Small hydro sites hydrology: Optimum capacity screening and estimation of fish habitat requirements....
-
Upload
reginald-robbins -
Category
Documents
-
view
224 -
download
1
Transcript of Small hydro sites hydrology: Optimum capacity screening and estimation of fish habitat requirements....
![Page 1: Small hydro sites hydrology: Optimum capacity screening and estimation of fish habitat requirements. Charles D. D. Howard Senior Advisor Charles Howard.](https://reader031.fdocuments.in/reader031/viewer/2022020717/56649ef25503460f94c0386d/html5/thumbnails/1.jpg)
![Page 2: Small hydro sites hydrology: Optimum capacity screening and estimation of fish habitat requirements. Charles D. D. Howard Senior Advisor Charles Howard.](https://reader031.fdocuments.in/reader031/viewer/2022020717/56649ef25503460f94c0386d/html5/thumbnails/2.jpg)
Small hydro sites hydrology: Small hydro sites hydrology: Optimum capacity screening and Optimum capacity screening and
estimation of fish habitat estimation of fish habitat requirements.requirements.
Charles D. D. HowardCharles D. D. HowardSenior Advisor Senior Advisor
Charles Howard & Associates LimitedCharles Howard & Associates Limited
www.cddhoward.comwww.cddhoward.com
![Page 3: Small hydro sites hydrology: Optimum capacity screening and estimation of fish habitat requirements. Charles D. D. Howard Senior Advisor Charles Howard.](https://reader031.fdocuments.in/reader031/viewer/2022020717/56649ef25503460f94c0386d/html5/thumbnails/3.jpg)
![Page 4: Small hydro sites hydrology: Optimum capacity screening and estimation of fish habitat requirements. Charles D. D. Howard Senior Advisor Charles Howard.](https://reader031.fdocuments.in/reader031/viewer/2022020717/56649ef25503460f94c0386d/html5/thumbnails/4.jpg)
How Accurate is the Estimated Energy?How Accurate is the Estimated Energy?
Optimizing Installed Capacity for Optimizing Installed Capacity for Small Hydro on Ungauged StreamsSmall Hydro on Ungauged Streams
Is the site a good investment opportunity, Is the site a good investment opportunity,
or a risky venture?or a risky venture?
Charles D. D. Howard, P. Eng.
How much water to leave for environment?How much water to leave for environment?
![Page 5: Small hydro sites hydrology: Optimum capacity screening and estimation of fish habitat requirements. Charles D. D. Howard Senior Advisor Charles Howard.](https://reader031.fdocuments.in/reader031/viewer/2022020717/56649ef25503460f94c0386d/html5/thumbnails/5.jpg)
Hydrology ConsiderationsHydrology Considerations
Charles D. D. Howard, P. Eng.
•Development of the flood frequency curve.
•Matching the penstock-turbine-generator set.
•Calculation of the energy capability.
•Economic optimisation of installed capacity.
•Assess impact of development on instream habitat
•The time series hydrograph: often unknown flows.
![Page 6: Small hydro sites hydrology: Optimum capacity screening and estimation of fish habitat requirements. Charles D. D. Howard Senior Advisor Charles Howard.](https://reader031.fdocuments.in/reader031/viewer/2022020717/56649ef25503460f94c0386d/html5/thumbnails/6.jpg)
1.1. The simulated hydrograph of The simulated hydrograph of hourly or daily flowshourly or daily flows..
• The watershed model provides opportunities to explore the sensitivity of hydrologic sequences to factors such as tree cover, soil types, land slopes, and the range of elevation. A particular watershed can easily be “transposed” to a different climate to show the relative importance of watershed and climate parameters.
Charles D. D. Howard, P. Eng.
![Page 7: Small hydro sites hydrology: Optimum capacity screening and estimation of fish habitat requirements. Charles D. D. Howard Senior Advisor Charles Howard.](https://reader031.fdocuments.in/reader031/viewer/2022020717/56649ef25503460f94c0386d/html5/thumbnails/7.jpg)
How Accurate is the Hydrology?How Accurate is the Hydrology?
