GENERAL NOTES: 1. CONTRACTOR SHALL INSTALL ALL IMPROVEMENTS IN ACCORDANCE WITH THE ISSAQUAH BUILDING CODES AND THE 2012 IBC. 2. CONTRACTOR SHALL READ THESE PLANS AND NOTES ENTIRELY AND BRING ANY DISCREPANCIES TO GRINDLINE SKATEPARKS INC. IMMEDIATELY. 3. CONTRACTOR SHALL VISIT THE SITE AND VERIFY EXISTING CONDITIONS BEFORE SUBMITTAL OF A CONSTRUCTION BID. 4. IT IS THE CONTRACTOR'S RESPONSIBILITY TO LOCATE ALL UTILITIES, SEWERS, WATER LINES, ETC. CALL BEFORE YOU DIG 811. 5. WORK IN PUBLIC RIGHT OF WAY REQUIRES A CONTRACTOR TO OBTAIN A RIGHT OF WAY DISTURBANCE PERMIT. PER MMC12.36 6. IF ANY UTILITIES OF FACILITIES CONFLICT WITH THE PROPOSED IMPROVEMENTS, ALL WORK SHALL STOP IMMEDIATELY AND THE UTILITY COMPANY SHALL BE NOTIFIED. 7. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO LOCATE ALL SUBSTRUCTURES WITHIN THE AREA OF PROPOSED IMPROVEMENTS, AND IN THE EVENT OF DAMAGE, HE SHALL BEAR THE TOTAL COST OF REPAIR OR REPLACEMENT. 8. THE CONTRACTOR WILL PROVIDE ALL LABOR, MATERIALS, TRANSPORTATION, AND SERVICES NECESSARY TO FURNISH AND INSTALL ALL CONSTRUCTION ELEMENTS AS SHOWN IN THESE PLANS AND NOTES. 9. THE CONTRACTOR SHALL OBTAIN, COORDINATE, AND PAY FOR ALL PERMITS, FEES, AND AGENCY INSPECTIONS AS REQUIRED. 10. ALL WORK SHALL BE GUARANTEED BY THE CONTRACTOR AS TO MATERIALS AND WORKMANSHIP FOR A PERIOD OF ONE YEAR FOLLOWING THE DATE OF THE FINAL ACCEPTANCE OF THE PROJECT. THE CONTRACTOR SHALL PROVIDE A WRITTEN GUARANTEE ON HIS LETTERHEAD AT THE TIME OF FINAL INSPECTION. SITE ADDRESS APPROX. PROJECT SITE 11. ALL DIMENSIONS ARE TAKEN FROM CURB FACE OR EDGE OF PAVING, UNLESS NOTED OTHERWISE ON PLANS. THE DIMENSIONS ARE SHOWN FOR APPROXIMATE LINE, AND ALL RADII, CURVES, AND SURFACES ARE TO HAVE EXTREMELY SMOOTH TRANSITIONS WITH ABSOLUTELY NO ABRUPT CHANGES OR BENDS. 12. ALL FORMS AND ALIGNMENT OF PAVING SHALL BE REVIEWED BY AN INSPECTOR PRIOR TO POURING. NOTIFICATION WILL BE GIVEN WITH AT LEAST 48 HOURS NOTICE. 13. FOR SITE GRADING, SEE SITE PLAN PROVIDED FOR APPROXIMATE SLAB ELEVATIONS. REFER TO SECTION DRAWINGS FOR VERTICAL CONTROLS OF SKATEPARK FEATURES. MAINTAIN POSITIVE DRAINAGE WITHIN NEW AND EXISTING SLABS. FIELD FIT AS NECESSARY. 14. THE DRAWINGS AND SPECIFICATIONS REPRESENT THE FINISHED STRUCTURE. ALL BRACING, TEMPORARY SUPPORTS, SHORING, ETC. ARE THE SOLE RESPONSIBILITY OF THE CONTRACTOR. SITE INSPECTIONS DO NOT INCLUDE THE INSPECTION OF CONSTRUCTION METHODS AND SAFETY CONDITIONS AT THE WORK SITE. THESE VISITS SHALL NOT BE CONSTRUED AS CONTINUOUS AND DETAILED INSPECTIONS. 15. DESIGN MATERIALS, EQUIPMENT, AND PRODUCTS OTHER THAN THOSE DESCRIBED OR INDICATED ON THE DRAWINGS MAY BE CONSIDERED FOR USE, PROVIDED PRIOR APPROVAL IS OBTAINED FROM THE OWNER, GRINDLINE SKATEPARKS INC. AND THE APPLICABLE GOVERNING CODE AUTHORITY. SKATEPARK AT TIBBETTS VALLEY PARK TIBBETTS VALLEY PARK 965 12TH AVE NW ISSAQUAH, WA 98027 RENDERING FOR REFERENCE ONLY- NOT FOR CONSTRUCTION SP1.0 TITLE SHEET SP1.1 SATELLITE IMAGE SP1.2 EXISTING CONDITIONS SP1.3 SITE PLAN SP1.4 MATERIALS PLAN SP1.5 CONCRETE JOINTS SP1.6 CONCRETE COLORS SP3.1 DETAILS SP3.2 DETAILS SP3.3 DETAILS CIVIL ENGINEER: PAUL HARMSEN, PE MACKAY SPOSITO PHONE: 509 366 8215 EMAIL: [email protected] LANDSCAPE ARCHITECT: JIM SANDLIN, PLA MACKAY SPOSITO PHONE: (360) 823 1346 EMAIL: [email protected] SHEET: SCALE: This design is an instrument of professional service and is the property of Grindline Skateparks Inc. Any use of these plans shall be restricted to the project for which they were prepared. SCALE: DRAWN BY: PROJECT: LOCATION: DATE: CHECKED BY: SP1.0 ISSAQUAH SKATEPARK ISSAQUAH, WA JRJ MBF 03.08.16 TITLE SHEET N.T.S. REVIEW SUBMITTAL NOT FOR CONSTRUCTION

