SMM Schedule - Measurement

6
PROJECT: STANDARD MEASUREMENT LIST FOR DESIGN AND BUILD CONTRACTS AND FEE PROPOSAL NOTE: ELEMENT WORK ENTAILED Demolitions and Alterations 1 Generally measured in accordance with SMM7 on the basis of each floor or as an item. SMM7 Substructure 1 Excavation SMM7 2 Disposal SMM7 3 Compaction SMM7 4 Earthwork Support (measured without indication to depth and distance between opposing faces M2 5 Working Space SMM7 6 Underpinning SMM7 7 Concrete SMM7 8 Formwork SMM7 9 Reinforcement (Mesh in M2, Bar in Tonnes irrespective of size unless bar schedules are issued) 10 Surface Finish to Concrete M2 11 Filling (Measured in M2 for all areas of specific thickness, measured in M3 for all bulk filling, compaction of bulk filling measured including compaction in layers and also final compaction) 12 Blinding & Compacting Filling (final finish of specific thickness measured in M2) M2 13 Retaining Walls (Measured in linear metres unless details available in which cases these are measured as SMM7) M 14 Ground Floor Slab SMM7 15 Lift pits SMM7 16 Brickwork & Blockwork SMM7 17 Forming cavities and cavity fill/insulation SMM7 18 DPC's and DPM SMM7 19 Piling (sub-contract package) ITEM 20 Ground improvement works ITEM 21 Soft spots ITEM 22 Obstructions ITEM 23 Excavating around existing services ITEM 24 Bulk Excavation and Fill/earth modelling (based on the requirements of the CSA) SMM7 The elements in this list may not be applicable to all contracts and should be read accordingly. Any items not stated on the following list will be measured generally in accordance with SMM7 providing the details are sufficient. It is important that the Estimator reads the following list and agrees with the Method of Measurement prior to the fee being agreed. All alterations to the Method of Measurement after the fee is agreed that involve abortive or additional works will be charged on the stated day rate this estimate is based on page 1

description

SMM Method of Measurement

Transcript of SMM Schedule - Measurement

Page 1: SMM Schedule - Measurement

PROJECT:

STANDARD MEASUREMENT LIST FOR DESIGN AND BUILD CONTRACTSAND FEE PROPOSAL

NOTE:

ELEMENT WORK ENTAILED

Demolitions and Alterations

1Generally measured in accordance with SMM7 on the basis of each floor or as an item. SMM7

Substructure 1 Excavation SMM72 Disposal SMM73 Compaction SMM74 Earthwork Support (measured without indication to depth and

distance between opposing faces M25 Working Space SMM76 Underpinning SMM77 Concrete SMM78 Formwork SMM79 Reinforcement (Mesh in M2, Bar in Tonnes irrespective of size

unless bar schedules are issued)10 Surface Finish to Concrete M211 Filling (Measured in M2 for all areas of specific thickness,

measured in M3 for all bulk filling, compaction of bulk filling measured including compaction in layers and also final compaction)

12 Blinding & Compacting Filling (final finish of specific thickness measured in M2) M2

13 Retaining Walls (Measured in linear metres unless details available in which cases these are measured as SMM7) M

14 Ground Floor Slab SMM715 Lift pits SMM716 Brickwork & Blockwork SMM717 Forming cavities and cavity fill/insulation SMM718 DPC's and DPM SMM719 Piling (sub-contract package) ITEM20 Ground improvement works ITEM21 Soft spots ITEM22 Obstructions ITEM23 Excavating around existing services ITEM24 Bulk Excavation and Fill/earth modelling (based on the

requirements of the CSA) SMM7

The elements in this list may not be applicable to all contracts and should be read accordingly.

Any items not stated on the following list will be measured generally in accordance with SMM7 providing the details are sufficient.

It is important that the Estimator reads the following list and agrees with the Method of Measurement prior to the fee being agreed.

