SKKU Lab - Meeting
description
Transcript of SKKU Lab - Meeting
1
SKKULab - MeetingSKKU LAB-MEETING, 28.APRIL.2014
DONG-HYUN KIM ON BEHALF OF THE CERN-904 TEAM
DEPARTMENT OF PHYSICS, SUNGKYUNKWAN UNIVERSITY, KOREA
2Content
1. Status of Korea-Chambers
2. Status of Data-analysis
31. Status of Korea-Chambers Complete constructed Korea-Chambers
8 – RE4/2 type, 2 – RE4/3 type
Finished all quality test at QC3
Visual test / Dark current test / Cosmic-ray test
42. Status of Data-Analysis Support to Higgs to WW Work
Event generation
Pythia simulation
Detector simulation
MC
Massive productionUsing the lxbatch
- Continuum- Signal
- Interference
Generate 400KEvents for each
data types
- 7 & 8 TeV- Width(GeV)
25 & 1
Continuum
Interference
Signal
52. Status of Data-Analysis
Representative Feynman graphs for the LO amplitude of
gg->WW-> l (Higgs signal (a) and continuum background (b)
contributions)
- S i g n a l( 8TeV, Hw25 )
SigHw25RoScMiCut
_140 _140_300
_300
Npt0 827317 202367 300234
Npt8 694672 195295 295487
Npt20 227385 155476 270017
SigHw25RoScMiCutOnPeak
_140 _140_300
_300
Npt0 82700 0 0
Npt8 69506 0 0
Npt20 22578 0 0SigHw25RoScMiCutSoulder
_140 _140_300
_300
Npt0 0 40248 0
Npt8 0 38842 0
Npt20 0 30766 0
SigHw25RoScMiCutTail
_140 _140_300
_300
Npt0 0 0 300234
Npt8 0 0 295487
Npt20 0 0 270017
- I n t e r f e r e n c e( 8TeV, Hw25 )
IntHw25RoScMiCut_140 _140_300 _300
Npt0 595946 536659 198426
Npt8 498645 512810 193675
Npt20 165861 379844 169408
IntHw25RoScMiCutOnPeak
_140 _140_300
_300
Npt0 119240 0 0
Npt8 99646 0 0
Npt20 33024 0 0IntHw25RoScMiCutSoulder
_140 _140_300
_300
Npt0 0 106904 0
Npt8 0 102087 0
Npt20 0 75707 0
IntHw25RoScMiCutTail
_140 _140_300
_300
Npt0 0 0 198426
Npt8 0 0 193675
Npt20 0 0 169408
- C o n t I n u u m( 8TeV, Hw25 )
CotHw25RoScMiCut_140 _140_300 _300
Npt0 3199 1177392 150980
Npt8 2667 1122196 143997
Npt20 1048 815333 110347
CotHw25RoScMiCutHead
_140 _140_300
_300
Npt0 309 117856 0
Npt8 254 112221 0
Npt20 83 81243 0
CotHw25RoScMiCutTail
_140 _140_300
_300
Npt0 0 0 150980
Npt8 0 0 143997
Npt20 0 0 110347
- G r a p h
Total
- G r a p h
OnPeak Head
- G r a p h
Soulder Tail
122. Status of Data-Analysis Study state
CMS Batch Job - http://information-technology.web.cern.ch/services/batch
CMS Software Framework
CMS PAT Tutorial - https://twiki.cern.ch/twiki/bin/view/CMSPublic/WorkBook-PATTutorial
132. Status of Data-Analysis
Batch system Scheduling system with access to many cores(farm)
User adds his jobs to the queue
Scheduling system starts jobs on one of the cores
-> ATLAS and CMS users have a very small share on the
CERN batch. All users are recommended to use the Grid,
since their turnaround will be higher
-> Limited by farm size
142. Status of Data-Analysis
Batch system Submit a job in your home directory to the 1-hour queue
bsub –q 1nh ~user1/jobs/job1.csh
Submit job2 with a 20MB memory limit (it is recommended to specify a memory limit)
bsub –M 20000 job2
Submit job3 to the 8-hour queue with a runtime limit of 120 minutes (it is recommended to specify a runtime limit)
bsub -q 8nh -W 120 job3
Run job4 on an SLC5 host
bsub –R "type=SLC5_64" job4
152. Status of Data-Analysis
Batch system Check which queues you have access to using the command
bqueues -u <username>