Site Plan for:
Krotz Springs Boat LaunchKrotz Springs Boat Launch
Town of Krotz SpringsTown of Krotz SpringsGreater Krotz Springs Port CommissionGreater Krotz Springs Port Commission
Presented by:Presented by:
Mireya Laigast, Project Manager - U.S. Army Corps of EngineersMireya Laigast, Project Manager - U.S. Army Corps of Engineersandand
Daniel McElmurray, Landscape Architect – Perez, APCDaniel McElmurray, Landscape Architect – Perez, APC
PEREZ, APCPEREZ, APC
Topics of DiscussionTopics of Discussion
Purpose of MeetingPurpose of Meeting BackgroundBackground Recommended Plan for Boat Launch Recommended Plan for Boat Launch
– Constraints and OpportunitiesConstraints and Opportunities– Proposed ImprovementsProposed Improvements– Phasing and CostsPhasing and Costs
What’s the Next Step?What’s the Next Step? SummarySummary Open to Discussion and FeedbackOpen to Discussion and Feedback
Purpose of MeetingPurpose of Meeting
Provide you an overview of projects currently in Provide you an overview of projects currently in
Site Planning PhaseSite Planning Phase
Present recommended boat launch improvements Present recommended boat launch improvements
at Krotz Springsat Krotz Springs
Solicit FeedbackSolicit Feedback
Determine level of support for the projectsDetermine level of support for the projects
Project BackgroundProject Background This Project is part of the Atchafalaya Basin Floodway This Project is part of the Atchafalaya Basin Floodway
System Project, Louisiana as authorized in the Water System Project, Louisiana as authorized in the Water Resources Development Act (WRDA) of 1986.Resources Development Act (WRDA) of 1986.
– Under the Recreational ElementUnder the Recreational Element Project authorized construction of 15 boat landings “in the Project authorized construction of 15 boat landings “in the
vicinity of” the Atchafalaya Basin.vicinity of” the Atchafalaya Basin. Received limited funding on recreation projects until WRDA Received limited funding on recreation projects until WRDA
2000.2000. Krotz Springs Boat Launch is currently slated to be launch 5 Krotz Springs Boat Launch is currently slated to be launch 5
of 15.of 15.
john eblen:
RPC input from RPC input from LynnLynn Krotz Springs Boat LaunchKrotz Springs Boat Launch
Access Access PointsPoints Parking AreaParking Area
Existing Existing LaunchLaunch
Steep grade of boat launch Poor condition of existing launch Limited width of parking area Limited number of parking spaces Limited property boundaries Adjacent pipeline Overhead electric lines Limited security features
Project IssuesProject Issues
Project IssuesProject Issues
Poor ConditionPoor Conditionof Existing Rampof Existing Ramp
Steep Grade of RampSteep Grade of Ramp
Inadequate Parking and Inadequate Parking and Turnaround AreaTurnaround Area
Krotz Springs Boat LaunchKrotz Springs Boat LaunchProposed ImprovementsProposed Improvements
Coordinated SignageImproved Access from Service Road
New Three Lane Boat LaunchExpanded Gravel Parking Area & ADA-compliant
ParkingNew Floating Dock
Canoe LaunchLandscaping
Trash receptaclesSecurity Lighting
Krotz Springs Boat LaunchKrotz Springs Boat LaunchProposed ImprovementsProposed Improvements
Krotz Springs Boat LaunchKrotz Springs Boat LaunchProposed ImprovementsProposed Improvements
New SignageNew Signage
New SignageNew Signage
New SignageNew Signage
Krotz Springs Boat LaunchKrotz Springs Boat LaunchProposed ImprovementsProposed Improvements
Expanded Parking Expanded Parking Area and Access Area and Access
RoadRoadNew Security LightingNew Security Lighting
Gravel Parking AreaGravel Parking Area
Krotz Springs Boat LaunchKrotz Springs Boat LaunchProposed ImprovementsProposed Improvements
New ThreeNew ThreeLane LaunchLane Launch
Canoe LaunchCanoe Launch
Krotz Springs Boat LaunchKrotz Springs Boat LaunchProposed ImprovementsProposed Improvements
New Floating DockNew Floating Dock
LandscapingLandscaping
Project PhasingProject Phasing
Construct new three lane launch and install new floating dock
Expand parking area and grade Install curbing Cover access lanes and parking areas with
limestone gravel Renovate existing launch into canoe launch Install security lighting Install landscaping
Krotz Springs $471,000Local match required, contributed on behalf of the Town of Krotz Springs and the Greater Krotz Springs Port Commission by DNR
Projected CostsProjected Costs
What’s the Next Step?What’s the Next Step? Step 1 - Complete final layout by 31 August 2002, based on
your feedback tonight, via e-mail or regular mail. Step 2 - Begin project engineering design (plans and specs). Step 3 - Complete Engineering Documentation Report by 31
December 2002. Step 4 - Complete plans and specifications by 30 Sept 2003. Step 5 - Execute Project Cooperation Agreement with Port
Commission by 31 October 2003. Step 6 - BCOE Review completed by 30 November 2003. Step 7 - Construction in FY04 pending funding, scheduled to
take advantage of mid-year low water season.
Note: This schedule is tentative and is contingent upon federal
funding
Contact:Daniel McElmurrayDaniel McElmurray
Perez, APCPerez, APC 909 Poydras St Suite 2250
New Orleans, LA 70112
[email protected]@e-perez.com
Phone: 504.584.5104Phone: 504.584.5104Fax: 504.584.5140Fax: 504.584.5140
We want your comments!We want your comments!