All alterations to the Method of Measurement after the fee is agreed that involve abortive or additional works will be charged on the stated day rate this estimate is based on

page 1

Page 2: SMM Schedule - Measurement

PROJECT:

STANDARD MEASUREMENT LIST FOR DESIGN AND BUILD CONTRACTSAND FEE PROPOSAL

Frame 1 Frame including cladding rails and windposts (sub contract package) ITEM

2 Fire Protection (measured linear ITEM unless details available) ITEM3 Concrete Encasement )4 Formwork ) (Full measure if details available SMM7/M5 Reinforcement ) otherwise M)

Upper Floors 1 Concrete & formwork SMM72 Decking (Studs part of steelwork) ITEM3 Edge formwork SMM74 Reinforcement measured if scheduled else kg/m3 SMM75 PCC units check areas (m2) M26 Lift capping Nr7 Perimeter cavity barrier M

Roof 1 Roof structure (measured plan area) M22 Coverings to Roof and Balconies (check areas) M23 Verges, eaves etc (check lengths) M4 Insulation M25 Rooflights Nr

6 Profiled metal roofing including flashings (check areas) M27 Eaves,verges etc (check length) M8 Rooflights including kerbs and flashings M2/Nr9 Entrance canopies Nr

10 Parapet M11 Patent glazing M212 Rainwater Installation (sub contract package) ITEM13 Roof access safety system ITEM14 Mansafe System (sub contract package) ITEM15 Secondary steelwork ITEM

Stairs1 Plan size overall x total rise between structural slabs including nr of

landings and type of stair NR2 Balustrading including fittings split raking/horizontal M3 Handrailing including fittings ditto M

page 2

Page 3: SMM Schedule - Measurement

PROJECT:

STANDARD MEASUREMENT LIST FOR DESIGN AND BUILD CONTRACTSAND FEE PROPOSAL

External Walls 1 Brickwork & Blockwork SMM72 Feature as necessary SMM73 Forming cavities including insulation SMM74 Closing cavities SMM75 Cavity barriers horizontal & vertical SMM76 DPC's SMM77 Tying brick and block to steel M8 Movement joints M9 Bed joint reinforcement M

10 Lintels NR11 Steel angle restraints to brickwork M

12 Cladding including flashings check areas M213 Secondary Steelwork ITEM14 Curtain walling including flashings check areas M215 Secondary Steelwork ITEM16 Structural glazing including flashings check areas M217 Secondary Steelwork ITEM18 Mansafe system ITEM19 Louvres including flashings check areas M2/NR20 Copings M21 Balustrading/handrailing M

External Windows

& Doors1 Windows irrespective of opening/fixed lights, measured in m2 or

number including ironmongery M2/NR2 Secondary Steelwork ITEM3 Window boards including decoration M4 External doors in sets including ironmongery and decoration NR5 Roller shutters NR6 Docking doors including dock shelters, traffic lights, bollards,

buffers and restraint system NR

Internal Walls 1 Blockwork SMM72 Head restraints M3 Fire proofing top of walls M4 Tying to steelwork M5 Lintels NR6 Concrete walls SMM77 Formwork SMM78 Reinforcement SMM79 Wall kickers SMM7

Internal Doors 1 Doors measured as sets including ironmongery and decoration NR

page 3

Page 4: SMM Schedule - Measurement

PROJECT:

STANDARD MEASUREMENT LIST FOR DESIGN AND BUILD CONTRACTSAND FEE PROPOSAL

Wall finishes 1 Plaster including reveals and angle beads SMM72 Drylining around steelwork M3 Paint or other decorative finish SMM74 Ceramic tiling/splashbacks SMM7

Floor finishes 1 Raised access floor including dustproofer below M22 Fire barriers to raised access floor M3 Skirtings (no distinction made for different backgrounds) M4 Screed M25 Screed/insulation/blockwork to make up floor levels M26 Ceramic tiles SMM77 Vinyl SMM78 Carpet SMM79 Matwells SMM7

10 Nosings and edge trims (if details available) SMM711 (Threshold/dividing strips not measured seperately, deemed

included in rates

Ceiling finishes 1 Suspended Ceilings irrespective of hanger depth M22 Edge trims including battens M3 Plasterboard and skim measured in same description M24 Fire barriers SMM75 Decoration SMM76 Access hatches NR

Finishes generally NB Wall, floor and ceiling finishes in staircase areas, plant rooms not measured seperately

