![Page 1: Slides by: Ms. Shree Jaswalssjaswal.com/wp-content/uploads/2018/09/SPM_Chp4_complete.pdfIntroduction developing the project schedule Scheduling Charts logic diagrams and network (AOA,AON)](https://reader033.fdocuments.in/reader033/viewer/2022060315/5f0bea077e708231d432d740/html5/thumbnails/1.jpg)
Slides by: Ms. Shree Jaswal
![Page 2: Slides by: Ms. Shree Jaswalssjaswal.com/wp-content/uploads/2018/09/SPM_Chp4_complete.pdfIntroduction developing the project schedule Scheduling Charts logic diagrams and network (AOA,AON)](https://reader033.fdocuments.in/reader033/viewer/2022060315/5f0bea077e708231d432d740/html5/thumbnails/2.jpg)
Introduction
developing the project schedule
Scheduling Charts
logic diagrams and network (AOA,AON)
critical path
calendar scheduling and time based network
management schedule reserve
PDM network,
PERT
CPM
Resource loading, resource leveling
allocating scarce resources to projects and several projects
Goldratt’s critical chain.
Chapter 4 Slides by: Ms. Shree Jaswal 2
![Page 3: Slides by: Ms. Shree Jaswalssjaswal.com/wp-content/uploads/2018/09/SPM_Chp4_complete.pdfIntroduction developing the project schedule Scheduling Charts logic diagrams and network (AOA,AON)](https://reader033.fdocuments.in/reader033/viewer/2022060315/5f0bea077e708231d432d740/html5/thumbnails/3.jpg)
Textbook:
* Chp 7: The Project's Schedule and budget
Reference Books:
#1 Chp 7: Network Scheduling and PDM
#1 Chp 8:PERT, CPM, Resource Allocation and GERT
#1 Chp 9: Cost estimating and budgeting
#1 Chp 10:Managing risks in projects
#2 Chp 8:Project Activity Scheduling
Note:* Textbook: "Information Technology Project Management" Jack T.
Marchewka
#1 Reference book: "Project Management for business and Technology"
John M. Nicholas
#2 Reference book: "Project Management" Jack R. Meredith
Chapter 4 Slides by: Ms. Shree Jaswal 3
![Page 4: Slides by: Ms. Shree Jaswalssjaswal.com/wp-content/uploads/2018/09/SPM_Chp4_complete.pdfIntroduction developing the project schedule Scheduling Charts logic diagrams and network (AOA,AON)](https://reader033.fdocuments.in/reader033/viewer/2022060315/5f0bea077e708231d432d740/html5/thumbnails/4.jpg)
Chapter 4 Slides by: Ms. Shree Jaswal 4
![Page 5: Slides by: Ms. Shree Jaswalssjaswal.com/wp-content/uploads/2018/09/SPM_Chp4_complete.pdfIntroduction developing the project schedule Scheduling Charts logic diagrams and network (AOA,AON)](https://reader033.fdocuments.in/reader033/viewer/2022060315/5f0bea077e708231d432d740/html5/thumbnails/5.jpg)
Activity definition
Activity sequencing
Activity duration estimation
Schedule development
Schedule control
Chapter 4 Slides by: Ms. Shree Jaswal 5
![Page 6: Slides by: Ms. Shree Jaswalssjaswal.com/wp-content/uploads/2018/09/SPM_Chp4_complete.pdfIntroduction developing the project schedule Scheduling Charts logic diagrams and network (AOA,AON)](https://reader033.fdocuments.in/reader033/viewer/2022060315/5f0bea077e708231d432d740/html5/thumbnails/6.jpg)
Project Management Tools
Gantt Charts
Project Network Diagrams
Activity on the Node (AON), Activity on arrow (AOA)
Critical Path Analysis
Pert
Precedence Diagramming Method (PDM)
Chapter 4 Slides by: Ms. Shree Jaswal 6
![Page 7: Slides by: Ms. Shree Jaswalssjaswal.com/wp-content/uploads/2018/09/SPM_Chp4_complete.pdfIntroduction developing the project schedule Scheduling Charts logic diagrams and network (AOA,AON)](https://reader033.fdocuments.in/reader033/viewer/2022060315/5f0bea077e708231d432d740/html5/thumbnails/7.jpg)
Simplest and most commonly used scheduling
technique
The chart consists of horizontal scale divided into
time units-days, weeks or months and vertical
scale showing project work elements.
Chapter 4 Slides by: Ms. Shree Jaswal 7
![Page 8: Slides by: Ms. Shree Jaswalssjaswal.com/wp-content/uploads/2018/09/SPM_Chp4_complete.pdfIntroduction developing the project schedule Scheduling Charts logic diagrams and network (AOA,AON)](https://reader033.fdocuments.in/reader033/viewer/2022060315/5f0bea077e708231d432d740/html5/thumbnails/8.jpg)
Advantages:
Gives a clear pictorial model of the project.
Simplicity for the planner and the user.
Easy to construct & understand.
Is a means for assessing the status of individual work elements and the project as a whole.
It can be used as Expense Charts
1.for labor planning
2.resource allocation
3.budgeting
Chapter 4 Slides by: Ms. Shree Jaswal 8
![Page 9: Slides by: Ms. Shree Jaswalssjaswal.com/wp-content/uploads/2018/09/SPM_Chp4_complete.pdfIntroduction developing the project schedule Scheduling Charts logic diagrams and network (AOA,AON)](https://reader033.fdocuments.in/reader033/viewer/2022060315/5f0bea077e708231d432d740/html5/thumbnails/9.jpg)
Chapter 4 Slides by: Ms. Shree Jaswal 9
![Page 10: Slides by: Ms. Shree Jaswalssjaswal.com/wp-content/uploads/2018/09/SPM_Chp4_complete.pdfIntroduction developing the project schedule Scheduling Charts logic diagrams and network (AOA,AON)](https://reader033.fdocuments.in/reader033/viewer/2022060315/5f0bea077e708231d432d740/html5/thumbnails/10.jpg)
Chapter 4 Slides by: Ms. Shree Jaswal 10
![Page 11: Slides by: Ms. Shree Jaswalssjaswal.com/wp-content/uploads/2018/09/SPM_Chp4_complete.pdfIntroduction developing the project schedule Scheduling Charts logic diagrams and network (AOA,AON)](https://reader033.fdocuments.in/reader033/viewer/2022060315/5f0bea077e708231d432d740/html5/thumbnails/11.jpg)
Chapter 4 Slides by: Ms. Shree Jaswal 11
![Page 12: Slides by: Ms. Shree Jaswalssjaswal.com/wp-content/uploads/2018/09/SPM_Chp4_complete.pdfIntroduction developing the project schedule Scheduling Charts logic diagrams and network (AOA,AON)](https://reader033.fdocuments.in/reader033/viewer/2022060315/5f0bea077e708231d432d740/html5/thumbnails/12.jpg)
Chapter 4 Slides by: Ms. Shree Jaswal 12
![Page 13: Slides by: Ms. Shree Jaswalssjaswal.com/wp-content/uploads/2018/09/SPM_Chp4_complete.pdfIntroduction developing the project schedule Scheduling Charts logic diagrams and network (AOA,AON)](https://reader033.fdocuments.in/reader033/viewer/2022060315/5f0bea077e708231d432d740/html5/thumbnails/13.jpg)
Drawbacks:
It does not explicitly show interrelationships
among work elements.
Gantt charts are often maintained manually. This
is easy task in small projects, but is burdensome
and a disadvantage in large projects; it causes
apathy and results in charts becoming outdated.
Chapter 4 Slides by: Ms. Shree Jaswal 13
![Page 14: Slides by: Ms. Shree Jaswalssjaswal.com/wp-content/uploads/2018/09/SPM_Chp4_complete.pdfIntroduction developing the project schedule Scheduling Charts logic diagrams and network (AOA,AON)](https://reader033.fdocuments.in/reader033/viewer/2022060315/5f0bea077e708231d432d740/html5/thumbnails/14.jpg)
Activity Start time Duration
A 0 5
B 6 3
C 7 4
D 8 5
14Chapter 4 Slides by: Ms. Shree Jaswal
![Page 15: Slides by: Ms. Shree Jaswalssjaswal.com/wp-content/uploads/2018/09/SPM_Chp4_complete.pdfIntroduction developing the project schedule Scheduling Charts logic diagrams and network (AOA,AON)](https://reader033.fdocuments.in/reader033/viewer/2022060315/5f0bea077e708231d432d740/html5/thumbnails/15.jpg)
0 6 12 18 24 30
Gantt charts
Time
Activitie
s
15Chapter 4 Slides by: Ms. Shree Jaswal
![Page 16: Slides by: Ms. Shree Jaswalssjaswal.com/wp-content/uploads/2018/09/SPM_Chp4_complete.pdfIntroduction developing the project schedule Scheduling Charts logic diagrams and network (AOA,AON)](https://reader033.fdocuments.in/reader033/viewer/2022060315/5f0bea077e708231d432d740/html5/thumbnails/16.jpg)
Suppose C & D must start only after activity B is
completed.
