SLIMATIC MORTAR MOULDING

3
SLIMATIC MORTAR MOULDING DEMO PRESENTATION

description

SLIMATIC MORTAR MOULDING. DEMO PRESENTATION. SLIMATIC MORTAR MOULDING PROPERTIES. The 10 to 12 seconds time required to tamp 32 times in 4 rounds is always respected. Respects the 2 minutes and 30 secondes after completion of the original mixing of the mortar batch. - PowerPoint PPT Presentation

Transcript of SLIMATIC MORTAR MOULDING

Page 1: SLIMATIC MORTAR MOULDING

SLIMATIC MORTAR MOULDING

DEMO

PRESENTATION

Page 2: SLIMATIC MORTAR MOULDING

SLIMATIC MORTAR MOULDING

PROPERTIES The 10 to 12 seconds time required to tamp 32

times in 4 rounds is always respected. Respects the 2 minutes and 30 secondes after

completion of the original mixing of the mortar batch.

Respects the tamping sequence.

Page 3: SLIMATIC MORTAR MOULDING

• Three cube compartments prepared at the same time (equivalent to three hands).

SLIMATIC MORTAR MOULDING

PROPERTIES