SiteManager Implementation Challenges
“Getting Connected”Joseph J. Bouchey
SiteManager AdministratorOffice Of Construction
Conn. Dept. of TransportationPH: (860) 594-2676FX: (860) 594-2678
![Page 2: SiteManager Implementation Challenges “Getting Connected” Joseph J. Bouchey SiteManager Administrator Office Of Construction Conn. Dept. of Transportation.](https://reader036.fdocuments.in/reader036/viewer/2022070413/5697bf941a28abf838c907cf/html5/thumbnails/2.jpg)
2
Challenges Speed-
– Login (blue bar of death)– Adding new items– Retrieving Samples
Keeping synchronized with the database - – Error messages upon saving
Migrating to new releases– Supporting and documenting version changes & training
Getting reports to end users quickly
![Page 3: SiteManager Implementation Challenges “Getting Connected” Joseph J. Bouchey SiteManager Administrator Office Of Construction Conn. Dept. of Transportation.](https://reader036.fdocuments.in/reader036/viewer/2022070413/5697bf941a28abf838c907cf/html5/thumbnails/3.jpg)
3
Terminal Server (TS) Advantage Speed - Screenshots are passed not database. Blue bar
login time is down to just a few seconds. 56K is OK. Support - Only one install on TS, end user problems are
limited to printing & login access. No more on-site visits Upgrades - SM was backed-up and upgraded and rolled
out from SM 3.3 to 3.4a-1 in 2.5hrs Training & Testing - Each client has access to
testing/training & production environments. (can be different versions of SM)
Downtime - Since TS implementation (7/6/04) we have had a total of 2 hours downtime. (Server reboot needed)
![Page 4: SiteManager Implementation Challenges “Getting Connected” Joseph J. Bouchey SiteManager Administrator Office Of Construction Conn. Dept. of Transportation.](https://reader036.fdocuments.in/reader036/viewer/2022070413/5697bf941a28abf838c907cf/html5/thumbnails/4.jpg)
4
Application ServerDPS
SiteManager Connection Diagram
Terminal ServerSM Client 3.4a-1MS Server 2003
DataBaseOracle 8.1.7
NT
Thin Clients - Screenshot
![Page 5: SiteManager Implementation Challenges “Getting Connected” Joseph J. Bouchey SiteManager Administrator Office Of Construction Conn. Dept. of Transportation.](https://reader036.fdocuments.in/reader036/viewer/2022070413/5697bf941a28abf838c907cf/html5/thumbnails/5.jpg)
5
Terminal Server Facts
$40,000 to implement includes Server & 300 Licenses
Couldn’t have done it without FLDOT– James Phillips - port assignment
Same principal as Citrix With VPN next best thing to being web
enabled
![Page 6: SiteManager Implementation Challenges “Getting Connected” Joseph J. Bouchey SiteManager Administrator Office Of Construction Conn. Dept. of Transportation.](https://reader036.fdocuments.in/reader036/viewer/2022070413/5697bf941a28abf838c907cf/html5/thumbnails/6.jpg)
6
![Page 7: SiteManager Implementation Challenges “Getting Connected” Joseph J. Bouchey SiteManager Administrator Office Of Construction Conn. Dept. of Transportation.](https://reader036.fdocuments.in/reader036/viewer/2022070413/5697bf941a28abf838c907cf/html5/thumbnails/7.jpg)
7
Connecting to SiteManager
Enter Windows Id and Password
Pick the serverProduction/test/training
![Page 8: SiteManager Implementation Challenges “Getting Connected” Joseph J. Bouchey SiteManager Administrator Office Of Construction Conn. Dept. of Transportation.](https://reader036.fdocuments.in/reader036/viewer/2022070413/5697bf941a28abf838c907cf/html5/thumbnails/8.jpg)
8
How to set personal connection options
You will be prompted to save as the default, click ok.
Re-type your windows password.
![Page 9: SiteManager Implementation Challenges “Getting Connected” Joseph J. Bouchey SiteManager Administrator Office Of Construction Conn. Dept. of Transportation.](https://reader036.fdocuments.in/reader036/viewer/2022070413/5697bf941a28abf838c907cf/html5/thumbnails/9.jpg)
9
SiteManager Login
![Page 10: SiteManager Implementation Challenges “Getting Connected” Joseph J. Bouchey SiteManager Administrator Office Of Construction Conn. Dept. of Transportation.](https://reader036.fdocuments.in/reader036/viewer/2022070413/5697bf941a28abf838c907cf/html5/thumbnails/10.jpg)
10
The Need for Customized Reports SiteManager internal reports fall short in
many areas Don’t have Powerbuilder knowledge on staff Don’t have RTF knowledge on staff Need ability to quickly query Manager’s want reports without the hassles of
logging into anything!