16Chapter 4 Slides by: Ms. Shree Jaswal
![Page 17: Slides by: Ms. Shree Jaswalssjaswal.com/wp-content/uploads/2018/09/SPM_Chp4_complete.pdfIntroduction developing the project schedule Scheduling Charts logic diagrams and network (AOA,AON)](https://reader033.fdocuments.in/reader033/viewer/2022060315/5f0bea077e708231d432d740/html5/thumbnails/17.jpg)
0 6 12 18 24 30
Gantt charts
Time
Activitie
s
17Chapter 4 Slides by: Ms. Shree Jaswal
![Page 18: Slides by: Ms. Shree Jaswalssjaswal.com/wp-content/uploads/2018/09/SPM_Chp4_complete.pdfIntroduction developing the project schedule Scheduling Charts logic diagrams and network (AOA,AON)](https://reader033.fdocuments.in/reader033/viewer/2022060315/5f0bea077e708231d432d740/html5/thumbnails/18.jpg)
Gantt charts don’t explicitly show task
relationships
don’t show impact of delays or shifting
resources well
network models clearly show
interdependencies
18Chapter 4 Slides by: Ms. Shree Jaswal
![Page 19: Slides by: Ms. Shree Jaswalssjaswal.com/wp-content/uploads/2018/09/SPM_Chp4_complete.pdfIntroduction developing the project schedule Scheduling Charts logic diagrams and network (AOA,AON)](https://reader033.fdocuments.in/reader033/viewer/2022060315/5f0bea077e708231d432d740/html5/thumbnails/19.jpg)
network of relationships
elements & relationships (sequence)
this is ACTIVITY-ON-NODE
can have ACTIVITY-ON-ARC
research
what’s
been done
research
what needs
doing pick
final
topicinternet
research
write print
19Chapter 4 Slides by: Ms. Shree Jaswal
![Page 20: Slides by: Ms. Shree Jaswalssjaswal.com/wp-content/uploads/2018/09/SPM_Chp4_complete.pdfIntroduction developing the project schedule Scheduling Charts logic diagrams and network (AOA,AON)](https://reader033.fdocuments.in/reader033/viewer/2022060315/5f0bea077e708231d432d740/html5/thumbnails/20.jpg)
Activity on node diagrams
A,6 B,9
20Chapter 4 Slides by: Ms. Shree Jaswal
![Page 21: Slides by: Ms. Shree Jaswalssjaswal.com/wp-content/uploads/2018/09/SPM_Chp4_complete.pdfIntroduction developing the project schedule Scheduling Charts logic diagrams and network (AOA,AON)](https://reader033.fdocuments.in/reader033/viewer/2022060315/5f0bea077e708231d432d740/html5/thumbnails/21.jpg)
Activity on arc or arrow
21 3
21Chapter 4 Slides by: Ms. Shree Jaswal
![Page 22: Slides by: Ms. Shree Jaswalssjaswal.com/wp-content/uploads/2018/09/SPM_Chp4_complete.pdfIntroduction developing the project schedule Scheduling Charts logic diagrams and network (AOA,AON)](https://reader033.fdocuments.in/reader033/viewer/2022060315/5f0bea077e708231d432d740/html5/thumbnails/22.jpg)
Activity Duration Immediate Predecessor
A 6 _
B 9 A
C 8 A
D 4 B,C
E 6 B,C
Duration is given in weeks
22Chapter 4 Slides by: Ms. Shree Jaswal
![Page 23: Slides by: Ms. Shree Jaswalssjaswal.com/wp-content/uploads/2018/09/SPM_Chp4_complete.pdfIntroduction developing the project schedule Scheduling Charts logic diagrams and network (AOA,AON)](https://reader033.fdocuments.in/reader033/viewer/2022060315/5f0bea077e708231d432d740/html5/thumbnails/23.jpg)
AON diagram corresponding to data in prev table
Critical path A-B-E:21 weeks
Start A,6
B,9 D,4
C,8 E,6
Finish
23Chapter 4 Slides by: Ms. Shree Jaswal
![Page 24: Slides by: Ms. Shree Jaswalssjaswal.com/wp-content/uploads/2018/09/SPM_Chp4_complete.pdfIntroduction developing the project schedule Scheduling Charts logic diagrams and network (AOA,AON)](https://reader033.fdocuments.in/reader033/viewer/2022060315/5f0bea077e708231d432d740/html5/thumbnails/24.jpg)
Activity on arc or arrow
Same example on AON network
1 2
A,12
24Chapter 4 Slides by: Ms. Shree Jaswal
![Page 25: Slides by: Ms. Shree Jaswalssjaswal.com/wp-content/uploads/2018/09/SPM_Chp4_complete.pdfIntroduction developing the project schedule Scheduling Charts logic diagrams and network (AOA,AON)](https://reader033.fdocuments.in/reader033/viewer/2022060315/5f0bea077e708231d432d740/html5/thumbnails/25.jpg)
Activity Immediate Predecessors Duration
A _ 6
B A 9
C A 8
D B,C 4
E B 6
F D,E 6
Duration is in days
25Chapter 4 Slides by: Ms. Shree Jaswal
![Page 26: Slides by: Ms. Shree Jaswalssjaswal.com/wp-content/uploads/2018/09/SPM_Chp4_complete.pdfIntroduction developing the project schedule Scheduling Charts logic diagrams and network (AOA,AON)](https://reader033.fdocuments.in/reader033/viewer/2022060315/5f0bea077e708231d432d740/html5/thumbnails/26.jpg)
1 2
26Chapter 4 Slides by: Ms. Shree Jaswal
![Page 27: Slides by: Ms. Shree Jaswalssjaswal.com/wp-content/uploads/2018/09/SPM_Chp4_complete.pdfIntroduction developing the project schedule Scheduling Charts logic diagrams and network (AOA,AON)](https://reader033.fdocuments.in/reader033/viewer/2022060315/5f0bea077e708231d432d740/html5/thumbnails/27.jpg)
Activity Immediate Predecessors Duration
A _ 6
B A 9
C A 8
D B,C 4
E B 6
F D,E 6
Duration is in days
27Chapter 4 Slides by: Ms. Shree Jaswal
![Page 28: Slides by: Ms. Shree Jaswalssjaswal.com/wp-content/uploads/2018/09/SPM_Chp4_complete.pdfIntroduction developing the project schedule Scheduling Charts logic diagrams and network (AOA,AON)](https://reader033.fdocuments.in/reader033/viewer/2022060315/5f0bea077e708231d432d740/html5/thumbnails/28.jpg)
1 2
4
3
28Chapter 4 Slides by: Ms. Shree Jaswal
![Page 29: Slides by: Ms. Shree Jaswalssjaswal.com/wp-content/uploads/2018/09/SPM_Chp4_complete.pdfIntroduction developing the project schedule Scheduling Charts logic diagrams and network (AOA,AON)](https://reader033.fdocuments.in/reader033/viewer/2022060315/5f0bea077e708231d432d740/html5/thumbnails/29.jpg)
Activity Immediate Predecessors Duration
A _ 6
B A 9
C A 8
D B,C 4
E B 6
F D,E 6
Duration is in days
29Chapter 4 Slides by: Ms. Shree Jaswal
![Page 30: Slides by: Ms. Shree Jaswalssjaswal.com/wp-content/uploads/2018/09/SPM_Chp4_complete.pdfIntroduction developing the project schedule Scheduling Charts logic diagrams and network (AOA,AON)](https://reader033.fdocuments.in/reader033/viewer/2022060315/5f0bea077e708231d432d740/html5/thumbnails/30.jpg)
1 2
4
3
55 6
30Chapter 4 Slides by: Ms. Shree Jaswal
![Page 31: Slides by: Ms. Shree Jaswalssjaswal.com/wp-content/uploads/2018/09/SPM_Chp4_complete.pdfIntroduction developing the project schedule Scheduling Charts logic diagrams and network (AOA,AON)](https://reader033.fdocuments.in/reader033/viewer/2022060315/5f0bea077e708231d432d740/html5/thumbnails/31.jpg)
Activity Immediate Predecessors Duration
A _ 6
B A 9
C A 8
D B,C 4
E B 6
F D,E 6
Duration is in days
31Chapter 4 Slides by: Ms. Shree Jaswal
![Page 32: Slides by: Ms. Shree Jaswalssjaswal.com/wp-content/uploads/2018/09/SPM_Chp4_complete.pdfIntroduction developing the project schedule Scheduling Charts logic diagrams and network (AOA,AON)](https://reader033.fdocuments.in/reader033/viewer/2022060315/5f0bea077e708231d432d740/html5/thumbnails/32.jpg)
1 2
4
3
5 6
7
32Chapter 4 Slides by: Ms. Shree Jaswal
![Page 33: Slides by: Ms. Shree Jaswalssjaswal.com/wp-content/uploads/2018/09/SPM_Chp4_complete.pdfIntroduction developing the project schedule Scheduling Charts logic diagrams and network (AOA,AON)](https://reader033.fdocuments.in/reader033/viewer/2022060315/5f0bea077e708231d432d740/html5/thumbnails/33.jpg)
Activity Immediate Predecessors Duration
A _ 6
B A 9
C A 8
D B,C 4
E B 6
F D,E 6
Duration is in days
33Chapter 4 Slides by: Ms. Shree Jaswal
![Page 34: Slides by: Ms. Shree Jaswalssjaswal.com/wp-content/uploads/2018/09/SPM_Chp4_complete.pdfIntroduction developing the project schedule Scheduling Charts logic diagrams and network (AOA,AON)](https://reader033.fdocuments.in/reader033/viewer/2022060315/5f0bea077e708231d432d740/html5/thumbnails/34.jpg)
3-5, 4-5, 7-8,6-8 are dummy activities
1 2
4
3
5 6
7
8 9
34Chapter 4 Slides by: Ms. Shree Jaswal
![Page 35: Slides by: Ms. Shree Jaswalssjaswal.com/wp-content/uploads/2018/09/SPM_Chp4_complete.pdfIntroduction developing the project schedule Scheduling Charts logic diagrams and network (AOA,AON)](https://reader033.fdocuments.in/reader033/viewer/2022060315/5f0bea077e708231d432d740/html5/thumbnails/35.jpg)
Dummy activities are used in AOA diagrams in case a node has more than one immediate predecessor.
