Operations Management Student Name _______________________.
Skill Builder Exercise #3
Problem 1.
Resistor for electronic circuits are manufactured on a high-speed automated machine. The machine
is set up to produce a large run of resistors of 1,000 ohms each.
To set up the machine and to create a control chart to be used throughout the run, 15 samples weretaken with four resistors in each sample. The complete list of samples and their measured alues are
as follows!Sample # Readings (in ohms)
1 1010 991 985 986
2 995 996 1009 994
3 990 1003 1015 10084 1015 1020 1009 998
5 1013 1019 1005 993
6 994 1001 994 1005
7 989 992 982 1020
8 1001 986 996 996
9 1006 989 1005 1007
10 992 1007 1006 979
11 996 1006 997 989
12 1019 996 991 1011
13 981 991 989 1003
14 999 993 988 984
15 1013 1002 1005 992
a" #10 points" $alculate control limits for R-chart.
b" #10 points" $alculate control limits for x -chart.
-
5/28/2018 Skill Builder 3 S14 (1)
2/3
c" #%0 points" &rom the charts, what comments can 'ou make about the process(
Problem2:
)eeral complaints recentl' hae been sent to the *otham $it' police department regarding theincreasing incidence of congestion on the cit'+s streets. The complaints attribute the cause of
these traffic tie-ups to a lack of s'nchroniation of the traffic lights. The lights are controlled b'
a main computer s'stem, and adusting this program is costl'. Therefore, the controllers are
reluctant to change the situation unless a clear need is shown.uring the past 'ear, the police department has collected data at 1,000 intersections. The data
were compiled on a monthl' basis as shown below!
Month Congestion IncidenceJanuary 14
February 18
March 14
April 12
May 16
June 8
July 19
August 12
September 14
ct!ber 7
"!#ember 10
$ecember 18
a) #%0 points" $ompute the following parameters
Mean proportion! ///////////////////
)tandard deiation! ///////////////////
b) #10 points" $alculate control limits and draw the control chart #use a multiple of times
sigma for the control limits".
-
5/28/2018 Skill Builder 3 S14 (1)
3/3
$2! ////////////////////
2$2! /////////////////////
d" #10 points" 3 new sample is collected at the ne4t anuar'. Out of 1000 intersections there are 15congestion incidences. 6s the process in control( 3nd wh'(
Problem 3:#%0 points" $-)pec, 6nc. is attempting to determine whether an e4isting machine is
capable of milling an engine part that has a ke' specification of 780.00 inches. 3fter a trial run on
this machine, $-)pec has determined that the machine has a sample mean of 7.001 inches with astandard deiation of 0.0015 inch.
)hould $-)pec use this machine to produce this part( 9h'(