![Page 11: SiteManager Implementation Challenges “Getting Connected” Joseph J. Bouchey SiteManager Administrator Office Of Construction Conn. Dept. of Transportation.](https://reader036.fdocuments.in/reader036/viewer/2022070413/5697bf941a28abf838c907cf/html5/thumbnails/11.jpg)
11
On every user’s desktop by default are 4 icon’s. 1) Shared folder with updated Construction information (read-only)2) Personnel end user space to store files – when on the road3) Production SiteManager4) SiteManager Reporting – Customized CTDOT specific reports5) End user created reporting is availableNote: MS Access is the DOT Standard front-end to SM Data.
Access front-end tied through an ODBC to ORACLEconnection
1)
2)
3)
4)
5)
Shows TS Server ID
![Page 12: SiteManager Implementation Challenges “Getting Connected” Joseph J. Bouchey SiteManager Administrator Office Of Construction Conn. Dept. of Transportation.](https://reader036.fdocuments.in/reader036/viewer/2022070413/5697bf941a28abf838c907cf/html5/thumbnails/12.jpg)
12
How To Run SiteManager Reporting
Select SiteManager Reporting
![Page 13: SiteManager Implementation Challenges “Getting Connected” Joseph J. Bouchey SiteManager Administrator Office Of Construction Conn. Dept. of Transportation.](https://reader036.fdocuments.in/reader036/viewer/2022070413/5697bf941a28abf838c907cf/html5/thumbnails/13.jpg)
13Each button is tied to either a specific report or additional reporting.
![Page 14: SiteManager Implementation Challenges “Getting Connected” Joseph J. Bouchey SiteManager Administrator Office Of Construction Conn. Dept. of Transportation.](https://reader036.fdocuments.in/reader036/viewer/2022070413/5697bf941a28abf838c907cf/html5/thumbnails/14.jpg)
14
The example above is tied to a DOT summary report.This report compares all Districts and the amount of assigned Work.
![Page 15: SiteManager Implementation Challenges “Getting Connected” Joseph J. Bouchey SiteManager Administrator Office Of Construction Conn. Dept. of Transportation.](https://reader036.fdocuments.in/reader036/viewer/2022070413/5697bf941a28abf838c907cf/html5/thumbnails/15.jpg)
15
![Page 16: SiteManager Implementation Challenges “Getting Connected” Joseph J. Bouchey SiteManager Administrator Office Of Construction Conn. Dept. of Transportation.](https://reader036.fdocuments.in/reader036/viewer/2022070413/5697bf941a28abf838c907cf/html5/thumbnails/16.jpg)
16The report also shows the overall Contract Value
![Page 17: SiteManager Implementation Challenges “Getting Connected” Joseph J. Bouchey SiteManager Administrator Office Of Construction Conn. Dept. of Transportation.](https://reader036.fdocuments.in/reader036/viewer/2022070413/5697bf941a28abf838c907cf/html5/thumbnails/17.jpg)
17This area is contract specific and requires some user selections
![Page 18: SiteManager Implementation Challenges “Getting Connected” Joseph J. Bouchey SiteManager Administrator Office Of Construction Conn. Dept. of Transportation.](https://reader036.fdocuments.in/reader036/viewer/2022070413/5697bf941a28abf838c907cf/html5/thumbnails/18.jpg)
18
All Reports are Contract Specific• Identifies all Items that exceed 125% of original contract Value• Displays current line item level detail sorted by Item Code, Project, then Category• Stockpile Report by Invoice Number• Daily snapshot of DWR work items performed on a given day and grouped by inspector. User is prompted to select day (YYYYMMDD)• Current list of all Prime/Subcontractor equipment sorted by vendor name then equipment ID• Listing of unauthorized DWRs sorted by date, then user
• Similar to the “Item Work Report”, but alsoincludes remark and subcontractor details• Used on older SM contracts when MP&T Items required additional general remarks details
![Page 19: SiteManager Implementation Challenges “Getting Connected” Joseph J. Bouchey SiteManager Administrator Office Of Construction Conn. Dept. of Transportation.](https://reader036.fdocuments.in/reader036/viewer/2022070413/5697bf941a28abf838c907cf/html5/thumbnails/19.jpg)
19The user can type the contract ID or use the drop down arrowfor the selection options
![Page 20: SiteManager Implementation Challenges “Getting Connected” Joseph J. Bouchey SiteManager Administrator Office Of Construction Conn. Dept. of Transportation.](https://reader036.fdocuments.in/reader036/viewer/2022070413/5697bf941a28abf838c907cf/html5/thumbnails/20.jpg)
20
![Page 21: SiteManager Implementation Challenges “Getting Connected” Joseph J. Bouchey SiteManager Administrator Office Of Construction Conn. Dept. of Transportation.](https://reader036.fdocuments.in/reader036/viewer/2022070413/5697bf941a28abf838c907cf/html5/thumbnails/21.jpg)
21
This Report shows what contract items are currently 125% overthe original contract amount and may be required to negotiate an adjusted contract price with the contractor.
