SkyPath latest proposal for the Northcote Point landing: August 2014
-
Upload
george-wood -
Category
Documents
-
view
225 -
download
0
Transcript of SkyPath latest proposal for the Northcote Point landing: August 2014
-
8/12/2019 SkyPath latest proposal for the Northcote Point landing: August 2014
1/10
-
8/12/2019 SkyPath latest proposal for the Northcote Point landing: August 2014
2/10
-
8/12/2019 SkyPath latest proposal for the Northcote Point landing: August 2014
3/10
-
8/12/2019 SkyPath latest proposal for the Northcote Point landing: August 2014
4/10
-
8/12/2019 SkyPath latest proposal for the Northcote Point landing: August 2014
5/10
SKYPATH -PHOTOMONTAGES 05SkyPath | 15.07.2014 43
Existing View
10 View of Northern Landing
-
8/12/2019 SkyPath latest proposal for the Northcote Point landing: August 2014
6/10
Existing View
09 View of Northern Landing
PHOTOMONTAGESSkyPath | 15.07.2014 42
-
8/12/2019 SkyPath latest proposal for the Northcote Point landing: August 2014
7/10
08 View of Northern Landing
Existing View
PHOTOMONTAGESSkyPath | 15.07.2014 41
-
8/12/2019 SkyPath latest proposal for the Northcote Point landing: August 2014
8/10
TIMBER HANDRAIL 900mmABOVE DECK LEVEL FIXED TOBRACKETS IN STEEL ARCHES
650mm DIA.CONCRETE
COLUMN - HEIGHTVARIES
SCULPTURAL FABRICAND STEEL
ARCHWAYS TO BECO-ORDINATED WITH
ARTIST AND PROJECT
ENGINEER
TOP OF ARCHWAYHEIGHT TO VARY + / -
250mm
COLUMN TO HAVEDECORATIVE
TRADITIONAL CARVINGTO ARTIST'S
SPECIFICATIONS
150mm THICKCONCRETE DECK
900
4500
CONCRETE CAPITAL
610 UB STEEL SUPPORTBEAMS
2350mm SQ x 450mmDEEP CONC. PAD
750mm DIA CONC PILES
VARIES
-2.7mM
IN
100
4200
4000
SCULPTURAL FABRIC AND STEEL
ARCHWAYS TO BE CO-ORDINATEDWITH ARTIST AND PROJECTENGINEER. ENSURE CYCLING /PEDESTRIAN SIGHT LINES ARECONSIDERED FOR SAFE STOPPING
DISTANCES
STEEL FRAMED MESHCLADDING REFER TO
LAYOUT PLAN FORLOCATIONS
TIMBER HANDRAIL 900mm ABOVEDECK LEVEL FIXED TO BRACKETS IN
STEEL ARCHES
650mm DIA. CONCRETE
COLUMN - HEIGHT VARIES /ALT. COMPOSITE DECK ONCOMPOSITE COLUMNS
COLUMN TO HAVEDECORATIVE
TRADITIONAL CARVINGTO ARTIST'S
SPECIFICATIONS
CONCRETE DECK
REFER TO PLAN FOR LOCATION WHERESTANDARD MESH TRANSITIONS INTO
SCULPTURAL MESH
COLUMNS AT 16.5mSPACINGS
CONCRETE CAPITAL
610 UB STEEL SUPPORTBEAMS
2350mm SQ x 450mmDEEP CONC. PAD
750mm DIA CONC PILES
STEEL MID SPAN SUPPORTFOR MESH CLADDING
DONOT SCALE.
CONTRACTOR MUST VERIFY ALLDIMENSIONS ON SITE
BEFORE COMMENCINGANY WORK
COPYRIGHT RESET URBAN DESIGN LTD
NORTH
JOB NUMBER DRAWING NUMBERREVISION
APPROVED BY DATE
DRAWN BY
DESIGNED BY SCALE
TITLE
PROJECT
SKYPATH
NORTHERN LANDINGSkypath Landing Detail Section1:50@ A3
2719 DD SE06
TEAM
AN
GFISSUEDFOR
CLIENT
ARESOURCE CONSENT30.06.14
AUCKLAND HARBOUR PATHWAY TRUST
RESET URBAN DESIGN LTD.
