacent carriage wash?

3. The first Environmental Impact Study has returned a decibel rating of circa 40db – at the closest

property to the loudest point of sound. This a good start for the design, and we want to improve

on it.

4. Can we install an acoustic fence the carriage wash and Great Eastern Street?

5. The carriage wash is to be designed using noise transfer reducing cladding. The use of acoustic

fencing/barriers on previous projects has not provided significant benefits due to the way noise

transfer travels. The design team will however, consider all options to minimise noise transfer

where required.

Page 10: SNC-Lavalin Atkins 16x9 Template€¦ · Staging Presentation Phase 3 version 1 3 The Cambridge Project will provide a larger, upgraded stabling and servicing facility at the Cambridge

Questions continued…..

Staging Presentation Phase 3 version 1

10

What will the carriage wash enclosure and plant room look like and how big will it be?

Although not designed in detail yet, the carriage wash enclosure will be approximately 9m high, 7m wide and 33m long

How many trains will use the wash every night?

The estimated number of trains through the area is four per hour. The exact number can’t be predetermined, however the hour-by-hour usage will vary. We will continue evaluate this throughout the build and initial operation.

Page 11: SNC-Lavalin Atkins 16x9 Template€¦ · Staging Presentation Phase 3 version 1 3 The Cambridge Project will provide a larger, upgraded stabling and servicing facility at the Cambridge

Staging Presentation Phase 3 version 1

11

Without enclosure……

Page 12: SNC-Lavalin Atkins 16x9 Template€¦ · Staging Presentation Phase 3 version 1 3 The Cambridge Project will provide a larger, upgraded stabling and servicing facility at the Cambridge

Staging Presentation Phase 3 version 1

12

With enclosure……

Page 13: SNC-Lavalin Atkins 16x9 Template€¦ · Staging Presentation Phase 3 version 1 3 The Cambridge Project will provide a larger, upgraded stabling and servicing facility at the Cambridge

Any questions and next steps

Staging Presentation Phase 3 version 1

13

• The project team will continue to distribute regular newsletters to local residents

• Further drop in sessions will be set up.

• All enquiries should be directed to Diane Rowe at Spencer Group –

• T: 01482 766340

• E: [email protected]