Skyway Public Scoping Meeting Concepts Under Consideration ... · AIM FOR THE SKY DESIGN...
1
AIM FOR THE SKY DESIGN COMPETITION CONCEPTS UNDER CONSIDERATION Exit 6 Exit 5 Exit 4 Exit 3 1. Skyway 2.0 2. Skyway River Loop* 3. Olmsted Remixed 4. City of Lights* 5. Queen City Harbor* 6. Rust Belt Resurgence 7. Sky Scape 8. Highways to Parkways* 9. Olmsted Parkway 10. Sapphire Necklace* 11. REC 12. Making Sense 13. Vision for Skyway & NY5 14. Buffalo Up!* 15. Erie Green 16. Buffalo Skybeach* *Concept includes a proposed crossing over the City Ship Canal to reconnect South Michigan Ave. to Fuhrmann Blvd. Broadway Broadway William St. William St. Clinton St. Clinton St. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 Church St. Church St.
Transcript of Skyway Public Scoping Meeting Concepts Under Consideration ... · AIM FOR THE SKY DESIGN...
![Page 1: Skyway Public Scoping Meeting Concepts Under Consideration ... · AIM FOR THE SKY DESIGN COMPETITION CONCEPTS UNDER CONSIDERATION Exit 6 Exit 5 Exit 4 Exit 3 1. Skyway 2.0 2. Skyway](https://reader033.fdocuments.in/reader033/viewer/2022043018/5f3aeba074f61127e373cf49/html5/thumbnails/1.jpg)
AIM FOR THE SKY DESIGN COMPETITIONCONCEPTS UNDER CONSIDERATION
Exit 6
Exit 5
Exit 4
Exit 3
1. Skyway 2.0
2. Skyway River Loop*
3. Olmsted Remixed
4. City of Lights*
5. Queen City Harbor*
6. Rust Belt Resurgence
7. Sky Scape
8. Highways to Parkways*
9. Olmsted Parkway
10. Sapphire Necklace*
11. REC
12. Making Sense
13. Vision for Skyway & NY5
14. Bu�alo Up!*
15. Erie Green
16. Bu�alo Skybeach*
*Concept includes a proposedcrossing over the City Ship Canalto reconnect South Michigan Ave.to Fuhrmann Blvd.
BroadwayBroadway
William St.William St.
Clinton St.Clinton St.
1
23
4
5
6
7
89
10
11
12
13
14
15
16
Church St.Church St.