In previous example:Activity Immediate Predecessors Duration
D B,C 4
F D,E 6
To represent activities D & F we use dummy activities
Chapter 4 Slides by: Ms. Shree Jaswal 35
![Page 36: Slides by: Ms. Shree Jaswalssjaswal.com/wp-content/uploads/2018/09/SPM_Chp4_complete.pdfIntroduction developing the project schedule Scheduling Charts logic diagrams and network (AOA,AON)](https://reader033.fdocuments.in/reader033/viewer/2022060315/5f0bea077e708231d432d740/html5/thumbnails/36.jpg)
ACTIVITY PREDECESSOR IMMEDIATE PRED: REDUNDANT PRED:
A --
B A A
C A A
D A,B,C B,C A
E A,B,C,D D A,B,C
F A,B,C B,C A
REDUNDANT ACTIVITY
36Chapter 4 Slides by: Ms. Shree Jaswal
![Page 37: Slides by: Ms. Shree Jaswalssjaswal.com/wp-content/uploads/2018/09/SPM_Chp4_complete.pdfIntroduction developing the project schedule Scheduling Charts logic diagrams and network (AOA,AON)](https://reader033.fdocuments.in/reader033/viewer/2022060315/5f0bea077e708231d432d740/html5/thumbnails/37.jpg)
It is only essential to know the immediate
predecessor of a node while constructing a
network.
All the predecessors except the immediate
predecessors of a node are redundant
predecessors( activities).
37Chapter 4 Slides by: Ms. Shree Jaswal
![Page 38: Slides by: Ms. Shree Jaswalssjaswal.com/wp-content/uploads/2018/09/SPM_Chp4_complete.pdfIntroduction developing the project schedule Scheduling Charts logic diagrams and network (AOA,AON)](https://reader033.fdocuments.in/reader033/viewer/2022060315/5f0bea077e708231d432d740/html5/thumbnails/38.jpg)
AON n/ws
There are no dummy activities
They are simpler
They are easier to construct.
38Chapter 4 Slides by: Ms. Shree Jaswal
![Page 39: Slides by: Ms. Shree Jaswalssjaswal.com/wp-content/uploads/2018/09/SPM_Chp4_complete.pdfIntroduction developing the project schedule Scheduling Charts logic diagrams and network (AOA,AON)](https://reader033.fdocuments.in/reader033/viewer/2022060315/5f0bea077e708231d432d740/html5/thumbnails/39.jpg)
AOA n/w’s
AOA method used just as often, probably because it was developed first and is better suited for PERT procedures
The PERT model places emphasis on events and in the AOA method events are specifically designated by nodes.
AOA diagrams use line segments to represent flow of work and time, it is easy to construct schedules that are similar in appearance to Gantt charts but incorporate advantage of networks
39Chapter 4 Slides by: Ms. Shree Jaswal
![Page 40: Slides by: Ms. Shree Jaswalssjaswal.com/wp-content/uploads/2018/09/SPM_Chp4_complete.pdfIntroduction developing the project schedule Scheduling Charts logic diagrams and network (AOA,AON)](https://reader033.fdocuments.in/reader033/viewer/2022060315/5f0bea077e708231d432d740/html5/thumbnails/40.jpg)
Most software packages create AOA n/w’s
that look similar to Gantt charts.
In particular it is best to select one form of
technique., AON or AOA, and stick to it.
40Chapter 4 Slides by: Ms. Shree Jaswal
![Page 41: Slides by: Ms. Shree Jaswalssjaswal.com/wp-content/uploads/2018/09/SPM_Chp4_complete.pdfIntroduction developing the project schedule Scheduling Charts logic diagrams and network (AOA,AON)](https://reader033.fdocuments.in/reader033/viewer/2022060315/5f0bea077e708231d432d740/html5/thumbnails/41.jpg)
The longest path from the origin node to the terminal
node
Gives the expected project duration (Te)
One project can have more than one CP
Shortening activities on CP (critical activities) will
help reduce the project duration
Shortening activities NOT on CP has no effect on
project duration
Delay in any activities on CP will result in delay of
project completion
Chapter 4 Slides by: Ms. Shree Jaswal 41
![Page 42: Slides by: Ms. Shree Jaswalssjaswal.com/wp-content/uploads/2018/09/SPM_Chp4_complete.pdfIntroduction developing the project schedule Scheduling Charts logic diagrams and network (AOA,AON)](https://reader033.fdocuments.in/reader033/viewer/2022060315/5f0bea077e708231d432d740/html5/thumbnails/42.jpg)
Start A,6
B,9 D,4
C,8 E,6
Finish
Critical path A-B-E:21 weeks
Activity,
duratio
n
predece
ssor
A,6 -
B,9 A
C,8 A
D,4 B,C
E,6 B,C
42Chapter 4 Slides by: Ms. Shree Jaswal
![Page 43: Slides by: Ms. Shree Jaswalssjaswal.com/wp-content/uploads/2018/09/SPM_Chp4_complete.pdfIntroduction developing the project schedule Scheduling Charts logic diagrams and network (AOA,AON)](https://reader033.fdocuments.in/reader033/viewer/2022060315/5f0bea077e708231d432d740/html5/thumbnails/43.jpg)
Specifies when at the earliest the activities can be
performed.
ES & EF are computed by taking a FORWARD pass
through the network
When an activity has several predecessors, its ES is
the MAXIMUM of all EF of predecessors
Chapter 4 Slides by: Ms. Shree Jaswal 43
![Page 44: Slides by: Ms. Shree Jaswalssjaswal.com/wp-content/uploads/2018/09/SPM_Chp4_complete.pdfIntroduction developing the project schedule Scheduling Charts logic diagrams and network (AOA,AON)](https://reader033.fdocuments.in/reader033/viewer/2022060315/5f0bea077e708231d432d740/html5/thumbnails/44.jpg)
Latest allowable times that the activity can be started
and finished without delaying the completion of the
project.
LS & LF are computed by taking a REVERSE pass
through the network. LS for the last activity (Ts) is
taken same as the EF for that activity (Te); larger value
can be selected if project does not have to be
completed by EF.
When an activity with multiple paths leading back,
backward path with MINIMUM of all LS is selected.
