A New Utility Scale Solar Inverter & DC Collection System
September 15, 2011
![Page 2: Slideshare presentation](https://reader036.fdocuments.in/reader036/viewer/2022062707/55855c7ad8b42a54608b52cb/html5/thumbnails/2.jpg)
• Nextronex Inc.• Formed June 2008
• Initial Offering Closed November 2009
• 2nd Round currently Open
• Over $ 2 MM invested to date
• Inverter System received UL 1741 Certification June 2010• First Installation May – July 2010 (399 kW, OANG Site)
• Two utility patents (and related foreign filings) pending
• Over 6 MW sold to date
• First Solar compatibility approval March 29, 2011
A New Utility Scale Solar Inverter & DC Collection System
![Page 3: Slideshare presentation](https://reader036.fdocuments.in/reader036/viewer/2022062707/55855c7ad8b42a54608b52cb/html5/thumbnails/3.jpg)
• Nextronex has developed a unique kit of parts containing everything needed from the string wiring to the utility connection
• Low Profile 150 kW inverters
• Smart Controller
• Zone Boxes with Telemetry
• Power Strip(s)
• Load Center(s)
• All components UL listed for operation up to 1000 V dc
• Best-in-class 98 % + peak efficiency
• Distributed Architecture (M/S Switching)
• Smart Grid Capability
A New Utility Scale Solar Inverter & DC Collection System
![Page 4: Slideshare presentation](https://reader036.fdocuments.in/reader036/viewer/2022062707/55855c7ad8b42a54608b52cb/html5/thumbnails/4.jpg)
The Nextronex Solution
• Distributed Architecture
• 1000 V DC System (minimize IR Drop and use 40 % fewer home runs)
• Low Profile Components for central array placement
• DC Bus (Power Strip) with Integral Zone boxes for very low loss, easy to install and service DC collection system
• Ungrounded DC operation for best safety (with differential GFD)
Single Line System
![Page 5: Slideshare presentation](https://reader036.fdocuments.in/reader036/viewer/2022062707/55855c7ad8b42a54608b52cb/html5/thumbnails/5.jpg)
PV Plant Loss Factors (exclusive of panels)
1. DC Wiring Losses, 2 % nominal Could be as high Defects as 15 %
2. Equipment Efficiency 2 % nominal 2 % nominal and Reliability
3. Low Light Level 1 % - 3 % depending 1 % - 3 % dependingEnergy Harvesting on climate on climate
4. Operation and – – Maintenance Issues
% Improvement 5 % - 8 % Up to 20 %
% Improvement from Model
% Improvement from Actual Installations
![Page 6: Slideshare presentation](https://reader036.fdocuments.in/reader036/viewer/2022062707/55855c7ad8b42a54608b52cb/html5/thumbnails/6.jpg)
Inverter Switching / Sequencing
• Before sunrise, the controller chooses the lead inverter for the day (rotated, based on run time)
• The lead inverter manages the MPPT for that day, and the remaining inverters are brought on-line in slave mode as needed
• Ramp rate, step size, timing have been worked out to insure accurate MPPT, and to quickly respond to cloud transients
![Page 7: Slideshare presentation](https://reader036.fdocuments.in/reader036/viewer/2022062707/55855c7ad8b42a54608b52cb/html5/thumbnails/7.jpg)
Inverter & System Efficiency
• The Ray-Max Inverter has a peak efficiency of 98 %
• Using the Nextronex Switching Algorithm, a 1 MW system with 6 inverters reaches peak efficiency at 3% (30 kW) output, and will begin to export power at 650 W
• The companion Load Center has a peak efficiency greater than 98 %, giving a system efficiency of 96 %
![Page 8: Slideshare presentation](https://reader036.fdocuments.in/reader036/viewer/2022062707/55855c7ad8b42a54608b52cb/html5/thumbnails/8.jpg)
MPPT Performance
Clear day performance Cloudy day performance
![Page 9: Slideshare presentation](https://reader036.fdocuments.in/reader036/viewer/2022062707/55855c7ad8b42a54608b52cb/html5/thumbnails/9.jpg)
Nextronex Linear Design
• (Photo of Nextronex Field Here)
![Page 10: Slideshare presentation](https://reader036.fdocuments.in/reader036/viewer/2022062707/55855c7ad8b42a54608b52cb/html5/thumbnails/10.jpg)
Nextronex Cluster Design
• (Photo of Nextronex Field Here)
![Page 11: Slideshare presentation](https://reader036.fdocuments.in/reader036/viewer/2022062707/55855c7ad8b42a54608b52cb/html5/thumbnails/11.jpg)
The DC Wiring Problem
• The DC collection system represents a significant investment in wire, connectors, and labor
• Problems are difficult to diagnose, especially after commissioning
• Large variability if rows are long, with many home runs (DC loss increases with wire length)
• Commonly accepted 2% drop is excessive for solar applications
![Page 12: Slideshare presentation](https://reader036.fdocuments.in/reader036/viewer/2022062707/55855c7ad8b42a54608b52cb/html5/thumbnails/12.jpg)
The DC Wiring Problem
• Installed Cost is proportional to Cu weight
• Operating Cost is proportional to CU loss
• Three Approaches:
- Constant area (CA) and constant V drop (CVD) have identical power less, while proportional area has 25 % less loss.
