1/8/2006 CIVE 554 - Knight 1 1/8/2006 CIVE 554 - Knight 1 CIVE 554/650 Site Investigation Techniques 1/8/2006 CIVE 554 - Knight 2 Geotechnical Engineering Soil Water Rock

Transcript of site Investigation - University of · PDF file1/8/2006 CIVE 554 - Knight 1 1/8/2006 CIVE 554 -...

1/8/2006

CIVE 554 - Knight 1

1/8/2006 CIVE 554 - Knight 1

CIVE 554/650Site Investigation Techniques

1/8/2006 CIVE 554 - Knight 2

Geotechnical Engineering

Soil

Water

Rock

1/8/2006

CIVE 554 - Knight 2

1/8/2006 CIVE 554 - Knight 3

Key Soil Engineering PropertiesCompressibility

Settlement

StrengthAbility to carry load

Permeability (hydraulic conductivity)Flow of water through soils

1/8/2006 CIVE 554 - Knight 4

Settlement Failure

1/8/2006

CIVE 554 - Knight 3

1/8/2006 CIVE 554 - Knight 5

Serviceability Requirements

1/8/2006 CIVE 554 - Knight 6

Shear Failure

1/8/2006

CIVE 554 - Knight 4

1/8/2006 CIVE 554 - Knight 7

Palace of Fine Arts, MexicoA strange case of Palace of Fine Arts in the Alameda area of Mexico City. Built sometime between 1900 and 1934, it was a magnificent and strongly built structure. It was built on grade, level with the square and other buildings nearby. But because of loose sand permeated with water in the subsurface, the massive structure sunk 6 ft into the ground! (Luckily, it settled evenly minimizing structural damage.) Believe it or not, in the 1960's the building moved again. This time it moved 12 ft up! The weight of skyscrapers being built around the Palace had pushed the subsurface water and soil around sufficiently to raise the building.(Source: Why Buildings Fall Down, M. Levy and M. Salvadori, WW Norton & Company, 1992)

1/8/2006 CIVE 554 - Knight 8

Permeability

1/8/2006

CIVE 554 - Knight 5

1/8/2006 CIVE 554 - Knight 9

Site Investigation (SI) ObjectiveObtain sufficient information to enable a safe and economic design to be made and to avoid any difficulties during construction

1/8/2006 CIVE 554 - Knight 10

SI RequirementsSequence, thickness and lateral extent of soil strata and where appropriate level of bedrockObtain representative samples of soils (and rock) for identification and classification and relevant soil parametersIdentify groundwater conditionsInsitu tests to access appropriate soil and/or rock characteristics

1/8/2006

CIVE 554 - Knight 6

1/8/2006 CIV E 353 - Knight 11

How Much Site Investigation?

More extensive site investigation & testing program

Cost

($)

Cost of site investigation & testing

Cost of construction

Total project cost

1/8/2006 CIV E 353 - Knight 12

How Much Site Investigation?

More extensive site investigation & testing program

Cost

($)

Cost of site investigation & testing

Total project cost

Minimum project cost

Optimum SI cost

1/8/2006

CIVE 554 - Knight 7

1/8/2006 CIVE 554 - Knight 13

Risks and ConsequencesWhat is the consequence of failure or changing ground conditions?What will it cost to fix? Are people life in danger?Economic and social costs?

1/8/2006 CIVE 554 - Knight 14

Soil SamplingCohesionless Soils

1/8/2006

CIVE 554 - Knight 8

1/8/2006 CIVE 554 - Knight 15

Test Pits

1/8/2006 CIVE 554 - Knight 16

Hand tools(a) posthole auger;

(b) helical auger

©20

04 B

rook

s/C

ole

Publ

ishi

ng /

Thom

son

Lear

ning

1/8/2006

CIVE 554 - Knight 9

1/8/2006 CIVE 554 - Knight 17

Drilling with continuous-flight augers(courtesy of Danny R. Anderson Consultants, El Paso, TX)

1/8/2006 CIVE 554 - Knight 18

Carbide-tipped cutting head on auger flight attached with bolt (courtesy of William B. Ellis, El Paso Engineering and Testing, Inc., El Paso, TX)

1/8/2006

CIVE 554 - Knight 10

1/8/2006 CIVE 554 - Knight 19

Hollow-Stem Auger Components

(after ASTM,2001)

©20

04 B

rook

s/C

ole

Publ

ishi

ng /

Thom

son

Lear

ning

1/8/2006 CIVE 554 - Knight 20

Wash boring

©20

04 B

rook

s/C

ole

Publ

ishi

ng /

Thom

son

Lear

ning

1/8/2006

CIVE 554 - Knight 11

1/8/2006 CIVE 554 - Knight 21

(a) Standard split-spoon sampler; (b) spring core catcher

©20

04 B

rook

s/C

ole

Publ

ishi

ng /

Thom

son

Lear

ning

1/8/2006 CIVE 554 - Knight 22

Configuration of Standard Penetration Test (SPT) hammers

(a) safety hammer;(b) donut hammer

(after Seed et al., 1985)

©20

04 B

rook

s/C

ole

Publ

ishi

ng /

Thom

son

Lear

ning

Nvalue = number of blows (hits) it takes to drive a standard split spoon 300mm with a 623N hammer dropped a distance of 762mm

(ASTM D1586)

1/8/2006

CIVE 554 - Knight 12

1/8/2006 CIVE 554 - Knight 23

N- valueNumber of blows to drive a SPT sample 300mm.