Transcript of SKATEPARK AT TIBBETTS VALLEY PARK - Issaquah...skatepark at tibbetts valley park tibbetts valley...

Page 1: SKATEPARK AT TIBBETTS VALLEY PARK - Issaquah...skatepark at tibbetts valley park tibbetts valley park 965 12th ave nw issaquah, wa 98027 rendering for reference only- not for construction

GENERAL NOTES:1. CONTRACTOR SHALL INSTALL ALL IMPROVEMENTS INACCORDANCE WITH THE ISSAQUAH BUILDING CODESAND THE 2012 IBC.2. CONTRACTOR SHALL READ THESE PLANS AND NOTESENTIRELY AND BRING ANY DISCREPANCIES TO GRINDLINESKATEPARKS INC. IMMEDIATELY.3. CONTRACTOR SHALL VISIT THE SITE AND VERIFY EXISTINGCONDITIONS BEFORE SUBMITTAL OF A CONSTRUCTION BID.4. IT IS THE CONTRACTOR'S RESPONSIBILITY TO LOCATE ALLUTILITIES, SEWERS, WATER LINES, ETC. CALL BEFORE YOUDIG 811.5. WORK IN PUBLIC RIGHT OF WAY REQUIRES ACONTRACTOR TO OBTAIN A RIGHT OF WAY DISTURBANCEPERMIT. PER MMC12.366. IF ANY UTILITIES OF FACILITIES CONFLICT WITH THEPROPOSED IMPROVEMENTS, ALL WORK SHALL STOPIMMEDIATELY AND THE UTILITY COMPANY SHALL BENOTIFIED.7. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TOLOCATE ALL SUBSTRUCTURES WITHIN THE AREA OFPROPOSED IMPROVEMENTS, AND IN THE EVENT OFDAMAGE, HE SHALL BEAR THE TOTAL COST OF REPAIR ORREPLACEMENT.8. THE CONTRACTOR WILL PROVIDE ALL LABOR,MATERIALS, TRANSPORTATION, AND SERVICES NECESSARYTO FURNISH AND INSTALL ALL CONSTRUCTION ELEMENTSAS SHOWN IN THESE PLANS AND NOTES.9. THE CONTRACTOR SHALL OBTAIN, COORDINATE, ANDPAY FOR ALL PERMITS, FEES, AND AGENCY INSPECTIONSAS REQUIRED.10. ALL WORK SHALL BE GUARANTEED BY THECONTRACTOR AS TO MATERIALS AND WORKMANSHIP FORA PERIOD OF ONE YEAR FOLLOWING THE DATE OF THEFINAL ACCEPTANCE OF THE PROJECT. THE CONTRACTORSHALL PROVIDE A WRITTEN GUARANTEE ON HISLETTERHEAD AT THE TIME OF FINAL INSPECTION.

