Transcript of Sl. N. Name of ProjectAgencyEstimated Cost Latest Estimated Cost by Planning Commission Fund Release...
![Page 1: Sl. N. Name of ProjectAgencyEstimated Cost Latest Estimated Cost by Planning Commission Fund Release by GoI ExpenditurePhysical Status 12345678 ENERGY.](https://reader030.fdocuments.in/reader030/viewer/2022032722/56649cdd5503460f949a85b0/html5/thumbnails/1.jpg)
![Page 2: Sl. N. Name of ProjectAgencyEstimated Cost Latest Estimated Cost by Planning Commission Fund Release by GoI ExpenditurePhysical Status 12345678 ENERGY.](https://reader030.fdocuments.in/reader030/viewer/2022032722/56649cdd5503460f949a85b0/html5/thumbnails/2.jpg)
Sl. N.
Name of Project Agency Estimated Cost
Latest Estimated
Cost by Planning
Commission
Fund Release by GoI
Expenditure Physical Status
1 2 3 4 5 6 7 8
ENERGYENERGY1 Strengthening of Sub
Transmission System Phase-1
Power Grid Corporation of India
552.40 470.72 552.40 482.40 System taken over by BSEB
2 Strengthening of Sub Transmission System Phase-II, Part-1
Power Grid Corporation of India
629.22 1005.72 740.00 542.07 9 Grid and 213K.M. of Transmission Line is proposed to be constructed. In addition 8 Power Grid Proposed to be modernised & renovated. Power Grid has issued work order and work is under progress.
Strengthening of Sub Transmission System Phase-II, Part-1I
1511.00 1240.86 69.66 268.80 16 NOS. new GSS and associated lines augmentation of old grids work is under progress.
3 Renovation and Modernisation of Muzaffarpur and Barauni Thermal Power Station
BHEL Consultant NTPC
506.20 506.20 367.73 114.44 Restoration of unit of 6 of BTPS and unit 2 of MTPS has been completed. Revised cost for R&M of Barauni & MTPS is Rs. 1025.96 Crs. CEA, MOP cleared the revised cost. Planning Commission approval required. This excludes consultancy charges of NTPC of BTPS.
3198.82 1729.79 1407.71
Status Report of Projects undertaken Status Report of Projects undertaken under under
Special Plan (RSVY)Special Plan (RSVY)(Rs. In (Rs. In Crores)Crores)
![Page 3: Sl. N. Name of ProjectAgencyEstimated Cost Latest Estimated Cost by Planning Commission Fund Release by GoI ExpenditurePhysical Status 12345678 ENERGY.](https://reader030.fdocuments.in/reader030/viewer/2022032722/56649cdd5503460f949a85b0/html5/thumbnails/3.jpg)
Sl. N.
Name of Project
Agency Estimated Cost
Latest Estimated
Cost by Planning
Commission
Fund Release by GoI
Expenditure Physical Status
1 2 3 4 5 6 7 8
IRRIGATIONIRRIGATION4 Renovation of
Eastern Gandak Canal Project
Water Resources Development Department (GoB)
294.00 294.00 51.9800 3.15 Matter is pending in Hon'ble High Court.
294.00 51.98 3.15
MINOR IRRIGATIONMINOR IRRIGATION5 Milllion Shallow
Tubewell Programme
NABARD 633.78 1039.74 544.64 404.47(Reported Actual
Utilization 312.97 Cr.
As adviced by Planning Commission whole scheme is under revision.
ROADROAD6 Development of
State HighwayCPWD & IRCON 2917.69 3075.00 2114.35 1976.02 IRCON - 330.71 K.M.
CPWD - 1667.00 K.M.
WATER SHED DEVELOPMENTWATER SHED DEVELOPMENT7 Integrated Water
Shed Development Programme
NABARD 60.00 60.00 10.00 8.02 Work started in 8 Districts. So far 78 projects covering water shed area of 81723.77 ha against target of 80,000 ha has been sanctioned and grant of 801.40 lakh released.
HORTICULTURE DEVELOPMENTHORTICULTURE DEVELOPMENT8 Horticulture
DevelopmentNABARD 35.53 0.00 18.1809 3.58 This scheme has been merged with
National Horticulture Mission.
95.53 28.18 11.60
![Page 4: Sl. N. Name of ProjectAgencyEstimated Cost Latest Estimated Cost by Planning Commission Fund Release by GoI ExpenditurePhysical Status 12345678 ENERGY.](https://reader030.fdocuments.in/reader030/viewer/2022032722/56649cdd5503460f949a85b0/html5/thumbnails/4.jpg)
Sl. N.
Name of Project Agency Estimated Cost
Latest Estimated
Cost by Planning
Commission
Fund Release by GoI
Expenditure Physical Status
1 2 3 4 5 6 7 8
FORESTRYFORESTRY
9 Community based integrated forest management and conservation project
ICFRE, Dehradun & Forest Department Govt. of Bihar
51.00 51.04 41.30 34.72 MOU between ICFRE, Dehradun & Forest Department, Govt. of Bihar has been signed.
I Agriculture Forestry in Vashali District
ICFRE, Dehradun 18.94 12.87 9.12 No of Plants Supplied to Farmers 37.06 Lakhs
II Restoration of Degraded forest in Banka and Jamui Districts
Forest Department, Govt. of Bihar
32.06 28.44 25.60 Till dated 18172 ha has been treated forest for restoration against target of 28676 ha.
10 Rail-cum-Road Bridge
Railway Board 554.00 125.00 125.00 Fund is to be directly release to Railway Board.
11 Re organisation of Power Sector of Consultancy
BSEB 1.57 0.00
Total :- 7190.82 8297.28 4636.81 3962.67