Chapter 4 Slides by: Ms. Shree Jaswal 44
![Page 45: Slides by: Ms. Shree Jaswalssjaswal.com/wp-content/uploads/2018/09/SPM_Chp4_complete.pdfIntroduction developing the project schedule Scheduling Charts logic diagrams and network (AOA,AON)](https://reader033.fdocuments.in/reader033/viewer/2022060315/5f0bea077e708231d432d740/html5/thumbnails/45.jpg)
Eg:
activity duration__predecessor
A requirements analysis 3 weeks -
B programming 7 weeks A
C get hardware 1 week A
D train users 3 weeks B, C
45Chapter 4 Slides by: Ms. Shree Jaswal
![Page 46: Slides by: Ms. Shree Jaswalssjaswal.com/wp-content/uploads/2018/09/SPM_Chp4_complete.pdfIntroduction developing the project schedule Scheduling Charts logic diagrams and network (AOA,AON)](https://reader033.fdocuments.in/reader033/viewer/2022060315/5f0bea077e708231d432d740/html5/thumbnails/46.jpg)
Critical path is: A-B-D 13 weeks
1 2
3
4
5 6
46Chapter 4 Slides by: Ms. Shree Jaswal
![Page 47: Slides by: Ms. Shree Jaswalssjaswal.com/wp-content/uploads/2018/09/SPM_Chp4_complete.pdfIntroduction developing the project schedule Scheduling Charts logic diagrams and network (AOA,AON)](https://reader033.fdocuments.in/reader033/viewer/2022060315/5f0bea077e708231d432d740/html5/thumbnails/47.jpg)
Total slack= LS-ES or LF-EF
Total slack of all activities along critical path
is zero.
Hence delaying any of these activities will
delay the project.
47Chapter 4 Slides by: Ms. Shree Jaswal
![Page 48: Slides by: Ms. Shree Jaswalssjaswal.com/wp-content/uploads/2018/09/SPM_Chp4_complete.pdfIntroduction developing the project schedule Scheduling Charts logic diagrams and network (AOA,AON)](https://reader033.fdocuments.in/reader033/viewer/2022060315/5f0bea077e708231d432d740/html5/thumbnails/48.jpg)
Free Slack= ES( earliest successor)- EF
In the eg, activity C has a free slack of 6
weeks( 10-4=6)
Free slack indicated the amount by which
activity can be delayed without affecting the
start of its successor activity.
48Chapter 4 Slides by: Ms. Shree Jaswal
![Page 49: Slides by: Ms. Shree Jaswalssjaswal.com/wp-content/uploads/2018/09/SPM_Chp4_complete.pdfIntroduction developing the project schedule Scheduling Charts logic diagrams and network (AOA,AON)](https://reader033.fdocuments.in/reader033/viewer/2022060315/5f0bea077e708231d432d740/html5/thumbnails/49.jpg)
can have more than one critical path
activity duration predecessor
A requirements analysis 3 weeks -
B programming 7 weeks A
C get hardware 7 weeks A
D train users 3 weeks B, C
critical paths A-B-D
A-C-D
both with duration of 13 weeks
49Chapter 4 Slides by: Ms. Shree Jaswal
![Page 50: Slides by: Ms. Shree Jaswalssjaswal.com/wp-content/uploads/2018/09/SPM_Chp4_complete.pdfIntroduction developing the project schedule Scheduling Charts logic diagrams and network (AOA,AON)](https://reader033.fdocuments.in/reader033/viewer/2022060315/5f0bea077e708231d432d740/html5/thumbnails/50.jpg)
After a project network has been created
and finalized the resulting schedule times
should be converted into a calendar schedule
plan
Calendar schedule plan expresses the
schedule in terms of calendar dates
Chapter 4 Slides by: Ms. Shree Jaswal 50
![Page 51: Slides by: Ms. Shree Jaswalssjaswal.com/wp-content/uploads/2018/09/SPM_Chp4_complete.pdfIntroduction developing the project schedule Scheduling Charts logic diagrams and network (AOA,AON)](https://reader033.fdocuments.in/reader033/viewer/2022060315/5f0bea077e708231d432d740/html5/thumbnails/51.jpg)
To complete the calendar schedule, the
network is converted into a time-based
network
Time based n/w’s have advantages of both
Gantt charts and networks because they
show the calendar schedules as well as
relationships among activities.
Chapter 4 Slides by: Ms. Shree Jaswal 51
![Page 52: Slides by: Ms. Shree Jaswalssjaswal.com/wp-content/uploads/2018/09/SPM_Chp4_complete.pdfIntroduction developing the project schedule Scheduling Charts logic diagrams and network (AOA,AON)](https://reader033.fdocuments.in/reader033/viewer/2022060315/5f0bea077e708231d432d740/html5/thumbnails/52.jpg)
Chapter 4 Slides by: Ms. Shree Jaswal 52
![Page 53: Slides by: Ms. Shree Jaswalssjaswal.com/wp-content/uploads/2018/09/SPM_Chp4_complete.pdfIntroduction developing the project schedule Scheduling Charts logic diagrams and network (AOA,AON)](https://reader033.fdocuments.in/reader033/viewer/2022060315/5f0bea077e708231d432d740/html5/thumbnails/53.jpg)
Chapter 4 Slides by: Ms. Shree Jaswal 53
![Page 54: Slides by: Ms. Shree Jaswalssjaswal.com/wp-content/uploads/2018/09/SPM_Chp4_complete.pdfIntroduction developing the project schedule Scheduling Charts logic diagrams and network (AOA,AON)](https://reader033.fdocuments.in/reader033/viewer/2022060315/5f0bea077e708231d432d740/html5/thumbnails/54.jpg)
Chapter 4 Slides by: Ms. Shree Jaswal 54
![Page 55: Slides by: Ms. Shree Jaswalssjaswal.com/wp-content/uploads/2018/09/SPM_Chp4_complete.pdfIntroduction developing the project schedule Scheduling Charts logic diagrams and network (AOA,AON)](https://reader033.fdocuments.in/reader033/viewer/2022060315/5f0bea077e708231d432d740/html5/thumbnails/55.jpg)
The Te first computed from the n/w is usually not the duration specified as the contractual completion time.
A Management schedule reserve is established by setting the required target time Ts at some amount greater than the time of the final schedule event Te.
Chapter 4 Slides by: Ms. Shree Jaswal 55
![Page 56: Slides by: Ms. Shree Jaswalssjaswal.com/wp-content/uploads/2018/09/SPM_Chp4_complete.pdfIntroduction developing the project schedule Scheduling Charts logic diagrams and network (AOA,AON)](https://reader033.fdocuments.in/reader033/viewer/2022060315/5f0bea077e708231d432d740/html5/thumbnails/56.jpg)
The schedule reserve and a management
budget reserve comprise a “safety buffer” that
the project manager can use to overcome
problems or delays that threaten project
performance
Chapter 4 Slides by: Ms. Shree Jaswal 56
![Page 57: Slides by: Ms. Shree Jaswalssjaswal.com/wp-content/uploads/2018/09/SPM_Chp4_complete.pdfIntroduction developing the project schedule Scheduling Charts logic diagrams and network (AOA,AON)](https://reader033.fdocuments.in/reader033/viewer/2022060315/5f0bea077e708231d432d740/html5/thumbnails/57.jpg)
Need for PDM: “Predecessor - Sucessor” type of networks
assume a “strict” sequential relationship between activities
They do not provide for tasks that can be started when their predecessors are only “partially” complete
PDM allows multiple relationships between activities Finish-to-Start (FS)
Start-to-Start (SS)
Start-to-Finish (SF)
Finish-to-Finish (FF)
Chapter 4 Slides by: Ms. Shree Jaswal 57
![Page 58: Slides by: Ms. Shree Jaswalssjaswal.com/wp-content/uploads/2018/09/SPM_Chp4_complete.pdfIntroduction developing the project schedule Scheduling Charts logic diagrams and network (AOA,AON)](https://reader033.fdocuments.in/reader033/viewer/2022060315/5f0bea077e708231d432d740/html5/thumbnails/58.jpg)
Finish-to-Start (FS)
The start of the Activity B can occur n days, at the earliest after the finish of Activity A
Start-to-Start (SS)
The start of Activity B can occur n days, at the earliest after the start of Activity A
Chapter 4 Slides by: Ms. Shree Jaswal 58
![Page 59: Slides by: Ms. Shree Jaswalssjaswal.com/wp-content/uploads/2018/09/SPM_Chp4_complete.pdfIntroduction developing the project schedule Scheduling Charts logic diagrams and network (AOA,AON)](https://reader033.fdocuments.in/reader033/viewer/2022060315/5f0bea077e708231d432d740/html5/thumbnails/59.jpg)
Start-to-Finish (SF)
The finish of Activity B must occur n days,
at the latest after the start of Activity A
Finish-to-Finish (FF)
The finish of Activity B will occur in n
days, at the latest after Activity A finishes
Chapter 4 Slides by: Ms. Shree Jaswal 59
![Page 60: Slides by: Ms. Shree Jaswalssjaswal.com/wp-content/uploads/2018/09/SPM_Chp4_complete.pdfIntroduction developing the project schedule Scheduling Charts logic diagrams and network (AOA,AON)](https://reader033.fdocuments.in/reader033/viewer/2022060315/5f0bea077e708231d432d740/html5/thumbnails/60.jpg)
PDM: RelationshipsA 15
PlasterWall
B 10Tear-down scaffolding
FS=5
A
FS=5
B
A 15Furniture move in
B 10Peoplemove in
SS=5
A
SS=5
B
A 15Test
new system
B 10Phase outold system
SF=20
A
SF=20
B
A 15Lay
asphalt
B 10Paint
parking linesFF=5
A
FF=5
B
60Chapter 4 Slides by: Ms.
