  • H E A L T H & S A F E T Y P L A N

    Site-Wide Health and Safety Plan for the

    Anniston PCB Site

    Revision 0

    Anniston, Alabama

    June 2004

  • Anniston PCB Site Site-Wide HASP

    Revision: 0 Date: June 2004

    Health and Safety Plan

    for the Anniston PCB Site

    Anniston, Alabama

    June 2004 Revision 0

    Approved By: __________________________________________________________________________________ Craig Branchfield: Anniston PCB Site Manager Date __________________________________________________________________________________ John Loper: CERCLA Manager Date __________________________________________________________________________________ Gayle Macolly: OU-1/OU-3 RI/FS Manager Date __________________________________________________________________________________ Alan Fowler: OU-2/OU-4 RI/FS Manager Date __________________________________________________________________________________ Charles Haury, CIH, CSP: HSO, OU-1/OU-3 Date __________________________________________________________________________________ Greg Ertel, CIH, CSP: HSO OU-2/OU-4 Date

  • 05/06/04 HASP Acknowledgement.doc

    Anniston PCB Site Anniston, Alabama

    Health and Safety Plan Acknowledgment

    I have read the Health and Safety Plan for the Anniston PCB Site, or its contents have been presented to me, and I understand the contents and I agree to abide by its requirements.

    Name (Print) Signature Representing Date

  • Anniston PCB Site Site-Wide HASP

    Revision: 0 Date: June 2004

    BLASLAND, BOUCK & LEE, INC. 6/3/04 engineers, scientists, economists 1 F:\FILEXCHG\ANNISTON\June 2004 HASP\Anniston HASP Rev 0.doc

    Table of Contents

    Section 1. Introduction..............................................................................................................1-1 1.1 General.............................................................................................................................1-1 1.2 Background ......................................................................................................................1-2

    1.2.1 Anniston Residential (OU-1) ...............................................................................1-3 1.2.2 Anniston Non-Residential (OU-2) .......................................................................1-3 1.2.3 Facility (OU-3) .....................................................................................................1-4 1.2.4 Choccolocco Creek (OU-4).................................................................................1-4

    1.3 Policy Statement ..............................................................................................................1-4 1.4 Definitions.........................................................................................................................1-5

    Section 2. Roles and Responsibilities .....................................................................................2-1 2.1 Project Personnel.............................................................................................................2-1

    2.1.1 Anniston PCB Site Manager ...............................................................................2-2 2.1.2 CERCLA Manager ..............................................................................................2-2 2.1.3 Operable Unit RI/FS Managers...........................................................................2-2 2.1.4 Health and Safety Officer (HSO).........................................................................2-3 2.1.5 Health and Safety Coordinator (HSC).................................................................2-3 2.1.6 Site Safety Officer (SSO) ....................................................................................2-4 2.1.7 Subcontractors ....................................................................................................2-6

    2.2 All On-Site Personnel.......................................................................................................2-6 2.3 Visitors..............................................................................................................................2-7 2.4 Stop Work Authority .........................................................................................................2-7

    Section 3. Project Hazards and Control Measures .................................................................3-1 3.1 Introduction.......................................................................................................................3-1 3.2 Field Activities, Hazards, and Control Procedures ..........................................................3-1

    3.2.1 Task 1 Mobilization/Site Survey.......................................................................3-2 3.2.2 Task 2 Water, Soil, and Air Sampling ..............................................................3-3 3.2.3 Task 3 Drilling and Monitoring Well Installation ...............................................3-5

    3.2.3.1 Geoprobe Hazards and Control Procedures ....................................3-5 3.2.3.2 Drilling..................................................................................................3-7

    3.2.4 Task 4 Residential Sampling and Excavation................................................3-12 3.2.5 Task 5 Sediment Sampling and Processing ..................................................3-13

    3.2.5.1 Vibracoring/Sediment Sampling ........................................................3-13 3.2.5.2 Manual Coring ...................................................................................3-16

    3.2.6 Task 6 Biota Sampling ...................................................................................3-17 3.2.6.1 Electrofishing .....................................................................................3-18

    3.2.7 Task 7 Personnel and Equipment Decontamination......................................3-20 3.2.7.1 Personnel Decontamination ..............................................................3-20 3.2.7.2 PPE and Equipment Decontamination..............................................3-21

    3.2.8 Task 8 Demobilization....................................................................................3-24 3.3 Chemical Hazards..........................................................................................................3-25

    Section 4. General Safety Practices.........................................................................................4-1 4.1 General Safety Rules .......................................................................................................4-1 4.2 Incident Investigation .......................................................................................................4-2 4.3 Safe Work Observation ....................................................................................................4-2 4.4 Activity Hazard Analysis (AHA) ........................................................................................4-3

  • Anniston PCB Site Site-Wide HASP

    Revision: 0 Date: June 2004

    BLASLAND, BOUCK & LEE, INC. 6/3/04 engineers, scientists, economists 2 F:\FILEXCHG\ANNISTON\June 2004 HASP\Anniston HASP Rev 0.doc

    4.5 Buddy System ..................................................................................................................4-3 4.6 Heat Stress.......................................................................................................................4-4 4.7 Cold Stress.......................................................................................................................4-8 4.8 Biological Hazards .........................................................................................................4-11

    4.8.1 Tick-Borne Diseases .........................................................................................4-12 4.8.2 Poisonous Plants ..............................................................................................4-13 4.8.3 Snakes ..............................................................................................................4-13 4.8.4 Dogs ..................................................................................................................4-14 4.8.5 Spiders ..............................................................................................................4-14 4.8.6 Mosquitoes........................................................................................................4-15 4.8.7 Bees, Ants and Other Insects ...........................................................................4-16

    4.9 Noise ..............................................................................................................................4-17 4.10 Spill Control ....................................................................................................................4-17 4.11 Sanitation .......................................................................................................................4-18

    4.11.1 Break Area ........................................................................................................4-18 4.11.2 Potable Water ...................................................................................................4-18 4.11.3 Sanitary Facilities ..............................................................................................4-18 4.11.4 Lavatory ............................................................................................................4-19

    4.12 Emergency Equipment..................................................................