SKY-MIS
-
Upload
rajkumarbhoraniya -
Category
Documents
-
view
219 -
download
0
Transcript of SKY-MIS
-
8/7/2019 SKY-MIS
1/26
1
Presented to
Prof. HitendraLachhwani
MIS PROJECT
(SKY APPLIANCES)
GROUP NO. -4
1/29/2011TOLANI INSTITUTE OF MANAGMENT STUDIES
-
8/7/2019 SKY-MIS
2/26
GROUP NO. 4
1/29/2011TOLANI INSTITUTE OF M ANAGMENT STUDIES 2
Roll no. Student name
73 Chirag padaliya
78 Rajkumar patel
86 Chetan pujara
108 Milan Thacker
115 Pintu Vaishnav
117 Anil Vekriya
-
8/7/2019 SKY-MIS
3/26
CONSUMER DURABLE GOODS INDUSTRY
1/29/2011TOLANI INSTITUTE OF M ANAGMENT STUDIES 3
The Indian consumer durables industryhas witnessed a considerable change in the
past couple of years. Changing lifestyle,
higher disposable income coupled withgreater affordability and a surge inadvertising has been instrumental in bringingabout a sea change in the consumer behavior
pattern.
-
8/7/2019 SKY-MIS
4/26
DVD/VCD Player
Microwave Owen
Mixer & Grinder
Iron
Fan
Television
Washing Machine
Air Conditioner
Audio Equipments
Mobile Phones
1/29/2011TOLANI INSTITUTE OF M ANAGMENT STUDIES 4
CONSUMER DURABLE GOODS
-
8/7/2019 SKY-MIS
5/26
VIDEOCON GROUP
1/29/2011TOLANI INSTITUTE OF M ANAGMENT STUDIES 5
Today the group operates through 4 key sectors:
-
8/7/2019 SKY-MIS
6/26
SKY APPLINCES
1/29/2011TOLANI INSTITUTE OF M ANAGMENT STUDIES 6
Sky appliances ltd, a division of Videocongroup is situated near Varsamedi village
(Gandhidham).
It has 37 acres of land at one plant.
Sky TV unit has a buildup area of 14368 sq.
meter.
Sky CPT TV unit has a buildup area of 25160
sq. meters.
Sky has 40 employees on pay roll base and all
labors are on contract base.
-
8/7/2019 SKY-MIS
7/26
1/29/2011TOLANI INSTITUTE OF M ANAGMENT STUDIES 7
PRODUCTION PROCESS
-
8/7/2019 SKY-MIS
8/26
QUALITY MANAGEMENT PROJECTS
OF COMPANY
1/29/2011TOLANI INSTITUTE OF M ANAGMENT STUDIES 8
SRT
Systematic re-engineering team.
It defines a standard activity for each process station. It is very useful for new model approval in production plant.
USER GUIDE:
SKY also introduce pictures or graphics for easyunderstanding of customers, meanwhile it also reduce a
cost.
-
8/7/2019 SKY-MIS
9/26
CONT.
1/29/2011TOLANI INSTITUTE OF M ANAGMENT STUDIES 9
5R: Reduce, Refuse, Retime, Recycle & Reuse
5S: Sorting, Systematic arrangement,
Sweeping, System, Standardization
6 Tools: Operating system & Development,
Self-inspection, Maintain process control, ,Quality audit, Review meeting
-
8/7/2019 SKY-MIS
10/26
1/29/2011TOLANI INSTITUTE OF M ANAGMENT STUDIES 10
JIT: (Just in time) In this project SKY divide its supplier according to
distance.
Suppliers divide in diameter of 25, 50, 100, 250, 500, 1000km.
According to distance transportation time or lead time is
decided.
6 SIGMA:
SKY introducing SRT, 5S, 5R, 6 tools to achieve 6 sigma for
production.
CONT.
-
8/7/2019 SKY-MIS
11/26
SYSTEM APPLICATION PROCESS (SAP)
1/29/2011TOLANI INSTITUTE OF M ANAGMENT STUDIES 11
SAP is one of the ERP software which comes under thebest business practices and is flexible in nature. It is
globally present.
SAP is said to be integrated as it overcomes thelimitations of traditional hierarchical and function-oriented
structures by integrating financial accounting, sales and
material planning, production planning, warehouse
management, and human resources management into aworkflow of business events and processes across
departments and functional areas.
Transaction code from A to X is default & Y to Z are
customize.