SITE ADDRESS

APPROX. PROJECT SITE

11. ALL DIMENSIONS ARE TAKEN FROM CURB FACE OREDGE OF PAVING, UNLESS NOTED OTHERWISE ON PLANS.THE DIMENSIONS ARE SHOWN FOR APPROXIMATE LINE,AND ALL RADII, CURVES, AND SURFACES ARE TO HAVEEXTREMELY SMOOTH TRANSITIONS WITH ABSOLUTELY NOABRUPT CHANGES OR BENDS.12. ALL FORMS AND ALIGNMENT OF PAVING SHALL BEREVIEWED BY AN INSPECTOR PRIOR TO POURING.NOTIFICATION WILL BE GIVEN WITH AT LEAST 48 HOURSNOTICE.13. FOR SITE GRADING, SEE SITE PLAN PROVIDED FORAPPROXIMATE SLAB ELEVATIONS. REFER TO SECTIONDRAWINGS FOR VERTICAL CONTROLS OF SKATEPARKFEATURES. MAINTAIN POSITIVE DRAINAGE WITHIN NEWAND EXISTING SLABS. FIELD FIT AS NECESSARY.

14. THE DRAWINGS AND SPECIFICATIONS REPRESENT THEFINISHED STRUCTURE. ALL BRACING, TEMPORARYSUPPORTS, SHORING, ETC. ARE THE SOLE RESPONSIBILITYOF THE CONTRACTOR. SITE INSPECTIONS DO NOT INCLUDETHE INSPECTION OF CONSTRUCTION METHODS ANDSAFETY CONDITIONS AT THE WORK SITE. THESE VISITS SHALLNOT BE CONSTRUED AS CONTINUOUS AND DETAILEDINSPECTIONS.

15. DESIGN MATERIALS, EQUIPMENT, AND PRODUCTSOTHER THAN THOSE DESCRIBED OR INDICATED ON THEDRAWINGS MAY BE CONSIDERED FOR USE, PROVIDEDPRIOR APPROVAL IS OBTAINED FROM THE OWNER,GRINDLINE SKATEPARKS INC. AND THE APPLICABLEGOVERNING CODE AUTHORITY.

SKATEPARK AT TIBBETTS VALLEY PARK

TIBBETTS VALLEY PARK

965 12TH AVE NW

ISSAQUAH, WA 98027

RENDERING FOR REFERENCE ONLY- NOT FOR CONSTRUCTION

SP1.0 TITLE SHEETSP1.1 SATELLITE IMAGESP1.2 EXISTING CONDITIONSSP1.3 SITE PLANSP1.4 MATERIALS PLANSP1.5 CONCRETE JOINTSSP1.6 CONCRETE COLORSSP3.1 DETAILSSP3.2 DETAILSSP3.3 DETAILS

CIVIL ENGINEER:

PAUL HARMSEN, PE

MACKAY SPOSITO

PHONE: 509 366 8215

EMAIL: [email protected]

LANDSCAPE ARCHITECT:

JIM SANDLIN, PLA

MACKAY SPOSITO

PHONE: (360) 823 1346

EMAIL: [email protected]

SHEET:

SCA

LE:

This

des

ign

is an

inst

rum

ent o

f pro

fess

iona

l ser

vice

and

is th

e pr

oper

ty o

f Grin

dlin

e Sk

atep

arks

Inc.

A

ny u

se o

f the

se p

lans

shal

l be

rest

ricte

d to

the

proj

ect f

or w

hich

they

wer

e pr

epar

ed.

SCA

LE:

DRAWN BY:

PRO

JEC

T:LO

CA

TION

:

DATE:

CHECKED BY:

SP1.0

ISSA

QUA

H SK

ATE

PARK

ISSA

QUA

H, W

A

JRJMBF

03.08.16

TITLE

SHE

ETN

.T.S

.

REVIEW SUBMITTALNOT FOR CONSTRUCTION

Page 2: SKATEPARK AT TIBBETTS VALLEY PARK - Issaquah...skatepark at tibbetts valley park tibbetts valley park 965 12th ave nw issaquah, wa 98027 rendering for reference only- not for construction

SHEET:

SCA

LE:

This

des

ign

is an

inst

rum

ent o

f pro

fess

iona

l ser

vice

and

is th

e pr

oper

ty o

f Grin

dlin

e Sk

atep

arks

Inc.

