A statistic approach to electronic moulding versus traditional plaster moulding
SLIMATIC MORTAR MOULDING
3
SLIMATIC MORTAR MOULDING DEMO PRESENTATION
-
Upload
mason-hayden -
Category
Documents
-
view
30 -
download
0
description
SLIMATIC MORTAR MOULDING. DEMO PRESENTATION. SLIMATIC MORTAR MOULDING PROPERTIES. The 10 to 12 seconds time required to tamp 32 times in 4 rounds is always respected. Respects the 2 minutes and 30 secondes after completion of the original mixing of the mortar batch. - PowerPoint PPT Presentation
Transcript of SLIMATIC MORTAR MOULDING
SLIMATIC MORTAR MOULDING
DEMO
PRESENTATION
SLIMATIC MORTAR MOULDING
PROPERTIES The 10 to 12 seconds time required to tamp 32
times in 4 rounds is always respected. Respects the 2 minutes and 30 secondes after
completion of the original mixing of the mortar batch.
Respects the tamping sequence.
• Three cube compartments prepared at the same time (equivalent to three hands).
SLIMATIC MORTAR MOULDING
PROPERTIES