Two methods for estimating discharge:Two methods for estimating discharge:
1.1.Regression (compare with similar stream).Regression (compare with similar stream).
2.2.Hydrology model (use topo and weather).Hydrology model (use topo and weather).
Hydrology of Ungaged StreamsHydrology of Ungaged Streams
Charles D. D. Howard, P. Eng.
![Page 8: Small hydro sites hydrology: Optimum capacity screening and estimation of fish habitat requirements. Charles D. D. Howard Senior Advisor Charles Howard.](https://reader031.fdocuments.in/reader031/viewer/2022020717/56649ef25503460f94c0386d/html5/thumbnails/8.jpg)
Dimensionless Daily Discharge in cubic meters per second
Ungaged = 0.9821*Gaged + 0.0179Correlation Coef. = 0.9313
0.00
2.00
4.00
6.00
8.00
0.00 2.00 4.00 6.00 8.00Gaged River
Un
gag
ed
Charles D. D. Howard, P. Eng.
Regression analysis method based on assumed similar stream
![Page 9: Small hydro sites hydrology: Optimum capacity screening and estimation of fish habitat requirements. Charles D. D. Howard Senior Advisor Charles Howard.](https://reader031.fdocuments.in/reader031/viewer/2022020717/56649ef25503460f94c0386d/html5/thumbnails/9.jpg)
0
1
2
3
4
5
6
7
8
1 21 41 61 81 101 121 141 161 181 201 221 241 261 281 301 321 341 361
Day of Year
Dis
char
ge/
Ave
rag
e
Actual
Estimated
How accurate is the estimated energy
potential?
Charles D. D. Howard, P. Eng.
Streamflow Comparison: actual and estimated
![Page 10: Small hydro sites hydrology: Optimum capacity screening and estimation of fish habitat requirements. Charles D. D. Howard Senior Advisor Charles Howard.](https://reader031.fdocuments.in/reader031/viewer/2022020717/56649ef25503460f94c0386d/html5/thumbnails/10.jpg)
Hydrology of Ungaged StreamsHydrology of Ungaged Streams
Charles D. D. Howard, P. Eng.
How risky is the How risky is the investment?investment?
![Page 11: Small hydro sites hydrology: Optimum capacity screening and estimation of fish habitat requirements. Charles D. D. Howard Senior Advisor Charles Howard.](https://reader031.fdocuments.in/reader031/viewer/2022020717/56649ef25503460f94c0386d/html5/thumbnails/11.jpg)
Energy production depends on how Energy production depends on how much of the streamflow will be used, much of the streamflow will be used,
and how much will be spilled.and how much will be spilled.
Energy from Ungauged StreamsEnergy from Ungauged Streams
Accuracy of the energy estimate Accuracy of the energy estimate depends on installed capacity.depends on installed capacity.
Charles D. D. Howard, P. Eng.
![Page 12: Small hydro sites hydrology: Optimum capacity screening and estimation of fish habitat requirements. Charles D. D. Howard Senior Advisor Charles Howard.](https://reader031.fdocuments.in/reader031/viewer/2022020717/56649ef25503460f94c0386d/html5/thumbnails/12.jpg)
Charles D. D. Howard, P. Eng.
Ungaged Site: Errors in annual energy depend on developed capacity.
0
2
4
6
8
10
12
0.00 0.50 1.00 1.50 2.00 2.50 3.00
Average Annual Mw
Per
cen
t
Evaluate Risk.
![Page 13: Small hydro sites hydrology: Optimum capacity screening and estimation of fish habitat requirements. Charles D. D. Howard Senior Advisor Charles Howard.](https://reader031.fdocuments.in/reader031/viewer/2022020717/56649ef25503460f94c0386d/html5/thumbnails/13.jpg)
Charles D. D. Howard, P. Eng.