1/8/2006 CIVE 554 - Knight 24

N60

6060RSBH nnnNnN =

N60 = Field corrected Standard Penetration number

N = Measured penetration number

nH = Hammer efficiency

nB = Correction for bore diameter

nS = Sampler correction

nR = Correction for rod length

1/8/2006

CIVE 554 - Knight 13

1/8/2006 CIVE 554 - Knight 25

Schmertmann’s(1975) correlation

betweenN60, σ0, and φ’

for granular soils

©20

04 B

rook

s/C

ole

Publ

ishi

ng /

Thom

son

Lear

ning

1/8/2006 CIVE 554 - Knight 26

Canadian Foundation Manual

1/8/2006

CIVE 554 - Knight 14

1/8/2006 CIVE 554 - Knight 27

Allowable Bearing Pressureqallow ~ 10 N (kPa)

1/8/2006 CIVE 554 - Knight 28

Cohesionless Soils

1/8/2006

CIVE 554 - Knight 15

1/8/2006 CIVE 554 - Knight 29

Cohesive Soils (TILL)

1/8/2006 CIVE 554 - Knight 30

Soil SamplingCohesive Soils

1/8/2006

CIVE 554 - Knight 16

1/8/2006 CIVE 554 - Knight 31

Sampling devices (b) thin-walled tube; (c) and (d) piston sampler

©20

04 B

rook

s/C

ole

Publ

ishi

ng /

Thom

son

Lear

ning

©20

04 B

rook

s/C

ole

Publ

ishi

ng /

Thom

son

Lear

ning

© 2004 Brooks/Cole Publishing / Thomson Learning™

1/8/2006 CIVE 554 - Knight 32

Soil TestsCohesionless Soils

Grain size distributionSpecific gravityDirect shearPermeabilityRelative density

Cohesive SoilsAtterberg LimitsHydrometerSpecific gravityConsolidation (oedometer)Unconfined compressionTriaxial test

Strengthpermeability

1/8/2006

CIVE 554 - Knight 17

1/8/2006 CIVE 554 - Knight 33

Limitation of Field Collected SamplesSample disturbanceRemoval of insitu field stress

Sample unloaded

especially important in very soft (weak) soils that have a high insitu void ratio

NEED INSITU SOIL PROPERTIES as this is what structure will feel…..in the field

1/8/2006 CIVE 554 - Knight 34

Measurement of Insitu Properties

Ground Water Table Location

1/8/2006

CIVE 554 - Knight 18

1/8/2006 CIVE 554 - Knight 35

Casagrande-type piezometer

1/8/2006 CIVE 554 - Knight 36

Groundwater Table Measurement

©20

04 B

rook

s/C

ole

Publ

ishi

ng /

Thom

son

Lear

ning

Casagrande-type piezometer(courtesy of N. Sivakugan, James Cook University, Australia)

1/8/2006

CIVE 554 - Knight 19

1/8/2006 CIVE 554 - Knight 37

Groundwater Table MeasurementOpen stand pipe with sand packStand pipe must be large enough to prevent meniscus effectsGround water table is where the water pressure is equal to the atmospheric pressure Pwater = Patmoshpere

GWT will vary over seasons and changes in atmospheric pressure. GWT measure wrt a bench mark – this must be stable..

1/8/2006 CIVE 554 - Knight 38

Measurement of Insitu Properties

Soft Cohesive Soils

1/8/2006

CIVE 554 - Knight 20

1/8/2006 CIVE 554 - Knight 39

Shear Circular Cylinder of Soil

1/8/2006 CIVE 554 - Knight 40

Geometry of field vane

(after ASTM, 2001)

Measures Undrained Strength (Cu or Su)

©20

04 B

rook

s/C

ole

Publ

ishi

ng /

Thom

son

Lear

ning

1/8/2006

CIVE 554 - Knight 21

1/8/2006 CIVE 554 - Knight 41

Field Vane Procedure

1/8/2006 CIVE 554 - Knight 42

1/8/2006

CIVE 554 - Knight 22

1/8/2006 CIVE 554 - Knight 43

Vanes and Rotation RateThe vanes have a rectangular shape and a height double their diameter, according to the recommendation included in the EUROCODE 7 (1977) and ASTM Standard Code (D 2573); in the latter one also vanes having a tapered end are allowed.The above mentioned codes prescribe that the rotation must be carried out at a rate of 0.1- 0.2 degrees/sec., that is (6 –12 degrees/min).