A

ny u

se o

f the

se p

lans

shal

l be

rest

ricte

d to

the

proj

ect f

or w

hich

they

wer

e pr

epar

ed.

SCA

LE:

DRAWN BY:

PRO

JEC

T:LO

CA

TION

:

DATE:

CHECKED BY:

SP1.1

ISSA

QUA

H SK

ATE

PARK

ISSA

QUA

H, W

A

JRJMBF

03.08.16

SATE

LLITE

IMA

GE

N.T

.S.

REVIEW SUBMITTALNOT FOR CONSTRUCTION

Page 3: SKATEPARK AT TIBBETTS VALLEY PARK - Issaquah...skatepark at tibbetts valley park tibbetts valley park 965 12th ave nw issaquah, wa 98027 rendering for reference only- not for construction

SHEET:

SCA

LE:

This

des

ign

is an

inst

rum

ent o

f pro

fess

iona

l ser

vice

and

is th

e pr

oper

ty o

f Grin

dlin

e Sk

atep

arks

Inc.

A

ny u

se o

f the

se p

lans

shal

l be

rest

ricte

d to

the

proj

ect f

or w

hich

they

wer

e pr

epar

ed.

SCA

LE:

DRAWN BY:

PRO

JEC

T:LO

CA

TION

:

DATE:

CHECKED BY:

SP1.2

ISSA

QUA

H SK

ATE

PARK

ISSA

QUA

H, W

A

JRJMBF

03.08.16

EXIS

TING

CO

ND

ITIO

NS

1" =

10'

REVIEW SUBMITTALNOT FOR CONSTRUCTION

Page 4: SKATEPARK AT TIBBETTS VALLEY PARK - Issaquah...skatepark at tibbetts valley park tibbetts valley park 965 12th ave nw issaquah, wa 98027 rendering for reference only- not for construction

LEGENDEOC EDGE OF CONCRETEINV INVERT ELEVATIONRIM RIM ELEVATIONFS FINISHED SURFACETT TOP OF TRANSITIONBT BOTTOM OF TRANSITIONTB TOP OF BANKBB BOTTOM OF BANK 6" SDR-35 DRAINLINE LIMITS OF WORK

EXISTINGSIDEWALK

EXISTINGSIDEWALK

2%

EXISTINGSIDEWALK

INSTALL (2)PICNIC BENCHES

2%

83.19 HP

1%

77.80 RIM76.36 INV

77.53 BB

80.35 EOC

53 LF 6" SDR-35 DRAINLINE @ 1%

2%

1%

2%

2%

MATCH EX.83.00 EOC

80.70 EOC

83.75 TB

82.25 BB

(MANUFACTURE T.B.DBY CLIENT)

PROPOSEDSTREET TREE

TIE INTO CATCHBASIN AS NEEDED

76.40 INV

81.65 FS

26 LF 6" SDR-35

DRAINLINE @ 1% 4 LF

2%

79

80.10 FS

19 L

F 6"

SD

R-35

DRA

INLI

NE

@ 1

%

SHEET:

SCA

LE:

This

des

ign

is an

inst

rum

ent o

f pro

fess

iona

l ser

vice

and

is th

e pr

oper

ty o

f Grin

dlin

e Sk

atep

arks

Inc.

A

ny u

se o

f the

se p

lans

shal

l be

rest

ricte

d to

the

proj

ect f

or w

hich

they

wer

e pr

epar

ed.

SCA

LE:

DRAWN BY:

PRO

JEC

T:LO

CA

TION

:

DATE:

CHECKED BY:

SP1.3

ISSA

QUA

H SK

ATE

PARK

ISSA

QUA

H, W

A

JRJMBF

03.08.16

PREL

IMIN

ARY

SITE

PLA

N1"

= 1

0'

REVIEW SUBMITTALNOT FOR CONSTRUCTION

Page 5: SKATEPARK AT TIBBETTS VALLEY PARK - Issaquah...skatepark at tibbetts valley park tibbetts valley park 965 12th ave nw issaquah, wa 98027 rendering for reference only- not for construction