Shree Jaswal
![Page 61: Slides by: Ms. Shree Jaswalssjaswal.com/wp-content/uploads/2018/09/SPM_Chp4_complete.pdfIntroduction developing the project schedule Scheduling Charts logic diagrams and network (AOA,AON)](https://reader033.fdocuments.in/reader033/viewer/2022060315/5f0bea077e708231d432d740/html5/thumbnails/61.jpg)
The two most commonly used methods for project planning and scheduling are:
Program Evaluation and Review Technique (PERT)
Critical Path method (CPM)
Chapter 4 Slides by: Ms. Shree Jaswal 61
![Page 62: Slides by: Ms. Shree Jaswalssjaswal.com/wp-content/uploads/2018/09/SPM_Chp4_complete.pdfIntroduction developing the project schedule Scheduling Charts logic diagrams and network (AOA,AON)](https://reader033.fdocuments.in/reader033/viewer/2022060315/5f0bea077e708231d432d740/html5/thumbnails/62.jpg)
Program Evaluation & Review Technique (PERT)
The Framework for PERT and CPM
There are six steps which are common to both
1. Define the Project and all of it’s significant activities or tasks.
2. Develop the relationships among the activities. Decide which activities must precede and which must follow others.
Chapter 4 Slides by: Ms. Shree Jaswal 62
![Page 63: Slides by: Ms. Shree Jaswalssjaswal.com/wp-content/uploads/2018/09/SPM_Chp4_complete.pdfIntroduction developing the project schedule Scheduling Charts logic diagrams and network (AOA,AON)](https://reader033.fdocuments.in/reader033/viewer/2022060315/5f0bea077e708231d432d740/html5/thumbnails/63.jpg)
3. Draw the "Network" connecting all the activities. Each Activity should have unique event numbers. Dummy arrows are used where required to avoid giving the same numbering to two activities
4.Assign time and/or cost estimates to each activity
5. Compute the longest time path through the network. This is called the critical path.
6.Use the Network to help plan, schedule, monitor and control the project.
Chapter 4 Slides by: Ms. Shree Jaswal 63
![Page 64: Slides by: Ms. Shree Jaswalssjaswal.com/wp-content/uploads/2018/09/SPM_Chp4_complete.pdfIntroduction developing the project schedule Scheduling Charts logic diagrams and network (AOA,AON)](https://reader033.fdocuments.in/reader033/viewer/2022060315/5f0bea077e708231d432d740/html5/thumbnails/64.jpg)
PERT was developed for application in projects where there is uncertainty associated with the duration and nature of activities.
Chapter 4 Slides by: Ms. Shree Jaswal 64
![Page 65: Slides by: Ms. Shree Jaswalssjaswal.com/wp-content/uploads/2018/09/SPM_Chp4_complete.pdfIntroduction developing the project schedule Scheduling Charts logic diagrams and network (AOA,AON)](https://reader033.fdocuments.in/reader033/viewer/2022060315/5f0bea077e708231d432d740/html5/thumbnails/65.jpg)
reflects PROBABILISTIC nature of durations
assumes BETA distribution
same as CPM except THREE duration estimates
optimistic
most likely
pessimistic
Chapter 4 Slides by: Ms. Shree Jaswal 65
![Page 66: Slides by: Ms. Shree Jaswalssjaswal.com/wp-content/uploads/2018/09/SPM_Chp4_complete.pdfIntroduction developing the project schedule Scheduling Charts logic diagrams and network (AOA,AON)](https://reader033.fdocuments.in/reader033/viewer/2022060315/5f0bea077e708231d432d740/html5/thumbnails/66.jpg)
Three time estimates :
The Optimistic (a) The minimum time in which the activity can be
completed
The Most Likely (m) Completion time having the highest probability
(normal time to complete the job)
The Pessimistic (b)
The longest time an activity could take to complete
Chapter 4 Slides by: Ms. Shree Jaswal 66
![Page 67: Slides by: Ms. Shree Jaswalssjaswal.com/wp-content/uploads/2018/09/SPM_Chp4_complete.pdfIntroduction developing the project schedule Scheduling Charts logic diagrams and network (AOA,AON)](https://reader033.fdocuments.in/reader033/viewer/2022060315/5f0bea077e708231d432d740/html5/thumbnails/67.jpg)
Chapter 4 Slides by: Ms. Shree Jaswal 67
![Page 68: Slides by: Ms. Shree Jaswalssjaswal.com/wp-content/uploads/2018/09/SPM_Chp4_complete.pdfIntroduction developing the project schedule Scheduling Charts logic diagrams and network (AOA,AON)](https://reader033.fdocuments.in/reader033/viewer/2022060315/5f0bea077e708231d432d740/html5/thumbnails/68.jpg)
a = optimistic duration estimatem = most likely duration estimateb = pessimistic duration estimate
Mean or expected time for completion of an activity , te is given byte = (a + 4m + b)/6
Variance, V is given byV = sqr((b-a)/6)
Chapter 4 Slides by: Ms. Shree Jaswal 68
![Page 69: Slides by: Ms. Shree Jaswalssjaswal.com/wp-content/uploads/2018/09/SPM_Chp4_complete.pdfIntroduction developing the project schedule Scheduling Charts logic diagrams and network (AOA,AON)](https://reader033.fdocuments.in/reader033/viewer/2022060315/5f0bea077e708231d432d740/html5/thumbnails/69.jpg)
The expected time Te , represents the point on distribution where there is a 50-50 chance that the activity will be completed earlier or later than it.
a=3,b=5,c=13
Te= (3+4(5)+13)/6= 6 days
Variance is the measure of variability in the activity completion time:
V=sqr((13-3)/6)=sqr(1.67)= 2.78
Chapter 4 Slides by: Ms. Shree Jaswal 69
![Page 70: Slides by: Ms. Shree Jaswalssjaswal.com/wp-content/uploads/2018/09/SPM_Chp4_complete.pdfIntroduction developing the project schedule Scheduling Charts logic diagrams and network (AOA,AON)](https://reader033.fdocuments.in/reader033/viewer/2022060315/5f0bea077e708231d432d740/html5/thumbnails/70.jpg)
The larger V, the less reliable Te, and the higher the likelihood that the activity will be completed much earlier or much later than Te.
More dispersed the distribution and greater the chance that the actual time will be significantly different from the expected time Te
Chapter 4 Slides by: Ms. Shree Jaswal 70
![Page 71: Slides by: Ms. Shree Jaswalssjaswal.com/wp-content/uploads/2018/09/SPM_Chp4_complete.pdfIntroduction developing the project schedule Scheduling Charts logic diagrams and network (AOA,AON)](https://reader033.fdocuments.in/reader033/viewer/2022060315/5f0bea077e708231d432d740/html5/thumbnails/71.jpg)
Probability of finishing by a target completion
date
The expected duration of a project - Te, is the
sum of expected activity times along the
critical path.
Te = ∑ te
The variation in the project duration
distribution is computed as the sum of the
variances of the activity durations along the
critical path
Vp = ∑ V
Chapter 4 Slides by: Ms. Shree Jaswal 71
![Page 72: Slides by: Ms. Shree Jaswalssjaswal.com/wp-content/uploads/2018/09/SPM_Chp4_complete.pdfIntroduction developing the project schedule Scheduling Charts logic diagrams and network (AOA,AON)](https://reader033.fdocuments.in/reader033/viewer/2022060315/5f0bea077e708231d432d740/html5/thumbnails/72.jpg)
Chapter 4 Slides by: Ms. Shree Jaswal 72
![Page 73: Slides by: Ms. Shree Jaswalssjaswal.com/wp-content/uploads/2018/09/SPM_Chp4_complete.pdfIntroduction developing the project schedule Scheduling Charts logic diagrams and network (AOA,AON)](https://reader033.fdocuments.in/reader033/viewer/2022060315/5f0bea077e708231d432d740/html5/thumbnails/73.jpg)
Now, although the project is estimated to be completed
within 29 weeks (Te=29) our Project Director would
like to know what is the probability that the project
might be completed within 27 weeks (i.e.Ts=27 or Due
Date or D=27).