Energy Comparison2 Mw Plant
0
500
1000
1500
2000
2500
1 21 41 61 81 101121141161181201221241261281301321341361
Day of the Year
KW
-Day
s
Estimated hydrology Measured
hydrology
![Page 14: Small hydro sites hydrology: Optimum capacity screening and estimation of fish habitat requirements. Charles D. D. Howard Senior Advisor Charles Howard.](https://reader031.fdocuments.in/reader031/viewer/2022020717/56649ef25503460f94c0386d/html5/thumbnails/14.jpg)
Look into using the hydrologic model in IMPLook into using the hydrologic model in IMP
Optimizing Installed Capacity for Small Optimizing Installed Capacity for Small Hydro on Ungauged StreamsHydro on Ungauged Streams
Hydrology should not be “assumed”Hydrology should not be “assumed”
Hydrology is a basic requirement.Hydrology is a basic requirement.
Charles D. D. Howard, P. Eng.
![Page 15: Small hydro sites hydrology: Optimum capacity screening and estimation of fish habitat requirements. Charles D. D. Howard Senior Advisor Charles Howard.](https://reader031.fdocuments.in/reader031/viewer/2022020717/56649ef25503460f94c0386d/html5/thumbnails/15.jpg)
The Integrated Method for PowerThe Integrated Method for Power
IMPIMP
IMP considers:IMP considers:
•Elevation rangesElevation ranges
•Topographic differencesTopographic differences
•Climate differences with locations and elevationClimate differences with locations and elevation
•Forest cover and soilsForest cover and soils
Charles D. D. Howard, P. Eng.
![Page 16: Small hydro sites hydrology: Optimum capacity screening and estimation of fish habitat requirements. Charles D. D. Howard Senior Advisor Charles Howard.](https://reader031.fdocuments.in/reader031/viewer/2022020717/56649ef25503460f94c0386d/html5/thumbnails/16.jpg)
2.2. IMP flood frequency curve.IMP flood frequency curve.
• In addition to providing an estimate of the flood frequency curve the method in IMP provides an opportunity to gain understanding of the practical role played by approximations and guestimates.
Charles D. D. Howard, P. Eng.
![Page 17: Small hydro sites hydrology: Optimum capacity screening and estimation of fish habitat requirements. Charles D. D. Howard Senior Advisor Charles Howard.](https://reader031.fdocuments.in/reader031/viewer/2022020717/56649ef25503460f94c0386d/html5/thumbnails/17.jpg)
Flood Frequency – snow and rain contributionsFlood Frequency – snow and rain contributions
RainSnow
Combined
Observed
![Page 18: Small hydro sites hydrology: Optimum capacity screening and estimation of fish habitat requirements. Charles D. D. Howard Senior Advisor Charles Howard.](https://reader031.fdocuments.in/reader031/viewer/2022020717/56649ef25503460f94c0386d/html5/thumbnails/18.jpg)
3.3. The Power Study ModelThe Power Study Model
• Selection of the penstock-turbine-generator set that best suits the site. Develop the data for a trade-off curve between reservoir capacity and costs, and generating capacity and costs. The model shows the relationship between energy output and the penstock capacity and identifies the maximum energy that can be developed from a given penstock diameter and material.
![Page 19: Small hydro sites hydrology: Optimum capacity screening and estimation of fish habitat requirements. Charles D. D. Howard Senior Advisor Charles Howard.](https://reader031.fdocuments.in/reader031/viewer/2022020717/56649ef25503460f94c0386d/html5/thumbnails/19.jpg)
Optimized installed capacityOptimized installed capacity
Optimum capacity = 16 MW
Marginal cost = marginal benefit
![Page 20: Small hydro sites hydrology: Optimum capacity screening and estimation of fish habitat requirements. Charles D. D. Howard Senior Advisor Charles Howard.](https://reader031.fdocuments.in/reader031/viewer/2022020717/56649ef25503460f94c0386d/html5/thumbnails/20.jpg)
4.4. Instream Habitat for FishInstream Habitat for Fish
• Gain an understanding of how new hydraulic conditions can simultaneously degrade and improve habitat, depending on species and life stage, and the hydrograph.