1/8/2006 CIVE 554 - Knight 44

Rotation RateRequired rate never happens in the field unless it is mechanized.It is difficult to get driller to take one minute to do the testMake sure it is done consistently…

1/8/2006

CIVE 554 - Knight 23

1/8/2006 CIVE 554 - Knight 45

Determination of SuUndrained shear resistance at failure (Su) is calculated by the maximum torque required to cut the soil included into the cylinder obtained rotating the vane blades.The general formula, referred to rectangular vanes having height (H) and diameter (D), is:

Su = T /((π D3/2) (H/D + a/2)) (1)where:

T = maximum applied torque (deducted any friction).a = factor depending by the assumed shear stress distribution at the ends of the cylinder obtained rotating the vane blades and amounting to 2/3 for uniform shear stress.

For rectangular vanes having H/D = 2, equation (1) is reduced to:Su = 6T / 7π D3 = 0.273T / D3 (2)

The remoulded shear strength value is calculated using the above mentioned formula (2) introducing the value of the torque, free from any friction, measured after some vane rotation turns, that is when the soil offers a fast constant resistance.

1/8/2006 CIVE 554 - Knight 46

Undrained Strength & Effective Stress

1/8/2006

CIVE 554 - Knight 24

1/8/2006 CIVE 554 - Knight 47

Field Vane Corrections

)()( fielducorrectedu SS λ=

λ =correction factor

1/8/2006 CIVE 554 - Knight 48

Figure 2.18 Variation of λ with cu(VST)/σ’0 [see Eq. (2.31)]

©20

04 B

rook

s/C

ole

Publ

ishi

ng /

Thom

son

Lear

ning

1/8/2006

CIVE 554 - Knight 25

1/8/2006 CIVE 554 - Knight 49

Variation of preconsolidation pressure with field vane shear strength(after Mayne and Mitchell, 1988)

©20

04 B

rook

s/C

ole

Publ

ishi

ng /

Thom

son

Lear

ning

[ ] 83.0)(04.7' fielduc S=σ

1/8/2006 CIVE 554 - Knight 50

Variation of β with plasticity index(after Mayne and Mitchell, 1988)

©20

04 B

rook

s/C

ole

Publ

ishi

ng /

Thom

son

Lear

ning

™o

fielduSOCR

')(

σβ=

1/8/2006

CIVE 554 - Knight 26

1/8/2006 CIVE 554 - Knight 51

Measurement of Insitu Properties

SANDS and CLAY

1/8/2006 CIVE 554 - Knight 52

Mechanical friction-cone penetrometer

(after ASTM, 2001)

©20

04 B

rook

s/C

ole

Publ

ishi

ng /

Thom

son

Lear

ning

1/8/2006

CIVE 554 - Knight 27

1/8/2006 CIVE 554 - Knight 53

Electric friction-cone penetrometer (after ASTM, 2001)

© 2004 Brooks/Cole Publishing / Thomson Learning™

1/8/2006 CIVE 554 - Knight 54

Friction Ratio (Fr)

c

c

qf

ceresisconeceresisfrictionalFr ==

tan tan

1/8/2006

CIVE 554 - Knight 28

1/8/2006 CIVE 554 - Knight 55

Penetrometer tests with friction measurement(after Ruiter, 1971)

©20

04 B

rook

s/C

ole

Publ

ishi

ng /

Thom

son

Lear

ning

1/8/2006 CIVE 554 - Knight 56

Variation of qc, σ’0, and Dr for

normally consolidated quartz sand

(based on Baldi et al., 1982and Robertson and Campanella, 1983)

©20

04 B

rook

s/C

ole

Publ

ishi

ng /

Thom

son

Lear

ning

1/8/2006

CIVE 554 - Knight 29

1/8/2006 CIVE 554 - Knight 57

Variation of qc with σ’0 and φ’ in

normally consolidated quartz

sand(after Robertson and Campanella, 1983)

©20

04 B

rook

s/C

ole

Publ

ishi

ng /

Thom

son

Lear

ning

1/8/2006 CIVE 554 - Knight 58

Correlation between qc, Fr, and the type of soil

1/8/2006

CIVE 554 - Knight 30

1/8/2006 CIVE 554 - Knight 59

General range of variation of qc/N60 for various types of soil(after Robertson and Campanella, 1983)