For this calculation, we use the formula for calculating
Z, the number of standard deviations that D is away
from Te.
Z =(Ts-Te)/ √ Vp
Chapter 4 Slides by: Ms. Shree Jaswal 73
![Page 74: Slides by: Ms. Shree Jaswalssjaswal.com/wp-content/uploads/2018/09/SPM_Chp4_complete.pdfIntroduction developing the project schedule Scheduling Charts logic diagrams and network (AOA,AON)](https://reader033.fdocuments.in/reader033/viewer/2022060315/5f0bea077e708231d432d740/html5/thumbnails/74.jpg)
Thus, Z=(27-29)/ √ 6 = -0.82
After referring to table for Z values for normal
distribution,
X1=-0.8,X2=-1.0,Y1=0.212,Y2=0.159
Now, using the formula,
Y=Y1+[(Y1-Y2)/X1-X2)]*(X-X1), we get
Y=0.2067=0.21(approx)
Therefore, probability is 21% to finish project
in 27 days
Chapter 4 Slides by: Ms. Shree Jaswal 74
![Page 75: Slides by: Ms. Shree Jaswalssjaswal.com/wp-content/uploads/2018/09/SPM_Chp4_complete.pdfIntroduction developing the project schedule Scheduling Charts logic diagrams and network (AOA,AON)](https://reader033.fdocuments.in/reader033/viewer/2022060315/5f0bea077e708231d432d740/html5/thumbnails/75.jpg)
Chapter 4 Slides by: Ms. Shree Jaswal 75
![Page 76: Slides by: Ms. Shree Jaswalssjaswal.com/wp-content/uploads/2018/09/SPM_Chp4_complete.pdfIntroduction developing the project schedule Scheduling Charts logic diagrams and network (AOA,AON)](https://reader033.fdocuments.in/reader033/viewer/2022060315/5f0bea077e708231d432d740/html5/thumbnails/76.jpg)
For above example to find out what is the date
when 95% of project will have been
completed…..
Again using the table and interpolating,
probability of 0.95 has Z value=1.645
Thus,1.645=(Ts-29)/ √ 6
So, Ts=33.03 days (highly likely)
Chapter 4 Slides by: Ms. Shree Jaswal 76
![Page 77: Slides by: Ms. Shree Jaswalssjaswal.com/wp-content/uploads/2018/09/SPM_Chp4_complete.pdfIntroduction developing the project schedule Scheduling Charts logic diagrams and network (AOA,AON)](https://reader033.fdocuments.in/reader033/viewer/2022060315/5f0bea077e708231d432d740/html5/thumbnails/77.jpg)
Putting too much emphasis on the critical
path can lead managers to ignore other paths
that are near-critical or have large variances,
and which themselves could easily become
critical
Chapter 4 Slides by: Ms. Shree Jaswal 77
![Page 78: Slides by: Ms. Shree Jaswalssjaswal.com/wp-content/uploads/2018/09/SPM_Chp4_complete.pdfIntroduction developing the project schedule Scheduling Charts logic diagrams and network (AOA,AON)](https://reader033.fdocuments.in/reader033/viewer/2022060315/5f0bea077e708231d432d740/html5/thumbnails/78.jpg)
Monte Carlo simulation is a procedure that takes into account the effects of near critical paths becoming critical.
Chapter 4 Slides by: Ms. Shree Jaswal 78
![Page 79: Slides by: Ms. Shree Jaswalssjaswal.com/wp-content/uploads/2018/09/SPM_Chp4_complete.pdfIntroduction developing the project schedule Scheduling Charts logic diagrams and network (AOA,AON)](https://reader033.fdocuments.in/reader033/viewer/2022060315/5f0bea077e708231d432d740/html5/thumbnails/79.jpg)
Need to have considerable amount of
historical data to make time estimates
PERT gives overly optimistic results.
Beta distribution gives large errors in
estimating Te.
Most of the errors in Te come from faulty
time estimates not Beta distribution.
Chapter 4 Slides by: Ms. Shree Jaswal 79
![Page 80: Slides by: Ms. Shree Jaswalssjaswal.com/wp-content/uploads/2018/09/SPM_Chp4_complete.pdfIntroduction developing the project schedule Scheduling Charts logic diagrams and network (AOA,AON)](https://reader033.fdocuments.in/reader033/viewer/2022060315/5f0bea077e708231d432d740/html5/thumbnails/80.jpg)
Although PERT and CPM employ networks and use the concept of critical path, the methods have two points of divergence.
CPM is a deterministic approach.CPM includes a mathematical procedure
for estimating the trade-off between project duration and cost.
CPM features analysis of reallocation of resources from one job to another to achieve the greatest reduction in project duration for the least cost.
Chapter 4 Slides by: Ms. Shree Jaswal 80
![Page 81: Slides by: Ms. Shree Jaswalssjaswal.com/wp-content/uploads/2018/09/SPM_Chp4_complete.pdfIntroduction developing the project schedule Scheduling Charts logic diagrams and network (AOA,AON)](https://reader033.fdocuments.in/reader033/viewer/2022060315/5f0bea077e708231d432d740/html5/thumbnails/81.jpg)
Chapter 4 Slides by: Ms. Shree Jaswal 81
BASIS FOR
COMPARISONPERT CPM
Meaning PERT is a project
management
technique, used to
manage uncertain
activities of a
project.
CPM is a statistical
technique of project
management that
manages well defined
activities of a
project.
What is it? A technique of
planning and control
of time.
A method to control
cost and time.
Orientation Event-oriented Activity-oriented
Evolution Evolved as Research
& Development
project
Evolved as
Construction project
![Page 82: Slides by: Ms. Shree Jaswalssjaswal.com/wp-content/uploads/2018/09/SPM_Chp4_complete.pdfIntroduction developing the project schedule Scheduling Charts logic diagrams and network (AOA,AON)](https://reader033.fdocuments.in/reader033/viewer/2022060315/5f0bea077e708231d432d740/html5/thumbnails/82.jpg)
Chapter 4 Slides by: Ms. Shree Jaswal 82
BASIS FOR
COMPARISONPERT CPM
Model Probabilistic Model Deterministic Model
Focuses on Time Time-cost trade-off
Estimates Three time estimates One time estimate
Appropriate for High precision time
estimate
Reasonable time
estimate
Critical and Non-
critical activities
No differentiation Differentiated
Suitable for Research and
Development Project
Non-research
projects like civil
construction, ship
building etc.
Crashing concept Not Applicable Applicable
![Page 83: Slides by: Ms. Shree Jaswalssjaswal.com/wp-content/uploads/2018/09/SPM_Chp4_complete.pdfIntroduction developing the project schedule Scheduling Charts logic diagrams and network (AOA,AON)](https://reader033.fdocuments.in/reader033/viewer/2022060315/5f0bea077e708231d432d740/html5/thumbnails/83.jpg)
Chapter 4 Slides by: Ms. Shree Jaswal 83
![Page 84: Slides by: Ms. Shree Jaswalssjaswal.com/wp-content/uploads/2018/09/SPM_Chp4_complete.pdfIntroduction developing the project schedule Scheduling Charts logic diagrams and network (AOA,AON)](https://reader033.fdocuments.in/reader033/viewer/2022060315/5f0bea077e708231d432d740/html5/thumbnails/84.jpg)
Tn- how long the activity will take under normal work conditions.
Also associated with normal pace is the normal cost, Cn, the price of doing the activity in normal time.
Usually normal pace is assumed to be the most efficient and thus least costly pace.
When maximum effort is applied, the duration so that activity can be completed in the shortest possible time, the activity is said to be crashed.
Chapter 4 Slides by: Ms. Shree Jaswal 84
![Page 85: Slides by: Ms. Shree Jaswalssjaswal.com/wp-content/uploads/2018/09/SPM_Chp4_complete.pdfIntroduction developing the project schedule Scheduling Charts logic diagrams and network (AOA,AON)](https://reader033.fdocuments.in/reader033/viewer/2022060315/5f0bea077e708231d432d740/html5/thumbnails/85.jpg)
In our example, cost slope for the activity
is $3K per week.
Thus, for each week the activity duration
is reduced( sped up) from the normal
time of 8 weeks, the additional cost will
be $3K.