![Page 21: Small hydro sites hydrology: Optimum capacity screening and estimation of fish habitat requirements. Charles D. D. Howard Senior Advisor Charles Howard.](https://reader031.fdocuments.in/reader031/viewer/2022020717/56649ef25503460f94c0386d/html5/thumbnails/21.jpg)
Channel shape affects habitat potentialChannel shape affects habitat potential
![Page 22: Small hydro sites hydrology: Optimum capacity screening and estimation of fish habitat requirements. Charles D. D. Howard Senior Advisor Charles Howard.](https://reader031.fdocuments.in/reader031/viewer/2022020717/56649ef25503460f94c0386d/html5/thumbnails/22.jpg)
Species & life stage of fish determines habitat requirementsSpecies & life stage of fish determines habitat requirements
![Page 23: Small hydro sites hydrology: Optimum capacity screening and estimation of fish habitat requirements. Charles D. D. Howard Senior Advisor Charles Howard.](https://reader031.fdocuments.in/reader031/viewer/2022020717/56649ef25503460f94c0386d/html5/thumbnails/23.jpg)
Combination of fish and channel shape determine Combination of fish and channel shape determine how discharge affects habitat.how discharge affects habitat.
![Page 24: Small hydro sites hydrology: Optimum capacity screening and estimation of fish habitat requirements. Charles D. D. Howard Senior Advisor Charles Howard.](https://reader031.fdocuments.in/reader031/viewer/2022020717/56649ef25503460f94c0386d/html5/thumbnails/24.jpg)
power canal
Reduced flow in bypass reach affects fish
Canal intakes
Near Kunming, SW China
canal
![Page 25: Small hydro sites hydrology: Optimum capacity screening and estimation of fish habitat requirements. Charles D. D. Howard Senior Advisor Charles Howard.](https://reader031.fdocuments.in/reader031/viewer/2022020717/56649ef25503460f94c0386d/html5/thumbnails/25.jpg)
Stream discharge changes determine habitat impactStream discharge changes determine habitat impact
Discharge
Habitat area
Date
![Page 26: Small hydro sites hydrology: Optimum capacity screening and estimation of fish habitat requirements. Charles D. D. Howard Senior Advisor Charles Howard.](https://reader031.fdocuments.in/reader031/viewer/2022020717/56649ef25503460f94c0386d/html5/thumbnails/26.jpg)
Hydrology ConsiderationsHydrology Considerations
Charles D. D. Howard, P. Eng.
•Development of the flood frequency curve.
•Matching the penstock-turbine-generator set.
•Calculation of the energy capability.
•Economic optimisation of installed capacity.
•Assess impact of development on instream habitat
•The time series hydrograph: often unknown flows.
![Page 27: Small hydro sites hydrology: Optimum capacity screening and estimation of fish habitat requirements. Charles D. D. Howard Senior Advisor Charles Howard.](https://reader031.fdocuments.in/reader031/viewer/2022020717/56649ef25503460f94c0386d/html5/thumbnails/27.jpg)
Thank you for listening.Thank you for listening.
![Page 28: Small hydro sites hydrology: Optimum capacity screening and estimation of fish habitat requirements. Charles D. D. Howard Senior Advisor Charles Howard.](https://reader031.fdocuments.in/reader031/viewer/2022020717/56649ef25503460f94c0386d/html5/thumbnails/28.jpg)
Small hydro sites hydrology: Small hydro sites hydrology: Optimum capacity screening and Optimum capacity screening and
estimation of fish habitat estimation of fish habitat requirements.requirements.
Charles D. D. HowardCharles D. D. HowardSenior Advisor Senior Advisor
Charles Howard & Associates LimitedCharles Howard & Associates Limited
www.cddhoward.comwww.cddhoward.com