How to make use of the WAgriCo project?- Prospects of implementation
Lothar Nolte
E-mail: [email protected]
Slide 2
Key Messages of WAgriCo
• Define target areas for measures.• Define environmental objectives as
emission reduction requirements.• Evaluate applicable measures with regard to cost-efficiency • Offer simple, flexible and voluntary measures and
integrate the measures in assistance programmes.• Use synergies in programme planning (multilateral approach).• Conduct a systematic impact monitoring.• Use competent advisory services (broker, mediator).• Involve the farming community in POM-development.
Slide 3
Why to implement supplementary measures?
• Diffuse N-emissions major problem • Nitrates Directive
50 mg/l compulsory state-wide action programme• WFD
+ time target good chemical status (GCS)
Supplementary measures (tailored to local conditions) accelerate GCS-achievement!
Slide 4
Thank you very much for your attention!
Slide 5
Target areas
Spatial units (compartements of groundwater bodies) with significant
• nitrate inputs (exceeding 50 mg/l) and• agricultural emissions and • limited denitrification capacity of the soil.
Slide 6
Target areas for supplementary measures and required reduction of N-emissions
Annual N-reduction requirement (kg N / ha)
Slide 7
Determination of required N-load reduction (emissions)
1. Delineation of off-target groundwater bodies (input-based)
2. Calculation of actual N-emission
3. Calculation of tolerable N-emission
4. Actual – tolerable N-emissions = N-reduction requirement
Slide 8
Cost-efficiency assessment
Step 1: Assessment of effectiveness • Literature research - published literature,1980-2000, German
- “grey literature” (interrogation)
- evaluation results (RDP)• Interviews (researchers, authorities, consultants)
Step 2: Cost assessment - definition of measures
(based on step 1) - compensation payments and effects
- combination of measures
Step 3: Statistical analyses - 8.400 soil samples (Nmin autumn)
- book-keeping records
Slide 9
Cost-effectiveness in €/kg reduced N-emission
M1 – M5: Greening
M34 – M38: Manure Management
Org
anic
Far
min
g
Advisory
LU Alteration
Measures
€ / k
g
Slide 10
N-fertiliser use analysis - 29.560 book-keeping records
• Cash Crop
• Lifestock (Pigs, Paultry)
• Forage
Manure (FYM, slurry)-N kg/ha
Com
mer
cial
N
app
lied
kg/h
a
Osterburg et. al 2007
Slide 11
Art. 21 EAFRD farm management
systems
(CC-advisory),
vocational training
Axis 1
Art. 57 EAFRD natural heritage
conservation (catchment advisory,
pilots, land purchaise)
Axis 3
Art. 39 EAFRDagri-environmental
measures
Axis 2
Axis 4 Leader
Provisions of the Council Directive 1698/2005
Slide 12
Conversion of Arable Land to Grasland
Grassland Extensification (side-specífic)
Target-Oriented Grassland Extensification
Organic Farming
Organic Farming++
Mulching, Low Tillage
Environment-Friendly Slurry Application
Set-Aside Land Greening
Flower Plant Strips
Catch Crops or Undersown Crops
Title Appliance
restricted to
priority areasAnimal Husbandry
Grasland
Arable Land
Organic Farming
Coop.Program Nature Conservation (various measures)
WFD
WFD
WFD
WFD
WFD
Agro-Environmental measures programmed in PROFIL
Slide 13
The rural development programme PROFIL
Budget (NI+HB) incl. national and private financing total 2.373 Mio. EUR
synergy potential - catchment advisory, land purchaise, pilots +++ - agri-environmental measures +++ - farm management systems + - vocational training ++ - afforestation + - farm modernisation + - local development strategies + Leader total +
Slide 14
specific agri-environmental measures for nature
conservation
specific agri-environmental measures for groundwater
protection
non-specific agri-environmental measures,
non-productive investments (land purchase, afforestationpublic relations
Utilisation of synergies by active management
vocational training
management systems
Slide 15
Stakeholder Participation
Discussion in three pilot areas within the WAgriCo-project using experiences from drinking water cooperations.
• Environmental Targets (required N-load reduction)
• Appropriate measures– Acceptance– Cost-Effectiveness– Potential area for implementation
For further information about WAgriCo (LIFE-Projekt): www.wagrico.de www.wagrico.org