Completing the project 1 week earlier i.e.
7 weeks, would increase the project cost
by ($9K +$3K=$12K)
Chapter 4 Slides by: Ms. Shree Jaswal 85
![Page 86: Slides by: Ms. Shree Jaswalssjaswal.com/wp-content/uploads/2018/09/SPM_Chp4_complete.pdfIntroduction developing the project schedule Scheduling Charts logic diagrams and network (AOA,AON)](https://reader033.fdocuments.in/reader033/viewer/2022060315/5f0bea077e708231d432d740/html5/thumbnails/86.jpg)
Basic rules:
Reducing the duration of an activity,
increases the cost by the cost-slope.
Increasing the cost of activity, reduces the
duration of the activity
Reduce the duration of activity with min
value of cost slope.
Chapter 4 Slides by: Ms. Shree Jaswal 86
![Page 87: Slides by: Ms. Shree Jaswalssjaswal.com/wp-content/uploads/2018/09/SPM_Chp4_complete.pdfIntroduction developing the project schedule Scheduling Charts logic diagrams and network (AOA,AON)](https://reader033.fdocuments.in/reader033/viewer/2022060315/5f0bea077e708231d432d740/html5/thumbnails/87.jpg)
Activity Normal Crash Cost Slope
Tn Cn Tc Cc_____________
A 9 10 6 16 2
B 8 9 5 18 3
C 5 7 4 8 1
D 8 9 6 19 5
E 7 7 3 15 2
F 5 5 5 5 _
G 5 8 2 23 5
$55K $104K
Chapter 4 Slides by: Ms. Shree Jaswal 87
![Page 88: Slides by: Ms. Shree Jaswalssjaswal.com/wp-content/uploads/2018/09/SPM_Chp4_complete.pdfIntroduction developing the project schedule Scheduling Charts logic diagrams and network (AOA,AON)](https://reader033.fdocuments.in/reader033/viewer/2022060315/5f0bea077e708231d432d740/html5/thumbnails/88.jpg)
1
2
6
3
5
4
Chapter 4 Slides by: Ms. Shree Jaswal 88
![Page 89: Slides by: Ms. Shree Jaswalssjaswal.com/wp-content/uploads/2018/09/SPM_Chp4_complete.pdfIntroduction developing the project schedule Scheduling Charts logic diagrams and network (AOA,AON)](https://reader033.fdocuments.in/reader033/viewer/2022060315/5f0bea077e708231d432d740/html5/thumbnails/89.jpg)
Activity Normal Crush Cost Slope
Tn Cn Tc Cc_____________
A 9 10 6 16 2
B 8 9 5 18 3
C 5 7 4 8 1
D 8 9 6 19 5
E 7 7 3 15 2
F 5 5 5 5 _
G 5 8 2 23 5
$55K $104K
Chapter 4 Slides by: Ms. Shree Jaswal 89
![Page 90: Slides by: Ms. Shree Jaswalssjaswal.com/wp-content/uploads/2018/09/SPM_Chp4_complete.pdfIntroduction developing the project schedule Scheduling Charts logic diagrams and network (AOA,AON)](https://reader033.fdocuments.in/reader033/viewer/2022060315/5f0bea077e708231d432d740/html5/thumbnails/90.jpg)
1
2
6
3
5
4
Chapter 4 Slides by: Ms. Shree Jaswal 90
![Page 91: Slides by: Ms. Shree Jaswalssjaswal.com/wp-content/uploads/2018/09/SPM_Chp4_complete.pdfIntroduction developing the project schedule Scheduling Charts logic diagrams and network (AOA,AON)](https://reader033.fdocuments.in/reader033/viewer/2022060315/5f0bea077e708231d432d740/html5/thumbnails/91.jpg)
1
2
6
3
5
4
Chapter 4 Slides by: Ms. Shree Jaswal 91
![Page 92: Slides by: Ms. Shree Jaswalssjaswal.com/wp-content/uploads/2018/09/SPM_Chp4_complete.pdfIntroduction developing the project schedule Scheduling Charts logic diagrams and network (AOA,AON)](https://reader033.fdocuments.in/reader033/viewer/2022060315/5f0bea077e708231d432d740/html5/thumbnails/92.jpg)
Chapter 4 Slides by: Ms. Shree Jaswal 92
![Page 93: Slides by: Ms. Shree Jaswalssjaswal.com/wp-content/uploads/2018/09/SPM_Chp4_complete.pdfIntroduction developing the project schedule Scheduling Charts logic diagrams and network (AOA,AON)](https://reader033.fdocuments.in/reader033/viewer/2022060315/5f0bea077e708231d432d740/html5/thumbnails/93.jpg)
Chapter 4 Slides by: Ms. Shree Jaswal 93
![Page 94: Slides by: Ms. Shree Jaswalssjaswal.com/wp-content/uploads/2018/09/SPM_Chp4_complete.pdfIntroduction developing the project schedule Scheduling Charts logic diagrams and network (AOA,AON)](https://reader033.fdocuments.in/reader033/viewer/2022060315/5f0bea077e708231d432d740/html5/thumbnails/94.jpg)
Observe that activities are plotted using values of Tc
![Page 95: Slides by: Ms. Shree Jaswalssjaswal.com/wp-content/uploads/2018/09/SPM_Chp4_complete.pdfIntroduction developing the project schedule Scheduling Charts logic diagrams and network (AOA,AON)](https://reader033.fdocuments.in/reader033/viewer/2022060315/5f0bea077e708231d432d740/html5/thumbnails/95.jpg)
CCPM was introduced in 1997 by Eliyahu
Goldratt.
CCPM is based on the idea that people often
inflate or add cushioning to their time
estimate in order to give themselves a form
of “safety” to compensate for uncertainty.
There are 3 basic reasons for inflating:
If your work is dependent upon the work of
someone else
Because of pessimism arising from a previous
experience where things did not go as planned
To guard against the cut which the project
sponsor or customer may put
Chapter 4 Slides by: Ms. Shree Jaswal 95
![Page 96: Slides by: Ms. Shree Jaswalssjaswal.com/wp-content/uploads/2018/09/SPM_Chp4_complete.pdfIntroduction developing the project schedule Scheduling Charts logic diagrams and network (AOA,AON)](https://reader033.fdocuments.in/reader033/viewer/2022060315/5f0bea077e708231d432d740/html5/thumbnails/96.jpg)
Added safety does not ensure timely
completion of projects due to following
reasons:
1. Student’s syndrome
2. Parkinson’s law
3. Resource contention
Chapter 4 Slides by: Ms. Shree Jaswal 96
![Page 97: Slides by: Ms. Shree Jaswalssjaswal.com/wp-content/uploads/2018/09/SPM_Chp4_complete.pdfIntroduction developing the project schedule Scheduling Charts logic diagrams and network (AOA,AON)](https://reader033.fdocuments.in/reader033/viewer/2022060315/5f0bea077e708231d432d740/html5/thumbnails/97.jpg)
CCPM follows a completely different
assumption: instead of adding safety to each
task, put that safety in the form of buffers
where needed the most.