1 2 3

2

3

9

10

10

16

10

15

16

11

11

11

11

7

14SP3.2 SP3.2 SP3.2 SP3.2

SP3.2

SP3.2

SP3.2

SP3.2

SP3.1 SP3.1 SP3.1 SP3.1

SP3.1

SP3.1

SP3.1

SP3.1

SP3.1

18

LEGEND

CONCRETE SURFACING

SHOTCRETE SURFACING

CONCRETE EDGE

STEEL GRIND EDGE - CANTILEVER STEEL CHANNEL

FLAT STEEL BAR GRIND EDGE - VERTICAL

HANDRAIL FOOTING - END PIECE

HANDRAIL FOOTING - CENTER POST

REINFORCED CONCRETE LEDGE - CANTILEVER EDGE

1SP3.1

2

3

12

13

9

DRAIN

11

14

15

10

STEEL COPING

16

ANGLE IRON - BANKED GRIND EDGE

SP3.2

SP3.1

SP3.1

SP3.1

SP3.2

SP3.2

SP3.2

SP3.2

SP3.2

SP3.2

TURNED DOWN CONCRETE EDGE8

SP3.1

POOL COPING 17SP3.2

18SP3.2

SHEET:

SCA

LE:

This

des

ign

is an

inst

rum

ent o

f pro

fess

iona

l ser

vice

and

is th

e pr

oper

ty o

f Grin

dlin

e Sk

atep

arks

Inc.

A

ny u

se o

f the

se p

lans

shal

l be

rest

ricte

d to

the

proj

ect f

or w

hich

they

wer

e pr

epar

ed.

SCA

LE:

DRAWN BY:

PRO

JEC

T:LO

CA

TION

:

DATE:

CHECKED BY:

SP1.4

ISSA

QUA

H SK

ATE

PARK

ISSA

QUA

H, W

A

JRJMBF

03.08.16

MA

TERI

ALS

PLA

N1"

= 1

0'

REVIEW SUBMITTALNOT FOR CONSTRUCTION

Page 6: SKATEPARK AT TIBBETTS VALLEY PARK - Issaquah...skatepark at tibbetts valley park tibbetts valley park 965 12th ave nw issaquah, wa 98027 rendering for reference only- not for construction

6SP3.1

LEGEND

COLD JOINT

KEY JOINT

BOND BEAM-STEEL COPING

SAW CUT JOINT

4SP3.1

5SP3.1

11SP3.2

SAW CUT PATTERN IS SHOWN TO PROVIDEDIRECTION. CONTRACTOR TO CUT SLAB ASNEEDED TO PREVENT CRACKING. SAW CUTSMUST BE MADE BEFORE ANY SIGNS OF THERMALCRACKING. THERMAL CRACKING AS A RESULTOF INSUFFICANT CRACK CONTROL MAY RESULTIN UNSKATABLE SURFACES.

BOND BEAM- POOL COPING 18SP3.3

SHEET:

SCA

LE:

This

des

ign

is an

inst

rum

ent o

f pro

fess

iona

l ser

vice

and

is th

e pr

oper

ty o

f Grin

dlin

e Sk

atep

arks

Inc.

A

ny u

se o

f the

se p

lans

shal

l be

rest

ricte

d to

the

proj

ect f

or w

hich

they

wer

e pr

epar

ed.

SCA

LE:

DRAWN BY:

PRO

JEC

T:LO

CA

TION

:

DATE:

CHECKED BY:

SP1.5

ISSA

QUA

H SK

ATE

PARK

ISSA

QUA

H, W

A

JRJMBF

03.08.16

CO

NC

RETE

JO

INTS

1" =

10'

REVIEW SUBMITTALNOT FOR CONSTRUCTION

Page 7: SKATEPARK AT TIBBETTS VALLEY PARK - Issaquah...skatepark at tibbetts valley park tibbetts valley park 965 12th ave nw issaquah, wa 98027 rendering for reference only- not for construction

NOTE: ALL COLORED CONCRETE SURFACING MIXES TO BEAPPLIED PER MANUFACTURERS RECOMMENDATION.COLOR TO BE VERIFIED BY CLIENT AND GRINDLINESKATEPARKS BEFORE INSTALLATION.