POBOX 106594AUCKLAND CITY
LEVEL1 SHED 20PRINCE'S WHARF
AUCKLAND NEW ZEALAND
t + 64 ( 0) 9 30 2 00 25
w w w w. r es e tu r ba n .c o .n z
No. Revision DateAppdChkBy
A RESOURCE CONSENT AN GF GF 30.06.14
KEY
-
8/12/2019 SkyPath latest proposal for the Northcote Point landing: August 2014
9/10
GL21.01
RL27.00
4000SKYPATH
AUCKLAND HARBOUR
BRIDGE CARRIAGEWAY
2350mm SQ x 450mm
DEEP CONC. PAD
HANDRAIL
SPEED TABLE FOR
PEDESTRIAN ACCESS
TO STOKES POINTSTOKES POINT RESERVE
650mm DIA.
CONCRETE
COLUMN
TURNSTILES AT SKYPATH ENTRY750mm DIA CONC PILES
3000
MAX.
13mM
AX.
VARIES
4000
SKYPATH
MESH SCREEN & STEEL
ARCHWAYS AT SKYPATH
LANDING
TOTARA SCREEN
VERTICAL ARTWORK
MOUNTED TO EXISTING
BRACED SUPPORTS
RL21.42
STEEL FRAMED MESH
CLADDING TO LOWER
SECTION OF SKYPATH
SCULPTURAL MESH
AND STEEL
ARCHWAYS TO UPPER
SECTION OF SKYPATH
DONOT SCALE.
CONTRACTOR MUST VERIFY ALLDIMENSIONS ON SITE
BEFORE COMMENCINGANY WORK
COPYRIGHT RESET URBAN DESIGN LTD
NORTH
JOB NUMBER DRAWING NUMBERREVISION
APPROVED BY DATE
DRAWN BY
DESIGNED BY SCALE
TITLE
PROJECT
SKYPATH
NORTHERN LANDINGCross Section C-C1:200 @ A3
2719 DD SE05
TEAM
AN
GFISSUEDFOR
CLIENT
BRESOURCE CONSENT30.06.14
AUCKLAND HARBOUR PATHWAY TRUST
RESET URBAN DESIGN LTD.
POBOX 106594AUCKLAND CITY
LEVEL1 SHED 20PRINCE'S WHARF
AUCKLAND NEW ZEALAND
t + 64 ( 0) 9 30 2 00 25w w w w. r es e tu r ba n .c o .n z
No. Revision DateAppdChkBy
A FOR IFORMATION AN GF GF 03.06.14
KEY
B RESOURCE CONSENT AN GF GF 30.06.14
CC
INDEX
-
8/12/2019 SkyPath latest proposal for the Northcote Point landing: August 2014
10/10
FL 21.01
AUCKLAND HARBOURBRIDGE CARRIAGEWAY
650mm DIA. CONCRETE
COLUMNS TO BE INSTALLED IN SAMEALIGNMENT AS EXISTING BRIDGE
SUPPORTS WHERE POSSIBLE
MESH SCREEN & STEELARCHWAYS AT SKYPATH LANDING
TOTARA SCREEN
SCULPTURAL MESH AND STEELARCHWAYS TO UPPER SECTION
OF SKYPATH
TURN STYLES AT ENTRANCE TO
SKYPATH
SKYPATH GATEWAY
FL 24.50
FL 31.44
FL 29.50
STEEL FRAMED MESH CLADDINGTO UPPER SECTION OF
SKYPATH
RAMPGRADEAT5.4%
COLUMN WITH EXTENDED
SUPPORT ARM
RAMPGRADEAT5%
DONOT SCALE.
CONTRACTOR MUST VERIFY ALLDIMENSIONS ON SITE
BEFORE COMMENCINGANY WORK
COPYRIGHT RESET URBAN DESIGN LTD
NORTH
JOB NU MBER DRAWING NUMBERREVISION
APPROVED BY DATE
DRAWN BY
DESIGNED BY SCALE
TITLE
PROJECT
SKYPATH
NORTHERN LANDINGLONG SECTION1:400 @ A3
2719 DD SE04
TEAM
AN
GFISSUEDFOR
CLIENT
BRESOURCE CONSENT30.06.14
AUCKLAND HARBOUR PATHWAY TRUST
RESET URBAN DESIGN LTD.
POBOX 106594AUCKLAND CITY
LEVEL1SHED 20PRINCE'S WHARFAUCKLAND NEW ZEALAND
t + 64 ( 0) 9 30 2 00 25
w w w w. r es e tu r ba n .c o .n z
No. Revision DateAppdChkBy
A FOR INFORMATION AN GF GF 09.06.14
KEY
B RESOURCE CONSENT AN GF GF 30.06.14