This would be in the form of feeding buffers,
resource buffers & a buffer at the end of the
project
CCPM begins by asking each person or team
assigned to a task to provide an estimate that
would have a 50 % chance of being completed
Critical chain is different from the critical path
in that it also takes into account resource
contention.Chapter 4 Slides by: Ms. Shree Jaswal 97
![Page 98: Slides by: Ms. Shree Jaswalssjaswal.com/wp-content/uploads/2018/09/SPM_Chp4_complete.pdfIntroduction developing the project schedule Scheduling Charts logic diagrams and network (AOA,AON)](https://reader033.fdocuments.in/reader033/viewer/2022060315/5f0bea077e708231d432d740/html5/thumbnails/98.jpg)
Chapter 4 Slides by: Ms. Shree Jaswal 98
A,10 B,10 C,10 E,10
D,10
A,5 B,5 C,5 E,5
D,5
10
2.5
Buffer
Feeder buffer
Project schedule with safety in each task
Critical chain project schedule
Critical Path: A-B-C-E, duration 40
days
![Page 99: Slides by: Ms. Shree Jaswalssjaswal.com/wp-content/uploads/2018/09/SPM_Chp4_complete.pdfIntroduction developing the project schedule Scheduling Charts logic diagrams and network (AOA,AON)](https://reader033.fdocuments.in/reader033/viewer/2022060315/5f0bea077e708231d432d740/html5/thumbnails/99.jpg)
Chapter 4 Slides by: Ms. Shree
Jaswal 99
![Page 100: Slides by: Ms. Shree Jaswalssjaswal.com/wp-content/uploads/2018/09/SPM_Chp4_complete.pdfIntroduction developing the project schedule Scheduling Charts logic diagrams and network (AOA,AON)](https://reader033.fdocuments.in/reader033/viewer/2022060315/5f0bea077e708231d432d740/html5/thumbnails/100.jpg)
Chapter 4 Slides by: Ms. Shree Jaswal 100
![Page 101: Slides by: Ms. Shree Jaswalssjaswal.com/wp-content/uploads/2018/09/SPM_Chp4_complete.pdfIntroduction developing the project schedule Scheduling Charts logic diagrams and network (AOA,AON)](https://reader033.fdocuments.in/reader033/viewer/2022060315/5f0bea077e708231d432d740/html5/thumbnails/101.jpg)
101Chapter 4 Slides by: Ms. Shree Jaswal
![Page 102: Slides by: Ms. Shree Jaswalssjaswal.com/wp-content/uploads/2018/09/SPM_Chp4_complete.pdfIntroduction developing the project schedule Scheduling Charts logic diagrams and network (AOA,AON)](https://reader033.fdocuments.in/reader033/viewer/2022060315/5f0bea077e708231d432d740/html5/thumbnails/102.jpg)
In earlier slides, it was assumed that the
resources are available (may be at a cost) in
abundance
In reality, some resources may be scarce or
shared
Resource loading refers to the amount of
resource required to conduct a project
Note: resource loading keeps changing
throughout a project because the amount of
resources needed for individual activities differs
102Chapter 4 Slides by: Ms. Shree Jaswal
![Page 103: Slides by: Ms. Shree Jaswalssjaswal.com/wp-content/uploads/2018/09/SPM_Chp4_complete.pdfIntroduction developing the project schedule Scheduling Charts logic diagrams and network (AOA,AON)](https://reader033.fdocuments.in/reader033/viewer/2022060315/5f0bea077e708231d432d740/html5/thumbnails/103.jpg)
Chapter 4 Slides by: Ms. Shree Jaswal 103
![Page 104: Slides by: Ms. Shree Jaswalssjaswal.com/wp-content/uploads/2018/09/SPM_Chp4_complete.pdfIntroduction developing the project schedule Scheduling Charts logic diagrams and network (AOA,AON)](https://reader033.fdocuments.in/reader033/viewer/2022060315/5f0bea077e708231d432d740/html5/thumbnails/104.jpg)
Resource leveling refers to scheduling activities in a
manner such that the resource loading is somewhat
“balanced” (or “smoothed”)
SMOOTHING: “flatten” as much as possible
Smoothed: Manpower
104Chapter 4 Slides by: Ms. Shree Jaswal
![Page 105: Slides by: Ms. Shree Jaswalssjaswal.com/wp-content/uploads/2018/09/SPM_Chp4_complete.pdfIntroduction developing the project schedule Scheduling Charts logic diagrams and network (AOA,AON)](https://reader033.fdocuments.in/reader033/viewer/2022060315/5f0bea077e708231d432d740/html5/thumbnails/105.jpg)
Equipment Requirement(!Erratic!)
105Chapter 4 Slides by: Ms. Shree Jaswal
![Page 106: Slides by: Ms. Shree Jaswalssjaswal.com/wp-content/uploads/2018/09/SPM_Chp4_complete.pdfIntroduction developing the project schedule Scheduling Charts logic diagrams and network (AOA,AON)](https://reader033.fdocuments.in/reader033/viewer/2022060315/5f0bea077e708231d432d740/html5/thumbnails/106.jpg)
LEVELING: flatten with reference to available resource
Leveled: Manpower
106Chapter 4 Slides by: Ms. Shree Jaswal
![Page 107: Slides by: Ms. Shree Jaswalssjaswal.com/wp-content/uploads/2018/09/SPM_Chp4_complete.pdfIntroduction developing the project schedule Scheduling Charts logic diagrams and network (AOA,AON)](https://reader033.fdocuments.in/reader033/viewer/2022060315/5f0bea077e708231d432d740/html5/thumbnails/107.jpg)
Activities must be scheduled so that the allocation of a particular resource to project activities does not exceed a specified maximum
Attention is given to maximum availability of resource
Most project management scheduling software use heuristics (procedure based upon a simple rule) for making the decisions
The heuristic rule for determining the scheduling priority are:
107Chapter 4 Slides by: Ms. Shree Jaswal
![Page 108: Slides by: Ms. Shree Jaswalssjaswal.com/wp-content/uploads/2018/09/SPM_Chp4_complete.pdfIntroduction developing the project schedule Scheduling Charts logic diagrams and network (AOA,AON)](https://reader033.fdocuments.in/reader033/viewer/2022060315/5f0bea077e708231d432d740/html5/thumbnails/108.jpg)
A
E
B
C
D
F
5
5
5
5
10
10
Chapter 4 Slides by: Ms. Shree Jaswal 108
The critical path length is 9 weeks and the
constrained-resource level is of 10 workers
![Page 109: Slides by: Ms. Shree Jaswalssjaswal.com/wp-content/uploads/2018/09/SPM_Chp4_complete.pdfIntroduction developing the project schedule Scheduling Charts logic diagrams and network (AOA,AON)](https://reader033.fdocuments.in/reader033/viewer/2022060315/5f0bea077e708231d432d740/html5/thumbnails/109.jpg)
Chapter 4 Slides by: Ms. Shree Jaswal 109
a. As soon as possible: activities that can be started sooner are
given priority over those that must be started later
10
5
As Soon As Possible
A
B
C D
F
E
11
![Page 110: Slides by: Ms. Shree Jaswalssjaswal.com/wp-content/uploads/2018/09/SPM_Chp4_complete.pdfIntroduction developing the project schedule Scheduling Charts logic diagrams and network (AOA,AON)](https://reader033.fdocuments.in/reader033/viewer/2022060315/5f0bea077e708231d432d740/html5/thumbnails/110.jpg)
b. As late as possible: activities that can be finished
later are given lower priority than those that must
be finished earlier
10
5
As Late As Possible
A
B
CD
F
E
110Chapter 4 Slides by: Ms. Shree Jaswal
10
![Page 111: Slides by: Ms. Shree Jaswalssjaswal.com/wp-content/uploads/2018/09/SPM_Chp4_complete.pdfIntroduction developing the project schedule Scheduling Charts logic diagrams and network (AOA,AON)](https://reader033.fdocuments.in/reader033/viewer/2022060315/5f0bea077e708231d432d740/html5/thumbnails/111.jpg)
c. Most resources : activities requiring more resources
are given priority over those requiring fewer
resources
10
5
Most Resources
A
B
C D
F
E
111Chapter 4 Slides by: Ms. Shree Jaswal
11
![Page 112: Slides by: Ms. Shree Jaswalssjaswal.com/wp-content/uploads/2018/09/SPM_Chp4_complete.pdfIntroduction developing the project schedule Scheduling Charts logic diagrams and network (AOA,AON)](https://reader033.fdocuments.in/reader033/viewer/2022060315/5f0bea077e708231d432d740/html5/thumbnails/112.jpg)
d. Shortest Task Time: activities of shorter duration
are given priority over those of longer duration
10
5
Shortest Task First
A
B
CD
F
E
112Chapter 4 Slides by: Ms. Shree Jaswal
11
![Page 113: Slides by: Ms. Shree Jaswalssjaswal.com/wp-content/uploads/2018/09/SPM_Chp4_complete.pdfIntroduction developing the project schedule Scheduling Charts logic diagrams and network (AOA,AON)](https://reader033.fdocuments.in/reader033/viewer/2022060315/5f0bea077e708231d432d740/html5/thumbnails/113.jpg)
e. Least Slack: activities with less slack time are given
priority over those with more slack time (critical
path activities are given highest priority)
10
5
Least Slack time
A
B
C D
F
E
113Chapter 4 Slides by: Ms. Shree Jaswal
11
![Page 114: Slides by: Ms. Shree Jaswalssjaswal.com/wp-content/uploads/2018/09/SPM_Chp4_complete.pdfIntroduction developing the project schedule Scheduling Charts logic diagrams and network (AOA,AON)](https://reader033.fdocuments.in/reader033/viewer/2022060315/5f0bea077e708231d432d740/html5/thumbnails/114.jpg)
• All these rules are subordinate to precedence
requirements, which means whatever the rule, the
resulting schedule will not violate the necessary
predecessor-successor relationship.
• Other ways to account for resource constraints in project
scheduling include:
• Reduce the level of resources per activity
• Split activities
• Alter the network: use PDM, convert FS to SS
relationships
114Chapter 4 Slides by: Ms. Shree Jaswal