©20

04 B

rook

s/C

ole

Publ

ishi

ng /

Thom

son

Lear

ning

1/8/2006 CIVE 554 - Knight 60

Measurement of Insitu Properties

Pressure Meters

1/8/2006

CIVE 554 - Knight 31

1/8/2006 CIVE 554 - Knight 61

(a) Pressuremeter; (b) plot of pressure versus total cavity volume

©20

04 B

rook

s/C

ole

Publ

ishi

ng /

Thom

son

Lear

ning

1/8/2006 CIVE 554 - Knight 62

Dilatometer and other equipment

1/8/2006

CIVE 554 - Knight 32

1/8/2006 CIVE 554 - Knight 63

a) Schematic diagram of a flat-plate dilatometer;(b) dilatometer probe inserted into ground

1/8/2006 CIVE 554 - Knight 64

Dillatometer test result conducted at Porto Tolle, Italy (after Marchetti, 1980)

©20

04 B

rook

s/C

ole

Publ

ishi

ng /

Thom

son

Lear

ning

1/8/2006

CIVE 554 - Knight 33

1/8/2006 CIVE 554 - Knight 65

Chart for determination of soil description and

unit weight(after Schmertmann, 1986)

Note: 1 t/m3 = 9.81 kN/m3

©20

04 B

rook

s/C

ole

Publ

ishi

ng /

Thom

son

Lear

ning

1/8/2006 CIVE 554 - Knight 66

Rock Sampling

1/8/2006

CIVE 554 - Knight 34

1/8/2006 CIVE 554 - Knight 67

Rock coring(a) single-tube core barrel;

(b) double-tube core barrel

©20

04 B

rook

s/C

ole

Publ

ishi

ng /

Thom

son

Lear

ning

1/8/2006 CIVE 554 - Knight 68

Casing and Core Sizes

1/8/2006

CIVE 554 - Knight 35

1/8/2006 CIVE 554 - Knight 69

Rock Drilling

100run drill oflength

recovered core covRe xlengtheryCore =

run drill oflength longer or 100mm pieces core of lengthTotalRQD =

Rock Quality Designation (RQD)

1/8/2006 CIVE 554 - Knight 70

RQD

1/8/2006

CIVE 554 - Knight 36

1/8/2006 CIVE 554 - Knight 71

Expect the Unexpected

1/8/2006 CIVE 554 - Knight 72

Peck, Hanson and Thornburn

Foundation Engineering (Second Edition)1974 Wiley & Son

1/8/2006

CIVE 554 - Knight 37

1/8/2006 CIVE 554 - Knight 73

Expect the UnexpectedWaste fillClaySandGravel/cobble seamsBouldersChanging ground conditionsOrganics

DESIGN BASED ONLIMITED BOREHOLE DATA

1/8/2006 CIVE 554 - Knight 74

Expect the Unexpected

1/8/2006

CIVE 554 - Knight 38

1/8/2006 CIVE 554 - Knight 75

Expect the Unexpected

1/8/2006 CIVE 554 - Knight 76

Expect the UnexpectedSand deposits discovered during hand carving slabs of clay during construction of Chicago subway systemOrigin of formation unknown

1/8/2006

CIVE 554 - Knight 39

1/8/2006 CIVE 554 - Knight 77

Expect the UnexpectedPermeability profile glacial deposit Chicopee, Mass USA (Terzaghi, 1929)Similar problem Oakridge moraine Markham, ON

1/8/2006 CIVE 554 - Knight 78

Expect the Unexpected

1/8/2006

CIVE 554 - Knight 40

1/8/2006 CIVE 554 - Knight 79

Expect the Unexpected

1/8/2006 CIVE 554 - Knight 80

Expect the Unexpected

1/8/2006

CIVE 554 - Knight 41

1/8/2006 CIVE 554 - Knight 81

New York City

1/8/2006 CIVE 554 - Knight 82

UW Field Test Site

1/8/2006

CIVE 554 - Knight 42

1/8/2006 CIVE 554 - Knight 83

Test Pit Locations

BA

A

B180 ft

8 in dia. HDPE pipe

excavation locations

Site trailer

Cross Section

Plan View

West face

East face

Pipe ExitPipe Entrance

1/8/2006 CIVE 554 - Knight 84

Clay and Sand

Bore limit

Slurry

1/8/2006

CIVE 554 - Knight 43

1/8/2006 CIVE 554 - Knight 85

Typical Soil Stratigraphy

Clayey SILT

SILTClay lens

SAND

1/8/2006 CIVE 554 - Knight 86

Subsurface SoilsGrain Size Distribution

0

10

20

30

40

50

60

70

80

90

100

0.001 0.01 0.1 1 10 100Particle Size (mm)

Perc

ent P

assi

ng

SILT with varying sand content trace gravel and clay

SAND with trace gravel, silt and clay

clay lens

Clayey SILT with some sand

1/8/2006

CIVE 554 - Knight 44

1/8/2006 CIVE 554 - Knight 87

Expect the Unexpected

Open fractures