![Page 22: SiteManager Implementation Challenges “Getting Connected” Joseph J. Bouchey SiteManager Administrator Office Of Construction Conn. Dept. of Transportation.](https://reader036.fdocuments.in/reader036/viewer/2022070413/5697bf941a28abf838c907cf/html5/thumbnails/22.jpg)
22
The calculation is based on the sum of the item installed vs. bid quantities.
![Page 23: SiteManager Implementation Challenges “Getting Connected” Joseph J. Bouchey SiteManager Administrator Office Of Construction Conn. Dept. of Transportation.](https://reader036.fdocuments.in/reader036/viewer/2022070413/5697bf941a28abf838c907cf/html5/thumbnails/23.jpg)
23
![Page 24: SiteManager Implementation Challenges “Getting Connected” Joseph J. Bouchey SiteManager Administrator Office Of Construction Conn. Dept. of Transportation.](https://reader036.fdocuments.in/reader036/viewer/2022070413/5697bf941a28abf838c907cf/html5/thumbnails/24.jpg)
24This report is a variation of the “Item Quantity Report”.It is more compact (less pages) and gives Category Details
![Page 25: SiteManager Implementation Challenges “Getting Connected” Joseph J. Bouchey SiteManager Administrator Office Of Construction Conn. Dept. of Transportation.](https://reader036.fdocuments.in/reader036/viewer/2022070413/5697bf941a28abf838c907cf/html5/thumbnails/25.jpg)
25
![Page 26: SiteManager Implementation Challenges “Getting Connected” Joseph J. Bouchey SiteManager Administrator Office Of Construction Conn. Dept. of Transportation.](https://reader036.fdocuments.in/reader036/viewer/2022070413/5697bf941a28abf838c907cf/html5/thumbnails/26.jpg)
26
Line Items grouped by Invoice Number with installation qty, payment and status
![Page 27: SiteManager Implementation Challenges “Getting Connected” Joseph J. Bouchey SiteManager Administrator Office Of Construction Conn. Dept. of Transportation.](https://reader036.fdocuments.in/reader036/viewer/2022070413/5697bf941a28abf838c907cf/html5/thumbnails/27.jpg)
27
1) Select a Contract
2) Select a Report
3) Select a Day
![Page 28: SiteManager Implementation Challenges “Getting Connected” Joseph J. Bouchey SiteManager Administrator Office Of Construction Conn. Dept. of Transportation.](https://reader036.fdocuments.in/reader036/viewer/2022070413/5697bf941a28abf838c907cf/html5/thumbnails/28.jpg)
28
PM & Inspectors wanted a daily snap shot of what work items were done on any given day including zero quantities.