COLORED CONCRETE SURFACING TYPE 3 - DAVIS COLORS®CONCRETE MIX. SAN DIEGO BUFF(5237)

SHEET:

SCA

LE:

This

des

ign

is an

inst

rum

ent o

f pro

fess

iona

l ser

vice

and

is th

e pr

oper

ty o

f Grin

dlin

e Sk

atep

arks

Inc.

A

ny u

se o

f the

se p

lans

shal

l be

rest

ricte

d to

the

proj

ect f

or w

hich

they

wer

e pr

epar

ed.

SCA

LE:

DRAWN BY:

PRO

JEC

T:LO

CA

TION

:

DATE:

CHECKED BY:

SP1.6

ISSA

QUA

H SK

ATE

PARK

ISSA

QUA

H, W

A

JRJMBF

03.08.16

CO

NC

RETE

CO

LORS

1" =

10'

REVIEW SUBMITTALNOT FOR CONSTRUCTION

Page 8: SKATEPARK AT TIBBETTS VALLEY PARK - Issaquah...skatepark at tibbetts valley park tibbetts valley park 965 12th ave nw issaquah, wa 98027 rendering for reference only- not for construction

0'-2"

1'-0"2" PRECAST BULLNOSE CONCRETECOPING. TEDDER STONE COPING CO.OR EQUAL WITH 3/8" MORTARJOINTS.

1" BED OF MORTARMASONRY MIX TOOLEDFLUSH WITH SHOTCRETE(COLOR TO MATCH CONCRETE)

MORTAR BED TO BE ARDEX CP

OR EQUIVALENT. ¼” THICKNESS

MAX

BLOCK JOINTS TO BE FILLED WITH

ARDEX CP OR EQUIVALENT AND LEFT

1/2 " BELOW EXPOSED EDGE OF BLOCK.

FILL REMAINING ½” WITH SIMPSON

STRONG-TIE SET22 OR EQUIVALENT

TO MAKE A FLUSH, SEAMLESS JOINT

BETWEEN BLOCKS

0'-6"

OVERLAP BAR #4 REBAR 24" MIN

COLD JOINT

TURNED DOWN CONCRETE EDGE REINFORCED CONCRETE LEDGE - CANTILEVER EDGE

1'-0"

#3 12" O.C.

#3 @ 12" O.C. MAX

0'-3" MIN

0'-5" TYP. VARIES,SEE SITEPLAN

NOTE TYP.SEE GEOTECH REPORT FOR SUBGRADERECOMMENDATIONS.

CONCRETE EDGE

8" MIN

SHEET:

SCA

LE:

This

des

ign

is an

inst

rum

ent o

f pro

fess

iona

l ser

vice

and

is th

e pr

oper

ty o

f Grin

dlin

e Sk

atep

arks

Inc.

A

ny u

se o

f the

se p

lans

shal

l be

rest

ricte

d to

the

proj

ect f

or w

hich

they

wer

e pr

epar

ed.

SCA

LE:

DRAWN BY:

PRO

JEC

T:LO

CA

TION

:

DATE:

CHECKED BY:

SP3.1

ISSA

QUA

H SK

ATE

PARK

ISSA

QUA

H, W

A

JRJMBF

03.08.16

DET

AIL

SN

.T.S

.

REVIEW SUBMITTALNOT FOR CONSTRUCTION

Page 9: SKATEPARK AT TIBBETTS VALLEY PARK - Issaquah...skatepark at tibbetts valley park tibbetts valley park 965 12th ave nw issaquah, wa 98027 rendering for reference only- not for construction

4" x 4" x 1/4" BLACK STEELANGLE IRON

0'-4"

INSTALL FLUSH W/ CONC. TYP.GRIND CONC. IF NECESSARY

24" LENGTH

24" LENGTH

#4 REBAR WELD TOTUBING EVERY 36" MIN.OFFSET HORIZONTAL ANDVERTICAL EVERY18" MIN.

GRIND STEEL TO MATCHANGLE OF LEDGE

4" x 4" x 1/4" BLACK STEELANGLE IRON

GRIND STEEL TO MATCHANGLE OF LEDGE

#4 REBAR WELD TOTUBING EVERY 36" MIN.OFFSET HORIZONTAL ANDVERTICAL EVERY18" MIN.

GRIND STEEL TO MATCHANGLE OF LEDGE

#4 REBAR WELD TOTUBING EVERY 36" MIN.OFFSET HORIZONTAL ANDVERTICAL EVERY18" MIN.