Fittings 1 Vanity Units NR2 W.C. cubicles (range of cubicles measured) NR3 IPS panels NR4 Grab rails etc (measured in sets) NR5 Purpose made fittings ITEM6 Shelving (depending on details) ITEM7 Signage (depending on details) ITEM8 Other fittings itemised if details available otherwise item ITEM

Mechanical &Electrical 1 Sub-contract package (item) ITEM

Sanitary ware and Wastes and Overflows etc assumed as part of the Sub Contract package

B.W.I.C. 1 Sub-contract package (item) ITEM

Attendances 1 Sub-contract package (item) ITEM

Lift Installation 1 Sub-contract package (item) ITEM

page 4

Page 5: SMM Schedule - Measurement

PROJECT:

STANDARD MEASUREMENT LIST FOR DESIGN AND BUILD CONTRACTSAND FEE PROPOSAL

DrainageNB Foul and Storm drainage measured together, Land drains

measured seperately1 Manholes measured by internal size, type, duty and depth to invert

level NR2 Pipes SMM73 Fittings SMM74 Trenches SMM75 Bed and surround SMM76 Aco etc drains M7 Gullies NR8 Connecting to existing NR9 Breaking up existing surfaces M

10 Adaptations to existing drains SMM711 Drainage to watercourse SMM7

External Works 1 Thermoplastic lining paint M2 Column protection in carpark NR3 Wall protection in carpark M4 Reinstating existing footpaths etc M/M25 Hard surfacing M26 Granular filling measured as thickness by location M26 Soft landscaping (sub contract sum) ITEM7 Area for landscaping measured for check area M28 Topsoiling measured by thickness if required M29 Kerbs including foundations M

10 PCC channels M11 Bollards/protection rails/Armco barriers NR/M12 Retaining Walls (Measured in linear metres unless details available

in which cases these are measured as SMM7) M13 Cycle sheds/shelters/gatehouse NR14 Vehicle Maintenance Unit SMM715 S278 Works SMM7 or MMHW16 S38 Works SMM7 or MMHW

NB

PROPOSED FEE FOR PROJECT

All hard and soft landscaping is measured from the formation level as shown on the drawings and Engineer's details. Any make up is measured in the Bulk Excavation and Filling section

page 5

Page 6: SMM Schedule - Measurement

PROJECT:

STANDARD MEASUREMENT LIST FOR DESIGN AND BUILD CONTRACTSAND FEE PROPOSAL

NOTE:

WE WILL ALSO ENDEAVOUR TO MEASURE ADDITIONAL ITEMS THAT ARE NOT SHOWN ON THE DRAWINGS/SPECIFICATION THAT WE FEEL MAY BE NECESSARY TO CONSTRUCT THE WORKS. WE WILL INCLUDE IN THE BILLS A SERIES OF MEASUREMENT NOTES TO ASSIST THE ESTIMATOR

IT IS ENCUMBENT ON THE ESTIMATOR TO ESTABLISH IF HE WISHES ADDITIONAL ITEMS TO BE MEASURED AND INFORM US OF HIS REQUIREMENTS AS SOON AS POSSIBLE.

THE FEE INCLUDES FOR A SINGLE PRINTED COPY AND SINGLE AGREED ELECTRONIC FILE FORMAT

WE RESERVE THE RIGHT TO CHARGE FOR ADDITIONAL COPIES OF THE BILLS OR FOR BQ'S AND ELECTRONIC FILES IN DIFFERENT FORMATS OR SORTATIONS

THE ABOVE SCHEDULES HAVE NO IN BUILT ALLOWANCE FOR ADDITIONAL TIME FOR ALTERATIONS TO THE MEASURED BILLS ISSUEDIF ANY OF THE ELEMENTS REQUIRE A REMEASURE BASED ON ADDITIONAL INFORMATIONISSUED DURING THE MEASUREMENT OF THAT ELEMENT, OR AFTER THE ELEMENT HAS BEENISSUED TO THE ESTIMATOR, THIS WILL BE CHARGED ON A DAY RATE OF £350/DAYANY ADDITIONAL REQUIREMENTS WILL BE CONFIRMED TO THE ESTIMATOR IN WRITING BYFACSIMILE OR 'E' MAIL.

ALTHOUGH WE WILL MEASURE ITEMS THAT ARE SHOWN ON THE DRAWINGS

page 6