Malaysia Airlines Engineering & Maintenance Division SMS IMPLEMENTATIONEngineering & Maintenance (Quality Assurance)ByMalaysia AirlinesEngineering & Maintenance Division Quality Assurance Department
-
AIRWORTHINESS NOTICE 101SAFETY MANAGEMENT SYSTEMS (SMS)FOR APPROVED MAINTENANCE ORGANISATION (AMO)
Target Implementation Date:
BY 1 JANUARY 2009Engineering & Maintenance (Quality Assurance)
-
AIRWORTHINESS NOTICE 101 BY 1 JAN 2009
GENERAL :
An AMO shall establish, maintain and adhere to a safety management system (SMS) that is appropriate to the size, nature and complexity of the operations authorised to be conducted under its operations certification and the safety hazards and risks related to the operations.Engineering & Maintenance (Quality Assurance)
-
AIRWORTHINESS NOTICE 101 BY 1 JAN 2009
GENERAL : cont.
A Safety Management System shall clearly define lines of safety accountability throughout the AMO, including a direct accountibility for safety on the part of senior management.Engineering & Maintenance (Quality Assurance)
-
SMS IN MAS E&MTo ensure compliance to AN 101, the followings were initiated:
A committee comprises of all department representative, was formed on 9 July 2008. where the first meeting was held. (It was also agreed that SMS meeting will be held bi-monthly, on Wednesdays.)
All meetings will be facilitated by Senior Manager Quality Assurance.
Engineering & Maintenance (Quality Assurance)
-
MAS E&M SMS COMMITTEE
- E&Ms SMS committee comprises the following departments :
Quality Assurance
Technical Training
Heavy Maintenance
Workshop Production
Commercial
Engineering & Maintenance (Quality Assurance)
-
SMS SUB - COMMITTEE
Materials Component Management
Technical Services
Engineering Planning
Maintenance Operations
Engineering & Maintenance (Quality Assurance)
-
SMS COMMITTEE Action Plan
The committee identified the following needed to be accomplished, on priority basis:
- Production of the Engineering SMS Manual ...target completion by September 08
SMS Training - Training on SMS for E&M Div personnel started 1 year ago. In order to ensure timely completion of all personnel within E&M, training will be conducted for trainers, from the various department. This will start in August 08
Engineering & Maintenance (Quality Assurance)
-
SMS COMMITTEE Action Plan
To accomplish the production of the E&M SMS manual, the committee had sought guidance from our MAS Corporate Safety Department (CSSHE), who has the Corporate SMS framework already in place, in the Corporate Safety ManualEngineering & Maintenance (Quality Assurance)
-
ENGINEERING SMS MANUAL
The Engineering SMS manual is currently being drafted and will be presented to the Management for acceptance , by 15 Sep 08.
Once accepted by Management, it will be presented to the DCA for approval. . . .targeted by end September 2008.
Engineering & Maintenance (Quality Assurance)
-
ENGINEERING SMS TRAINING
To ensure all personnel within the E&M Division are trained on the SMS and in a timely manner, the Committee decided :
To train all the committee members and nominated trainers, from the various Department, beginning 28 -29 Aug 2008.
- The trainers, will in turn, train all personnel from their respective department.Engineering & Maintenance (Quality Assurance)
-
ENGINEERING SMS TRAINING
For this training needs and to ensure timelycompletion of this training to all personnel in E&M Div, the Committee had sought assistance from our MAS Corporate Safety , Security, Healthand Environment Department (CSSHE). The MASCSSHE Dept. has several of their personnel specially trained on the SMS.
CSSHE had agreed to start the Train the Trainerssession on 28-29 Aug 2008.
Engineering & Maintenance (Quality Assurance)
-
ENGINEERING SMS MANUAL
The Engineering SMS manual shall contain:
Document Control. . . currently in place.
SMS Regulatory Requirements. . .drafting
Scope of the SMS. . .drafting
Safety Objectives and Goals. . . currently in place
Roles and Responsibilities. . . currently in place
Safety Investigations. . . currently in place
Engineering & Maintenance (Quality Assurance)
-
ENGINEERING SMS MANUAL
Non-punitive Reporting Policy . . . currently in place
Safety Reporting. . . currently in place
Hazard Identification and Risk Assessment. . . currently in place but needs review to cater to E&M environment.
Performance Indicators and Acceptable Level of Safety. Currently in place. MAS E&M currently monitors Incidents due to Aircraft Systems and Human Factors in Engineering, the target/limit set at 10.0 inc/10,000 cycles, A/C Ground Incidents - target/limit 1.0 inc/10,000 flt hours; Industrial Incidents - 2.2 inc/million man hours. These are monitored through the Departmental KPI and the Engineering Safety Council Meeting
Engineering & Maintenance (Quality Assurance)
-
ENGINEERING SMS MANUAL
SMS Safety Training. . .started 1 year ago but will now focus on completion of training to all personnel within E&M
SMS Audit and Safety Review . . .drafting
SMS Data and Records Management. . . currently in place
Management of Change. . .drafting
Emergency Response Plan. . . currently in place but will be reviewed to suit the E&M environment. To start off, 8 significant emergency situations, which requires the action of the Emergency Response Team, will be included into the SMS manual.
Engineering & Maintenance (Quality Assurance)
-
ENGINEERING SMS ACCOUNTABLE MANAGER
The Engineering SMS Accountable Manager shall be the Senior General Manager (E&M)
Engineering & Maintenance (Quality Assurance)
-
Engineering & Maintenance (Quality Assurance)ENGINEERING SMS SAFETY MANAGERThe SMS Committee will nominate a Safety Manager, who will ensure compliance to the requirement laid out in the SMS manual.
The Safety Manager will be approved by the Accountable Manager.
-
Engineering & Maintenance (Quality Assurance)The End