Ska Presentation Ska- An Assessor Perspective

Transcript of Ska Presentation Ska- An Assessor Perspective. Ska Presentation RLB and Ska Who is using it? ...

Ska Presentation

Ska- An Assessor Perspective

Ska Presentation

RLB and Ska

Who is using it?

Who’s interested?

Client Spotlight-UoL

Case Studies:

ADT Workplace

University of Liverpool

BREEAM V Ska

How we do the assessment.

Potential Pitfalls of Ska

Today’s Presentation

Ska Presentation

RLB History with Ska

First accredited in 2010.

2 assessors initially, now up to 4 with

more proposed.

Varying sectors- public, education,

healthcare and private companies.

Carried out circa 30 assessments

across the team.

Development Partner of Ska HE and

Ska Residences.

Ska Presentation

Client Spotlight- UoL• First engaged in 2012.• Included as part of Estates Strategy

as an alternative to BREEAM.• Instructed to ‘hold hands’ with the

design team.• 3 projects so far instructed:

– Guild Building Refurbishment

– Senate Drum Building– Melville Grove Student

Residences. • General target- Ska Silver –

compared to BREEAM ‘Very Good’.

Ska Presentation

Case Study | LGoS | University of Liverpool

• 2500m2 mixed refurbishment of retail/restaurant/WC facilities et

• £4m value (approx.• Only assessed relevant areas

of refurbishment.• RLB instructed at RIBA Stage

C• Silver target award enabled

flexibility.• Good practice includes:

• Lighting design.• Use of CHP.• Remote Monitoring• Floor finishes.

Ska Presentation

Case Study | 1 New York Street | Manchester

• Fit out of office accommodation in Manchester City Centre.

• 2000m2 of office accommodation over 3 floors.

• 1st project in North West to achieve Ska Gold

• Many Sustainable Good Practice Measures implemented including:

• LED Lighting

• Split energy metering with remote monitoring capability.

• Sustainable timber sources.

• Existing furniture from old office re-used and recycled.

• 90% of waste diverted from landfill.

• Project has resulted in dramatic reduction in staff churn- 44%

Ska Presentation

How it Works

Scoping Assessment Certification

Ska Presentation

The Scoping Process

Ska Presentation

Ska Presentation

• Initial Assessment of Specification/Drawings etc.

•Allows Ska Assessor to comment on design.

• Project Awarded a hypothetical score.

Design

Stage

• Initial comments/scoring taken forward to be reassessed at design.

• Verification with site inspections/presentation of

invoices/commissioning certificates etc.

• Certification carried out.

Handover

Stage

• Re-assessment of certain GPM’s 1 year on.

• Not compulsory- Good Practice

Occupancy Stage

Our role during the Assessment Stages

Ska Presentation

• prohibitive.

BREEAM?Ska?

Ska Presentation

Benefits to our clients

• CSR• Employee Engagement• Reduce Energy Costs• Reduce CO2 usage• Enhanced Capital

Allowances• Facilitates Design

Standards• Engagement in

Assessment Process• Low implementation costs• Kickstarting stalling

projects.

Ska Presentation

Kickstarting Stalling Projects

Case Study 1

Office Building | Reading

• 4000m2 of office accommodation in Reading.

• Proposed Building constructed 1988

• Estate Strategy -BREEAM Very good

• PTE £500k over client budget. Project Stalling with only 3 months left to exercise break on existing accommodation

• By using Ska- £50k saving on professional fees, omission of £300k of ‘un-necessary work’ further £150k saved on value engineering.

Ska Presentation

Kickstarting Stalling ProjectsCase Study 2

Hospital | North West England

• PCT looking to purchase old school site for new hospital.

• Estate Strategy BREEAM Very Good • Main school building- constructed C19- GII*

Listed.• Over budget based on ‘unnecessary

enhancements to account for listed building.• Proposal-

• Listed building to be refurbished as admin accommodation- Ska Assessed.

• New build – hospital accommodation – BREEAM

• Removing listed section of the project from BREEAM- anticipated saving £500k*

Ska Presentation

Addressing client concerns How much does it

cost?

“Yes, but what about added construction

costs?”

“Not as much as you think! £3k-£10k depending on scope of works.”

“Depending on the award you target, we believe Ska can almost be cost neutral to a contract.”

“Do I need to do it?!!”“In a nutshell, of course not,

it doesn’t yet form part of planning conditions as BREEAM does,

however many organisations are using it as part of the their CSR/Sustainable polices.”“Is it a viable alternative

to BREEAM?”

“Yes, definitely and depending on the scheme, we have used Ska to help

get projects off the ground.”

Ska Presentation

How much Does it cost?

Ska Presentation