InspectorRemark informationSub or PrimeWork LocationSummary of Qty
![Page 29: SiteManager Implementation Challenges “Getting Connected” Joseph J. Bouchey SiteManager Administrator Office Of Construction Conn. Dept. of Transportation.](https://reader036.fdocuments.in/reader036/viewer/2022070413/5697bf941a28abf838c907cf/html5/thumbnails/29.jpg)
29
![Page 30: SiteManager Implementation Challenges “Getting Connected” Joseph J. Bouchey SiteManager Administrator Office Of Construction Conn. Dept. of Transportation.](https://reader036.fdocuments.in/reader036/viewer/2022070413/5697bf941a28abf838c907cf/html5/thumbnails/30.jpg)
30
Identifies if placed quantities exist
Grouped by date
![Page 31: SiteManager Implementation Challenges “Getting Connected” Joseph J. Bouchey SiteManager Administrator Office Of Construction Conn. Dept. of Transportation.](https://reader036.fdocuments.in/reader036/viewer/2022070413/5697bf941a28abf838c907cf/html5/thumbnails/31.jpg)
31
![Page 32: SiteManager Implementation Challenges “Getting Connected” Joseph J. Bouchey SiteManager Administrator Office Of Construction Conn. Dept. of Transportation.](https://reader036.fdocuments.in/reader036/viewer/2022070413/5697bf941a28abf838c907cf/html5/thumbnails/32.jpg)
32
This report is used rather then the SM “Item Work Report.
Remarks are used to identify location of the computationsTypically Volume, Book and Page
![Page 33: SiteManager Implementation Challenges “Getting Connected” Joseph J. Bouchey SiteManager Administrator Office Of Construction Conn. Dept. of Transportation.](https://reader036.fdocuments.in/reader036/viewer/2022070413/5697bf941a28abf838c907cf/html5/thumbnails/33.jpg)
33This area is contract & Subcontract specific and requires some user selections
![Page 34: SiteManager Implementation Challenges “Getting Connected” Joseph J. Bouchey SiteManager Administrator Office Of Construction Conn. Dept. of Transportation.](https://reader036.fdocuments.in/reader036/viewer/2022070413/5697bf941a28abf838c907cf/html5/thumbnails/34.jpg)
34
![Page 35: SiteManager Implementation Challenges “Getting Connected” Joseph J. Bouchey SiteManager Administrator Office Of Construction Conn. Dept. of Transportation.](https://reader036.fdocuments.in/reader036/viewer/2022070413/5697bf941a28abf838c907cf/html5/thumbnails/35.jpg)
35This report finds when the sub was approved, started work and last worked. It also specifies if a DBEand contact information. This list is sorted alpha numeric.
![Page 36: SiteManager Implementation Challenges “Getting Connected” Joseph J. Bouchey SiteManager Administrator Office Of Construction Conn. Dept. of Transportation.](https://reader036.fdocuments.in/reader036/viewer/2022070413/5697bf941a28abf838c907cf/html5/thumbnails/36.jpg)
36
![Page 37: SiteManager Implementation Challenges “Getting Connected” Joseph J. Bouchey SiteManager Administrator Office Of Construction Conn. Dept. of Transportation.](https://reader036.fdocuments.in/reader036/viewer/2022070413/5697bf941a28abf838c907cf/html5/thumbnails/37.jpg)
37
Report Identifies current Payroll submittals sorted by vendor, then by date
![Page 38: SiteManager Implementation Challenges “Getting Connected” Joseph J. Bouchey SiteManager Administrator Office Of Construction Conn. Dept. of Transportation.](https://reader036.fdocuments.in/reader036/viewer/2022070413/5697bf941a28abf838c907cf/html5/thumbnails/38.jpg)
38
![Page 39: SiteManager Implementation Challenges “Getting Connected” Joseph J. Bouchey SiteManager Administrator Office Of Construction Conn. Dept. of Transportation.](https://reader036.fdocuments.in/reader036/viewer/2022070413/5697bf941a28abf838c907cf/html5/thumbnails/39.jpg)
39
Report Identifies amount of Subcontract work completedcompared against the actual subcontracted amount.
![Page 40: SiteManager Implementation Challenges “Getting Connected” Joseph J. Bouchey SiteManager Administrator Office Of Construction Conn. Dept. of Transportation.](https://reader036.fdocuments.in/reader036/viewer/2022070413/5697bf941a28abf838c907cf/html5/thumbnails/40.jpg)
40
![Page 41: SiteManager Implementation Challenges “Getting Connected” Joseph J. Bouchey SiteManager Administrator Office Of Construction Conn. Dept. of Transportation.](https://reader036.fdocuments.in/reader036/viewer/2022070413/5697bf941a28abf838c907cf/html5/thumbnails/41.jpg)
41
This report is compared against the payroll received report to determine if payrolls are missing. If onsite is marked NO, then no work was performed and only a payment was made. T_DWR_CONTR