Slide 1 Item #6 Watershed Modeling at SFEI John J. Oram, Lester J. McKee, Mikolaj Lewicki SPLWG...

6
Slide 1 Item #6 Watershed Modeling at SFEI John J. Oram, Lester J. McKee, Mikolaj Lewicki SPLWG December 2007

Transcript of Slide 1 Item #6 Watershed Modeling at SFEI John J. Oram, Lester J. McKee, Mikolaj Lewicki SPLWG...

Page 1: Slide 1 Item #6 Watershed Modeling at SFEI John J. Oram, Lester J. McKee, Mikolaj Lewicki SPLWG December 2007.

Slide 1Item #6

Watershed Modeling at SFEI

John J. Oram, Lester J. McKee, Mikolaj LewickiSPLWG December 2007

Page 2: Slide 1 Item #6 Watershed Modeling at SFEI John J. Oram, Lester J. McKee, Mikolaj Lewicki SPLWG December 2007.

Slide 2Item #6

Objectives

• Improve understanding of monitored watersheds

• Determine sediment and contaminant loads from unmonitored watersheds

Page 3: Slide 1 Item #6 Watershed Modeling at SFEI John J. Oram, Lester J. McKee, Mikolaj Lewicki SPLWG December 2007.

Slide 3Item #6

Other Studies

• Bay Area Hydrologic Model (BAHM)– SCVURPPP, ACCWP, SMCWPPP– Model Used: HSPF– Purpose: Stormwater management

• Brake Pad Partnership (BPP)– Gov., Manufacturers, Enviros, stormwater

mngers– Model Used: HSPF– Purpose: Impact of brake pad Cu on South

San Francisco Bay

Page 4: Slide 1 Item #6 Watershed Modeling at SFEI John J. Oram, Lester J. McKee, Mikolaj Lewicki SPLWG December 2007.

Slide 4Item #6

Other Studies (continued)

• BAHM and BPP are where we want to be:– multi-watershed models– Water, sediment, contaminant loads

• However, we want to walk … not run.– Develop single watershed models where we

monitor sediments and contaminants– Incrementally add watersheds as we gain

knowledge

Page 5: Slide 1 Item #6 Watershed Modeling at SFEI John J. Oram, Lester J. McKee, Mikolaj Lewicki SPLWG December 2007.

Slide 5Item #6

Project #1 : Guadalupe River

• $75k funding for 2008

• Objectives:– Develop HSPF model for

1) Water

2) Sediment

3) Hg and PCBs

– Estimate current loads– Determine proportional flow regime– Estimate long-term avg loads

Page 6: Slide 1 Item #6 Watershed Modeling at SFEI John J. Oram, Lester J. McKee, Mikolaj Lewicki SPLWG December 2007.

Slide 6Item #6

Project #1 : Guadalupe River

• Potential Challenges– Reservoirs– Plumbing (e.g., storm drains)– Stream x-sections– Others …

• Would like to leverage SCCWRP– Learn Drew Ackerman’s HSPF secrets– Why use SWMM for BMPs?