- Proportional Area (PA) has the lowest power drop but the largest variation in voltage drop.
Constant Area (CA) Proportional Area (PA) Constant V drop (CVD)
![Page 13: Slideshare presentation](https://reader036.fdocuments.in/reader036/viewer/2022062707/55855c7ad8b42a54608b52cb/html5/thumbnails/13.jpg)
The DC Wiring Problem
• Conclusions:• Volume of Cu needed is proportional to the square of the total current,
and the square of the linear dimensions
• For all cases, total power loss and voltage drop are inversely proportional to the conductor volume
• Tapping the collection bus in the center results in 4x less copper volume than tapping at and end point
Constant Area (CA) Proportional Area (PA) Constant V drop (CVD)
![Page 14: Slideshare presentation](https://reader036.fdocuments.in/reader036/viewer/2022062707/55855c7ad8b42a54608b52cb/html5/thumbnails/14.jpg)
A New Utility Scale Solar Inverter and Wiring Topology
Voltage Drop with Perimeter InverterVoltage Drop with Center Inverter Cluster
![Page 15: Slideshare presentation](https://reader036.fdocuments.in/reader036/viewer/2022062707/55855c7ad8b42a54608b52cb/html5/thumbnails/15.jpg)
The Importance of Information
• Without data, it is impossible to keep a solar array in top condition
• Overall Power and Energy Output can be assessed against weather data
• String level monitoring to quickly address faults
• Inverter and Transformer data for predictive maintenance
• Advanced telemetry for timely updates and remote monitoring
![Page 16: Slideshare presentation](https://reader036.fdocuments.in/reader036/viewer/2022062707/55855c7ad8b42a54608b52cb/html5/thumbnails/16.jpg)
Operation and Maintenance
• Distributed Architecture for Fault Tolerance and Reliability
• Modular Inverter Design – Replace Core Inverter in 30 Minutes without shutting system down
• Smart Controller provides the centralized control, data, and telemetry point to monitor system performance and respond to faults and alarms
• Zone level monitoring and switching to isolate problem strings for servicing without shutting system down
![Page 17: Slideshare presentation](https://reader036.fdocuments.in/reader036/viewer/2022062707/55855c7ad8b42a54608b52cb/html5/thumbnails/17.jpg)
The Smart Grid
• Utilities will need to control the output parameters of a solar array if the promise of the “smart grid” is to be realized
• Curtailment to protect distribution and transmission lines
• VAR and Power Factor Correction
• Phase imbalance and brownout correction
• Shut-down verification for safety of line personnel
• The Nextronex Smart Controller provides the communication point and our inverters are programmed to respond to external commands
![Page 18: Slideshare presentation](https://reader036.fdocuments.in/reader036/viewer/2022062707/55855c7ad8b42a54608b52cb/html5/thumbnails/18.jpg)
A New Utility Scale Solar Inverter & DC Collection System
Questions?
Contact Brandon Lohmeyer, Account Manager
Office: (567)225-3341
Email: [email protected]