-
8/7/2019 SKY-MIS
12/26
SAP MODULES
1/29/2011TOLANI INSTITUTE OF M ANAGMENT STUDIES 12
Sr. No. Modules Function of modules
1 FICO Accounting & Costing
2 SD Sales & Distribution
3 PP Production & Planning
4 EM Plant maintenance
5 QM Quality management
6 HCM Human capital management 7 MMINV Material management & Inventory
8 MMBUY Material management & purchase
-
8/7/2019 SKY-MIS
13/26
1/29/2011TOLANI INSTITUTE OF M ANAGMENT STUDIES
13
-
8/7/2019 SKY-MIS
14/26
SAP DISADVANTAGES:
1/29/2011TOLANI INSTITUTE OF M ANAGMENT STUDIES
Locked into relationship by contract andmanageability with vendor - a contract can hold acompany to the vendor until it expires and it can be
unprofitable to switch vendors if switching costs aretoo high
Inflexibility- vendor packages may not fit acompany's business model exactly and
customization can be very expensive Return on Investment may take too long to be
profitable
SAP ERP implementations have a risk of project14
-
8/7/2019 SKY-MIS
15/26
BARCODE SYSTEM
1/29/2011TOLANI INSTITUTE OF M ANAGMENT STUDIES 15
There is 18 digits barcode. EX: 76 03 10 27 01 323 00001
76- Plant location
03- Month of production
10- Year of production
27- Item number
01- Brand code
323- Color code of brand
00001- Serial number
-
8/7/2019 SKY-MIS
16/26
KNOWLEDGE MANAGEMENT SYSTEM
1/29/2011TOLANI INSTITUTE OF MANAGMENT STUDIES 16
Sky distributing knowledge of expert by e mail &telephone across the globe. One senior person from
R&D department visit plant every month.
Videocon create knowledge directories of employees
with special area of expertise & other member of organization.
R&D department send blue print (documented) for
assembly line of new model to SKY for production,so it is a structured knowledge (explicit knowledge).
Employees of SKY take advice of experts via e-mail
or telephone, so it is semi structured knowledge
(Tacit knowledge).
-
8/7/2019 SKY-MIS
17/26
1/29/2011TOLANI INSTITUTE OF M ANAGMENT STUDIES 17
Learning Management System
Sky has innovation school which basicallydeals with 6 days training for labor before
performing job.
GIS (Geographic information system)
Videocon group using data visualization tool to
locate a center which gives maximum tax
benefit, facilities for transportation & cheap
labors, so Videocon decided to establish a new
plant in KUTCH as SKY Appliances.
-
8/7/2019 SKY-MIS
18/26
ORDER FULFILLMENT PROCESS
1/29/2011TOLANI INSTITUTE OF M ANAGMENT STUDIES 18
-
8/7/2019 SKY-MIS
19/26
SUPPLY CHAIN MANAGEMENT
1/29/2011TOLANI INSTITUTE OF MANAGMENT STUDIES 19
It is a co-ordination or linkage between the
activities involved in buying the raw
material and making a TV & Washing
machine.
Bill of Material goes to Production Planning
and Control (PPC) department and the PPCdepartment generates information and
gives to production department
-
8/7/2019 SKY-MIS
20/26
1/29/2011TOLANI INSTITUTE OF M ANAGMENT STUDIES 20
INTERNET FOR SUPPLY CHAIN MGMT..
-
8/7/2019 SKY-MIS
21/26
1/29/2011TOLANI INSTITUTE OF M ANAGMENT STUDIES 21
PPC Department is an interface between production andmarketing department.
ITEM CODE of all the items is available in SAP. If new
item is entered then a new code is entered in SAP then
with that code a purchase request is opened in SAP.Purchase Requisition goes to the Head of the
Department (HOD), and if the HOD approves it then he
releases the Purchase Request.
Then a purchase order is released on the vendor. (PO
includes quantity required, rate, value, and delivery time
required). Then the goods are delivered by TRUCKS.
CONT
-
8/7/2019 SKY-MIS
22/26
1/29/2011TOLANI INSTITUTE OF M ANAGMENT STUDIES 22
A receipt is received in acknowledge with
reference to Purchase Order, an entry is done on
the Gate.
Stores department will receive the goods and
unload and physically count the no. of units
mentioned as per challan.
If the units are according to the challan then
Goods Received Note is given.
Then the lot goes to Quality Check. If the Quality
Check department approves then payment is
made by Accounts Department.
CONT.
-
8/7/2019 SKY-MIS
23/26
1/29/2011TOLANI INSTITUTE OF M ANAGMENT STUDIES 23
INDUSTRY VALUE CHAIN
-
8/7/2019 SKY-MIS
24/26
SUGGESTIONS
1/29/2011TOLANI INSTITUTE OF M ANAGMENT STUDIES 24
After doing cost benefit analysis, SKY
can use punch card system for labor
attendance to reduce daily clerical work for attendance of labor.
-
8/7/2019 SKY-MIS
25/26
VOTE OF THANKS
1/29/2011TOLANI INSTITUTE OF M ANAGMENT STUDIES 25
We are grateful to Mr. Rao (Plant overhead), Mr.Kultun & Mr. Nikhil (HR managers), Mr. Sumit
(Finance) Mr. Ravi (Purchase), Mr. Sanjay
(Engineering), Mr. Vishwjeet (IT), Mr. Vipul (Planning)
and all the employees of Sky Appliances Ltd. whoguided us and provided their valuable guidance and
cooperation during the course of the project.
We are also thankful to Mr. Hitendra Lachhwani who
helped us as and when required with his guidance.
-
8/7/2019 SKY-MIS
26/26
1/29/2011TOLANI INSTITUTE OF M ANAGMENT STUDIES 26