3/8"

6" x 1/4" FLAT BAR STEEL (TYP.)

0'-6"

INSTALL FLUSH W/ CONC. TYP.GRIND CONC. IF NECESSARY.

#3 REBAR4" LENGTH MIN. @ 12" OCWELDED TO FLAT STEEL BARTIED INTO REBAR GRID

NOTE: PRIME STEEL WITH WITH RUST-OLEUM INTERIOR/EXTERIORFLAT PRIMER OR EQUAL BEFORE INSTALLATION.PAINT EXPOSED STEEL WITH RUST-OLEUMACRYLIC INTERIOR/EXTERIOR BLACK GLOSS ENAMEL OREQUAL AFTER INSTALLATION.

0'-1/4"

1/8" BULLNOSE CONTINUOUSTOOLED EDGE.

WELD #4 REBAREVERY 36" MIN.

24" LENGTH MIN.

8" LENGTH MIN.

#4 REBAR W 6"HOOKS @BAR ENDS

FOR WELDING.

TOP VIEW

2.5" ID SCH. 40STANDARD BLACKSTEEL SEAM WELDEDPIPECOPING.

PERSPECTIVE VIEW

#4 REBAR

2.5" ID SCH. 40 STANDARDBLACKSTEEL SEAM WELDED PIPECOPING.

0'-1/4"

SHOTCRETE SURFACING

2.0"- 2.5" ID SCH. 40 STANDARDBLACK STEEL SEAM WELDED PIPECOPING. (SEE SECTIONS FOREXACT MATERIAL)

0'-4"

0'-9"

0'-5"

NOTE: PRIME STEEL WITH WITH RUST-OLEUM INTERIOR/EXTERIOR FLAT PRIMER OR EQUAL BEFORE INSTALLATION.PAINT EXPOSED STEEL WITH RUST-OLEUM ACRYLICINTERIOR/EXTERIOR BLACK GLOSS ENAMEL OR EQUALAFTER INSTALLATION.

COLD JOINT

0'-7"

SHEET:

SCA

LE:

This

des

ign

is an

inst

rum

ent o

f pro

fess

iona

l ser

vice

and

is th

e pr

oper

ty o

f Grin

dlin

e Sk

atep

arks

Inc.

A

ny u

se o

f the

se p

lans

shal

l be

rest

ricte

d to

the

proj

ect f

or w

hich

they

wer

e pr

epar

ed.

SCA

LE:

DRAWN BY:

PRO

JEC

T:LO

CA

TION

:

DATE:

CHECKED BY:

SP3.2

ISSA

QUA

H SK

ATE

PARK

ISSA

QUA

H, W

A

JRJMBF

03.08.16

DET

AIL

S

1" =

20'

REVIEW SUBMITTALNOT FOR CONSTRUCTION

N.T

.S.

Page 10: SKATEPARK AT TIBBETTS VALLEY PARK - Issaquah...skatepark at tibbetts valley park tibbetts valley park 965 12th ave nw issaquah, wa 98027 rendering for reference only- not for construction

NOTE TYP.REINFORCEMENT:#3 REBAR @ 12" O.C. UNLESS OTHERWISE NOTED TYP.STEEL:CONTINUOUS WELD ON ALL JOINTSALL STEEL TO BE PAINTED BLACK.

1/2"

POLYURETHANEELASTOMERIC SEALANT.

TOOL FLAT A SMOOTHBOND BREAKER MEMBRANE.

1/2" MIN.

0'-5"

CONCRETE SURFACING

SHEET:

SCA

LE:

This

des

ign

is an

inst

rum

ent o

f pro

fess

iona

l ser

vice

and

is th

e pr

oper

ty o

f Grin

dlin

e Sk

atep

arks

Inc.

A

ny u

se o

f the

se p

lans

shal

l be

rest

ricte

d to

the

proj

ect f

or w

hich

they

wer

e pr

epar

ed.

SCA

LE:

DRAWN BY:

PRO

JEC

T:LO

CA

TION

:

DATE:

CHECKED BY:

SP3.3

ISSA

QUA

H SK

ATE

PARK

ISSA

QUA

H, W

A

JRJMBF

03.08.16

DET

AIL

S

1" =

20'

REVIEW SUBMITTALNOT FOR CONSTRUCTION

N.T

.S.